Loading...
2005-02-21 Revised Plan Review for Sanitary Dwer Trunk Extension ~ SEH February 21,2005 RE: Albertville, Minnesota Towne Lakes 5th Addition Sanitary Sewer Trunk Extension SEH No. A-ALBEV04l7.00 Mr. John Becker Westwood Professional Services, Inc. 7599 Anagram Drive Eden Prairie, MN 55344 Dear Mr. Becker: I have reviewed the revised plans (dated January 25, 2005) for the sanitary sewer trunk extension and I have the following comment: 1. When the utility crossing license was obtained from the DNR for the crossing of Otsego Creek, a 27-inch RCP culvert was proposed to be installed at the creek crossing. The most current plan indicates a 36-inch RCP culvert will be installed. Westwood must provide verification from the DNR that the change in pipe size and invert elevation is allowed. The revised plans are hereby approved, provided the culvert issue is resolved with the DNR. Please call me at 651.490.2147 if you have any questions. Sincerely, W-/ Robert L. Moberg PE Project Manager cag c: Larry Kruse, City of Albertville Dave Hempel, CPDC La'Mpnt Knazze III, DNR x:\aelalbev\041700\wordlbecker021805.doc Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 5511 0-5196 SEH is an equal opportunity employer I www.sehinc.com I 651.490.2000 I 800.325.2055 I 651.490.2150 fax