1996-12-09 Soils Data Compilation 1 MEYER ROHLIN, INC. .ENGINEERS-LAND SURVEYGRS 1111 Hwy. 25 N., Buffalo, Minn. 55313 Fax 612-682-9492 Phone 612-682-1781 1-500-563-1781 December 6, 1996 Mr. Kevin Mealhouse City of Albertville PO Box 9 - Albertville, MN 55301 `_ ' RE: Parkside 3rd Addition Albertville, MN Dear Mr. Mealhouse: Per your request, I am forwarding this letter in regard to the building pad site grading for the above-referenced project. Removal of all topsoiljorganic soil, depth of engineered fill placed, and building pad oversize were verified by a field representative under my. supervision. All engineered fill was placed and compacted in lifts of 2' or less. Oversize of engineered fills was constructed with maximum 1:1 slopes. Density tests taken by Independent Testing Technologies, Inc. verified that the contractor's equipment and construction method provided the compaction as required in the project specifications. Material used in engineered fills was from the project site, was of the same soil type, was compacted in uniform lifts, and was compacted using. the same equipment and construction methods. I hereby certify that the compaction on lots with engineered fill meets the required compaction as required in the project specifications. If you have any questions, please do not hesitate to contact me. Sincere y, MEYER- HLIN, INC. Thore Meyer Professional Eng' Reg. No. 6218 cc: Don Jensen - Kenco Garrison-Hale - City of Albertville Pete Carlson.- City Engineer File 96105 r~ I' Thore P. Meyer, Professional Engineer Robert Rohlin, Licensed Land Surveyor _ . , -~; ~ r -; i~ MEYEf~ ROHLIN, ING. ENGINEERS-L4ND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn. 55313 Fax 612-682-9492 Phone 612-682-1781 1-SOa-563-1781 November 27, 1996 Mr. Kevin Mealhouse City of Albertville PO Box 9 Albertville, MN 55301 RE: Parkside 3rd Addition Albertville, MN Dear Mr. Mealhouse, Per the request of Kenco Construction, the following information has been compiled in regard to the site grading of the above referenced project. Building pad areas were constructed using the strip method type of construction. Building pads were constructed such that the front of all buildings would be at the 35' setback line which is 65' from street centerline. Density tests taken verified that the contractors equipment and construction method provided the required compaction. Removal of all topsoil/organic soil, depth of engineered fill placed, and building pad oversize were verified by a field representative under my supervision. Excavation oversize was measured in relation to the center of a 50' wide building pad. All engineered fills for building pads were constructed with maximum 1:1 slopes. The attached sheets detail each lot of the project with specific information in regard to the depth of topsoil/organic soil removed, the depth of engineering fill placed, and the excavation oversize of building pads. I ~ Thore P Meyer, Professional Engineer Robert Rohlin,~ Licensed Land Surveyor '" - ~: ' t:4 a PARKSIDE 3RD ADDITION - SITE GRADING INFORMATION DEPTH OF DEPTH OF WIDTH OF TOPSOIL/ORGANIC ENGR FILL BUILDING PAD BLOCK LOT SOIL REMOVED PLACED OVERSIZE 1 1 1.0 1.3 5 1 2 1.0 1.1 5 1 3 1.0 --- - 1 4 4.9 3.0/7.8 15 1 5 4.9 10.1/8.5 15 2 1 1.2 4.1 15 2 2 1.2 4.7 15 2 3 1.0 2.0 5 2 4 1.0 --- - 2 5 1.0 --- - 3 1 1.0 2.2 5 3 2 1.0 2.8 5 4 1 1.0 1.3 5 4 2 1.0 --- - 4 3 1.0 0.5 5 4 4 1.0 --- - 4 5 1.0 0.1 5 4 6 1.0 1.8 5 5 1 1.0 1.5 5 5 2 1.5 1.1 15 5 3 1.5 3.6 15 5 4 1.5 3.0 15 6 1 1.5 2.0 15 7 3 2.1 9.0/5.8 15 7 2 1.0 1.3/2.1. 5 7 3 3.8 8.7/7.5 15 7 4 3.8 6:2/9.0 15 7 5 3.8 11.1/i0.9 15 7 6 1.6 6.6/6.8 15 7 7 1.6 6.6/5.4 15 7 8 1.6 7.2/6.0 15 7 9 2.1 8.2/5.0 15 7 10 2.1 7.8/4.6 15 7 11 2.1 5.4/5.2 15 7 12 2.1 4.5/4.3 15 7 13 2.9 7.7/4.5 15 7 14 2.9 7.4/5.5 15 7 15 2.9 8.5/5.8 15 7 ~ 16 2.9 8.4/6.2 15 7 17 2.9 6.7/5.5 15 7 18 1.0 4.0/1.8 15 7 19 1.0 2.8/2.6 5 t ~r DEPTH OF DEPTH OF TOPSOIL/ORGANIC ENGR FILL BLOCK LOT SOIL REMOVED PLACED 7 20 2.3 5.1/1.9 7 21 2.3 6.1/3.9 7 22 2.3 4.8/5.1 7 23 2.3 8.3/5.6 7 24 2.3 8.8/6.1 7 25 2.3 9.1/6.4 8 1 1.0 0.5/--- 8 2 1.0 0.1/--- 8 3 1.0 0.6/--- 8 4 1.0 ---/---- 8 5 1.0 0.9/--- 8 6 1.0 2.3/---_ 8 7 1.0 2.2/---~ 8 8 1.0 1.2 8 9 1.0 3.6 8 10 1.0 3.9 8 11 1.0 3.2 8 12 1.0 1.4 8 13 1.0 1.0 8 14 1.0 0.2 8 15 1.0 3.3 8 16 1.0 1.7/1.0 8 17 1.0 0.2/--- 8 18 1.0 --- 8 i9 1.0 --- 8 20 1.0 --- 8 21 1.0 --- 8 22 1.0 --- 8 23 1.0 0.7/--- 8 24 1.0 2.1/--- 8 25 1.0 1.3/--- 9 1 - 1.0 --- 9 2 2.2 --- 9 3 2.2 --- 9 4 1.0 --- 9 5 i.0 --- 9 6 1.6 --- 9 7 1.6 0.2 9 8 1.6 1.6 9 9 1.6 2.3 9 10 1.0 2.5 9 11 1.0 --- 9 12 1.0 --- 9 13 1.0 --- 9 14 1.0 --- 9 15 1.0 --- 9 16 1.0 1.1 9 17 1.0 1.7 WIDTH OF BUILDING PAD OVERSIZE 5 20 20 20 20 20 5 5 5 5 r 5 5 5 5 5 5 5 5 5 5 5 5 15 15 15 15 15 15 15 5 5 i rr I~ 1012 SOUTH BENTON DRIVE • SAUK RAPIDS, MN 56379 Phone: (612) 253-4338 • FAX: (612) 253-4547 r MAY 19,1995 PROJECT 95-145 GEOTECHNICAL EXPLORATIONS FOR PA.RI~SIDE THIRD ADDITION ALBERTVILLE, MI]vNESOTA Prepared For: t I~ENCO, INC. 1012 SOUTH BENTON DRIVE • SAUK RAPIDS, MN 56379 Phone: (612) 253-4338 • FAX: (612) 253-4547 Ma_y 19, 1995 .; Mr. Kent Roessler Kenco, Inc. 13736 Johnson Street Northeast Ham Ia1ce, MN 55304 RE: 95-105 Report of Geotechnical Explorations Parkside 3rd Addition, Alberttrilte, Minnesota. Dear Mr. Roessler: r Independent Testing Technologies, Inc. is pleased to submit the results of our subsurface investigation program for Parkside 3rd Addition in Albertville, Minnesota. This report represents our work on this project as authorized by you. Enclosed please find three copies. The majority of the soils encountered during our investigation consisted of lean sandy clays. Topsoil thickness ranged from i2 to 18 inches. Perched water conditions are present on this site. Soil samples obtained during our investigation will be stored at our office for sixty (60) days after the date of this report. They will then be disposed of unless you advise otherwise. Mr. Roessler, it has been our pleasure to work with you on this project. Please contact us at. (612) 253-4338 if you have any questions or need additional services. Sincerel}t, Patrick A. Johns n, P.E. MN Registration #22037 cc: ~-5s-. Bob Rohlin, Meyer Rohlin, Inc. b:b5105rpt.wpd r GEOTECHNICAL EXPLORATIONS PARKSIDE THHII2D ADDITION ALBERTVILLE,IVIINNESOTA PROJECT 95-105 Introduction 1 Protect Information This report presents the results of our subsurface investigation for Parkside Third Addition located in Albertville, Minnesota. Project information was obtained from a discussion with Mr. Bob Roblin, of Meyer Roblin, Inc., and from the preliminary plat dated 1~Iay ZZ, 1995. We understand that the proposed subdivision will consist of approximately 112 residential lots. In accordance with your verbal authorization, we have conducted a subsurface .exploration program for the proposed subdivision. Scope of Services Our authorized scope of services included the following: 1. To roves 'gate the subsurface soil and water conditions encountered at five(5) standard penetration borings as shown on the boring location plan in Appendix 1. 2. To perform laboratory tests to aid in the classification of the soils encountered and in the determination of their engineering properties. 3. To provide a report of our findings including recommendations for earthwork to meet FHA 79g requirements. i~ 2 General Site Conditions The proposed project site is located on a farm off County Road 119 (LeBeaux Avenue) to the south of Parkside First and Second Additions in Albertville, Minnesota The general site topography is gently rolling with slopes ranging from 2°,'o to 6°0. According to the Soil Survey of Wright County, . t r Minnesota, prepared by the Soil Conservation Service, this site lies within the Hayden-Dundas feat soil association, which consists of medium textured and moderately fine textured soils on gently rolling uplands. The individual soils mapped on this site are rated poor to fair for stability and bearing capacity and have high susceptibility to frost action. Highly plastic soils are mapped over a large portion of this site. Ezpioration Program Five (5} standard penetration borings were conducted on the site as shown on the boring location plan in Appendix 1. All borings were advanced to a depth of twenty feet using a 3 1/4-inch I.D. hollow stem auger. Samples were obtained every two and a half feet for the first ten feet, and every five feet thereafter using a 2-inch O.D. split spoon sampler in accordance with the American Society for Testing and Materials (ASTM} D1~86. Standard penetration values (N-Values) were obtained at each sample interval. N-Values were obtained by driving the sampler into the soil using a 140-pound hammer falling thirty inches. After the initial set of six inches, the number of blows required to drive the sampler twelve inches is known as the standard penetration resistance or i~ 3 N-value. Water levels were noted during drilling and immediately after completion. Surface elevations at each boring location were estimated based on the grades shown on the preliminary plot. Laboratory Testing Laboratory tests were performed on selected samples to aid in the identification of the soil strata and to provide an estimate of it's engineering characteristics. Three samples were tested to determine percent fines in accordance with ASTI~i D1140. One sample was tested to determine atterberg limits in accordance with ASTZ~i D4318. Test results are tabulated in Appendix 3. A chart explaining the Unified Soils Classification System is also included in Appendix 3. Exploration Results All boru~ encountered a surficial topsoil layer ranging nine to eighteen inches in thickness. Below the topsoil, the borings generally encountered lean sandy clays (CL), clayey sands (SC), and highly plasfic clays (CIS. The soils in boring B-1 were brown in color, mottled at the surface, wet, and generally graded to grey in color at depth. The soils in the remainder of the borings were all grey, firm, and dry. The standard penetration resistance N values were moderately high, indicating that the soils were in a firm condition. Complete boring logs are included in Appendix 2. Water Level Observations Observations of subsurface water conditions were made during drilling operations and immediately after drilling completion. Groundwater was encountered at the time of drilling in boring ST-1 at a depth of five feet. No water was encountered in the other borings at the tune of dn`Iling. ' It should be noted that fluctuations in the level of the groundwater can occur due to variations ' in rainfall, temperature, spring thaw, and other factors not evident at the time of our investigation. i 1 z ' The water levels observed represent perched water or water trapped above impervious=layers. It is ' our opinion that over time, the water levels would vise to correspond roughly with the water level in the wetlands to the north and west of the site. Engineering Review Based on our findings, this site appears to be moderately well suited for the proposed development of residential lots and associated streets and utilities. According to our estimates, fills required to reach proposed grades will be less than eight feet in depth. The following recommend- ' ations are to ensure satisfactory performance of the controlled earthwork. ' Structural Fill Recommendations Independent Testing recommends that areas to receive fill be stripped entirely of topsoil. ' Topsoil throughout the site is expected to be approximately one foot deep with lower elevations having more and higher elevations having less. All organic, soft, frozen, or otherwise unsuitable material should also be removed. The stripped area should be observed by a qualified soils enginneer ' or a technician under his supervision prior to commencing fill operations. i~ s The on-site soils consisting of clayey sands (SC) and lean clays (CL) are considered adequate material for use as controlled fill. However, fat, highly plastic clay should only be used as fill at a minimum depth of four feet below finished grades. Also, highly plastic clay should not be used as backfill behind foundations and retaining walls or on steep slopes. All struciural fill shall be free from z Y organic material: soft, wet, or frozen soils; highly expansive soils; rocks in excess of six inches in diameter, and other deleterious material. The fill should be compacted in 8-inch loose lifts to a minimum of 95°0 of standard proctor ma.Yimum density in accordance with ASTl~i D698. We recommend that the fill be compacted to within plus or minus 2% of optimum moisture content as determined by a standard proctor. tiVhere fill is to be placed on banks or slopes steeper than 5:1 (horizontal to vertical), the fill should be stepped or benched into the original ground surface. Most of the soils on this site contain more than Sd% fines (material passing a #200 sieve) by weight. These soils are highly susceptible to moisture during earthwork operations. Also, some of the natural soils at depth may have moisture contents above optimum, and may require drying or mixing in order to achieve the desired compaction. Based on the above, we recommend that the earthwork operations be performed during dryer periods of the year, such as summer or early fall. Foundation Recommendations We recommend that foundations be placed on natural, inorganic, undisturbed soils or r controlled fill. We recommend that strip footings be designed based on a net allowable soil bearing 6 pressure of 2,000 p.s.i. or less. We recommend that foundations bear at a minimum of four feet below exterior grade to provide against frost. We recommend that highly plastic clays (CIT) are not used to backfill below grade foundation walls. i ~ Pavement Recommendations t The subgrade lean clay {CL), highly plastic clay (CH), and clayey sand (SC) encountered are classified as A-5 and A-7-6 soils in accordance wish the American Association of State Highway Officials (AASHTO} classification system. A-6 and A-7-6 soils are rated fair to poor for use as roadway subgrade material. Without benefit of a laboratory R-value determination-and based on MN/DOT guidelines, an R-value of 5 can be assumed for these materials. Based upon our investigation, it is our opinion that the subgrade soils encountered in the roadway will be suitable for support of the pavement section, designed using an R-value of 5. Where pavements or curb and gutter will be placed on highly plastic clays, we recommend a minimum 24-inch granular cushion bedding. Closing Our work was performed for geotechnical purposes only and not to document the presence or extent of any contamination on the site. LVe can note that our crew did not detect any obvious contamination by sight or smell during drilling operations. However, human senses are limited in terms of contamination detection and, therefore, the lack of detection through human sensing does i~ 7 not preclude the possibility of the presence of contamination of the site. This report represents the result of our subsurface investigation and is based on information gathered at specific locations. Subsurface conditions can change a great deal over short horizontal distances. Also, the actual interface between strata will likely be gradual transition rather than an abrupt change as represented on the boring logs. Geotechnical engineering is based extensively on opinion. Therefore, the data contained in this report should be used as a guide, and we recommend that construction monitorYng be performed by a qualified geotechnical engineer. Any changes in the subsurface conditions from those found during this investigation should be brought to the attention of the soils engineer. Based upon the results of our borings, it is our opinion that the on-site soils are adequate for support of proposed fills and foundation loads. Excessive settlement of any fill placed in accordance with our recommendations is not .expected nor should it cause severe damage to structures or property. We recommend that a soils engineer be retained to provide construction materials testing and observation services to verify that proper construction techniques are employed. Necessary services include: * observation of excavation bottoms prior to placement of fill or backfill. * Check lowest level of house slabs to verify locations at least four (4} feet above groundwater. i~ '~ u fl ' i~l 'AU ~f ~ // \ ~ r. 4 .' ./ I ~ I ~ ~~ / T, . ; ...; ~ . `11 \' 7 's ,~ j ~~:~. -:;~~:.