Loading...
1992-05-28 CC Minutes . ALBERTVILLE CITY COUNCIL WORK MEE'l'ING May 28, 1992 Albertville City Ball 7:00 PM PRESENT: Counci lmen Donatus Vetsch, Mike Potter, Duane Berning, and Mark Barthel (arrived at 7:40 PM), City Engineers Thore Meyer and Norm Gartner, City CLerk Linda Houghton Acting Mayor Vetsch called the meeting to order. The Council reviewed the bids received for the repairs of Main street. The Council asked that Linda contact Omann Brothers to get clarification of the materials they plan to use. The Council will award the bid at the next regular meeting. The Council reviewed the Feasibility study for the 1992-l1B Project dated April 20, 1992. This study is of the existing sewer mains. The reports details seven options for upgrading the existing mains. The Council directed Thore to put together a cost estimate for the revision of Proposal #4 extending the replacement of mains to 56th street and Main and for two blocks along Lander Avenue for the June l5th Council meeting. . Norm Gartner suggested that the City attempt to secure a low interest MPCA loan for the improvement and make plans to construct the new lines next year. The Council also reviewed the Feasibility study for expansion of the wastewater treatment plant. Thore explained that based on residential development only, the current corporate limits of the City could hold an additional 1877 new homes, or an additional population of 6,300. Based on these projections, the wastewater treatment plant would require a capacity of 507,000 gallons per day. Councilmen Vetsch and Potter will go on a tour of several wastewater treatment facilities on June 3 with the engineers. The other councilmen will tour those facilities at another time. LeRoy Berning of the Albertville Jaycees asked the Council to consider holding off on replacing the damaged roof of the park shelter because the Jaycees are considering constructing an addi tion to the shel ter that would require that roof to be replaced. Linda has checked with the insurance adjuster and has been informed that the insurance will pay directly to the city and the City has the option to use that money to upgrade the building. It was the consensus of the Council to allow the Jaycees to make a decision on the addition before the roof is replaced. . Potter made a motion to authorize Linda to get two bids from electricians to temporarily restore power at City Park for the ball field lights. She is authorized to accept the lower bid and have the work done as soon as possible. Barthel seconded the motion. . . . All voted aye. Linda was directed to contact the Wright County Sheriff's Office to verify that their investigation of arson on the park shelter had been completed, and if so, to direct the maintenance department to remove the debris. Barthel made a motion to adjourn. Potter seconded the motion. All voted aye.