Loading...
2017-01-23 Parks Committee Minutes Albertville Parks 1-23-17 Called to order 8:02 Attendees: Tim Guimont, John Vetsch, LeRoy Berning, Larry Boller, Andy Swanson Street and Sidewalk Improvements - Tim presented a map for street and sidewalk improvements that will be made this summer. Improvement include removal of 8-foot bituminous trail and installation of a 5-foot sidewalk along sections of 58 Street, Kalland Ave. and Karston Ave.; all th trails within Oakside Park will be overlayed; and a section of sidewalk along Kantar Court from Oakside Park to Kalland Ave. will be added. Albertville Train Depot - Concept of train depot was presented by LeRoy. The committee offered suggestions and endorsements of the overall plan. Westwind Park - As part of the Westwind Park rehab project, a boardwalk and plantings can be added, but no parts of the adjacent swamp/grassland can be filled or altered. Park grant application will be submitted by March with potential approval coming by June. - The committee agreed on a “woodsy” theme for the park to guide the design and equipment selections. Next meeting: Monday, February 27 at 8:00