~~ J .. .,- _~, -= mil''' ~ ~'~. - ~~ f.. ~ ~ 1 1. -_ __-~! ~ ~F- ~ ~i'~ , lam. ~' ~'~: '~ ; ~I "~I 1 . m -~ ~.~ ' 1 ~, i~ IL ' I ,~' 'o . i ~ r ~ ~~ . ~.: ~ ` ~ ~~ I _ ~_I~- _ i}}}~~~---I,•~~ ~i •~ -~~~ fig- -#~ _ \:~ i'. ~,:. - --- r ~~ .~~I ~ r ~~ ~ :~ ti ~ ti. F ~ iti ~ ~~ ~~. i ~ 1 ~ ~ ~, , _ _.. ,, , .a _~- ~~~ 'L _ ~~~'~ Dirt=~ ~~~,- '~, ~~(j ~ , ,~~~~~ . _ Z:`_ r_ --lip=-~~; - ~-. .- --~ - . ~,~-~~. , ~ fir. m ~.~1~'~ w JIB" - - i~ i N.~ ~~; 1 ~ ! • :' , ,, , (~ ~~ '1 ~ ~~ .,ter-:_~L- ~1 I ~;' ;; `,~'- ~= i :'', ~~; ~. ' 1 ~ f~ 1 ~b•l;i ~ i y; f.'~~nfl 4 J 4 ~~ , ~ ~~•.. _ - -- - - - --- .-s ------- vl »o ~- ___-- u.i,uc-o n,~p b 1'oT~2'w INDEPENDENT TESTING TECHNOLOGIES, INS. LocoFSOrL en~ac I] 0 u ri n r PROJECT: 95-105 BORING: B-1 DATE DRILLED: 5-17-95 SURFACE ELEV.: 966 Kenco, Inc. START TIME: 9:30 FlNISHTIME: 10:45 Parkside Third Addition DRILLING METHOD: 3 1 j4" I.D. Hollow Stem Auger Albertville, Minnesota CREW: CA j PJ LOCAT101V: See Boring Location Plan - 610' West & 260' North of the Southwest Property Corner Depth ASTM Description of Material Sample (Feet] Symbol ASTM D2488 ~ N WL Notes OL ORGANIC SILT, Topsoil. 1.0 CL LEAN SILTY CLAY, wj fine to med'sum grained SAND, brown, grey, mottled, { 1 12 Water measured at 5'3" Wj lenses of clean SAND. _ at 4:OOpm on 5-17-95. 2 17 % less than tf200 sieve = 44.6. 3 27 Wj a layer of fine SANG, vret at 9 feet 4 21 5 21 ~ 6 24 Grades to grey at 16 feet. E 7 12 21.5 Boring cnmp{ete to 21.5 feet. Water measured at 5'3" at 4:110 pm nn 5-7 7-95. . i~ n n n u ii n D D i~ II n n i~ i~ n n i~ n INDEPENDENT TESTING TECHNOLOGIES, INC. tocoFSOr~ tgAR1NG PROJECT: 95-105 BORING: B-2 DATE GRILLED: 5-17-95 SURFACE ELEIf.: 96.4 Kenco, tnc. START TIME: 10:45 FlNISH TIME; 12:00 Paricside Third Addition DRIWNG METHOD: 3 114" I.D. Hallow Stem Auger Albertville, Minnesota CREW: GA j PJ LOCATION: See Boring Location Plan - 800' West & 530' North of the Southeast Propcrty Corner Depth ASTM Description of Material Sample (Feet) Symbol ASTM D2488 it N WL Notes OL ORGANIC SILT, Topsoil. 1.0 CL LEAN SILTY CLAY, wj a little fine to medium grained SAND, grey, mottled. 1 13 i 2 1Z LL..=48 PL = 18 P1=30 3 23 4 31 5 12 6 25 21.5 Baring complete to 21.5 feet. No water measured to cave-in at 19'9" immediately after completion. P i~ INDEPENDENT TESTING TECHNOLOGIES, INS. toGOFSVrL ~4L7/NG PROJECT: 95-105 80R(NG: B-3 DATE DRILLED: 5-17-95 SURFACE ELE1l.: 962 Kenco, inc. STARTT(l+AE: 12:30 FINISH TIME: 1:30 Paricside Third Addition DRILLING METHOD: 3 1 j4' l.D. Hollow Stem Auger Albertville, Minnesota CREW: CA j PJ LOCATION: See Boring Location P(an - 1220' Wes t & 160' North of the Southeast Property Corner Depth ASTM Description of Material Sample [Feet) Symbo! ASTM D2488 # N WL Notes OL ORGANIC SILT, black, Topsoil. Z.0 CL LEAN CLAY, wj lint SAND, brown, motticd. 1 7 8 r 2 4 3 20 4 25 Grades to grey at 1 Z feet. ~ 5 18 6 31 21.5 Baring cnmp(ete to 21.5 feet. No water measured to cave-in at 7 9'Z" immediately after cornpletion_ r i~ i~ n ii ii i~ L i~ i~ it i~ L ii II li II II L IIYDEPEIYDENT TESTING TECHNOIfOGIES, INS. ~~~~~ ~a~rc PROJECT: 95-105 BORING: B-4 DATE DRILLED: 5-17 95 SURFACE ELEV.: 962 Kenco, Inc. STARTTIIv1E: 1:30 FINISHTIt~IE: 2:30 Paricside Third Addition DRIWNG METHOD: 3 1 j4' I.O. Hollow Stem Auger Albertville, Minnesota CREW: CA j PJ LOCATION: See Boring Location Plan - 1620' Wcst & 170' North of the Southeast Property Corner Deptfi ASTM Description of Material Sample (Feet] Symbol ASTM D2488 #t N WL Notes OL ORGANIC SILT, Topsoil. 1.5' CL LEAN SANDY CLAY, wj fine to medium grained SAND, wj a trace of GRAVEL, brown, mottled. i 1 ; 8 % less than #200 sieve , = 40.0. Z 6 3 17 4 19 Grades to grey at 13 feet. 5 11 No sample recovery. 6 21 21.5 baring cnrnplete to 21.5 feet. Nn water measured to cave-in at 19'3" immediately after completion. INDEPENDENT TESTING TE~HNOL4GIES, INC. LQGOFSOIl BUf7/NG PROJECT: 95-105 BORING: B-5 DATE DRILLED: 5-17-95 SURFACE ELEV.: 954 Kenco, Inc. START TIME: 2:45 FINISH TIME: 3:d5 Paricside Third Addition DRILLING METHOD: 3 1 j4' I.D. Hollow Stem Auger Albertville, Minnesota CREW: CA j PJ LOCATION: See Boring Location Plan - 1800' West & 800' North of the Southeast Property Comer Depth ASTM Description of Material Sample (Feet] Symbol ASTM D2488 ~ N WL Notes OL ORGANIC SILT, Topsoil. 1.5 CL LEAN SANDY CLAY, wj Fine to medium grained SAND, grey, mottled. 1 ~ 0 9~ Icss than lt200 sieve = 37.2. Grades to brown, mottled at 4 feet. 2 7 3 it 4 17 j 5 19 Water measured at 16'5" immediately after completion. 6 31 21.5 Boring complete to 21.5 feet. Water measured at 16'5" immediately after completion. r Independent Testing Technologies, Inc. 1012 South Benton Orive Sauk Rapids, MN 36379 RESULTS OF #200 WASH (612) 253-4338 Report Date: May 19, 1995 Project 95-105 Parkside Third Addition Albertville, Minnesota Client: Kenco, Inc. cc: Meyer Rohlin, Inc. Testing Specialist: PJ r Boring #. B-1 B-4 B-5 Sample #. 2 1 1 Oate Tested: 5-19-95 5-19-95 5-19-95 Depth: 5.0' - 6.5' 2.5' -'4.0' 2.5' - 4.0' Location: See Booing Location Plan Moisture Content %: 18.8 23.8 23.8 Total Percent Passing: 44.6 40.0 37.2 Soil Description: CL CL CL b:w5105.wp1 Re ully Submitted: Patrick A. Johns Project Manager h ~ ~" ~ OON~ ~ C n. ~' ~ oo° § ~ n ~ ~ ti• W O_ ~ 6 A R N D Y _ o F ~ g~^ ~ v x F n B ~ ~~ ~ ~ ~ ~K _ - S n •• ~~ ~~~ ~p y phpFi ~~ =~ P .~ N~~ M m ~. ~ M ~ ( .~ eQ &G ~~ I a $ `n ~~ ~ z o~ > ba ~ ~ ~. a ~ ~ ~ ~ ~ ~ I I ~ ~~ ~ „~~~ o ,; ~ = ~•° ~ > ~ ~ =$ ~ , N j a t9 ~ '" = ~ , ~ O• ~' )j J ~ a p 11 N 1~ a o $ ~' ~ ~ u ~g$ ~ ~.~ .,, g ~ 6~ Z ~' I I ~' o G s ~ C > T, ~- -~_ <- -- c3 _ -e tt 7 _ .7= 7 - __ ~ n r Y 7 o C •f.. _ f a Y ->r G Y .1 w 7 9 C ~- ~ ^ N ~"-107«.c 7'0 ~-- - CO Y Y -,f•~ - J ~ ~ u..~ ~~ d 7^ c c= - tax Tic __n rG~i Gam.. .. ~ « A^ w M1 O ^ 67 Y^0 'x ~ 7 q -r.Yy1M1p7 YN`_ _ Yn r 1 G~7 Nf~i ^`:~ Geer _ A ~ 7•K y .n. Y - _ ^nAN G N ~ ~ ~ !~ ..~. ~~p S.. N ~ ~, .JU 7 n ~ Y = n .. ~ ~ - r 1~ 3 u E^' __ ` c .c^37•.. it ~- _ ~ A `<n A 77A _ Y - G A ... ~ j f 7 _ tJ 7A _ 7 ~'-t`f« 7 ^ S ~ C' n-~ ~- ~ C~ G _ _1 C.~ «<C ~~ n fi _ ~ _. O =~Y O tai ~ ^y. O'~ ~ = ~ A 7 - •` " e o _ < ^ 1 i 7A ~~ ~.Or~ _~, ~Of~ 'C L. w. O ~ ~ C, G C .' .' MNN ~1 O .• A A A f n •~"' f 3 ^~ G~~7., ~(.C r ~ N -S.A`<.G.~ ^C? ~ .p O - J i N w 1 c ~?i+~ 7 ~ rte= < x :An r~ 3 G'~7.. 7'~-~'~ ~ 'C _ r ~ O it CAC t: ..~_ti'• ~ ~ n q %'~7A ACS-= •< _ d .". ^ V `~ C r. ~ >io O- m ~>ris~~.c~ D~GOj~G a 3 J n O- ~< 0 S_ N- o a''t r 3 G < N xGNt-li ^iiisr^ti _77r G - ~ t5 GN ~ ~ G f•^ ^- c - - H r: - ~ C. S f. _ f:~~ r r r ti 'G ^, r _ _ .T. CGGGti -t r - « r 7 H _ f. -_ _- y Lr r Il- .".i r. «• C r -__ ~<___ :. - n ~ .- ~. -. i _- 1 A ~ C A I Y O l « I Fulc•craulcd soils ~ Coarse-grain~tl soils )lore than half of rtutcrial is swla//tr More than h;liCof material is than 7S wm save size lurRar than 75 Nm sicvc sizc'• a jpU t The 73 xm sicvc size is about the snvllvst particle visible to naked eye) I C I 7 S:Ind1 ~ More than half of coarx Silts and clays I I'r;cation is smaller than li u d C I Silts and clays c 1 mm sicvc sin: q 1 Imlt arcat r than ~ liquid limit 30 Icss than SO ~ ~ Sands with fllte: (appreciable amount of I « flocs) + I ~ C ~J 'J~d ~ ~ ~iO a~IC SG ~3y ~l0 ? SL ~0 n~ MY'•~ ~ •• A~ ~ • ~'< ~ AG S>' G^ S3A C GS tC^ AG S7 ao7 ^N ".Y~y ~ ~A w = Q n r7~ ^ fib G~' 7.0 3 o 3 a _ i5 , „ ..n s7 7 r7 c I Y ~ v ~ A a G6 ~ z Y N 7 ~',~ Q N^ d ~ A .. • O N « G i o o 7 o E E o o ~}•` ~ E~ o 0 ~1 ? Z ° . , •e 3 v' 13y ~ Q~ ~,~ ~ ~>o y ~ z c ~ 3 o S i 3 a ^ 3 ~ ~ b l o. n ~ ~! o I n~ y ~ ~ ( r { , ~ ~, 7 i gi -, -~ C I ~ a w „ ^.ol « Go7i ~ ~ ~ oi~ n o I ~ I~ d ! ~.Ai -uA ~ Y Y Y AAIn n 91 « 7 I f ft ~ :~ ? l am ~ 7 I ~ t, I ~ :' L 7 1=~ w 7 6 . t1 I ~• Y fl l ^ I ? ~ I A `C 0• I .a. =. - _' N Y G ~ ~ M N E ,~~~I ^ N ~ I w ,0= Fw ~ NwI ~ 7• 3 - NG ~- 7~Y 7• G « n n ~ ~ =• ~ G ..~ c 7't ~ a ' A ~ E ~ ~ w n o ~ 'fl ~ G N `e ^• ~ iu E < -•~ ~'~ 7 A L ~i ~~I - =~~ ~ A ~..~~ A 71 soy H ~ Y. r~Y Ya-,3~ 7 7 p^ C67 ~ a7A~onY~ 7 n y O 7 A Y ~ C G7 .; m O 7 m ~ G ~ ~ • N 7 3 ~ ~ 7 A + v C 0 7 ; G 6 Q n S~ ~• Y 7 Y 7 7 '<~N Y~n~ a ~3~'RF G~~~a-«-- 0 7 ~ c^ ~ ~ a~o3?7`G ~ O a v7M^ aNy ^6 C 7 AO ~`<' G Y S. 3'fl G'a« pc ^G >o 7 ~ ^ NaS, ao R'«^G ^ ~r ti ? C M1 r~i O ~. ~ ~ ~ O ~t f~ O ~ 1 O iv ~„ tJ d O p A W 0 tNt+ d t- A T ~ l7 ~' ~ c d a; to L] ~ ~ O A 3- O ~ ~' V m O b0 ~ ~. O (D ~ a O 0 In ~ ~ 0 r 7 9 ~ ~ ~ G N R ^ « 3c -a a ~ .^..w A 7 l G 9 ... 7 ~ ~ Q (~rfa VCIS More than half of coarse fraction is target than ~ tom sicvc size Clean sands piule or no flnu) b S O O 7 3~ n .- `< 7 O ^ « n .". m O r a 7 A A 3' H 7 A N « Y G gam N C Y 7 7 Y A n ~, 7 n N - M w ~~ r o. Y. A C 0 ~« Y .: 7 A Gravels with flnu (appreciable amount oC flocs) s z ^~ n0 a.~ ~' G H 7 ,~^, .. C W n t~ ^ _ v O' v u 6 t~ ^ n R. o o -0 ~ ~ v G n o _ _~ ~ ~ 'O ~ w R' o n 7 C ~ N 4 Clutt ¢ravels pIttie or ao IInu) b E SO O 7 n ~ O tj 7 ~~ an rO r Y p7 3 -°. 7 A " a },30 N C .~ ^« 7 «p n n 7 n R r ^a ~: r 7 r a: A C ~~ ~ ^ A - A n y ~~ i ti I ~ a ' n~ ~~ I b~ c f1 _ul 'o ~ t7 N 'o N n - ~ « ~ N () A Y A- Q ~ N 7 A 7 7~ u A L~ j 7 j- 3w C+O~ An o G Gti H« G A c6 X- NO ~G O ~« wG ~ 7 n ~! 7 L 7G ~$ ~ Y ~a 0 '" A 0 7 a iw O ~:" r ~ 3 ~' ~ =< n n _ ~ ' ~ M w M N C~ ^ ; A• T C A W A ` AA FA t' A V ~ N G ^ ~ 7 - - ~ ~ 7 n J n I ~ ~ •_ O ~ --fir-'r -_-yam moo-t y7cd'n~~o° LV ~.`'LN=fir AAA7« AnS Y~A^Ln' -O .fin GN^Z S AEG, •~'9;' C`<~tt- '"7='gy3~=`' a N~~ N' R~ ~ CGr71Gy G< ~cNO~ ~o~'..~3 'wP ^f CJ~ 17 ^O a j 3tl A d ~ 7AAQ~Y^.. ^' n? a O ~ A ~7 rEi 7 t1C GL O N Nf3t GG `<np AO Cw 6 v-'n'n~~f = 70°7 31^oc3'o'+~' - O O O _. n r~ E o~ N.Q C a n~ w'O ma y- N~` n Ux ¢nin siu curve in identiCyin¢ the factions as ¢iven under field identification Plasticity index Determine percentages of gavel and sand from gain sin .- /v w !a t11 rn curve Depending on percentage of fines (faction smaller than 75 O O o O O O ym sieve size) coarse grained soils are classified as follows: i I.css than S % GW, GP, SW, SP ^ ~ S % to 12 °; Borderlfne cases requirin¢ use of ~~ ~ ~. dual symbols ;c 1 ~ ~ ~ g ea ~I A 'c ~ doo r r i F.« = - o = ~~ i O _ - I i 3 I 1~ I 300 x_ x +~ l l 9 7 P Ill I I ~ 1{ jll ~ More than 12;; GM, CC, SM, SC n Y^ UD^ Y :g :Q -~ -a 3w S 7 ,,,, ~ o- a 7 1 3 ` 3• ASR' ~ R' ~- ~E ~ E °'~oAF.o c - O1c~aSo ~ 7~.Gti . g~ ~ Q> G J A « A l1 `~ . a a ~ _ O n ~ « A 7 (, z 3 ._~-. 7 d d O 7 P A H 0 C n C p q d Ot b X OrI l d m ~ A ~ E 91 ^ 7 a ~ W a~ a i+D~ m.>: a :~ 7 :~ ~- W P'~A S~ A- 7 a=3 03 ti S N N .y ~~. o- o yo n N E a~ o-s.E g C L ~ ° c n a ~-i: •.e ~. G 1 S~ ~> C ~ in ~ U Q a r - N n ~ o x 3 ~' a a N d 0 3 .~ 3 A O n ~" Q ~ ~ ^ !1 t~ n A = E ~ ~ A 3 a W x m G G R ~~ 1 J G7' ;nr C ~4 a7 0 C iJ •! •o a z Y 3 N 7 }}~~ O ij ~. Q7 A ~ N O C. iw G 0 a_ Ao :n wH iii O 7 --? A7 C' r~ (+d n G n .r.~ A ~_ O i~ 1 NTE RTEC November 21, 1996 Mr. Don Jensen Kenco 13736 Northeast Johnson Street Ham Lake, MN 55304 .~;~, =a~n IMertec Corporation '' 0801 Washington Avenue South P.O. Box 39108 Minneapolis, Minnesota 55439-0108 612-941-5600 Fax: 941-4151 Engineers and Scienfists Serving the Built and Natural Environments'9 Project BABX-96-816 Dear Mr. Jensen: Re: Preliminary Geotechnical Evaluation, Parkside 4th Addition, Center Oaks and Adjacent Commercial Parcels, I-94 and La Beaux Avenue, Albertville, Minnesota As you authorized on October 14, 1996, we have completed the preliminary geotechnical evaluation for the Parkside 4th Addition, Center Oaks and adjacent commercial parcels. The purpose of the evaluation was to assist in evaluating subsurface soil and groundwater conditions with regard to site grading and foundation support of the proposed houses and commercial buildings. Please consult the text of this report for our analyses and recommendations. It has been a pleasure performing these services for you. If you have any questions regarding this report, please call John Carlson at (612) 942-1783. Sincerely, ~~ ~~-. John T. Carlson, PE .Senior Engineer ~ ~ ~~ Gr~~; R. J dro, PE Principal Engineer Attachment: Preliminary Geotechnical Evaluation Report c: Mr. Scott Dahlke Meyer-Rohlin, Inc. 1 jtclgcj:mjs\babx\geocpt\96816 ~,:~ Table of Contents 1 Description Page A. Introduction ............................................... 1 A.l. Purpose ........................................... 1 A.2. Scope..... ...................................... 1 A.3. Available Information .. ......... .................... 1 }A.4: Boring Locations and Elevations ............................ 1 B. Results .................................................. 2 B.1. Logs ............................................. 2 B.2. Site Conditions ....................................... 2 B.3. Soils ............................................. 2 B.4. Groundwater ........................................ 2 B.S. Laboratory Testing ............................... ... 3 C. Analyses and Recommendations .................................. 3 G 1. Proposed Construction .................................. 3 C.2. Site Work .......................................... 3 C.3. Foundation Design .................................... 5 C.4. Construction Considerations ............................... 6 C.S. Pavement Areas ...................................... 6 C.6. Utilities ........................................... 7 D. Procedures ..................................:........ ... 7 D.1. Drilling and Sampling .................................. 7 D.2. Soil Classification ..................................... 7 D.3. Groundwater Observations .................. . ............. 8 E. General Recommendations ...................................... 8 E.1. Basis of Recommendations ................................ 8 E.2. Review of Design ..................................... 8 E.3. Groundwater Fluctuations ................................ 9 ~E.4. Use of Report ........:............................... 9 E.S. Level of Care ........................................ 9 Professional Certification Appendix Boring Location Sketch Descriptive Terminology . Log of Boring Sheets ST-1 through ST-6 r i~ s'" f aua int+ertec Corporation '`a,doi Washington Avenue South N T E R T E C ?