Loading...
2008-05-05 PUD Concept Plan, Site, Building Review Approval~' n NORTHWEST ASSOCIATED CONSULTANTS, INC. 4800 Olson Memorial Highway, Suite 202, Golden Valley, MN 55422 Telephone: 763.231.2555 Facsimile: 763.2312561 planners@nacplanning.com May 5, 2008 David E. Dye Dominium Development & Acquisition, LLC 2355 Polaris Lane North, Suite 100 Minneapolis, MN 55447 Re: PUD Concept Plan and Site and Building Plan Review Approval for the Albertville Townhomes NAC File No.: 163.06 - 07.25 M r. Dye, This letter is to verify that the applications for the Planned Unit Development (PUD) Concept Plan and Site and Building Plan Review. for Albertville Townhomes were approved by the Albertville City Council at their April 21, 2008 meeting. Numerous flexibilities were granted from the Albertville City Code with the approval of the PUD Concept Plan. These flexibilities include: 1) More than one principal building allowed on the lot; 2) Construction of a private street system, which has allowed for: a. The street widths being narrowed; b. The densities achieving applicant's request; and c. The waiving of the front setback requirements for those structures located on the private streets. (The 35 ft. front setback requirement only applies to public rights- of-way); 3) East side yard setback reduced to 10 feet; 4) Cross-access easements with the adjoining property for circulation; and 5) Storm water ponding to benefit both properties. The City of Albertville has, in turn, received benefits for granting the aforementioned flexibilities. These benefits include: 1) Increased architectural standards; and 2) Playground equipment. :~ ~ Albertville Townhomes - Flexibilities with PUD May 5, 2008 Page 2 of 2 Thank you for your cooperation in the application process. Si Al~"n Brixius City Planner cc: Larry Kruse, City Administrator