Single Family Dwelling Handout A,lbertville
SINGLE FAMILY DWELLING
HANDOUT
The City of Albertville Building Department requires the following information be provided with submittal of
a building permit application.
1. Two (2) sets of a Certified Lot Survey
2. Two (2) Full Sets of Building Plans and one (1) set of 11 x 17 Plans or electronic set. Plans
need to include the following information.
• Elevation Drawings (exterior views), of front, rear and sides of the finished building.
• Floor Plans of the basement and of each floor showing the dimensions of the house,
interior rooms and label the use of each room (bedroom,bathroom, etc.),smoke and
carbon monoxide detectors,window and door locations (safety glazing if required),
interior walls,header sizes,stairs and plumbing and mechanical equipment.
• Section Drawings (side cutaway view) showing the details of the footing,foundation
construction with a drainage system,waterproofing and insulation,floor,wall and roof
construction. Provide copies of the floor and roof truss specifications prepared and
stamped by a MN licensed engineer at the framing inspection.
• Include Plans for decks,porches and garages if applicable.
3. Energy Code Data: Energy Compliance Forms
4. Make Up Air Quantity Worksheet
5. Combustion Air Calculation Worksheet OR
Heating and Cooling Load Calculations in Accordance with ASHRAE Standards Manual J
8th Edition
7. Passive Radon Reduction System design information, including soil gas membrane installation.
8. Wall bracing details including partial framed openings.
General Information
A Certificate of Occupancy or Temporary Certificate of Occupancy is required before the house can be
occupied. All required inspections must be completed and approved including final approval from the State
Electrical Inspector.A Sod and Tree Escrow Deposit is required prior to issuance of a Certificate of
Occupancy. An As-built Survey must be submitted and approved prior to installing sod,trees or irrigation
systems. See attached form for As-built requirements.
REVISION DATE 05/20/2019
A,lbertville
Required Inspections:
Erosion Control: Inspection is required before permit will be issued.
Footings: After forms and re-enforcing are in place but prior to placement of concrete footings and walls.
Foundation/Foundation Reinforcement/Damp Proofing: Block and wood foundations prior to back fill,
cast in place concrete,after the forms and re-enforcing are in place prior to placement of concrete.
Waterproofing and drain tile must also be inspected prior to backfilling.
Drain Tile/Sump Pump Discharge Line: The trench must be left open at all connections and a tracer wire
shall be installed along with the pipe. The tracer wire must be a continuous sheathed wire with a minimum
gauge of 14. If the drain tile is to outlet into a pond or wetland, a stake must clearly mark its termination
outlet. See City Ordinance 2002-18B for complete regulations.
Radon System under slab.
Plumbing Rough-In:After all water piping and waste and vent piping is installed, a 5#air test for 15
minutes is required on the waste and vent piping.
Mechanical Rough-In: When all ducting,furnace and mechanical equipment are installed (prior to
covering). Fireplaces,Masonry Chimneys and Woodstoves,for pre-fabricated fireplaces call for
inspection when framing is complete,masonry chimneys,fireplaces and woodstoves when set and house
heating test is in place. Provide the manufacturers installation instructions on site.
Framing:When all the framing is complete and all plumbing,mechanical is installed and after State
Electrical Inspector has completed required Electrical Rough-In inspection.
Insulation: after installing vapor retarder and attic ventilation prior to covering.
Plumbing/Heating Final: A manometer test of the waste and vent piping on plumbing is permissible.An air
test on gas piping must hold 25#for at least 12 hours.
Radon System A final inspection.
Final:When house is complete, final electrical inspection is completed and all other inspections have been
approved and after Sod and Tree(s) have been installed or escrow has been paid.
Site plan and permit card must be on site at all times. A$50.00 fee is charged for a duplicate permit
card. Dumpsters must be covered at all times and erosion control must be in place at all times or
work may be suspended by the Building Official. A$50.00 reinspection fee applies to all dumpsters
left uncovered.
REVISION DATE 05/20/2019
J�
A.,lbertville
Small"II"own Living.Big O yy Life.
LOT SURVEY REQUIREMENTS - RESIDENTIAL
Building permit applications shall be accompanied by a legal certificate of survey depicting the
following:
1. North arrow and scale of drawing (all submitted copies shall be to-scale).
2. Legal description, address of parcel and location of permanent property corner monuments.
3. Dimensions and location of all platted and recorded easements.
4. Location of all existing buildings and structures.
5. Location of existing utilities, including but not limited to manholes, hydrants, catch basins,
power poles and telephone boxes. Show existing and proposed sewer and water service
locations.