•O. Box 39108 Minneapolis, Minnesota SS439-0108 612-94i 5600 Fax: 94 i -41 S 1 Engineers and Scientists Serving the Built and Natural Environments'D A. Introduction A.1. Purpose The purpose of this preliminary geotechnical evaluation was to assist in evaluating subsurface soil and groundwater conditions with regazd to site grading and foundation support of the proposed houses and commercial buildings. A.2. Scope A total of six standard penetration test borings were performed for this evaluation. Laboratory tests were conducted on select soil samples to determine their moisture content. With the results of the borings and laboratory tests, this engineering report was prepared addressing our analyses and recommendations. The scope of our work did not include an exploration for environmental contamination at the boring locations. A.3. Available Information We were provided with a preliminary plat plan dated September 20, 1996, for the Parkside 4th Addition and a concept plan dated October 2, 1996, for the Center Oaks and commercial parcels prepazed by Meyer-Rohlin, Inc. The site plans show the existing roadways, property boundazies and surface topography contours and the proposed house lots, roadways and commercial pazcels. A.4. Boring Locations and Elevations The boring locations were selected by Kenco. The borings were located in the field by the Braun Intertec drilling crew by referencing to features shown on the site plans provided. The approximate boring locations are shown on the attached sketch. The ground surface elevations at the boring locations (shown on the attached Log of Boring sheets) were estimated from the surface topography contours on the site plans provided. Thus, the surface elevations should be considered approximate. i i~ `;~, ~nco - Project BABX-96-816 November 21, 1996 Page 2 B. Results B.1. Logs Log of Boring sheets indicating the depths and identifications of the vazious soil strata, penetration resistances, laboratory test data and groundwater observations aze attached. The strata changes were inferred from the changes in the penetration test samples and auger . cuttings. The. depths shown as changes between the strata are only approximate. The changes are likely transitions and the depths of the changes vary between the borings. Geologic origins presented for each stratum on the Log of Boring sheets aze based on the soil types, blows per foot, and available common knowledge of the depositional history of the site. Because of the complex glacial and post-glacial depositional environments, geologic origins can be difficult to ascertain. A detailed investigation of the geologic history of the site was not performed. B.2. Site Conditions The property generally contains small hills and low-lying azeas. Several existing structures aze located on the property. B.3. Soils The borings generally encountered about 1 to 1 1/2 feet of clay or sand topsoil at the ground surface. Underlying the topsoil at Boring ST-1, approximately 5 1/2 feet of alluvial lean clay was encountered. Standard penetration tests indicate the clay are generally in a soft condition. Underlying the topsoil and/or alluvial clay, the borings encountered glacial till clays to the boring termination depths. These soils consist mainly of sandy lean clay and contain traces of gravel. Standard penetration tests indicate the clays to be generally in a medium to stiff condition with some upper soft zones. B.4. Groundwater Groundwater was not encountered during the drilling operation. After drilling, groundwater was not encountered to cave-in depths ranging from 14 to 16 feet. r i~ • - r~a~, z - ~ nco - ~ - ,~'roject BABX-96-816 November 21, 1996 Page 3 Because of the low permeability of the clay soils, it may take several days for water to seep into and stabilize in the boreholes. Groundwater levels should be expected to show annual and seasonal variations. B.S. Laboratory Testing Moisture content tests were performed on select soil samples, and the results of the tests are shown on the attached Log of Boring Sheets opposite the samples on which the tests were run. 1 The moisture content tests were performed in accordance with American Society for Testing and Materials (ASTM) procedures. C. Analyses and Recommendations C.1. Proposed Construction The Parkside 4th Addition and Center Oaks developments. will consist of constructing house pads with associated roadways and utilities. We assume the houses will have shallow or full-depth basements with concrete or masonry block foundation walls, and wood-frame construction above grade. We assume the houses will be supported by typical spread footing foundation systems with relatively light foundation loads, less than 2,000 pounds per square foot (psf). We assume the buildings constructed in the commercial parcels will be slab-on-grade, one-story structures. We assume the buildings will be constructed with concrete or masonry block foundation walls with a steel frame and roof. We assume the commercial buildings will be supported by typical spread footing foundation systems with light to moderate foundation loads, less than 3,000 psf. At the time of this report, defmite development plans for the Parkside 4th Addition, Center Oaks and commercial parcels were not available for our use. C.2. Site Work Based on the results of the borings, the surficial topsoil and soft clays are judged to be potentially compressible and unsuitable for fill and foundation support. The underlying medium to stiff clays appear generally suitable for fill and foundation support. t D u C i~ L ~I iCO Project BABX-96-816 November 21, 1996 Page 4 We recommend that an excavation/backfill approach be used for site development. This will involve excavating the vegetation, topsoil and soft clays and then placing engineered fill, if necessary, to establish building grades. The following tabulation outlines the anticipated excavation depths at the boring locations. BaFring Number Sutrface Elevation (feet) Anticipated Excavation Depth (feet) Approximate Excavation Bottom Elevation (feet) ST-1 948 7 941 ST-2 950 4 946 ST-3 966 1 965 ST-4 963 1 1/2 961 1/2 ST-5 964 1 1/2 962 1/2 ST-6 .966 1 965 The excavation depths indicated in the above table are approximate and could vary. The actual depths of excavation required may differ between boring locations and should be determined in the field at the time of the site grading. In areas requiring engineered fill to establish footing grades, the excavations must be oversized to provide lateral stability to the engineered fill. The. bottom of excavation should be oversized 1 foot beyond the outside edge of the footing for each foot of engineered fill placed below the bottom of the footing (1:1 oversizing). To minimize disturbing the clay soils, we recommend the excavations be performed with a smooth-bucket backhoe. If the excavation bottom soils become disturbed, they should be subcut and replaced with engineered fill. The bottoms of the excavations should be observed by a geotechnical engineer or technician under the direction of a geotechnical engineer to evaluate the removal of unsuitable soils and ~~~nco ~-" - `Project BABX-96-816 ' November 21, 1996 Page S the suitability of the natural soils left in place. This should be done prior to the placement of engineered fill and/or footings. ' Based on the results of the borings, the clays below the topsoil appear generally suitable for use as engineered fill. It should be anticipated that portions of the clays will be in a wet condition ' and will require aeration during placement to lower their moisture contents so that the specified compaction requirements can be achieved. ' We recommend the engineered fill placed for building support be compacted to at least 95 percent of standard Proctor density (ASTM D 698) for footings designed for soil bearing pressures up to 2,500 psf. For higher bearing pressures the fill compaction requirements will need to be increased. This should be analyzed as needed. We recommend the moisture ' contents of the engineered fill soils be within 3 percentage points of the optimum moisture content. Compaction tests should be taken to evaluate the contractor's method of fill placement. 1 If fill depths exceed 10 feet, the compaction specification should be raised to at least 98 percent of standard Proctor density and a construction delay may be needed to allow the fill to consolidate under its own weight. Deep fill situations will need to be reviewed on a case-by- ' case basis. C.3. Foundation Design Based on the soil boring results and performance of the above~lescribed soil correction procedures, for residential construction it is our opinion the engineered fill soils and underlying medium to stiff clays should be suitable for support of spread footings sized for an allowable soil bearing pressure of up to 2,000 psf. We recommend that strip footings be at least 20 inches wide and that column pads be at least 3 by 3 feet. It is our opinion that total and differential settlements based on these loadings should not exceed ' 1 inch and 1/2 inch, respectively. This loading should also provide a theoretical factor of safety of greater than 3 against localized shearing or base failure of the spread footings. icall the soil bearin ressure for-commercial buildings of the type proposed ranges from TYP Y~ g P 2,000 to 3,000 psf. If the higher 3,000 psf bearing pressure is to be used, the engineered fill r u ~~nco - Project BABX-9fr- 816 November 21, 1996 Page 6 placed to establish foundation grades should be compacted to at least 98 percent of standazd Proctor density. ' C.4. Construction Considerations . We recommend the site be graded to provide positive drainage of run-off water away from the buildings at all locations. We also- recommend the buildings be constructed with perimeter drain file systems. i ' We recommend the basement floor grades be established to maintain at least a 4-foot sepazation between the basement floor grades and groundwater. Groundwater was not encountered in the ' borings. However, because of the lack of rain during the summer and fall of 1996, we anticipate the site may contain perched groundwater. We recommend test pits be excavated in ' the spring of 1997 to further evaluate the perched groundwater. The test pits will also assist in further evaluating the soil conditions at the site. J i~] II II u II We recommend that Braun Intertec review the grading plan to evaluate if any fill lots will require a construction delay prior to building construction to allow .for consolidation of thick (10 feet or greater) fills. C.S. Pavement Areas We recommend the vegetation and topsoil be excavated from the pavement azeas. In areas requiring engineered fill to establish pavement grades, the excavation should be oversized at least 1 foot beyond the outside edge of the curb line for each foot of fill placed below the bottom of the curb line. The engineered fill placed in paved areas should be compacted to at least 95 percent of standard Proctor density to within 3 feet of subgrade and 100 percent within the upper 3 feet. We recommend the moisture contents of the engineered fill soils be within 4 percentage points of the optimum moisture content to within 3 feet of subgrade and no greater than 1 percentage point over the soils' optimum moisture content in the upper 3 feet. Prior to placement of the aggregate base, we recommend the pavement subgrade be proofrolled with a loaded tandem truck to detect unstable areas. Any unstable areas should be subcut and replaced with a drier, compactable soil or dried and recompacted. n ' ~.~ ,,~ ~•nco - Project BABX-96-816 ' November 21, 1996 Page 7 Based on the borings, it appears the subgrade soils will consist mainly of sandy lean clay. For ' pavement design, we recommend an assumed Hveem stabilometer R-value of 12 be used. ' Consideration should be given to constructing the pavements with a sand subbase. Construction with a sand subbase will provide a more stable pavement subgrade and reduce the required pavement section. Drain file should be placed in the sand subbase to drain low-lying areas where Ovate; could.potentially pond. C.6. Utilities The clays below the topsoil at the anticipated pipe invert levels appear generally suitable for ' pipe support. We recommend the utility trench backfill be compacted to the specifications previously outlined in Section C.S., Pavement Areas. D. Procedures D.1. Drilling and Sampling The penetration test borings were performed on October 21, 1996, with a core and auger drill equipped with 3 1/flinch inside diameter hollow-stem auger mounted on a flotation-tire carrier. ' Sampling for the borings was conducted in general accordance with ASTM D 1586, "Penetration Test and Split-Barrel Sampling of Soils." Using this method, the borehole was advanced with the hollow-stem auger to the desired test depth. A 140-pound hammer falling 1 30 inches was then used to drive the standard 2-inch split-barrel sampler a total penetration of 1 1/2 feet below the tip of the hollow-stem auger..The blows for. the last foot of penetration ' were recorded and aze an index of soil strength chazacteristics. Samples were taken at 2 1/2-foot vertical intervals to the 15-foot depth and then at 5-foot intervals to the termination ' depths of the borings. A representative portion of each sample was then sealed in a glass jar. D.2. Soil Classification ' Soils encountered in the borings were visually and manually classified in the field by the crew chief in general accordance with ASTM D 2488, "Description and Identification of Soils (Visual-Manual Procedures)." A summary of the ASTM classification system is attached. All samples were then returned to our laboratory for review of the field classifications by a r i~ _ enco ~~ Project BABX-96-816 November 21, 1996 Page 8 geotechnical engineer. Representative samples will remain in our office for a period of 60 days to be available for your examination. D.3. Groundwater Observations Immediately after taking the final samples in the bottoms of the borings, the holes were probed through the hollow-stem auger to check for the presence of groundwater. Immediately after withdrawal of the auger, the doles were again probed and the depths to water or cave-ins were noted. The borings were then immediately liackfilled. E. General Recommendations E.1. Basis of Recommendations The analyses and recommendations submitted in this report are based upon the data obtained from the. soil borings performed at the locations indicated on the attached sketch. Often, variations occur between these borings, the nature and extent of which do not become evident until additional exploration or construction is conducted. A reevaluation of the recommendations in this report should be made after performing on-site observations during construction to note the characteristics of any vaziations. The variations may result in additional foundation costs, and it is suggested that a contingency be provided for this purpose. It is recommended that we be retained to perform the observation and testing program for the site preparation phase of this project. This will allow correlation of the soil conditions encountered during construction to the soil borings, and will provide continuity of professional responsibility. E.2. Review of Design This report is based on the design of the proposed structures as related to us for preparation of this report. It is recommended that we be retained to review the geotechnical aspects of the designs and specifications. With the review, we will evaluate whether any changes in design have affected the validity of the recommendations, and whether our recommendations have been correctly interpreted and implemented in the design and specifications. r .._ ~nco ~~. - `Project BABX-96-816 ' November 21, 1996 Page 9 E.3. Groundwater Fluctuations ' We made water level observations in the borings at the times and under the conditions stated on the boring logs. These data were interpreted in the text of this report. The period of ' observation was relatively short, and fluctuation in the groundwater level may occur due to rainfall, flooding, irrigation, spring thaw, drainage, and other seasonal and annual factors not ' evident at the time the observations were made. Design drawings and specifications and construction planning should recognize the possibility of fluctuations. E.4. Use of Report This report is for the exclusive use of the addressee and the copied parties to use to design the ' proposed structures and prepare construction documents. in the absence of our written approval, we make no representation and assume no responsibility to other parties regarding ' this report. The data, analyses and recommendations may not be appropriate for other structures or purposes. We recommend that parties contemplating other structures or purposes contact us. E.S. Level of Care ' Services performed by Braun Intertec Corporation personnel for this project have been conducted with that level of care and skill ordinarily exercised by members of the profession currently practicing in this azea under similar budget and time restraints. No warranty, ' expressed or implied, is made. Professional Certification: - I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of Minnesota. John T. Cazison, PE C Senior Engineer Registration Number: 20663 I ~ ~ 1 ~ ~~ _ J r 1J,~.~,, 1 ii h.a~ ~~~ j i 1 (~ ~ ~~ '~ ~, ~ ~~ ~ LK:.u.C~ s• /~ /~ 1 ~ r ~.:~~''' .,~ , 1 'L/ 1 • CEDAR GRR~K - _ ~c c~~T~R oAKs O<cnber ~, 79~Ju ~' ~ t~ Exyling Zoning. K1A ~~ ~~ Minimum lat Area15,000 Sq. Ft. lvtinimum lot Width -100.OU Ft. 1pldllogs~ 346 ~--~ CtEpAR CREFK-237 tas CENTER OAKS ~ '115 tots ,• ~~N/~` ~rf~ ~~~ 9'iU' A ~3 l~ C ! t `.~tl • __ - .. -1{~./- - -- .~ r!j '•r - ter' a ~ v - ~ ! ~ ~7--~ Irv X",,. r~ gqT ~~ ts. _.,~ ...._. .. ~:, ~f +,~~ ~~~rtY ~~~°?=*~ - ~~w ~ ,~• ~~-- ~+C?~~F^~• ~~G~~c~-. -"tif=f :~'•... '-_ f i~ jiffy ..f~~~ ~t~:~(l~~' •i f.S -g+ ~ '/ w 1 1 '~ _ ~~r .i !: ; .~.. i ~ r Q ry ' ~ r ~ ~ v rte' `~ ^ } ~. ~ ~ ~ 4• r ,, ~, ( ~ ~~1 4a ~1d1~ i ~ ~ I ~'}~ ~ ,i I ~~ h~ 30 4 ~ ~ j ~, ~,~ JL 4 1 V ,! ~' t ~ ~ ~ / ~ 1 t ~ ' ~~ ' , Ma ~ i I v ~ ~~~/Z ' c ~ 1:~9 ON~ j~/ ~,Z r ~ . / 1 ~--. ~~i O~N3>i ~tjLl : 6 9651; ' SZ ' 1~0 t . P t? ~~ scr~ptive Term~nol~y ' ' Designation D 2487-83 ' Standard Test Metfiod for CLASSIFICATION OF SOILS FOR ENGINEERING PURPOSES CRITERIA FOR ASSIGNING GR UP SYMB ND SOIL CLASSIFICATION • 045 A CG GRCN/P NAMES USING LABORATORY TESTS • GROUP SYMBOL GROUP NAME` '^ `o GRAVES CYAN GRAVELS C• ~ 4 and 1 < C, S 3 • GW Wiltgraded growl r b e ` Mae than 50% of f di Lass Than 5% floes • C < 4 and/a 1 > C > 3 • • < GP Poorly graded growl O o : Z ~ ~ coase ro on rofained on GRAVELS WITH FINES Fines Bassi as ML a MH GM Si tavI 4s ~ xo g No. 4 sieve Mao than 12'G fln.s• Fines dassify os CL «CH GC Clayey growl w w ~ o SANDS CLEAN SALVOS C > 6 and T < C < 3 • SW Wsllgradad sand' ~ s Z SO% w more ~ Less than 5°6 Fines s C < 6 and/a 1 > C > 3 • SP Poorly graded sand O ~ V i? '• bad1On Pm~s tJ 4 i SANOS WIT}i FINES Fines dassi(y as ML a MH SM Silty sand •ss o. s eve Mor• Ihan 12% floes' Fines dossify as Cl a CH SC Clayey sands"' • ` t"O a"'c PI > 7 and is on a above 'A' Tins r CL Lsar~ '~ - ~ ~ e SILTS AND CLAYS li id li it ~ PI <4 a plots balrnv'A' fln• r ~ ~.~ ,~ ,~ „ > w a. ~ qu m kss than 50•,6 organic L'quid limit • own dried < 0.75 OL Orgdnie d°Y ss"• Z e $ Uquid limit -not dried Organic srlf "-' °ar ~ ~ ` Z r^O OA C PI pbta on a above 'A' Rns CM Fd day w o Z SILTS AND CLAYS ~ 1 PI plots bebw'A' Gn• MH Elaswc :tTt s~'+` e liquid limit LL o '^ 50%or rtara organic liquid limit-own dried <0.75 ~ Organic day s~'•`+ Uquid limit -not dried Organic siR ~`+ Hi h is sale Primari o nie natter, dark in color, and nie odor PT Peat a. limed oa the mabral posing Ihs Sin (/5-mm(siaw. b. If field sample contdned cobbles and/a boulder, add'with cobbles and/a bevlden' b group name. c. Gta`•h wish 5 b 1296 fines r•quiro dual symbols. GWGM vrodgraded grovel with silt GWGC wegyraded gravel with day ~-CM P°OdY g^~"d growl with silt GPrC P°Orfys~gravel.Mth day d Sands with 5 b 12% fines requiro dual symbols.. SWSM weltgmdedsarulwithsil! SWSC wellgradad sand with day SPSM poorly grodad sand with silt SPSC poorly graded sand with day a C~-0„JO„ C ~? f. R soil oonbina L i5%Os'a°nd, add'with sand' b group name. g. # fines dmsi(y as CLJ~AL, me dual symbol GCGM, $CSM. b. If fines ors organic, add'with orgmric first b group name. v If sal ooatoias ~ 15% growl, add -with gmwr' b group name j. !F Altsrberg Rmib pbt in hotdted area, sal b a CLJ~AI, silly Boy. k. If wrl oontdm 15 b 29% plus No. 200, add'with sand' a•'wids growl' whhichever is predominant. 1. Y sal ooebins > 30% plus No. 200, prodominmstly sand, odd'sandt/ b group home. m. M sal ooebins L 30% plus Ne. 200, prdorninandy growl, add'gravN~' b group norn•. ^. N L 4 cad pots on a above'A' Rm. e. PI < 4 a pbt bebw'A' Rna. p. PI plots en w above 'A' Roe. q. PI phis bebw'A' Roe. bo K ~ W ~ yZ 1- 30 v N ,~ to 7 4 0 o to Is zo 3o ao 50 60 7o eo 90 loo no LIQUID LtlMIT (ttjj LABORATORY TESTS DD Dry Density, pct OC Organic Content, WD Wet Density, pct S Percent of Saturation, MC Natural Moisture Content, % SG Specific Gravity LL liquid Limit, % C Cohesion, psf PL Plastic Limi#, % 0 Angle of Internal Friction PI Plasticity index, % qu Unconfined Compressive Strength, psf P200 °o Passing 200 Sieve qp P«ket Penetrometer Srength, tsf ~`°Ir soar.. ,ar7s ~ Equation of •A'iine ~k, ~ Fiorizonbl at PI~4 b Ut25S, Vj J tMn %0.73 (t1-20) ^~/ ~ .P Equarion of •U• ins O Virticd at t1-16 b PI-7, ~ ~ `~` then PI-0.9 (LL$l ~ i / ~ i OQ- MH oR OH i~ Gv -- ML OR OL cL Mt. PARTICLE SIZE IDENTiFICA710N Boulders ............................ over 12" Cobbles ............................. 3" to 12" Gravel Coarse ........................... 3/4"~" Fine ............................... No. 4-x/4" Sand Coarse ........................... No. 4-No. 10 Medium .......................... No. 10--No. 40 Fine ............................... No. 40-No. 200 Silt .................................... No. 200-.005 mm Ckry .................................. less than .005 mm RELATNE DENSITY OF COHENSIONLESS SOILS - very loose ........................................... 0-4 BPF .; = loose ................................................ 5-10 BPF medium dense ................................. 1 1 ~0 BPF dense ............................................. 31-50 BPF very dense ..............................:............. 50+ BPF CONSISTENCY OF COHESIVE SOILS very soft ............................................: 0-1 8PF soft .................................................... 2--3 BPF rather soffi ........................................... 4-5 BPF medium .............................................. b-8 BPF rather stiff ......................................... 9-12 BPF stiff ................................................ 13-1 t5 BPF very stiff ......................................... 170 BPF hard .....................................................30+ BPF DRIWNG NOTES Standard penetration test borings were advanced by 3 1 /4" or 6 1 /4" ID hollowatem augers unless noted other- wise. Jetting water was used >n dean out auger prior to sampling only where indicated on logs. Standard penetration test borings are designated by the prefix "ST" (SplitTube). Power auger borings were advanced by 4" or 6' diameter, continuous-flits, solid stem augere.~ Soil dassificafion and strain depths are inferred from disturbed samples angered to the surface and are, therefore, somewhat approximate. Power auger borings are designated by the prefix "B". Hand probings were odvanced manually with a 1 1 /2' diameter probe and are limited io the depth from which the Probe can be manually withdrawn. Hand probings are tndtcated by the prefix 'H'. SAMPLING: All samples are taken wish the standard 2" O.D. split-tube sampler, excepfiwhere noted. TW indicates thin-wall (undisturbed) sample. BPF: Numbers indicate blows Qe wfoot recorded in standard penetration test also known as N value. The sampler is set 6' into und'utur~ed soil below the hollow-stem auger. Driving resistances are then counted for second and third 6" increments and added to get BPF. Where thex differ significantly, they are reported in the following form-2/ 12 for the second and third 6 increments, respectively. WH: WH indicates the sampler penetrated soil under weight of hammer and rods alone, driving not required. 1NR: WR indicates the sampler penetrated soil under weight of rods alone, hammer weight and driving not required. NOTE: All tests run in general accordance with applicable ASTM standards. ~~~ ~ SM I NTE RTEC I~ L(`~ OF BORING r PROJECT: BABX-96-816 BORING: ST-1 GEOTECHNICAL EVALUATION - Parkside 4th Addition and Adjacent LOCATION: Commercial Parcels See attached sketch. Albertville, Minnesota DRILLER: M. Rowland METHOD: 3 1/4" HSA DATE: 10/21/96 SCALE: 1" = 4' Elev. Depth ASTM 948.0 0.0 Symbol Description of Materials BPF Tests or Notes CL LEAN CLAY, black, wet. (Topsoil) NOTE: All ground surface 946.5 1.5 elevations shown on boring CL LEAN CLAY, with a trace of fibers, gray, wet, soft logs were estimated from to rather Soft. 2 contour lines on plans. (Alluvium) Elevations should be field verified. _ 4 MC = 35~ 941.0 7.0 CL SANDY LEAN CLAY, with a trace of Gravel, l0 rust-stained at 7 1/2 feet, gray, wet, medium to rather stiff. (Glacial Till) 7 10 7 7.5 20.5 10 END OF BORING. Water not observed with 19 feet of hollow-stem auger in the ground. Water not observed to cave-in depth of 16 feet immediately after withdrawal of auger. 1~ 1 Boring immediately backfilled. ' ~ BABX-96-816 Braun Intertec - 11/21/9b ST-1 page 1 of 1 '' L ~",:G OF BORING ~ PROJECT: BABX-96-816 BORING: $T-2 GEOTECffi~tICAL EVALUATION Parkside 4th Addition and Adjacent LOCATION: Commercial Parcels See attached sketch. Albertville, Minnesota DRILLER: M. Rowland METHOD: 3 I/4" HSA DATE: 10/21/96 SCALE: 1" = 4' Elev. Depth ASTM 950.0 0.0 Symbol Description of Materials BPF Tests or Notes CL LEAN CLAY, black, wet. 948.5 1.5 (Topsoil) CL LEAN CLAY with SAND, with a trace of Gravel, rust-stained, brown, wet, soft. _ 2 (Glacial Till) 946.0 4.0 CL SANDY LEAN CLAY, with a trace of Gravel, brownish- rust-stained ra to ra wet medium to 6 MC = 23 % g y g y, , , rather stiff. (Glacial Till) 10 941.0 9.0 CL SANDY LEAN CLAY, with a trace of Gravel, gray, wet, medium to rather stiff. 12 (Glacial Till) 8 10 6 9.5 20.5 END OF BORING. Water not observed with 19 feet of hollow-stem auger in the ground. Water not observed to cave-in depth of 14 1/2 feet immediately after withdrawal of auger. Boring immediately backfilled. BABX-Y6-tf16 Braun intertec - 11/21/Y6 J 1-L pil~'C 1 Vl 1 r L(~ OF BORING ' PROJECT: BABX-96-816 BORING: ST-3 GEOTECIINICAL EVALUATION - Parkside 4th Addition and Adjacent LOCATION: Commercial Parcels See attached sketch. Albertville, 1Vlinnesota DRILLER: M. Rowland METHOD: 3 i/4" HSA DATE: 10/21/96 SCALE: i" = 4' Elev. Depth ASTM 966.0 0.0 Symbol Description of Materials BPF Tests or Notes CL LEAN CLAY, black, wet. 965.0 1.0 (To soil) CL p SANDY LEAN CLAY, with a trace of Gravel, _ brown to brownish gray, moist to wet, medium to 11 stiff. (Glacial Till) i ~ ~; - 7 MC=17% 7 9 Rust-stained to 12 1/2 feet. With layers of Poorly 11 Graded Sand with Silt at 7 1/2 and 15 feet. 14 14 5.5 20.5 END OF BORING. Water not observed with 19 feet of hollow-stem auger in the ground. Water not observed to cave-in depth of 14 feet immediately after withdrawal of auger. Boring immediately backfilled. BABX-96-816 Braun Intertec - 11/21/96 ST-3 page 1 of 1 ' ~ L `~'`G OF BORING r PROJECT: BABX-96-816 BORING: ST-4 GEOTECIiNICAL EVALUATION Parkside 4th Addition and Adjacent LOCATION: Commercial Parcels See attached sketch. Albertville, Minnesota DRILLER: M. Rowland METHOD: 3 1/4" HSA DATE: 10/21/96 SCALE: 1" = 4' Elev. Depth ASTM 963.0 0.0 Symbol Description of Materials BPF Tests or Notes CL LEAN CLAY, dark brown, wet. 961.5 1.5 (Topsoil) CL SANDY LEAN CLAY, with a trace of Gravel, rust-stained, brown to brownish gray, moist to wet, _ 10 rather stiff to stiff. (Glacial Till) i 1 10 MC{=16% 12 10 13 12 15 2.5 20.5 END OF BORING. Water not observed with 19 feet of hollow-stem auger in the ground. Water not observed to cave-in depth of 15 feet immediately after withdrawal of auger. Boring immediately backfilled. BABx-96-x16 Braun Intertec - 11!21/96 ~i-a page i of L L'°~G OF BORING PROJECT: BABX-96-816 BORING: ST-5 GEOTECIINICAL EVALUATION Parkside 4th Addition and Adjacent LOCATION: Commercial Parcels See attached sketch. Albertville, 11Tnnesota DRILLER: M. Rowland METHOD: 3 i/4" HSA DATE: 10/21/96 SCALE: 1" = 4' Elev. Depth ASTM 964.0 0.0 Symbol Description of Materials BPF Tests or Notes SM : • ~ : SILTY SAND, fine-grained, dark brown, moist. 962.5 1.5 (Topsoil) CL SANDY LEAN CLAY, with a trace of Gravel, - rust-stained with layers of Silty Sand at 5 feet, 24 brown to grayish brown, moist to wet, medium to stiff. F r (Glacial Till) i0 _ MC=18% 14 14 14 7 10 3.5 20.5 END OF BORING. Water not observed with 19 feet of hollow-stem auger in the ground. Water not observed to cave-in depth of 15 feet immediately after withdrawal of auger. Boring immediately backfilled. r " BABX-96-816 Braun Intertec - 11/21/96 ST-5 page 1 of i L~`~'.G OF BORING ~ PROJECT: BABX-96-816 BORING: ST-$ GEOTECHNICAL EVALUATION Parkside 4th Addition and Adjacent LOCATION: Commercial Parcels See attached sketch. Albertville, 1VTinnesota DRILLER: M. Rowland METHOD: 3 I/4' HSA DATE: 10/21/96 SCALE: 1" = 4' Elev. Depth ASTM 966.0 0.0 Symbol Description of Materials BPF Tests or Notes SC ~ : ~ : CLAYEY SAND, fine-grained, black, wet. 965.0 1.0 (To soil) CL p LEAN CLAY with SAND, rust-stained, brown, wet, medium. 7 (Glacial Till) 7 MC = 20% ' 959.0 7.0 CL SANDY LEAN CLAY, with a trace of Gravel, 13 rust-stained, brown to grayish brown, wet, medium to stiff. (Glacial Till) 11 9 9 14 5.5 20.5 END OF BORING. Water not observed with 19 feet of hollow-stem auger in the ground. Water not observed to cave-in depth of 16 feet immediately after withdrawal of auger. Boring immediately backfilled. I' BABX-96-816 Braun Intertec - 11/21/96 ST-b page i of 1 Z1.+26/1996 13:17 320253457 INL~EFENL~ENT TESTING Pf~GE 02 ,~: ~,, ~(P ~ c~S ~ID~,~'~~I~~f~"~~~STt~IG 7EC~NULtl~1~S, 1N~. .(~. ~.o~C ~C25. 'IpYA1Tl~..pA~IK,, MN 5fi387 sli: (32'1,0 ~`~,`~-~.~~$~ ~i: (~;~'U!} 2"5~~4~47 /~FP4f~'1'" QF /~l~L D~~~4~' ~J12~7-,~ orb Date: November 15, 1996 Project': 96-202A Parkside 3rd Addition Albertville, Minnesota Meyer f~ohlin,. Inc. field Technician: MAL x'-_- _ Nuclear Method (ASTM D2922} Sand Cone Method (ASTM. 0.1556) ' , ~ Modified.Proctar (ASTM D1 a57) x Standard Proctor (AST'M Q&98) 1 t~# ' ~ pate ~ Spit ID # .GI~Ssific~tioa Qp#imum Maistare Mdz lab D Qensi !n place % Moisture . In Place Q l~~nsl . Percef~t tom ac~an Specified Cod ac#inn Result 11.1x,96 P-1 . CL 20.6 ]0Z_6 25.1 97.5 ~ ~95 ~95 ~ PA55 ~ . 11 ~ ~1 a~ ~6. P-1 ~ ~ ~ CL 20.6. 102.6 26.3 97,3 95 95 ~ PASS . 11- l q ~96 ' P-2 ~. CL-M L 20.0 1.06.2 23.9 .101.0 95 l f 2 ~ ~ 95 PASS . ~ i~ Benc~mari~:' t #~ - Test l.~catian ~;levatian L.ot ~ Bfock'7 South l"oQ.tin Line 7' West afi t#~e Southeast House Corner ~ Fvatin Grade Lot 3, Block 1 North E`ootin Line 15` fast of the Northwest House Corner . l~aot~in Carade Lat 3 . Blpc~k 7 East Faotin Line 5' North of the Southwest Gara e Corner Fp~l:in Grade ?il2a-~ Submitted By: ~aiy hero, Project Manager ~ - - ~r t ' 11`,'26A139E 13:17 32F71534547 INDEPENDENT TESTING Pfi~GE 03 t '. ~(V~~~~l~~~~ ~~IA11k~ut ~1....~i~~V~..V~7~1~~~~ ~Ili~• \ d'FPI.~f~T JIFF/fl.Q.~,~~...~~~.~~~~` Report Gate: ~ November 25, 196 Project: ~-202A Parkside 3rd Additiort Albertville, Minnesota ~liertt: ~,enca, Inc. ' cc: - _ Pield Technician: MAL x Nuclear Method (ASTM 02922) Sand Cone Method tP,STM x1556) Modified Proctor (ASTM 01557) x Standard Proctor (ASTM DB98) • Optimum Maz Lxb In Place in Place Percent ' 5{jecifietf 1'est# Dete Soi# 1D #~ Glassif'seafio~r IY#oisture D Densi % Moisture D gesls~ Cnm ac.ti.on ~ Cam action 5 Result ~ PASS 4~ 11.21.96 ~ P-1 CL ZQ.6 102.6 23.6 99.4 97 ~ ~ 9 ~ 5 :1~1-21-96 P-1 CL 20.6 102.6 20.1 100.6 9$ 95 ~ PASS 6 11.21-96 P-2 ~ CL 20.0 106.2 23.0 101.3 95 112 ~ 95 PASS 7 11-21.96 P•1 CL 20.6 102.6 22 ~ ; 97.8 951 /2 9~ ~ •PASS $ ~11-21-96 P-1 CL 20.6 102.6 2{l.^u 101.8 99 95 PASS 9 11-21-96 ~ P • 1 C~ 20.fi 102.6 23.4 100.4 9$ ~ 95 ~ PASS ' Ber7chrr~ark: ~~ Test #~ 4 Ldt i Black 7 Tes# i.oca#iae 2' South and 2' West of the Southwest foatin corner •E#eva#ian 955 l12 5 ~ Lot 1 Buck ?` 2' South and 2' West of the Southwest faatin~ carnet 954 . f . trot 3 Block 7 2' West of the Northwest Walkout footin corner 953 1 lnt ~ Slnck 7 86' North and 15` Esat of the Southwest lot corner ~ 958 $ Lot 5 flock 7 84' North and 15' sat of the Southwest Ivt Darner 956 ~ 12 9 Lo# 5 Bloc{C 7. $0` Narth and 15' 6sat of the Southwest lot corner 955 Submitted i?y: /d f' ~< f ~ ~ / z.r.162o~A-!~ ~Aalitcheil A. t.yt3rh, Crc~jert.,'~`anager . ~` n 0 i 1 Li u ri i1J2E,f1956 13:17 32E~25345a7 INDEPENDENT TES~~NG PAGE E~4 ~~ ~~ ~~ ~3~ 31S'>" AW1=NUB SC?UTH • PJ. BC~X 32~ w Wl~IT~~ l'A~CK, MN ~56~>~7' ~~ ~ Phbrle: (320) 25.3-433$ ~ F'ax: {3~fJ) 253-4547. November ? ~, 1996 NIr_ lean .lc:rtsert 1S.i;rrcu, lnc:. 1373.b NE ]ohnsc~ri Street Flarri Lake, MN 55344 1~1~: q~_2t)?A excavation ~bserw~atiorr and Cnnstrtrctiozt Material Testing Services Lot 3, ~1ock 7 l~arkside Ord Addition Albertville, Minnesota l,~zy~tr i~lr. Jensen: •~~s requested and authorized, Independent Testing Technalos~ies, lnc, recently cor}dtictcd an observation of the excavation for the above referenced project in Albertville, l~•linns~sota. In addition, compactis~n tests were; taken vn the tr11 placed arrd compacted within the building and oversized areas. The purpose of our observation was to assist in cvaluatiitg the suitability of the sails encountered in the battorrr of the excavation far support ufthe proposed faatiztg, fi11 and floor slab Ioads..The compaction tests were trtken to a;;sist ip evaluating the suitability of the till placed,artd compacted. Design Informatiazz The building being constructed is a multilevel with a walk out and attached garage. tt is cur understanding that the footings have been designed utilizing a mg.~ci:rrtum net soil bearing pressure of 1500 pounds per square foot {psf). FiQid Se.tl~ices C)ur initial observation was conducted on November 2d, 1'996. At that tune, hand auger borings and test pits were conducted adjacent to the walk out footings to depths ranging from 4 to ~~ feet. f-iand auger probes were conducted to assist in evaluating tkte soils encouzttered in the battoat of the excavation. 1/stirrtates of soil density were based.on tl~e resistance ofth~ hand auger probes. The soils were visually classified in acaordarlce with the Antez°ican Society t~f Testing. aztd Materials (A5T~1 D248~). by examining the hand r~ci~.tG.r l7ral.~e.cuttirtgs. r ~~I i\lr L.V/ 17JG 1J.1 f .:;~ti~:7,~~-+.