Loading...
2014-07-28 Park Board MinutesAlbertville Parks Committee meeting minutes July 28, 2014 Attendees: Tim Guimont, Andy Swanson, Larry Sorensen, Mark Barthel, Jon Vetsch, Sharon Oakvik, LeRoy Berning Visitor(s): none Oakside Park Trail - Roughly 375 feet of new, proposed trail in Oakside Park would cost about $11,250, and 2,400 feet of overlay would add another $3,600; these are rough estimates. - The city has 8,801 feet of trail, not including Jason Ave. Considering the age and condition of trails throughout the city, the committee recommends repairing and replacing existing trails as necessary before adding new trails. Tim will get estimates to replace the trail on Kalland Ave. from 58t" St. to Kalland Dr., and 58t" St. from Kalland Ave. to 57t" St. Parks Equipment and Landscaping - Linwood Park: Tennis court net poles have been repaired and net has been replaced. - Winter Park: Swing set has been installed. - Central Park: Holiday tree has been installed. - Mulch: Dug out all mulch from Oakside Park and replaced with new; all other parks received a new top coat of chips, except for Central Park and Villas Park. Next meeting: Sept. 22 at 8:00 Minutes recorded and prepared by Andy Swanson, andy.swanson99@gmail.com; 763-370-2428