6. Front, side, and rear yard setback dimensions to existing and proposed buildings (measured
to exterior wall).
7. All outside dimensions of buildings, including decks, fireplaces and cantilevers.
8. Setback dimensions to existing buildings on adjacent lots.
9. Location of irons at each side lot line establishing proposed front and rear building line. The
maintenance of these irons, once established by the surveyor, shall be the responsibility of the
building permit applicant.
10. Location and dimension of proposed driveway.
11. Benchmark elevation and description of location.
12. Driveway slope (maximum driveway slope is 10%).
13. Grade elevations at the following points (additional elevations may be required):
a. Existing and proposed at each lot corner.
b. Existing street elevations (centerline and top of curb) at each lot line and both sides of
proposed driveway edges.
c. Existing elevation on side lot lines, at extension of proposed front and rear building
lines and any major grade changes.
d. Proposed elevation on side lot lines, at extension of proposed front and rear building
lines (a minimum 2% grade along all lot lines is required).
e. Proposed lowest floor, garage floor and top of foundation elevations.
f. Existing and proposed elevations at all major corners of building.
g. Existing and proposed elevations at top and bottom of any major slopes.
h. First floor elevation and at-grade building corner elevations of existing buildings on
adjacent lots,within 25 feet of side lot line.
14. Location and elevations at top and bottom of any proposed retaining walls.
15. Proposed direction of surface water drainage indicated by arrows and elevations.
16. The normal water level (NWL) and high water level(HWL) or Ordinary High Water
elevation and contour for lots abutting a body of water.
17. All delineated wetlands and wetland buffers.
18. Proposed location of rock construction entrance and silt fence(or other erosion control).
19. Proposed location of sump pump discharge line and location at which line will connect to
storm sewer or daylight.
A berty le City Iut * 59.91 ain Avenue NL,PO Box 9 Allbe;rt:vitlr MN 553W e (763)497 3384
A,lbertville
Small"II"own living.Big Uty life.
As-Built Survey Checklist - Residential
Prior to receiving a Certificate of Occupancy, an as-built survey shall be submitted certifying the
following:
1. As-built elevations @ Top of Foundation.
2. As-built elevations of Garage Floor at Overhead Door Apron.
3. As-built grade elevations of lot corners.
4. As-built grade elevations of building corners.
5. As-built elevations on the side yard swales at the extension of building corners and
high points and top of street curb.
6. Proposed and As-built elevations of lowest floor of walkouts or lookouts.
7. Existing Grade and Top of Foundation for any Buildings within 25 feet of the
property line.
8. Dimension from building to property lines.
9. Locations and elevations of ponds or wetlands.
10. Identify all wetland delineations.
11. Locations of all wetland demarcation/signage.
12. HWL or OHWL contour of any pond wetland drainage ditch or water course.
13. Elevations and locations of drainage ways.
14. Sign certification of surveyor.
15. Indicate decks,porches, cantilevers and bay windows.
16. Locations of any retaining walls and elevations of the top and bottom of the wall
along its length.
17. Verification that all property corners are in place at time of survey.
Allbertvitle City fut 5959 Min Avenue NL,PO Box 9*Allbertvitte MN 55301 a (763)X497-3384
IMPORTANT REMINDERS
Failure to comply with the items below may result in stop work orders,fines,and inspection delays
EROSION CONTROL
Building sites shall comply with MPCA erosion and sediment control requirements and shall
include perimeter control around all disturbed areas,inlet protection for all inlets on or
adjacent to the site,and rock construction entrances. Streets shall be kept free of dirt and
debris at all times.
SUMP PUMP DISCHARGE REQUIREMENTS
All sump pump discharge lines shall be buried and installed per City Standard Details (attached).
DUMPSTER COVERS
All dumpster shall be covered at all times.
WORKING HOURS
NO work between the hours of nine o'clock(9:00) P.M. and seven o'clock(7:00)A.M.
Monday through Saturday and all day Sunday.
ON STREET PARKING
All construction vehicles shall comply with parking restrictions and no parking signs.
TEMPORARY HEAT REQUIREMENTS
(Weather Depending)
Contractor shall comply with temporary heat requirements (attached).