~4r' lf'JUtYtr~J1!tPJI ~t:~~ 1Nla F'(~laE E~ "Chi hind auger proves encountered approximately ~ feet of clay fill (GL) above.nmtive, lean clays (C'L) ti~~hich were in a dense carsditian. Groundwater was not encountered. . ~Canapactior+ tests were ta>*en on the fill placed. These tests, which were sent. to you under . separate ~caver, indicate that-the fill was compacted to or in excess of ~~S°l~ of standard. tractor decisit;~. Surnntary ~asad on the results af' our excavation observation and density testing, it is our o.~ainittn . that the natura€ Solis in the bottom of the excavation are suitable far support of tl7.e . ar#ticipated~6ll, ~faatin~ arfd foundation loads. In addition, the fill is adequately compacted .. ~ . fQr ~uppart ~at`nc~ structure. ~roundw~rer was not absert~ed in.the excavated area, but in'order to reduce the risk of Mature tnaasture problems. we recommend waterproofing the below grade walls .arad t1Y~ installation of a perimeter drain file system, • I'v1r., Jensen, it has been a pleasure to be of service to you on this project.. €f you. have any cjuestions,~c~r iF.r~-e can be of further a$sistance, please fee! free to contact us." 5.iricet'~1y, irche!! ,~.. L;ynch. Frc~ject 1Vlana~er s ~:06'1~02A1tr INDEPENDENT TESTINb fE~HNOLOGIES, INC. ' PO BOX 325, WAITS PARK, MN 56387 PH: (320) 253-4338, FX: (320) 253-4547 REPORT OF F/ELD COMPACT/ON TESTS 1 Re ort Date: December 2 1996 - p Project. 96 202A Parkside 3rd Addition Albertville, Minnesota Client: Kenco, Inc. cc: Meyer Rohlin, Inc. Field Technician x Nuclear Method (ASTM D2922) Modified Proctor (ASTM D1557) x MAL Sand Cone Method (ASTM D1556) Standard Proctor (ASTM D698) Test # Date Soil 1D # Classification Optimum Moisture Maz Lab D Densi In Place % Moisture In Place D Densi Percent Com action Specified Com action Result 10 11-27-96 P-1 CL 20.6 102.6 23.0. 97.9 95 1 /2 95 PASS 11 11-27-96 P-2 CL 20.0 106.2 20.6 104.3 98 95 PASS 12 11-27-96 P-2 CL 20.0 106.2 22.3 103.0 97 95 PASS 13 11-27-96 P-2 CL 20.0 106.2 21.0 102.4 96 1 /2 95 PASS 14 11-27-96 P-2 CL 20.0 106.2 22.0 104.0 98 95 PASS 15 11-27-96 P-1 CL 20.6 102.6 21.1 99.5 97 1 /2 95 PASS Benchmark: Test # Test Location Elevation 10 Lot 3, Block 7 2' South & 1' West of the Southwest Footin Corner 956 11 Lot 3 Block 7 2' South & 1' West of the Southwest Footin Corner 954 1 /2 12 Lot 3 Block 7 2' South & 1' West of the Southwest Footin Corner 953 13 Lot 7, Block 7 80' North & 15' East of the Southwest Lot Corner 956 14 Lot 7 Block 7 80' North & 15' East of the Southwest Lot Corner 954 1 /2 15 Lot 7 Block 1 80' North & 15' East of the Southwest Lot Corner 958 a:d6202A-15 Submitted By: ~~~.i~ ~. chell A. Lynch, Project M ger IND P E ENDENT TESTING ~~E~HNOLOGIES, INC. PO BOX 325, WA1TE PARK, MN 56387 PH: (320) 253-4338, FX: (320) 253-4547 r ,~ . ~ ~~ .~ .~ REPORT OFf/ELD COMPACTION TESTS 1 Re ort Date: December 2 1996 Pro'ect: 96-202A p J Client: Kenco, Inc. cc: Meyer Rohlin, Inc. Parkside 3rd Addition Albertville, Minnesota Field Technician: MAL 'i. x Nuclear Method (ASTM D2922) ' Modified Proctor (ASTM D1557) x Sand Cone Method (ASTM D1556) Standard Proctor (ASTM D698) Test # Date Soil ID # Classification Optimum Moisture Max Lab D Densi In Place % Moisture In Place D Densi Percent Com action Specified Com action - Result 16 11-27-96 P-2 CL 20.0 106.2 22.6 101.3 95 1 /2 95 PASS 17 11-27-96 P-2 CL 20.0 106.2 20.9 103.6 97 1 /2 95 PASS 18 11-27-96 P-2 CL 20.0 106.2 19.4 104.8 98 1 /2 95 PASS Benchmark: Test # Test location Elevation 16 Lot 9 Block 7 80' North & 15' East of the Southwest Pro er Corner 957 17 Lot 9 Block 7 80' North & 15' East of the Southwest Pro er Corner 955 1 /2 18 Lot 9 Block 7 80' North & 15' East of the Southwest Pro er Corner 954 1 /2 a:d6202A-18 Submitted By: itchell A. Lynch, roj anager i~ II SM f NTE RTES Report of Field Compaction Tests ' Date: August 22, 1996 Client: Mr. Greg Brown ' Brown & Cris Inc. 19740 Kenrick Avenue • Results. Lakeville, MN 55044 X Nuclear Method Sand Cone Method ~ocations: Bench Mark: ASTM D 2922-81 X Standard Proctor ASTM D 698-91 ASTM D 1556-82 Modified Proctor ASTM D 1557-91 Tut Vo. Teu Location Elcwation 1 58th Street NE, Sta. 15+80, sanita sewer trench 943 2 58th Street NE, Sta. 16+45, sanitar sewer trench 943 3 Kalland Ave. North, Sta. 4+35, sanitar sewer trench 940 4 Kalland Ave. North, Sta. 3+75, sanitar sewer trench 939 A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. Remarks: ~: Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH i~ P Braun lntertec Corporation 1520 24th Avenue North P.O. Box 189 ~~ St. Cloud, Minnesota 56302-0189 b 12-253-9940 Fax: 253-3054 Engineers and Sdentists Serving the built and Naruroi Environments" Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN Tat Vo. Datc Soil I.D.9' Clauification OPtintwn Muitwre' Max. Lab .Dry Daui[y' (PCF) In Place % Moisture*' In Place Dry Dettsity"' (PCn Relative % curttQacriat Speciriai Mittimutn % canpaction anmetut 1 8-14-9b P-1 SC 15 114 19 111 97 95 A 2 8-14-96 P-1 SC 15 114 19 110 9b 95 A 3 8-14-96 P-2 SC 17 108 22 103 95 95 A 4 8-14-96 P-2 SC 17 108 26 100 93 95 B * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation ~L'~ J s G. Vos ngineering Assistant li i~ I NTE RTEC Report of Field Compaction Tests 'Date: August 22, 1996 Client: X Nuclear Method Sand Cone Method -7.ocations• no.,,.t, a,r.,rv. ASTM D 2922-81 X Standard Proctor ASTM D 691E-yl ASTM D 1556-82 Modified Proctor ASTM D 1557-91 Teu No. Test Location Elevatiai 5 58th Street NE, Sta. 15+95, sanitar sewer trench 94716 6 58th Street NE, Sta. 1b+85, sanitar sewer trench 952 7 58th Street NE, Sta. 17+00, sanita sewer trench 950 8 58th Street NE, Sta. 17+95, sanitar sewer trench 950 9 Kalland Avenue North, Sta. 2+30, sanita sewer trench 947 10 Kalland Avenue North, Sta. 3+15, sanitar sewer trench 949 11 Kalland Avenue North, Sta. 4+20, sanitar sewer trench 948 A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications Remarks; 'c: i~ i~ Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 engineers and Scientists Serving the 3viit and Natural Environments' Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN P Tcu No. Date Soil [.D.X Classification Optviuun Moisauc' Maz. Lab Dry Dcruity* (PCF~ In Place % Moiswre'* !n Place Dry Danity" (PCB Relative % Cooipacdon Specified Miiiiiinan % Compaction Cumtiiaus 5 8-15-96 P-2 SC 17 108 22 106 98 95 A 6 8-15-96 P-2 SC 17 108 23 103 95 95 A 7 8-15-96 P-2 SC 17 108 21 107 99 95 A 8 8-15-96 P-1 SC 15 114 20 112 98 95 A 9 8-15-96 P-2 SC 17 108 23 105 97 95 A 10 8-15-96 P-2 SC 17 108 21 106 98 95 A 11 8-15-96 P-2 SC 17 108 23 103 95 95 A Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH * =Optimum Moisture .and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation ~~ _ Ja ~ G. Vos gtneering Assistant ~~~~ ~;~ i NTE RTEC Report of Field Compaction Tests ' Date: August 22, 1996 ' Client: Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue ' Lakeville, MN 55044 R ults• Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Engineers end Scentisrs serving ;he 3uiit cnd fVeturc! Ewironments` Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN P es Tzst No. ale ~~ I.D.M lassification _ Uptiuwin Mouwrc' Max.~Lab Dry Dauity (PCF) In Place % Moisuuc" In Place Dry Dznsity" (PCF} Relative % Contpaciiiat Specific! Maiinrun % Compaction umnxYUs 12 8-15-9b P-2 SC 17 108 18 108 100 95 A 13 8-15-96 P-2 SC 17 108 21 106 98 95 A 14 8-15-96 P-2 SC 17 108 20 105 97 95 A 15 8-15-96 P-2 SC 17 108 20 108 i00 95 A lb 8-15-96 P-2 SC 17 108 20 106 98 95 A X Nuclear Method ASTM D 2922-81 Sand Cone Method ASTM D 1556-82 Locations: B h Ylark• X Standard Proctor AJ 1 M ll oya-y t Modified Proctor ASTM D 1557-91 enc ~ Test No. Tzst Location Fkwatian 12 58th Street NE, Sta. 17+20, sanita sewer trench 953 13 Kalland Avenue North, Sta. 4+20, sanita sewer trench 952 14 Kalland Avenue North, Sta. 3 +20, sanitar sewer trench 951 15 Kalland Avenue North, Sta. 2+20, sanita sewer trench 950 16 Kalland Avenue North, Sta. 1 +20, sanitar sewer trench 945 A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications Remarks: c: Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Roblin Attn: Mr. Pete Carlson SEH * = Upttmum Motsture ana MaX. Lao ury LCILSIIy LUUrIUGu to nearest 1/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Iniertec Corporation ~// ~.ti/ J G. Vos Engineering Assistant i~ ~~ 8 ~ ~ ~ ~ ::n I NTE RTEC Report of Field Compaction Tests ' Date: August 22, 1996 I' Client: i~ Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 engineers and Scienrisrs Servinc the Built cnd Narurcl Environmems Project : BAXX-9b-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN r' a C~ Lal W Test No. ate Soil I.D.// lassificatuxt Optitnwn Moisuue" Max. Lab Dry Density" (PCF) In Place ~ Moiswre" to Place Dry Dauiry"' IPCh~ Rclauve % Canpaction Specifuxl Mitwnwn `X Cotupaction atunctus 17 8-16-9b P-2 SC 17 108 20 106 98 95 A 18 8-16-96 P-2 SC 17 108 23 104 96 95 A 19 8-16-96 P-2 SC 17 108 22 105 97 95 A 20 8-16-96 P-2 SC 17 108 20 108 100 100 A 21 8-16-96 P-1 SC 15 li4 20 109 96 95 A 22 8-16-96 P-1 SC 15 114 19 110 97 95 A 23 8-16-9b P-1 SC 15 114 21 108 95 95 A X Nuclear Method Sand Cone Method Locations: 'Bench Mark• i~ n ASTM D 2922-li l x ~tariaara rroccor HJ 11V1 L 070-71 ASTM D 1556-82 Modified Proctor ASTM D 1557-91 rest No. Test Location Elevation 17 Kalland Avenue South, Sta. 2+00, sanita sewer trench 959 18 Kalland Avenue South, Sta. 1 +00, sanitar sewer trench 958 19 Kalland Avenue South, Sta. 0+04, sanita sewer trench 951 20 58th Street NE, Sta. 17+50, sanitar sewer trench 959 21 58th Street NE, Sta. 15+79, sanitar sewer trench 949 22 Kalland Avenue North, Sta. 1 +00, sanitar sewer trench 950 23 Kalland Avenue North, Sta. 1 +46, sanitar sewer trench 951 A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. ' Remarks: c: Attn: Mr. Don Jensen Kenco ' Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson ' SEH * = Upumum lvtolsture ana max. L.aD Lry t~cu~ity ,.,utt..~., to nearest 112. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation C/ ~" - Ja~tes G. Vos Engineering Assistant i~ II ~~ ~M 1 NTE RTEC ' ~eport of Field Compaction Tests Date: August 22, 1996 'Client: i Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 Braun Intertec Corporation 1520 24th Avenue Norfh P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Engineers and Scientists Serving the 3uilt and Natural Environments' Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavetnent Construction Albertville, MN r r i Kesults: Test No Dau ~~ l.D.d' Classification Optutwm Muiswrc' Max. Lab Dry Da>say' (PCF7 In Place % Moiswre" In Place Dry Deiuuy'• (PCF~ Relative % C~xnpaction Spuifsxt Mbwtwm % Compaction Contmcnts . 24 8-16-96 P-1 SC 15 114 21 108 95 95 A ~ 25 8-16-96 P-1 SC 15 114 18 108 95 95 A 26 8-16-96 P-2 SC 17 108 20 106 98 95 A 27 8-16-96 P-2 SC 17 108 22 104 96 95 A 28 8-16-96 P-2 SC 17 108 23 103 95 95 A 29 8-16-96 P-2 SC 17 108 19 105 97 95 A ~ 30 _ 8-16-96 P-2 SC 17 108 21 104 96 . c•m 95 ~ r >1 LAO n A 1 X Nuclear Method ' Sand Cone Method Locations: ~B hM k n n i~ ASTM D 29"l"L-tSt X JCdiluaru rlu~tu> ~-av=+T= ++ ~~~ -- ASTM D 1556-82 Modified Proctor ASTM D 1557-91 enc ar Ter< No. Tcu Location Fkvatwn 24 Kalland Avenue North, Sta. 2+50, sanita sewer trench 951 25 Kalland Avenue North, Sta. 3+50, sanita sewer trench 951'fz 26 57th Street NE, Sta. 21+50, sanitar sewer trench 9531k 27 Kalland Avenue South, Sta. 1+50, sanitar sewer trench 959 28 58th Street NE, Sta. 17+25, sanitar sewer trench 958 29 58th Street NE, Sta. 15+50, sanita sewer trench 956'fz 30 Kalland Avenue North, Sta. 2+00, sanitar sewer trench 953 T .L Tl-.. r1u ni fa. ~ nl~Pll ' A. Test Results Comply With Specitcations. B. Test Results Do Not Comply With Specifications. ' Remarks: c: Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson ' SEH ^' = V~llllltllil 1v1V Wlutc. cuau iTaan. a..... .~.) .~..-"'--~ -------- to nearest i/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation ~: /~- J es G. Vos ngineering Assistant i~ r - P ~~ ~~ ~ a" c~ o ~ ' u °' ~ ~ o® ~ ~~ .9 0., a~ oo 1, !., n ~ J. ~ o '`~ ~ y~ ~ -~ ~ ~ o ~ o c, ,v ~ o v o a p p -~ O p d O ___. .~ v 1, ~ U V v S~ l~ \) ~ ~' ~ S c ~ ~ S ~ ~ ~ 1~ ~ , ~, ~' ~ 3 ~ 3 ~ ~ 3 v 4 a ~ ~ ~' ~ ~i ~~ ~ i =- M ~ ~ i _ ~.. a a 0~- r r ~ ~ ~ y~ r ~ ~ ~ ~ ~ ~ •a ~ ~ ~ ~ `~ ~ ~. o ~ .. Q vim. ~ ~ ~~ ~ +~_ ~~ ~ o ~ ~ ~ ~ ~ O' o ~ ^7 ~ ~ ~ ~ ~ ~ tom, x ~ x ~ O ~ ~ i ~. .~ ~ ~. ~ ~ ~ ~ ~ ~ ~ ~ - t~ 1 ~ ~~ ~ I~ ~ ~ V ~ ~ I ~ , f Q ~ T ;` ~ `~ ~ ~ ' ~ r z . rb t`I ~'y, t'~ ry ~'a ~ c~ t``) M M M ~'~ M M M M r'J ~ ,.___~ - --- - -- --- --- - - .b u ~a a~ s ~ ~ ~ ~~ ~ ~ ~ ~. ~ ~ ~ ~ ~~ l ~. ~i ~ ~' ~ ~ ~ ~ ~ ~~ v ~,.~ S ~ ~ S~ r~ d L a ti~ a ~ 3 e s ~ ~ G ~ ., ~ ~ a ~°`~ ~ 1 ~ ~ a ~ ~ i J L ; ~ cs ~ ~ ~ a \\~ c-, i ~ I ~ ~ ~ L ~ ~ ~ ~. r ~ -~ ~ ~~ ~ ~ ~a ~ `~ O O M - 0 ~ ~ 0 ~ ~ r~ ~ `~ s ~ p ~ o o ~ Q o ~ ~ n n n ~~ O ~ ~ 1- ~'6 ~`'1 `'6 t` S ~ ~~ ~ ~ ~ o , o ~ ~ o 1 M ~, o `, 1~ ~. ~ i L ~~ ~- ~ j ,~ J 5~ I ` -_ ` ~ ~ ti i ~ ~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ s r tr ~ -~ tr ~... ~ ~ ~ ~ ~ ~ I ~' ~ ,,~ ,,+, .~ ~ -7 `~ ' (moo --~(~ t~„/1 n U `V ~ 1 , T ~ ~ ~ ~ _~ P i~ n BRauNSM I NTE RTEC Report of Field Compaction Tests ' Date: August 29, 1996 Client: I' Results: i~ Nuclear Method Sand Cone Method Locations: Bench Mark: ASTM D 2922-81 X Standard Proctor ASTM D 698-91 ASTM D 1556-82 Modified Proctor ASTM D 1557-91 Tcst No. Test Location Elevation 47 57th St. NE, Sta. 25+00, watermain trench 959'h 48 57th St. NE, Sta. 23+30, watermain trench 960 49 57th St. NE, Sta. 21 +40, watermain trench 958'6 50 57th St. NE, Sta. 20+00, watermain trench 956 51 58th St. NE, Sta. 16+75, watermain trench 956 52 58th St. NE, Sta. 17+75, watermain trench 958'6 53 Kalland Ave. S, Sta. 0+75, watermain trench 960 A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications Remarks; ~c: i~ i~ Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 Project Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Engineers and Scientists Serving the Built and Noturoi Environments' BAXX-9b-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN r i Tcst No. Date Soil I.D.p Classification Optimum Moisture' Maz. Lab Dry Dutsity' (PCH~ In Placc % Moisture" In Place llry Density" (PCF7 [tetativc % Compaction Spuificd Minimwn % Compaction Camnetus 47 8-21-96 P-3 CL 15'h 112'6 21 108 96 95 A 48 8-21-96 P-2 SC 17 108 19 107 99 95 A 49 8-21-96 P-2 SC 17 108 21 106 98 95 A 50 8-21-96 P-2 SC 17 108 20 104 96 95 A 51 8-21-96 P-3 CL 15'h 112'h 21 108 96 95 A 52 8-21-96 P-3 CL 15'h 112'6 20 108 96 95 A 53 8-21-96 P-2 SC 17 108 17 108 i00 95 A Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation Ja s G. Vos E gineering Assistant ~ ~: ~~-~, I NTE RTEC Report of Field Compaction Tests ' Date: August 27, 1996 Client: Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue ' Results. Lakeville, MN 55044 Braun Intertet Corporation 1520 24th Avenue North. P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 ngineers and Scientists Serving the Built and ~'~latural Environments' Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN t r ., Test No. Dale Soil LD.,Y Classification Opfintutn Moisture' Max. Lab Dry Deiuity' (PCh~ - In Place % Maiswrn" In Mace Dry Dassuy'• (1'CF~ RCIanVC % Can ctian pa Spxifiai Mi[wnwn % C omQectiwt wnuuus S4 8-21-96 P-2 SC 17 108 19 103 9S 9S A SS 8-21-96 P-3 CL 1S'fi 1121fz 19 108 96 95 A S6 8-21-96 P-3 CL 151fz 1121fz 19 107 9S 9S A X Nuclear Method ASTM D 2922-81 X Standard Proctor ASTM D 698-91 Sand Cone Method ASTM D 1556-82 Modified Proctor ASTM D 1557-91 -L,ocations• Bench Mark: Test No. Test Loeatiun Elevation 54 Kalland Ave. So., Sta. 1+75, watermain trench 958'6 SS Kalland Ave. So., Sta. 2+75, watermain trench 958 S6 Kalland Ave. So., Sta. 3+75, watermain trench 9S8'fz A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. Remarks: ~: Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz ' Meyer-Rohlin Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation ~~ ~~ ~~ Ja G. Vos En tneering Assistant i~ BRAUN~M 1 NTE RTEC Report o[ Field Compaction Tests Date: August 27, 1996 Client: Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue ' Lakeville, MN 55044 Results. Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Cngineers and Scientists Serving the Built cnd Natural Environments Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN r Test No. Date SoH I.D.q Classification Optiniwn Moiswre' Mex. Lab Dry Density" (PCE1 Itt Place % Moisture" Lt Placx Dry Density"• (YCF) Relative % Canpaction Specified Miniiswnt % Compaction Cawnenu 57 8-22-96 P-3 CL 15'fz 112'6 21 107 95 95 A 58 8-22-96 P-3 CL 15'fi 112'6 20 110 98 95 A 59 8-22-96 P-2 SC 17 108 24 103 95 95 A 60 8-22-96 P-3 CL 15'fz 112'6 20 110 98 95 A 61 8-22-96 P-2 SC 17 108 22 103 95 95 A 62 8-22-96 P-3 CL 15'fi 112'fz 18 110 98 95 A X Nuclear Method ASTM D 2922-81 ' Sand Cone Method ASTM D 1556-82 Locations: Bench Mark: X Standard Proctor ASTM D 698-91 Modified Proctor ASTM D 1557-91 Test No. Tcu Location Elevatiai 57 Kalland Ave. N., Sta. 0+50, watermain trench 956 58 Kalland Ave. N., Sta. 1+20, watermain trench 953 59 Kalland Ave. S., Sta. 5+07, service trench 960'6 60 Kalland Ave. N., Sta. 1+50, watermain trench 954'6 61 Kalland Ave. N., Sta. 2+50, watermain trench 950 62 Kalland Ave. S., Sta. 3+73, service trench 958'f~ A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications Remarks: ' c: Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Roblin Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun lntertec Corporation // ~- Ja}}nne G. Vos Et,gtneering Assistant i~ n B ~ ~ ~ ~ C M 1 NTE RTEC Report of Field Compaction Tests Date: August 27, 1996 Client: f ~ Results: X Nuclear Method Sand Cone Method Zocations: Bench Mark: ASTM D 2922-81 X Standard Proctor ASTM D 698-91 ASTM D 1556-82 Modified Proctor ASTM D 1557-91 Tes[ No. Test Laeation Elevation 63 Kalland Ave. N., Sta. 2+23, service trench left 951'fz 64 Kalland Ave. N., Sta. 1+33, service trench ri ht 954'f~ 65 58th St. NE, Sta. 17+60, storm drain trench 958 A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. Remarks. ~~ II ~~ Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 Braun fntertec Corporation 520 2dth Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 _ngineers cnc ~cienrisis ~ervinq the 9uiit enc Narural Environments' Project : BAXX-96-b39 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN P Test No. Date Soil I.D.p Classification Optittwtn Moisaue* Max. Lab Dry Density' (PCF) In Pface % Moiswre•` In Ytacc Dry llensay" {PCF) Relative % Canpu:tion Specifial Mitsutaun Canpactioo Conuncw 63 8-23-96 P-3 CL 15'fi 112'6 16 111 99 95 A 64 8-23-96 P-2 SC 17 108 22 105 97 95 A 65 8-23-9b P-2 SC 17 108 21 106 98 95 A Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: IVir. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to neazest 1/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation i ~ ~ ~,.~.,~ ~ ~ ~--" .. ~ ii es G. Vos ngineering Assistant I~ D BRAUNSM l NTE RTEC Report of Field Compaction Tests Date: August 27, 1996 Client: Results: II II II X Nuclear Method Sand Cone Method Locations: Bench Mark: ASTM D 2922-81 X Standard Proctor ASTM D 698-91 ASTM D 1556-82 Modified Proctor ASTM D 1557-91 Tcst Na. Test Location Ekvatitw 66 57th Street NE, Sta. 17+90, watermain trench 959'6 A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. Remarks: c: Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH n Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Engineers cnc ScieNists Serving the Built ono Nerura! Environments' Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN ;, P Test No, Date Soil LD.~ Classification Optutum Moisaue• Max. Lab Dry Detuity (PC>7 In Place % Moiswre'• In Place Dry Density's (PCF~ Rclativc % Can ction pa Specified Mittittautt % Cotnpactiat ununents b6 8-26-96 P-2 SC 17 108 20 107 99 95 A * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation `~ ~_ es G. Vos ngineering Assistant ~~ B RAU 1~ISM ! NTE RTEC Report of Field Compaction Tests ' Date: August 29, 1996 Client: ,Results: Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 engineers and Scientists Serving the Built and Natural Environments" Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN r 'rest No. Date Soil -.D.X Classification Optinuun Moiswro' Max. Lab Dry Densiry' {PCh~ In Place % Moisture" In Place Dry Dcncity" (PCh~ Relative % Canpaction Specified Mininwtn % Campactiat omntetus 67 8-27-96 P-1 SC 15 114 17 113 99 95 A 68 8-27-96 P-1 SC 15 114 18 113 99 95 A 69 8-27-96 P-1 SC 15 114 15 114 100 95 A 70 8-27-96 P-2 SC 17 108 19 106 98 95 A 71 8-27-96 P-3 CL 15'fi 112-fi 18 108 96 95 A X Nuclear Method Sand Cone Method ~.ocations: Bench Mark_ A5TM D 2922-81 X Standard Proctor ASTM D 698-91 ASTM D 1556-82 Modified Proctor ASTM D 1557-91 Test No. Test Location Elevation 67 57th St. NE, Sta. 15+00, sanitar sewer trench 942 68 57th St. NE, Sta. 14+00, sanita sewer trench 942 69 57th St. NE, Sta. 15+00, sanita sewer trench 947 70 57th St. NE, Sta. 16+00, sanita sewer trench 955 71 58th St. NE, Sta. 13 +42, service trench 954 A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications Remarks: ~t Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place % Moisture and In Piace Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation ~4/ J s G. Vos gineering Assistant ~ B Rau N=° INTERTEC Report of Field Compaction Tests ' Date: August 29, 1996 Client: Mr. Greg Brown ' Brown & Cris Inc. 19740 Kenrick Avenue ' Results. Lakeville, MN 55044 Braun Intertec Corporation 520 24th Avenue North P.O. Box 189 St. Good, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 cc"ngineers and Suentists Serving the Built and Natural Environments"' Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN Tca No. Date Soil LD.At Classification Optitmun Moisaue• Max. Lab Dry Density* (PCF~ In Place % Moisauc*• In Place Dry Densuy*' (PCF) Relative % Compaction Specifwci Mutanwu % Compaction Cotnntews 72 8-28-96 P-3 CL 15'fz 112'6 20 107 95 95 A 73 8-28-96 P-1 SC 15 114 18 109 95 95 A 74 8-28-96 P-1 SC 15 114 19 111 97 95 A 75 8-28-9b P-3 CL 1516 112'6 20 109 97 95 A 76 8-28-96 P-3 CL 15'fz 112'6 20 107 95 95 A X Nuclear Method ASTM D 2922-81 X Standard Proctor ASTM D 698-91 Sand Cone Method ASTM D 1556-82 Modified Proctor ASTM D 1557-91 -Locations: Bench Mark Tea No. Tea Location Elevation 72 57th St. NE, Sta. 13+74, sanita sewer trench 946 73 57th St. NE, Sta. 13 +00, sanita sewer trench 944 74 Kalcnda Drive, Sta. 0+50, sanita sewer trench 942 75 58th St. NE, Sta. 13+00, sanitar sewer trench 948 76 58th St. NE, Sta. 11+95, sanitar sewer trench 947 A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications Remarks: ,c: Attn: Mr. Don Jensen Kenco ' Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH u * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place % Moisture and In Piace Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation ,~ s G. Vos gineering Assistant i~ ~~ BRAUNS~~ I NTE RTEC Report of Field Compaction Tests ,Date: September 3, 1996 ,Client: 'D~ ,Jr~ X Nuclear Method Sand Cone Method ~.oc:ations• ASTM D 2922-81 X Standard Proctor AJ"1'M ll 6y2S-yl ASTM D 1556-82 Modified Proctor ASTM D 1557-91 Test Nu. Test location Elevation 77 57th Street NE, Sta. 13+00, sanitar sewer trench 950 78 57th Street NE, Sta. 12+00, sanitar sewer trench 948 79 57th Street NE, Sta. 1 i +00, sanitar sewer trench 947 80 57th Street NE, Sta. 27+00, 15' Lt. of centerline (sub rode 960'h 81 57th Street NE, Sta. 25+50 13' Rt. of centerline sub rode 962 82 57th Street NE, Sta. 23+90, 17' Lt. of centerline (sub rode) 964 83 57th Street NE, Sta. 21 +25, 2' Rt. of centerline (sub rode) 962 A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. Remarks. ~~ n Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 Braun tntertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 ngineers enc Sdenrisrs Serving the Buiit cna Ncturoi nvironments° Project : BAXX-96-b39 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN Teat No. Date Soil i.D.N Ckuaifcatioa Optimum Mowwre• Max. Lib Dry Demity (PCF) In Place ',G Moia[uro'• In-;Phce Dry Deoaity'• (PCB Relative 9f Cumpactim Specified Minimum K Compaction Commenu 77 8/29/96 P-1 SC 15 114 18 115 101 95 A 78 8!29/96 P-2 SC 17 108 20 104 96 95 A 79 8/29/96 P-2 SC 17 108 17 108 100 95 A 80 8/29!96 P-2 SC 17 108 13 108 100 100 A 81 8/29/96 P-3 CL 15'h 112'/z 15 113 100 100 A 82 8/29/96 P-2 SC 17 108 13 105 97 100 B 83 8/29/96 P-3 CL 15'h 112'h 16 114 101 100 A Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Roblin Attn: Iv1r. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place 4'o Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation 1/ ~~". J es G. Vos ngineering Assistant i~ i~ B ~ ~ ~ ~ .M i NTE RTEC Report of Field Compaction Tests ,Date: September 3, 1996 Client: Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 esults• X Nuclear Method ' Sand Cone Method Loc:attons: n~.,,.1, >,,r~~>r• ASTM D 2922-81 X Standard Proctor AJ'1~M ll 6y2S-y 1 ASTM D 1556-82 Modified Proctor ASTM D 1557-91 Tut Nu. Tout [.ucalioa Elevation 84 57th Street NE, Sta. 24+00 17' Lt. of centerline (sub fade 964 85 58th Street NE, Sta. 11 +00 sanitar sewer trench 954 86 58th Street NE, Sta. 10+00, sanir_ar sewer trench 952 87 58th Street NE, Sta. 9+00, sanitar sewer trench 950 88 Kalland Avenue South, Sta. 4+00 9' Lt. of centerline sub fade 963 89 Kalland Avenue South, Sta. 2+00, 6' Rt. of centerline sub fade) 962 ~ A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. Remarks: !c: II Braun Intertec Corporation 1520 24th Avenue NorTh P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Engineers and Scientists Serving the Built and Natural Environments" Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN P - Taut No. date Soil I.D.N C}asuification Optimum Moiuture' \kax. Lab Dry Deouity• (PCB Ia Phce % Muuture•• In PFaca Dry Deasiry•" (PCF) Relative % Compaction Specified Minimum % Compactiaa Cummenta 84 8/29196 P-2 SC 17 108 16 108 100 100 A 85 8/29/96 P-2 SC 17 108 19 103 95 95 A 86 8/29/96 P-2 SC 17 108 18 109 101 95 A 87 8/29/96 P-2 SC 17 108 18 106 98 95 A 88 8/29/96 P-2 SC 17 108 16 109 101 100 A 89 8/29/96 P-2 SC 17 108 16 109 101 100 A Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest i/2. ** = In Place ~O Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation ~~~/~ mes G. Vos Engineering Assistant II ~~~ ~' I NTE RTEC Report of Field Compaction Tests Date: September 5, 1996 Client: Mr. Greg Brown ' Brown & Cris Inc. 19740 Kenrick Avenue . Lakeville, MN 55044 Results. i Braun lntertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Engineers and Scientists Serving ,•he Built and Natural Environments' Project BAXX-96-b39 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN P Tut No. Nate Soil I.D.N C}assifiwtion Optimum Moieturc• Muz. [rb Ory Orauity (PCF~ In Ptace % Moinwre•• In Puce Ory Demity•• (PCF~ Rel-aliva % Compaction Specifud Minimum % Compaction Commenu 90 9/3/96 P-2 SC 17 108 23 102 95 95 A 91 9/3196 P-2 SC 17 108 21 102 95 95 A 92 9/3/96 P-2 SC 17 108 20 100 93 95 B 92A 9/3/96 P-2 SC 17 108 20 104 96 95 A 93 9/3/96 P-3 CL 15'h 112'h 8 ll6 103 100 A 94 9/3/96 P-3 CL 15'h 112'h 12 116 103 100 A 95 9/3/96 P-2 SC 17 108 11 108 100 100 A ~ X Nuclear Method ASTM D 2922-81 ' Sand Cone Method ASTM D 1556-82 L~c:ations: Bench Mark: X Standard Proctor ASTM D 698-91 Moditied Proctor ASTM D 1557-91 'feat No. "rest l.u~ation Elev+aun 90 57th Street NE, Sta. 7+40, sanitar sewer trench 951 91 58th Street NE, Sta. 6+50, sanitar sewer trench 951'/z 92 58th Street NE, Sta. 5+50, sanitar sewer tench 947 92A Retest of #92 947 93 Kalland Avenue South, Sta 3+00, on centerline (sub cads 962jh 94 Kalland Avenue South, Sta 1+00 on centerline (sub rade) 96Th 95 Kalland Avenue North, Sta, 4+00, on centerline (sub rade) 954'6 R. Test Results Comply With Specifications. B. Test Results Do Not Compty With Specifications. Remarks : ,c: Attn: Mr. Don Jensen Kenco Attn: Mr. Run Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest I/2. ** = In Place Y Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun [ntertec Corporation L/ l/ J• es G. Vos Engineering Assistant u u ..~-~- BRA~JNS.., J NTE RTEC Report of Field Compaction Tests ,Date: September 4, 1996 Client: Mr. Greg Brown ' Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 'Results: Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Engineers end Scientists Serving the Built and Nerural Environments` Projeca : BAXX-9b-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN r Teat No. Date Soil I.D.,t C}aaaification Optimum Moiswre~ Max. t:~ Dry Dcaaity' (PCF) la Place Y6 Moiswre" m Pace llry Deoaity"" (PCf•~ Relative 9i Cumpai~tiaa spcciried Minimwn `K Compaction Comments 96 9/3/96 P-2 SC 17 10$ 13 111 103 100 A 97 9/3/96 P-2 SC 17 108 12 108 .100 100 A 98 9/3/96 P-2 SC 17 108 13 109 101 100 A 99 9/3/96 P-3 CL 16'/z 112'/z 9 114 101 100 A 100 9/3/96 P-3 CL 16'f~ 112'/z 12 115 102 100 A 101 9/3/96 P-3 CL 16'fi 112'fz 9 116 103 100 A 102 9/3/96 P-3 CL 161h Il2lfi 7 116 103 100 A ~?C Nuclear Method ASTM D 2922-81 X Standard Proctor ASTM D 698-91 Sand Cone Method ASTM D 1666-82 Modified Proctor ASTM D 1557-91 oc;atiuns: 13ench Mark: Tut Nu. Teat L.ucttiua r'.ICYdI1U0 96 Kalland Avenue North, Sta. 3+00, 12'Rt. of centerline (sub rade) 954 97 Kalland Avenue North, Sta. 2+00, 10' Lt. of centerline (sub rade 956 98 Kalland Avenue North, Sta. 1 +00 on centerline sub rade 968'/z 99 67th Street NE Sta. 20+00 15' Rt. of centerline (sub rade) 961'/ 100 57th Street NE Sta. 19+00, 10' Lt. of centerline sub rade 962 101 57th Street NE Sta. 18+00 on centerline sub rade 962'f~ 102 57th Street NE, Sta. 17+00, 10' Rt. of centerline (sub rade) 962 ~t. Test Results Comply With Specifications. B. Tesi Results Do Not Comply With Specifications Remarks. 0 Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place Y Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Curpuration _ ~ //: J• s G. Vos ngineering Assistant i~ II s Rau N5M I NTE RTEC Report of Field Compaction Tests ,Date: September 4, 1996 Client: Mr. Greg Brown ' Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 Results: X Nuclear Method Sand Cone Method ~I..OC:1t1UnS: Bench Mark: ASTM D 2922-81 X Standard Proctor ASTM D 698-91 ASTM D 1556-82 Modified Proctor ASTM D 1557-91 Test No. Test Location U' oration 103 58th Street NE Sta. 5+45 sanitar sewer trench 954 104 58th Street NE Sta. 4+50 sanitar sewer trench 952 105 58th Street NE, Sta. 3+50 sanitar sewer trench 950 106 57th Street NE, Sta. 7+00, sanitar sewer trench 952 107 57th Street NE, Sta. 5+95, sanitar sewer trench 949 ~A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. Remarks: ~: Attn: Ivir. Don Jensen i~ n Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 engineers and Scientists Serving the Built and Natural Environments` Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN i r Test No. Date So;! l.D.C CFaasifiption Optimum Mowwre• Ahax. [.