2005-02-21 Revised Plan Review for Sanitary Dwer Trunk Extension
~
SEH
February 21,2005
RE: Albertville, Minnesota
Towne Lakes 5th Addition
Sanitary Sewer Trunk Extension
SEH No. A-ALBEV04l7.00
Mr. John Becker
Westwood Professional Services, Inc.
7599 Anagram Drive
Eden Prairie, MN 55344
Dear Mr. Becker:
I have reviewed the revised plans (dated January 25, 2005) for the sanitary sewer trunk extension and I
have the following comment:
1. When the utility crossing license was obtained from the DNR for the crossing of Otsego Creek, a
27-inch RCP culvert was proposed to be installed at the creek crossing. The most current plan
indicates a 36-inch RCP culvert will be installed. Westwood must provide verification from the
DNR that the change in pipe size and invert elevation is allowed.
The revised plans are hereby approved, provided the culvert issue is resolved with the DNR.
Please call me at 651.490.2147 if you have any questions.
Sincerely,
W-/
Robert L. Moberg PE
Project Manager
cag
c: Larry Kruse, City of Albertville
Dave Hempel, CPDC
La'Mpnt Knazze III, DNR
x:\aelalbev\041700\wordlbecker021805.doc
Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 5511 0-5196
SEH is an equal opportunity employer I www.sehinc.com I 651.490.2000 I 800.325.2055 I 651.490.2150 fax