FROM SUMP PUMP
MIN 2"AIR GAP
PVC SCH 40 OR SDR 21 TRACER WIRE
WITH TRACER WIRE SERVICE TEE
•• ��11-I�I—III—I I—III III—III III—III—I 1I-
I I I—I I I—I I I—I I III I I—II I—III—III—III-111-
I II—III—I I I—I I—I I—_ III—III—I I—III III—I I—III—III—III—III—III—I 11=
I—III—III—I�I—I I—III III—I�I—I�I—III—III—I 11=1
• .. I�I—III—I I I—I�I—I�1=1�I- -III—III—I 11=1 I I III I I—I 11=1 11=1 I I—I 11=1 I I—
.
. .. •y.:'I�I-III-I�I I I-I�I-I�1= -I 11=1 11=1�1=1 = - - - I I-
-1 11=1 I I-I 1=1 I I-�11=1 11=1 I I
I I I-I I I-I 15 - I I- I I 1=1 11=1 I I= 11=1 11=1 11=
-I I MI I I-1 I I- MI I MI I MI 11=__= I-1 I I-I I I-I I I-I I I-I I I.
`°:• III-III-I 11=1 I I= -ITI-ITI-III-ITI-I I I-ITI-ITI-ITI=ITI=ITI=ITI-ITI-ITI-
-I I I-I I I-I I1=1I I- ALL COMMON DRAIN TILE SHALL HAVE A
MINIMUM OF 18" COVER.ALL SERVICE DRAINTILE
INSTALL DISCHARGE PIPE FROM HOUSE TO SHALL HAVE A MINIMUM OF 12" COVER TO TOP
DAYLIGHT OUTLET OR STORM SEWER STRUCTURE OF PIPE. BUILDER SHALL REMOVE CAP AT SERVICE
OR WATERBODY. AND MAKE CONNECTION TO DRAIN TILE.
HOUSE CONNECTION SERVICE CONNECTION
CAST IRON PLUGS STEEL FENCE POST
(GRINNELL CORED \�
BAR PLUG) INSTALL A CLEANOUT EVERY 200 LINEAL FEET
THREADED PVC AND AT THE TERMINUS OF DRAINTILE LINE.
FEMALE ADAPTER I 1 I II II I I II I CLEANOUT LOCATED AT TERMINUS SHALL HAVE
_ TRACER WIRE EXTENDED 18 ABOVE THE SURFACE
PVC RISER EXTENDED 12" -111=1 111-
ABOVE SURFACE TRACER I I—III I-111-11�. GRADE.
I-1 I I-I III-III-I�,
WIRE COILED INSIDE OF PIPE ,i 1=III-III I-111-111-I I PVC SCH 40 OR SDR 21
., I i 1=1 11=1 11=1 III-III-I 11=1 I�-
-I I I-1I1=1I I-I I I—I1I MI I IEIII=III=III WITH TRACER WIRE
1LI J
Tf-7 TIT=;fff=T1 ;1Tf =-- - _
DRAINTILE CLEANOUT TRACER WIRE ACCESS
BOX SNAKE PIT LITE
STEEL FENCE POST DUTY BOX
APPROVED EQUAL
RHINO TRIVIEW PVC DRAINTILE
FLEX TRACER WIRE, WITH TRACER WIRE
GREEN IN COLOR PVC DRAINTILE
WITH TRACER
CONCRETE _ III-1 WIRE
HEADWALL PER (-
PLATE STO-13
RIP RAP
-II1- - 1-111-11I-III-III-III-III-III-1 • • r GROUT
-���111���111���111���111���111���111���111���111���111���111���111�� •; �.:�;'•. DRAINTILE
DRAINTILE OUTLET TO WATERBODY CONNECTION TO STORM SEWER
DATE:
SUMP PUMP 072019
lbi.- riiiville DISCHARGE STD.DETAIL
Small Town living.Big Okiij Life. REQUIREMENTS 4-306 (1 OF 2)
MINIMUM DRAINTILE REQUIREMENTS
• PIPE SIZE-4" MIN NON PERFORATED PIPE.
• TYPE OF PIPE-SCH 40 OR SDR 21 NON PERFORATED
• DEPTH OF PIPE- 12"TO TOP OF PIPE FROM FINISH
GRADE
• TRACER WIRE-MINIMUM GAUGE#12
COPPERHEAD COPPER CLAD STEEL TRACER WIRE,
GREEN IN COLOR.