+6 Dry Deosiry• (PCF) la Pace % Moiswre•• In Place Dry Deaaity (PCFJ Rehtive % Compaction Specified Minimum % Compactiw Commea4 103 9/3196 P-2 SC 17 108 19 105 97 95 A 104 9/3!96 P-2 SC 17 108 19 103 95 95 A 105 9/3/96 P-2 SC 17 108 23 105 97 95 A 106 9!3/96 P-2 SC 17 108 23 103 95 95 A 107 9/3/96 P-2 SC 17 .108 19 105 97 95 A Kenco ~ Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest I/2. ** = In Place ~O Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun lntertec Corporation ~~~ es G. Vos ngineering Assistant B RAi~ N~. I NTE RTEC Report of Field Compaction Tests Date: September 5, 1996 Client: Mr. Chris Decathelineau 1 Latour Construction 2134 County Road 8 NW ' Maple Lake, MN 55358 Results: ~ Project Project Description: Pine Meadows III Buffalo, MN Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940- Fax: 253-3054 fnaineers and Scientists Serving the Built and Natural Environments" BDXX-96-187D F Text No. Date Soii I.D.M . C}axxiricatiua Gplimum Moixture• Max. Lrb Dry llcatiry• (PCF~ to YFace % Moixturo•• Ia Ylaee Dry Density"• (PChI Relative % Compaction SpeciFied Minimum % Compa~tiw ummcnu 105 9/4/96 P-8 CL-5 10 130'/2 7 133 102 100 A 106 9/4!96 P-8 CL-5 10 130'h 7 132 101 100 A 107 9/4/96 P-8 CL-5 10 130'h 9 133 102 100 A 108 9/4196 P-8 CL-5 10 130'h 7 130 100 100 A 104A 9/4196 P-8 CL-5 10 ~ 130'h 8 131 100 100 A X Nuclear Method ASTM D 2922-81 X Standard Proctor ASTM D 698-91 Sand Cone Method ASTM D 1556-82 Modified Proctor ASTM D 1557-91 Locations: Bench Mark: Ton of Class 5 = 1~~ ' Tut No. Tut L.ocatiun Elevatiua ' 105 106 5th Street NE, Sta. 6+00, on centerline 5th Street NE, Sta. 9+00, on centerline 99'h 99'h 107 lbth Street NE, Sta. 12+00, on centerline 99~h 108 4th Street NE, Sta. 3+50, on centerline 99'h 104A Retest of #104 gg.h A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. Remarks: c: Mr. Ron Geurts Meyer-Roblin, Inc. * =Optimum Moisture and Max. Lab Dry Density rounded to nearest t/2. ** = In Place 4o Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec: Curporuiiun treba aboratory Manager II II ~~ ~ SM 1 NTE RTEC Braun Interlec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Engineers and Scientists Serving the Built cnd Natural Environments' 1 Report of Field Compaction Tests 'Date: September 6, 1996 Client: II..... X Nuclear Method Sand Cone Method ![.ovations: AS"I'M ll "ly"?"L-tS l x ~>:anuaru rrucwr r» t tv. L ~»-~ j ASTM D 1556-82 Moditied Proctor ASTM D 1557-91 ncllLU that Text No. t.. Text l.oeauua Fle.etion 108 58th Street NE, Sta. 14+00, watermain trench 954 109 58th Street NE Sta. 13+00 watermain trench 953'h 110 57th Street NE, Sta. 15+00 watermain trench 956 111 58th Street NE Sta. 16+75 on centerline (sub rade 960 112 58th Street NE, Sta. 15+85 12' Lt. of centerline sub rade 959'h 113 58th Street NE, Sta. 15+00 10' Rt. of centerline sub rade 959 114 58th Street NE, Sta. 14+00, watermain trench 956 A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. Remarks: ~~ D Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 Project : BAXX-96-b39 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN Resutts: Tut Nu. ate Soil I.D.X l.usirication Optimum Moisturo• Max. lab Dry Deosity• (PCF~ to PNace R Moixtute••` in PFace Dry Density•• (i'CF) Relative 9G Compaction Speciried Minimum !6 Compaction omments 108 9/4/96 P-3 CL 15'h 112'h 18 110 98 95 A 109 9/4/96 P-3 CL 15'h 112'h 17 109 97 95 A 110 9/4196 P-3 CL 15'h 112'h 18 109 97 95 A 111 9/4/96 P-3 CL 15'h 1 i2'h 18 112 100 100 A 112 9/4/96 P-3 CL 15'h 112'h 15 113 100 100 A 113 9/4/96 P-2 SC 17 108 12 109 101 100 A 114 9/4196 P-3 CL 15'h 112'h 18 110 98 95 A Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH * _ Optimum Moisture aua Max. i_.ao ury >Jensuy It,tlttlti;.tt to nearest 112. ** = In Place Y Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation ~/~ ~' ~~1 ~ ~ . J• es G. Vos ngineering Assistant f! • :M ~~~ i NTE RTEC Report of Fietd Compaction Tests ' Date: September 5, 1996 Client: Mr. Greg Brown ' Brown & Cris Inc. 19740 Kenrick Avenue ' Results: Lakeville, MN 55044 Braun lntertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 512-253-9940 Fax: 253-3054 naineers and Scienlisrs Serving she Builf and Natural Fnvironmenls°' Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN Teat No. Datc Soil I.D.N C}asaificatim Oytimum Mouwro' Max. tab Dry Deoairy~ (PCF~ In Ylace % Mouwre"' In Y}ace Dry Deo+ity" (PCB Re4tive % Comlwc4ioa Syecilird Miulmum % ComRactim Commw4 115 9/4/96 P-2 SC 17 108 19 106 99 95 A 116 9/4/96 P-4 CL-5 7 136 5 139 102 100 A 117 9/4!96 P-4 CL-5 7 13b 4 141 104 100 A 118 9/4/96 P-4 CL-5 7 136 5 138 102 100 A 119 9/4/96 P-4 CL-5 7 136 5 139 102 100 A 120 9/4/96 P-4 CL-S 7 136 5 139 102 t00 A 121 9/4/96 P-4 CL-S 7 136 5 138 102 100 A X Nuclear Method ASTM D 2922-81 X Standard Proctor ASTM D 698-91 ' Sand Cone Method ASTM D 1556-82 Modified Proctor ASTM D 1557-91 Locations: Bench Mark: Teat No. - Teat l.ucatioo Bkvatiiw 115 58th Street NE, Sta. 11 +50, watermain trench 954 116 57th Street NE, Sta. 27+50, 15' Lt. of centerline 962 117 57th Street NE, Sta. 26+50, on centerline 963 118 57th Street NE, Sta. 25+50, IO' Rt. of centeriine 963'.4 119 57th Street NE, Sta. 24+SO 10' Lt. of centerline 965 120 57th Street NE; Sta. 23+50, on centerline 965'/z 121 57th Street NE, Sta. 22+50, 15' Rt. of centerline 965 A. Test Results Comply With Specifications. ' B. Test Results Do Not Comply With Specifications 'Remarks : c: Attn: Mr. Don Jensen Kenco ' Attn: Mr. Ron Guertz Meyer-Rohl in Attn: Mr. Pete Carlson t SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place % Moisture and in Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertt~c Corporation ~~` ~z----- J~ s G. Vos gineering Assistant i~ ~~~-uNSM I NTE RTEC Repot-t of Field Compaction Tests ' Date: September S, 1996 Client: Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN SS044 Retultt~ ..,~ Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 b 12-253-9940 Fax: 253-3054 Engineers and Scientists Serving the Built cnd Natural Environments` Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN P Test No. Date Soil I.D.N Ctaesiricatioa Cptimuw Moiuwte• Maz lab L'ry :xiuity' tPC~ is Place % Moiswre'• Ia Plaace Dry Dea~ity'• (1'CF) Reladva ~ Comlraetioa SpecifieA Minimum % Compaction Commeau 122 9/4/96 P-4 CL-S 7 136 4 137 101 100 A 123 9/4!96 P-4 CL-S 7 136 S 138 102 100 A ' X Nuclear Method Sand Cone Method ASTM D 2922-81 X Standard Proctor ASTM D 698-91 ASTM D 1SS6-82 Modified Proctor ASTM D 1SS7-91 Locations: Bench Mark: Test No. Teu licatiut Elavaliuo 122 S7th Street NE, Sta. 21+50, 15' Lt. of centerline 964 123 S7th Street NE, Sta. 20+50, on centerline 963 A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. ~Zertiarl:s : c: Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation v~ J' s G. Vos gineering Assistant ~ ~ B~auN=. INTERTEC f i T i l C Report o on ests F ompact e d 'Date: September 6, 1996 Client: Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 Results: X Nuclear Method Sand Cone Method ocations: Bench Mark: ASTM D 2922-81 X Standard Proctor ASTM D 698-91 ASTM D 1556-82 Modified Proctor ASTM D 1557-91 rest No. Test 1-ocatkm F.kvation 124 57th Street NE, Sta. 8+75, watermain trench 952 125 58th Street NE, Sta. 6+00, watermain trench 9511h 126 58th Street NE, Sta. 5+00, watermain trench 9491h 127 Kalland Avenue South, Sta. 1 +00, 12' Rt. of centerline 9621h i28 Kalland Avenue South, Sta. 2+00, on centerline 9631h 129 Kalland Avenue South, Sta. 3+00, 11' Lt. of centerline 964 130 Kalland Avenue South, Sta. 4+00, 10' Rt. of centerline 9641h ~ A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications Remarks; ~~ r f-- x. 'Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-99d0 Fax: 253-3054 Engineers and Scientists J"ervirg .he Buiit and Naturci Envircnments' Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN r i Test No. Date Soil I.D.N Classifa:ation Optimtun Moisture' Max. tab Dry Density (PCB to P1acc % Moisaue" In Placc Dry Deuciry" (PCF~ Relative % Canpaction Specified Minittwm % Computiat Catttnetus 124 9/5!96 P-3 CL 151h 112'6 18 107 95 95 A 125 9/5/96 P-2 SC 17 108 20 103 95 95 A 126 9/5/96 P-2 SC 17 108 20 103 95 95 A 127 9/5/96 P-4 CL-5 7 136 5 139 102 100 A 128 9/5/96 P-4 CL-5 7 136 5 136 100 100 A 129 9/5/96 P-4 CL-5 7 136 5 138 101 100 A 130 9/5/96 P-4 CL-5 7 136 6 137 101 i00 A Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH AME Concrete * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation ijx'es G. Vos ngmeering Assistant i~ ~~~ ~s;~ I NTE RTC Report of Field Compaction Tests 'Date: September 6, 1996 Client: ''>z~tttrt:• X Nuclear Method Sand Cone Method Zucations: R;-~nrh Marlr- ASTM D 2922-81 X Standard Proctor ASTIvI D 698-91 ASTIvi D 1556-82 Modified Proctor ASTM D 1557-91 Tut No. Tut Lorrtiun Hleva4on 131 Kalland Avenue South, Sta. 5+00 on centerline 965 132 58th Street NE, Sta. 14+50 15' Rt. of centerline 960 133 58th Street NE, Sta. 15+50, on centerline 960'h 134 58th Street NE, Sta. 16+50, 15' Lt. of centerline 96Th 135 58th Street NE, Sta. 17+50, 10' Rt. of centerline 962'h 136 57th Street NE, Sta. 19+50, 12' Lt. of centerline 963 137 57th Street NE, Sta. 18+50, 14' Rt. of centerline 963'h A. Test Results Comply With Specifications. ,B. Test Results Do Not Comply With Specifications. Remarks. ~~ i~ II Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 5t. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Engineers ana Scieniis;s Serving the 8uili and Naiural Environmenrs~ Project : BAXX-96-639 Project llt~cription: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN Test No. Date Soil I.D.N C}a,wiricatiun Optimum Mouwrc• Mrx. l.b Dry Density (P(:F~ In Place % Muiswrc•• In PFaoe Dry Deosity (PCR Relative % Compactiua Specirird Minimum % Compaction . Cummenu 131 9/5/96 P-4 CL-5 7 136 5 136 100 100 A 132 9/5/96 P-4 CL-5 7 136 5 133 98 100 B 133 9!5/96 P-4 CL-5 7 136 6 I39 102 100 A 134 9/5!96 P-4 CL-5 7 136 5 136 100 100 A 135 9/5/9b P-4 CL-5 7 136 5 139 102 100 A 136 9/5/96 P-4 CL-5 7 13b 6 137 101 100 A 137 9/5/96 P-4 CL-5 7 136 6 139 102 100 A Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohl in Attn: Mr. Pete Carlson SEH AME Concrete * =Optimum Moisture and Max. Lab Dry Density rounded t0 11CdCeSI i ~2. ** = In Place Y'o Moisture and In Piave Dry Density rounded to nearest whole number per ASTM procedures. Braun lntertec Corporation ~~ ~. n} s G. Vos ~tSgineering Assistant i~ n $M I NTE RTES Report of Field Compaction Tests 'Date: September 6, 1996 Client: I' D~ .lr.- r n n ' X Nuclear Method ' Sand Cone Method Locations: ASTM D 2922-81 X Standard Proctur ASTM D 698-91 ASTM D 1556-82 Modified Proctor ASTM D 1557-91 Text Nu. 'text L-uc~tioo Elcratioa 138 57th Street NE, Sta. 17+50, on centerline 964 132A 139 Retest of #132 57th Street NE, Sta. 7+50, watermain trench 960 95Th 140 Kalland Avenue North, Sta. 1+00, 15' Lt. of centerline 959'h 140A Retest of #140 959'h 141 Kalland Avenue North, Sta. 2+00, on centerline 95Th 142 Kalland Avenue North, Sta. 3+00, 15 Rt. of centerline 955'h A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. Remarks: 'c: ~~ ~~ Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 Braun Intertec Corporation 1520 24th Avenue Nortfi P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 engineers end Scientists Serving !ne Built and Naiuraf c"nvironments Project : BAXX-96-639 Prujeta llescription: Parkside 3rd Addition Utility & Pavement Cunstructiun Albertville, MN r Text Nu. Date Soil (.U.p CFaxxiricatiua Optimum Muuture' Max. t..b Dry Deoxiry• (YCF~ la Y6.ce % Muixtur~•• In Ykaoe Dry Deaxity" (PCF~ ReFative % Cumpactiw Spec'>fied Minimum % Cumprctiua CummeWx 138 9/5/96 P-4 CL-5 7 136 5 136 100 100 A 132A 9/5/96 P-4 CL-5 7 136 5 136 100 100 A 139 9/5/96 P-2 SC 17 108 22 102 95 95 A 140 9/5/96 P-4 CL-5 7 136 ~ 132 97 100 B 140A 9/5/96 P-4 CL-5 7 136 4 136 100 100 A 141 915/96 P-4 CL-5 7 136 4 i37 101 100 A 142 9/5196 P-4 CL-5 7 136 4 137 101 100 A Attn: Mr. Don Jensen Kencu Attn: Mr. Ron Guertz Meyer-Ruhlin Attn: Ivlr. Pete Carlson SEH AME Concrete * =Optimum Moisture and Max. Lab Dry Density rounded to nearest I/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole numbar per ASTM procedures. Braun Intertec Corporation J• e~ G. Vos gineering Assistant INTERTEC f ' T i t i C Re ort o P on es s om act F eld P Date: September 6, 1996 Client: Mr. Greg Brown Brown & Cris Inc. ' 19740 Kenrick Avenue Lakeville,. MN 55044 i Resuits: ' X Nuclear Method Sand Cone Method Locutions: Rr,nr•h Marlr• ASTM D 2922-81 X Standard Proctor ASTM D 698-91 ASTM D 1556-82 ~ Modified Proctor ASTM D 1557-91 ' Teat No. Test Iwicttiua Elevation 143 57th Street NE, Sta. 4+00, watermain trench 950'h ~ A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. Remarks; ' c: ~~i .:.. Braun Interte< Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fox: 253-3054 Engineers and Scientists Serving the r3uiit and Natural Environments-" Project : BAXX-96-639 Projeea Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN r Teat No. Date Suit I.U.N CLusificatiun Optimum Mowwre• WLx. Lab Dry Deatity' (PCh~ iu Place % Moiswre" N Place Dry Density' IPCt~ Relative % Cum~rac[ioa Specified M'mimum % Compactiuo Cummenta 143 915/96 P-2 SC 17 108 24 103 95 95 A Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Roblin Attn: Ivir. Pete Carlson SEH AME Concrete * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place °lo Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation -~ ~~~ es G. Vos ngineering Assistant r >~ ~ ~ ~M 1 NTE RTEC Report of Field Compaction Tests ' Date: September 9, 1996 Client: ' Retuidti_ Nuclear Method ' Sand Cone Method Locations: Bench Mark: ASTM D 2922-81 X Standard Proctor ASTM D 698-91 ASTM D 1556-82 Modified Proctor ASTM D 1557-91 Test 40. Trrt Location Elevatiaa 144 57th Street NE, Sta. 15+65 service trench 955'h 145 .58th Street NE, Sta. 11 +53, service trench 952 146 57th Street NE, Sta. 14+80 service trench 956 147 57th Street NE, Sta. 13+80, service trench 956 A. Test Results Comply With Specifcations. B. Test Results Do Not Comply With Specifications r Remarks; ~~ Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 _ Braun tntertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 5b302-0189 612-253-9940 Fax: 253-3054 Engineers and Scientists Servinc the Buiit and Natural Environments Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN f Trsi 4u. Data Suit l.D..Y CLuitiwtiun Optimum Muicwce• Mu. L+b Dry Dcority (PCf•~ to P4ce 9G Muirwro•• Ia PFace Dry Deo.ity (YCH) Ro}ative 9G Compactiua SpociPed Minimum !i Compaction Cummrots 144 9/6/96 P-3 CL 15'h 112'/z 20 108 96 95 A 145 9!6/96 P-3 CL 15'h 112'h 17 112 100 95 A 146 9/6/96 P-3 CL 15'h 112'h 18 108 96 95 A 147 9/6/96 P-3 CL 15'h 112'h 18 111 99 95 A c Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest I/2. ** = In Place g'o Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation . G~-~- es G. Vos ngineering Assistant ~ sRauN=M INTERTEC r Report of Field Compaction Tests Date: September 10, 1996 Client: Mr. Greg Brown ' Brown & Cris Tnc. 19740 Kenrick Avenue Results: Lakeville, MN 55044 X Nuclear Method Sand Cone Method ~L.ocations: Bench Mark: ASTM D 2922-81 X Standard Proctor ASTM D 698-91 ASTM D 1556-82 Moditled Proctor ASTM D 1557-91 Test No. Tut Location Alevatiw 148 57th Street NE, Sta. 9+10, service trench 953 149 57th Street NE Sta. 8+40 service trench 950'h 150 58th Street NE Sta. 11 +54 service trench 954'h 151 57th Street NE, Sta. 8+ 10, service trench 952 152 57th Street NE Sta. 7+45, service trench 951'6 153 58th Street NE Sta. 9+75 service trench 953'6 A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. Remarks: ~: Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz ' Meyer-Roblin Attn: Mr. Pete Carlson SEH Braun Intertec Corporation 1520 24th Avenue North P.O. Box 1$9 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 ngineers and Scientists Serving the 2uiit and Narurai Environmenis' Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavetnent Construction Albertville, MN Test Nu. Date Suit I. D.N CLs.irication Optimum Moisturcf Max. tab Ury Oeasity' (PCF) In PFux % Muiswrc" m Pkaoe Dry Density" (PCr) Relative % Compaction speciried Minimum % Compaction Comments 148 9-9-96 P-2 SC 17 108 18 107 99 95 A 149 9-9-96 P-3 CL 15'h 112'h 18 111 99 95 A 150 9-9-96 P-3 CL 15'h 112'h 19 109 97 95 A 151 9-9-96 P-2 SC 17 108 20 104 96 95 A 152 9-9-96 P-5 CL 20 103 23 103 100 95 A 153 9-9-96 P-3 CL 15'h 112'h 19 109 97 95 A * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place 3o Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation ~~~ s G. Vos ngineering Assistant i~ ~~ sRau~SM I NTE RTEC Report of Field Compaction Tests ' Date: September 11, 1996 Client: ' Rc~ults: i~ n n X Nuclear Method ' Sand Cone Method Locations: Bench Mark: ASTM D 2922-81 X Standard Proctor ASTM D b98-91 ASTM D 1556-82 Modified Proctor ASTM D 1557-91 Tut No. Tut l.watio¢ ~,yp~ ' 154 155 58th Street NE, Sta. 6+85 service trench 58th Street NE, Sta. 5+80 service trench 951'6 950'/z - A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. Remarks: c: Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz ' Meyer-Rohlin Attn: Mr. Pete Carlson SEH n Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 - "Braun Intertec Corporation 1520 24th Avenue North P.O. Box i 89 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Engineers crd Scientists Serving ;he Built cnc !Vatura( Environments' Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN P Tut No. Date Soil I.D.N C}aeoifuutioa Optimum Mouturc' Maz. [mob Dry Demiry~ (PCF~ Ia Puce 7C Muutule" In 1'hx Dry Deasiry~ (PCB Refativa if Compactica Spocified Minimum R Compacticu ommco4 154 9/10/96 P-5 CL 20 103 26 98 95 95 A 155 9/10/96 P-5 CL 20 103 26 98 95 95 A * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation ~~~ es G. Vos ngineering Assistant n n 8 ~ ~ ~ ~ ,M I NTE RTEC Report of Field Compaction Tests .tte: September 11, 1996 Client: Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 ~esults: _ 'Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Engineers and Scientists Serving the Built and Natural Environments Project : BAXX-96-639 Project Desuiption: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN Teut Nu. Date Suit I.D.X Clauiftcatian Optimum Mowture~ Maz_ llb Dry Den~iry` (PCB In Place !f MouWre"" to PFace Ury Geasiry'~ (PCF) ReYative Y. Compoctien Specified Minimum 4i Compactim pmmeou 156 9/11/96 P-2 SC 17 108 19 107 99 95 A 157 9/11/96 P-2 SC 17 108 19 109 i01 100 A 158 9/11/96 P-2 SC 17 108 19 108 100 100 A 159 9!11/96 P-2 SC 17 108 19 109 101 95 A i ~X Nuclear Method ASTM D 2922-81 X Standard Proctor ASTM D 698-91 Sand Cone Method ASTM D 1556-82 Modified Proctor ASTM D 1557-91 cations: Bench Mark: Tout Nu. Trat lwx:ttiuo tskvatiuo 156 58th Street NE, Sta. 2+90, service trench 951'6 157 57th Street NE Sta. 11 +50, storm drain trench 956 158 57th Street NE, Sta. 13+20 storm drain trench 956'h I59 58th Stree*. NE Sta. 1 +60, service trench 952'h '~. