Loading...
2007-05-28 CC Minutes Joint OtsegoA�Ibcrtvillc snmm M� u.rq. eb aa, u ,. JOINT ALBERTVILLE CITY COUNCIL AND OTSEGO CITY COUNCIL WORKSHOP May 28, 2007 MINUTES Albertville City Hall 7:00 PM PRESENT FROM ALBERTVILLE: Mayor Ron Klecker, Council members Dan Wagner, LeRoy Berning, Tom Fay and John Vetsch; City Administrator Larry Kruse and Assistant City Engineer Adam Nafstad ABSENT: None PRESENT FROM OTSEGO: Mayor Larry Fournier, Council members Vern Heidner, Jessica Stockamp, Mark Thorsted, Tom Darkenwald; City Administrator Mike Robertson and City Engineer Ron Wagner ABSENT: None OTHERS PRESENT: Wally Odell Mayor Klecker and Mayor Fournier called the Albertville/Otsego Joint City Council meeting to order at 7:05 p.m. The Albertville and Otsego City Council met to review a draft agreement worked at by the two staffs which basically would allow the City of Albertville to take the lead to construct a four-way divided highway from the Albertville Premium Outlet Mall north through 70th Street, with each City paying it respective share based on the amount of improvement in their City. The purpose of the agreement is to get the City of Otsego's cooperation to pay for the transition area which goes 800 feet into Otsego. Albertville Assistant Engineer Adam Nafstad state the preliminary estimate for Otsego ranged from $45,000 if the County was involved to $225,000 if they were not excluding right-of-way. The City of Otsego balked at entering into the agreement citing the difficulties working with Wright County and stated the agreement was just a blank check. Otsego desired a cap, expecting Albertville to pay for Otsego improvements beyond a designated cap. Otsego stated the estimated .6 acres of Otsego right-of-way could cost millions of dollars, placing Otsego in a difficult position. Otsego also desired Albertville to be responsible for the cost of improvements in Otsego at the expiration of the agreement if Otsego's platting trigger had not been met. MACity Council\Council Minutes\2008 Minutes\M 05-28-08 Joint Meeting with Otsego.doc City of Albertville Joint City of Albertville, City of Otsego & Wright County Highway Department September 25, 2007 Page 2 of 2 Albertville City Council expressed disappointment that the Otsego City Council was not willing to assume responsibilities for the cost of what is a fairly minor transition from a two lane road to a four lane road in their city. After much discussion, the issue was tabled for six months or a year. KADLER AVENUE In an informal presentation, Otsego City Engineer Ron Wagner shared two preferred layouts of the proposed Kadler Interchange. One option showed a typical diamond interchange with the entire freeway moved to the north. The other option had a folded diamond on the north side of the freeway. Both plans had a tight ramp configuration on the south side of the freeway. Wagner stated Otsego's preference would be to remove the ramps from CSAH 19 and just have full interchanges at CSAH 37 and Kadler Avenue. Wagner explained how he believed the traffic could then access the Albertville Premium Outlets. Wagner reported the City was officially mapping the corridor to protect the right-of-way. ADJOURNMENT Mayor Fournier and Mayor Klecker sincerely thanked everyone for the great meeting. Meeting adjourned at 9:15 p.m. Ron Klecker, Mayor Larry Kruse, City Administrator MACity Council\Council Minutes\2008 Minutes\M 05-28-08 Joint Meeting with Otsego.doc