NOTE:
CORRECT FITTINGS MUST BE USED WITH ALL PIPE, NO TAPING OR
SPLICING WILL BE ACCEPTED.A TRACER WIRE SHALL BE INSTALLED
ALONG WITH THE PIPE,THIS WIRE MUST BE COPPERHEAD#12 AWG
CCS#1230HS COMPLYING WITH ASTM-D-1248, 30 VOLT RATING BE
EXPOSED A MINIMUM LENGTH OF 12 INCHES AT THE HOUSE AND
SHALL DEAD END AT THE CONNECTION OR TILE DISCHARGE. NO WIRE
SHALL BE ACCEPTED EXCEPT AS SPECIFIED ABOVE.
NOTE:
NOTE:THE TRENCH MUST BE LEFT OPEN AT ALL CONNECTIONS FOR
INSPECTION PURPOSES. IF A TILE LINE IS TO DEAD END INTO A POND
OR WET LAND A FENCE POST SHALL CLEARLY MARK ITS END.ALL
INSPECTIONS SHALL REQUIRE A 24 HOUR NOTICE.ALL TRENCHES
MUST BE BACK FILLED WITHIN 24 HOURS. IT IS RECOMMENDED THAT
A REPRESENTATIVE OF THE BUILDER BE PRESENT AT ALL INSPECTIONS.
DATE:
SUMP PUMP 07/2019
lbi.- rtville DISCHARGE STD.DETAIL
Small Town living.Big Okiij Life. REQUIREMENTS 4-306 (2 OF 2)
WINTER TEMPORARY HEAT REQUIREMENTS FOR
CONSTRUCTION HEATERS
1. 75 feet of the flexible hose is the maximum allowed
unless pre-approved by the Building Inspector.
2. Only approved flexible hoses may be used - provided by
installer.
3. ALL locating and RELOCATING of construction heaters
will be done ONLY by permitting contractor.
4. Outdoor air shall be supplied for heaters at all times.
5. An approved manual shut off valve shall be installed at
each unit and thermostatically controlled.
6. All propane (LP) tanks will be installed and sited per
NFPA 58.
ANY VIOLATION OF THE ABOVE COULD LEAD TO
CITATIONS AND ALL FUTURE INSPECTIONS HELD
Date Received
Ile BUILDING PERMIT APPLICATION Date Notified
A,Ibertvi 5959 Main Avenue NE Date Paid
Small.rows.„Living.Big Cfty Life. Albertville, MN 55301 Ck, Cash, CC
Phone: 763.497.3384 Fax 763.497.3210 Permit#
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Site Address: BUILDING PERMIT FEES
Business Name:
The Applicant is: Owner Contractor Tenant I Permit
Legal Description:PID# Surcharge
Addition Lot Block
Owner: I Plan Check
Name Address I Engineering(site)
I I
City State Zip I Mechanical
Email I Fireplace(s)
I I
Phone(H) (W) (C) I Plumbing
I I
Contractor: I Sewer
Company Name License#
I I Water
I Address City St Zip
Water Meter
I I
Contact Person Email I City WAC
I I
Phone: (W) (C) (Fax) I JP WAC
I I
Architect: I SAC
Name Address
Storm Water
I City State Zip
I I License Check
E-Mail
Other
Phone (W) (C) (Fax)
I I TOTAL
I Type of Work:
New Construction Residential Addition Alteration Finish Bsmt I Type of Const.
New Construction Commercial ❑Garage/Shed ❑Reside/Reroof ❑Fireplace I Use of Bldg
Tenant Finish Plbg Htg Deck
I I
Description of Work: I Occupancy Group
I I
Occupancy Load
Size of Structure: Total Square Footage:
Length First Floor I Zoning
Width Second Floor I Code Used
Height Basement
Garage
Estimated Valuation of Work: $ I Are Fire Sprinklers Required:'
Yes []No
Separate permits are required jor electrical,plumbing,heating or fireplace. 1 herehy apply for the above consideration and declare
that the information and materials submitted with this application are in compliance with City Ordinance and Policy Require- I Date Approved
ments and are complete and accurate to the best of mp knowledge. It is applicants responsibility to locate and establish the
elevations,if needed,of all site improvements. Required adjustments at owners expense. I understand that all City incurred I Fire Dept•
professional fees and expenses associated with the processing of this request are the respansihility of the property owner and/or
applicant and will be promptly paid Ifpayment is not received from the applicant,the proper y owner acknowledges and agrees I City Engineer
to be responsible.
Applicants Signature Applicants Printed Name Date Notify of Assoc&Covenant
— — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —
Public Works
Approved by Building Official Value Approved Date
City Planner
Special Conditions or Comments: