Loading...
1993-12-13 CC Minutes Special . . . ALBERTVILLE CITY COUNCIL SPECIAL MEETING December 13, 1993 Albertville City Hall 7:30 PM PR,ESEr.fT" OL~ Mi kE~ Pot t er" r (~ol_1_nri] rnem})el-S .John. 'letsch. / D'.1al1e Bern ng, Sharon And~rson and Albert Barthel, City Engineers Norm t~l .1.. A., 1~1JE:}! !-olke .....1""11 ~ C4t Clerk Li.f\da I~o t ('111 Navar Potter called t ~p~-ci31 meeting of the Al ~.l yCn.tlnc~i,I tel .cJ:c(lf::l-~ [J11rr: f~ t}f the fneet.ing is to the operation of the wastewater treatment facility. The has received a price for contracted maintenance from PSG year's operation in the amount of $104,679. rtv:Llle cli SCtlSE~ (". ' 1 ~"ouncl "' for one Linda reported that the operational costs for the wastewater treatment facility from January through October 1993 was $53,412.11. This incl udes the portion of wages and benefi ts proportionate to the hours spent at the facility. The largest single expenditure in 1993 was for alum, totaling $25,441.49 for the year. Norm, Linda and Ken met earl ier to refine the anticipated operational costs of the facili ty using Ci ty staff. A proposed expense budget was drafted and presented to the Council. Expenditures are anticipated around $85,000. This figure includes 30% of the wage and benefit package paid to the two maintenance employees, as well a $7,500 repair and replacement fund. The Chemical budget was set at $10,000, although Norm explained that as a result of the benchmark testing that was done, he felt that the chemical budget was on the extreme high end. Because Linda was concerned over the difference between what had been spent on chernicals '1" 1~~~=~? ;:1-0,(1 fI J-~T{ v.1~:LS Fit"'oject:Lrl';:f fCJl"~ J9~~J4 tl-1e formuJ_d us to cal late ~ 3d,1 tions wa dOllbled to a rive at 1.je City has been ?-'3 n on tria h~s also cotter a owe h .. nrlce 1\ en ~__ anri ;~ livery than t ;;E (: f\I () t~rn_ t"": ;~:; t 1._ rn;:l t th_at it -Sb(}l1 (:1 ~,t r~e ',""1'::;0;+-:/ t.o spelld site to operate the has anticipated that the system. more t ~ ~ daily at ~~e wasteuater facility. Potter expressed concern that PSG it will require 4-5 hours per day to operate Resident Jim Walsh stated that he is opposed to contracting with outside firms to operate the City's wastewater plant. He ci ted the exampl e of the Joint Powers Board wi th a contract maintenance firm and the disappointment the City of Albertville has experienced because of that. Resident Gary Schwenzfeier also expressed opposition to removing the wastewater plant from the City's direct operation. Mayor Potter stated that contracting out the operation of the . . . wastewater treatment plan~ GO _ t seem to be d viable option at t S pOlnt. ~L, he a I ~, was the Council's responsibility to check all options to determine the most cost effective way to operate City services. Mayor Potter will schedule another meeting at a later date to meet with PSG to discuss questions about the contract proposed. Vetsch made a motion to adjourn at 9:00 PM. Berning seconded the motion. All voted aye.