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. Remarks: .~ Attn: Mr. Don Jensen K i~ n enco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place 9b Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation v~- es G. Vos ngineering Assistant P i~ i~ ~ Rau N=M I NTE RTES Report of Field Compaction Tests ' Date: September 13, 1996 Client: Res Its n n X Nuclear Method Sand Cone Method Locations: Bench Mark• n ~~ Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302.0189 612-253-9940 Fax: 253-3054 Engineers and Scientists Serving the 3uiit and Naturel Environments' Project : BAXX-9b-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN r u Test No. ate Soil I.D.N }aaairirrtion (~timwn Mouturo+ n.}ax, I.ob Ury Deoaity+ (PCF~ In Place % MouWre•' to Place Dry Deoaity" (PCB Relative % Comp~actioo SPccifiel Minimum % Compactiw omments 160 9/12/96 P-1 SC 15 114 21 109 95 95 A 161 9/12/96 P-2 SC 17 108 20 103 95 95 A 162 9/12/96 P-1 SC 15 114 19 111 97 95 A 163 9112/96 P-3 CL 15'f~ 112'h 17 113 100 95 A ASTM D 2922-81 x ~tanaara rroctor a~ t nn >J oya-y r ASTM D 1556-82 Modified Proctor ASTM D 1557-91 Teat No. Tut lunation ~`d~O° 160 Kalenda Drive Sta. 2+00 Sanitar Sewer Trench 942 161 Kalenda Drive, Sta. 1 +00 Sanitar Sewer Trench 950 162 Kalenda Drive, Sta. 3+00 Sanitar Sewer Trench 943 163 Kalenda Drive, Sta. 2+00, Sanitar Sewer Trench 951 Ira Tesi Results Comply With Specifications. Test Results Do Not Comply With Specifications. Remarks c: n n Attn: Mr. Don Jensen Kenco Attn: Mr._ Ron~Guertz e>~l~.ohlin~`. Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab llry llenstty rounaea to nearest 1/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation es G. Vos ngineering Assistant I~ i~ BRau~ I NTE RTEC Report of Field Compaction Tests ' Date: September 19, 1996 Client: Mr. Greg Brown ' Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 ,Results: X Nuclear Method Sand Cone Method ~4..ocations: Bench Mark: ASTM D 2922-81 X Standard Proctor ASTM D 698-91 ASTM D 1556-82 Modified Proctor ASTM D 1557-91 Tat No. Tat Locatim Elev+tim 164 58th Street NE Sta. 13+50 l2' Rt. of centerline sub rade 958 165 58th Street NE Sta. 11 +50 on centerline sub rade 957 166 58th Street NE Sta. 9+50 12' Lt. of centerline sub rade 956 167 58th Street NE Sta. 7+50 6' Rt. of centerline sub rade 955 168 58th Street NE Sta. 5+50 6' Lt. of centerline sub rade 954 169 58th Street NE Sta. 3+50 on centerline sub rade 954'h 170 58th Street NE, Sta. 1+50, 10' Rt. of centerline (sub rade) 955'h ~A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. Remarks; ~' II II <. Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 b 12-253-9940 Fax: 253-3054 Engineers and Scientists Serving the Built and Natural Environments"' Project : BAXX-9639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN Tat No. Date Soli I.D.tY Cbesil'u:atim Optimum Moismree Mwt. Isb - Dry Denitye (PCF) to Tlaca % Moietueep ,In Pi+ee Dry DmaityN (PCB Relotive % Cempxtim Specified Minimum % Compoctim Cemmmts 164 9/18/96 P-3 CL 15'h 112'h 12 115 102 100 A 165 9/18/96 P-3 CL 15'h 112'6 10 113 101 100 A 166 9/18/96 P-3 CL 15'h 112'h 15 114 101 100 A 167 9/18196 P-3 CL 15'h 112'h 10 115 102 100 A 168 9/18/96 P-3 CL 15'h 112'h 10 113 101 100 A 169 9/18/96 P-3 CL 15'h 112'h 12 112 100 100 A 170 9/18/96 P-3 CL 15'h 112'h 9 117 104 100 A Attn: Mr. Don Jensen Kenco Attn~.dvlry,~Ron-Guert Meyer-Rohlin° Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation ~v ~ ~~~ J ~s G. Vos ineering Assistant i~ ~~ BRAUN..; I NTE RTEC Report of Field Compaction Tests ' Date: September 19, 1996 Client: Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 'Results: Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Engineers and Scientists Serving the Built and Natural Environments Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN Ted No. Dote Sod I.D.! Cla/sificaticn Optimum Mouture~ Mu. [~h Dry Deo/itye (PCFj m Place R Mouh~re« Io Phce Dry Den/ity~ (PCFj Reluive ff Co mpacLm Specified Minimum R Compact~oe omments 171 9/18/96 P-1 SC 15 114 20 107 95 95 A 172 9/18/96 P-1 SC 15 114 20 108 96 95 A 173 9/18/96 P-1 SC 15 114 Zl 107 95 95 A 174 9/18/96 P-2 SC 17 108 21 103 95 95 A ' -~ Nuclear Memoa AJ 1 M ll "lyZ"1-251 X Standard Proctor ASTM D 698-91 r,._a ..___ ~ ~_.L _ ~ . ~..., AV a a., aJ 1JJV-UL iviuuuiru rcucwr HJ 11V1 L 1JJ 1-`/1 Cat10nS: Bench Mark: Ted No. Ted I.aatiaa Elevation 171 Kalenda Drive Sta. 5+25 sanit sewer trench 942'6 172 Kalenda Drive Sta. 4+50 sani sewer trench 945'h 173 Kalenda Drive Sta. 4+00 sani sewer trench 948 174 Kalenda Drive Sta. 3+45 sanit sewer trench 955 d, Tact T2am~lfe l~.. .,1. lU:.{. Q.. :~.....: ,tr ~_. ~~_ .a• awe ~ au ~.../WtJl~ •I 1111 J~/G.lll\rAUV11J. B. Test Results Do Not Comply With Specifications Remarks. n n Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH - vYuWaaW aavaoluaa: auu L~IaA. 1..6(J Lir LGl1J1L~ 1VVL4G4 to nearest 1/2. ** = In Place 9b Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation ~~ v ' es G. Vos ngineering Assistant ~ ~ ~ BRau~r INTERTEC Report of Field Compaction Tests Date: September 20, 1996 Client: Mr. Greg Brown ~, , Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 Results: X Nuclear Method ASTM D 2922-81 X Standard Proctor ASTM D 698-91 /~I~ VfaalY vVLV l~1VY1V~a AJ 11'1 L 1J/V'UL 1YLVti ll.lt~A1 L"1.UVtVI L'1J 11V1 L 1JJ /-y l Bench Mark: Test No. Tat I.ootian Elewtiao 175 Kalenda Drive Sta. 5+40 sanit sewer trench 953 176 Kahler Drive Sta. 2+28 rani sewer trench 951 177 Kahler Drive Sta. 1 +75 sanit sewer trench 952 178 Kahler Drive Sta. 1 +04 sanit sewer trench 951 179 Kalenda Drive Sta. 5+00 sanitar sewer trench 956 180 Kalenda Drive Sta. 4+00 sanitar sewer trench 957 181 56th Street NE, Sta. 0+80, sanit sewer trench 950 ~r Test Results Comply With Specifications. Test Results Do Not Comply With Specifications. ~emarks. c: i~ Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota Sb302-0189 b 12-253-9940 Fax: 253-3054 Engineers and Scientists Serving the Built and Natural Environments' Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN Test No. I~te Sob i.D./ Chssificatim Optimum Moisturce Mu. t~ Dry Deairy• (PCF) la P6x A Mououep in Pbce Dry Deairy" (PCF] Relative tf Comp~ctiaa specified bfmimum 7f Compaction Commenu 175 9/19/96 P-3 CL 15'~ 112'6 19 109 97 95 A 176 9/19/96 P-2 SC 17 108 21 103 95 95 A 177 9/19/96 P-3 CL 15'fs 112'fz 19 108 96 95 A 178 9/18/96 P-2 SC 17 108 22 103 95 95 A 179 9/19/96 P-2 SC 17 108 20 103 95 95 A 180 9/19/96 P-2 SC 17 108 20 105 97 95 A 181 9/19/96 P-2 SC 17 108 21 104 96 95 A Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 112. ** = In Place 9'o Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation vl~~ ~ es G. Vos ngineering Assistant ~ seauN INTERTEC Report of Field Compaction Tests 'Date: September 20, 1996 Client: Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 Results: Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-4940 Fax: 253-3054 Engineers and Scientists Serving the Built and Natural Environments^ Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN r Test No. Date Sal I.D.I Claaaificaticn Optimum Maapu~e~ ,~~. r~ Dry Dmaity~ (p<;~ = Tn Plaoe ~ 1e« ro ~ Dry Demity"" (pCF7 Re6ativc 9f Compadim ~~ Afioimum 9f Compaction ammeau 182 9/20/96 P-2 SC 17 108 19 108 100 100 A 183 9/20/96 P-2 SC 17 108 19 108 100 100 A 184 9/20/96 P-3 CL 15'fz 112'fs 16 114 102 100 A 185 9!20!96 P-3 CL 15'!z 112'6 16 112 100 100 A 186 9/20/96 P-3 CL 15'fi 112'6 18 113 100 100 A 187 9/20/96 P-3 CL 15'fZ 112'6 17 112 100 100 A 188 9!20/96 P-3 CL 15'~ 112'/z 17 115 102 100 A x tvuctear Method ASTM D 2922-81 X Standard Proctor ASTM D 698-91 J 411LL VVItG 1Y1GLLlVU cations: Bench Mark: tiJ 1 rVr L rood-o~ Moatrtea rroctor AJ~1~M ll 1SS7-y t Teat No. Tat l.ocatim pe~~ 182 57th Street NE Sta. 1b+25 on centerline sub ade 961 183 57th Street NE Sta. 14+75 12' Lt. of centerline sub rade 959 184 57th Street NE Sta. 13+25 10' Rt. of centerline sub rade .958 185 57th Street NE Sta. 11 +75 on centerline sub rade 957 186 57th Street NE Sta. 10+25 9' Lt. of centerline sub rade 956'f~ 187 57th Street NE Sta. 8+75 9' Rt. of centerline sub rade 955'/z 188 57th Street NE, Sta. 7+25, on centerline (sub rade) 955 A. lest xesutts c:ompty wrth Specifications. Test Results Do Not Comply With Specifications. Remarks. n n Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation ~~~ es G. Vos ngineering Assistant F B R A U N sM _ Braun Intertec Corporation 1520 24th Avenue North I NTE RTEC P.°. Bax,89 St. Cloud, Minnesota 56302-0189 612-253-9940 Pax: 253-3054 Engineers and Scientists Serving the Built and Natural Environments" Report of Field Compaction Tests - Date: September 24, 1996 Project : BAXX-96-639 t ~ ~ Client: Mr. Greg Brown Project Description: l 1 Brown & Cris Inc. Parkside 3rd Addition Utility & Pavement 19740 Kenrick Avenue Construction Lakeville,. MN 55044 Albertville, MN 'Results: P J Teat No. Date Soil I.D./ Clz.sific~tim Optimum Moiaoue• Af4:. !mob Dry Demiry• (PCF) In Plxe % Mouturo•• In P6+ce Dry Deo•ity (PCF7 Relative % Compxtim Specified Minimum % Compactim CommeW 189 9123196 P-5 CL 20 103 26 98 95 95 A 190 9/23/96 P-5 CL 20 103 25 100 97 95 A 191 9/23/96 P-5 CL 20 103 26 98 95 95 A 192 9/23/96 P-5 CL 20 103 33 93 90 95 A X Nuclear Method ASTM D 2922-81 X Standard Proctor ASTM D 698-91 Sand Cone Method ASTM D 1556-82 Modified Proctor ASTM D 1557-91 ~I.ocations: Bench Mark: Tut No. Tat Lowtim Blevatian 189 56th Street NE Sta. 5+45 sani sewer trench 951 190 56th Street NE Sta. 5+45 sanit sewer trench 954 191 56th Street NE Sta. 6+95 sani sewer trench 953 192 56th Street NE Sta. 6+95. sanit sewer trench 955'fz '-A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. Rem arks: ,: Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz ' Meyer=Rohlin Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place 96 Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation ~i ~~~ J G. Vos gineering Assistant i~ ~~ BRauNSM I NTE RTEC Report of Field Compaction Tests 1Date: September 25, 1996 Client: Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 ~Results• i~ Nucleaz Method ASTM D 2922-81 X Standard Proctor ws rna lu oya-y>i o.._a n,._,, a.r,..t.,,a A QT11d Tl t cc~_47 IVfnriifiarj Prnrtnr ASTM D 1557-91 Locations: ~.,.-- -•------- . --- -- - - --- - -- Bench Mark: Test No. Tat i.ocatiaa Elevatiaa 193 Kahler Drive Sta. 3+00 watermain trench 951'k 194 Katiler Drive Sta. 1+50 watermain trench 952 •c-_-.~_._ ~ - n_.:_....., ld..:~.,.-o .,...t A,f.. T oh Tlrv rlancity rnunrlP~ K. a wt 1`wuaw wauyay •~ aau .,~c~.aaawa,vuu. B. Test Results Do Not Comply With Specifications Remarks: ~: Attn: Mr. Don Jensen i~ Braun tntertec Corporation ~+ ~, `1520 24th Avenue North 1" J ~-; ` P.O. Box 189 /~ '-~` ~ St. Cloud, Minnesota 56302-0189 `" € ~%~ ~ 612-253-9940 fax: 253-3054 Engineers and Scientists Serving the Built and Natural Environments' Project : BAXX-96-639 Project Description: Pazkside 3rd Addition Utility 8r. Pavement Construction Albertville, MN C Tact No. Data Soil I.D./' Classirxatian Optimum Moisturo~ ~ ~ Dry Dwuy' (PCB In Piaca 9i Moisturo'"' In l'Ixe Dr} Deady" (PCF] °ch_tro $ Compactim ~~ S+~i^.i=+ua ;4 Compadiaa ~~ 193 9/24/96 P-2 SC 17 108 22 105 97 95 A 194 9/24196 P-2 SC 17 108 20 105 97 95 A Kenco Attn: Mr. Ron Guertz ~jvfeyer-Roblin Attn: Mr. Pete Carlson SEH to nearest 1/2. ** = In Place 9b Moisture and In Place Dry Density rounded to nearest whose number per ASTM procedures. Braun Intertec Corporation es G. Vos ngineering Assistant i~ ~ sRauN°M INTERTEC Report of Field Compaction Tests ' Date: September 26, 1996 Client: Mr. Greg Brown ' Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 'Results: X Nuclear Method ASTM D 2922-81 X Standard Proctor ASTM D 698-91 ~auu ~.Vll~: ivicutvu AJ t ivt L 1JJV-OG 1V1UU1tIC(1 I"TUGWr AJ 1 M L 1JJ ~-Y! cations: Bench Mark: Teat No. Tea I.ocatiaa Elevatiaa 195 56th Street NE, Sta. 0+50, watermain trench 952 196 56th Street NE Sta. 1 +50, watermain trench 95Th 192A Retest of #192 955'h 197 56th Street NE, Sta. 2+50 watermain trench 952'h 198 56th Street NE, Sta. 3+50, watermain trench 952 n. icu ncsuus ~.omply wun ~peClncactons. B. Test Results Do Not Comply With Specifications. Remarks: ,: Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz ' Meyer-Roblin Attn: Mr. Pete Carlson SEH n oti'~ ~~i Project Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 fax: 253-3054 Engineers and Scientists Serving the Built and Natural Environments' BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN P 7 Teat No. Date Soil I.D.N Chaaifintim Optimum Moisture' Maz I~b Dry Deaaity' (PCFj In Phce R Moia~ro~' In Phce Dry Deruity~" (PCF7 Rek+tive 9f Compnctim Specified Minimum Sf Compactim ommeata 195 9/25/96 P-2 SC 17 108 21 107 99 95 A 196 9/25/96 P-2 SC 17 108 21 106 98 95 A 192A 9/25!96 P-5 CL 20 103 27 100 97 95 A 197 9/25/96 P-2 SC 17 108 23 103 95 95 A 198 9/25/96 P-3 CL 15'h 112'h 20 109 97 95 A '" = Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place 9b Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation Ja s . Vos gineering Assistant B~~~~s~s NTE RTEC Report of Field Compaction Tests ate: October 1, 1996 Client: Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue ~esults: Lakeville, MN 55044 t /~ ~i~'~ Project Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Engineers and Scientists Serving fhe Built and Natural Environments`" BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN Test No. Date Soil I.D.N Clauifir~tioa Optimum Mouturo~ Max. I~b Dry Deoeity~ (PCH7 In Place % Mouture" la Plan Dry DeasityM (PCB Relative % Compaction Specified Minimum % Compaction Commeola 199 9/90/96 P-2 SC 17 108 18 109 101 95 A 200 9/30/96 P-2 SC 17 108 19 104 96 95 A 201 9/30/96 P-2 SC 17 108 22 106 98 95 A 202 9/30/96 P-3 CL 15'/z 112'fz 21 109 97 95 A X Nuclear Method ASTM D 2922-81 X Standard Proctor ASTM D 698-91 Cana gone Metnoa AJ 1 M ll IJJb-2SZ Moattted Proctor AJ7~M ll 1SS7-y1 cations: Bench Mark: Tut Na. Tat [.oration Ekvttim 199- Kalenda Drive Sta. 1 +00 watermain trench 955 200 Kalenda Drive, Sta. 3+00, watermain trench 956 201 56th Street NE Sta. 7+50 watermain trench 955'fz 202 56th Street NE, Sta. 8+50 watermain trench 956 A. -1-est Kesults Comn)v With Sneciticati~ns. Test Results Do Not Comply With Spet;itlcations. Remarks: Attn: Mr. Don Jensen Kenco ' ~t~tti: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH 't' _ (lnti m~lrn T~nectltrP a.il~ T~f~r. ~ p}t nrv Tl?nclty Tr117nr1prl to nearest 1/2. ** = In Place Yb Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation // : ~ y Ja G. Vos Engineering Assistant sM i A BRAUN on Braun Intertec Corporat 1520 24th Avenue North - I N T E RT E ~ ~.o. Bax 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 I Engineers and Scientists Serving the Built and Natural Environments"' '' Report of Field Compaction Tests ' Date: October 2, 199b Project : BAXX-9639 Client: Mr. Greg Brown Project Description: ' Brown & Cris Inc. Parkside 3rd Addition Utility & Pavement 19740 Kenrick Avenue Construction Lakeville, MN 55044 Albertville, MN ' Results: 11 ' X Nuclear Method ' Sand Cone Method Locations: Ra~n~h Marlr- ASTM D 2922-81 X Standard Proctor ASTM D 698-91 ASTM D 1556-82 Modified Proctor ASTM D 1557-91 ' Tat No. Tat I.xatiaa FJevation 203 Kalenda Drive, Sta. 5+ 10 watermain trench 956 ~ A. Test Results Comply With Specifications. B. Test Results Do Not Comply With Specifications. Remarks: ' c: Attn: Mr. Don Jensen K i~ I' Test No. Date Soil I.D.fI = Chssificatim Optimum Moisture' Mu. Isb Dry Deasity' (PCB In Plaoe 9G MoisWrc" to Place Dry Density" (PCF) Relative X Compaction Specified Ivfinimum X Compaction Commea4 .203 10/1/96 P-2 SC 17 108 20 103 95 95 A enc n: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place 9b Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation ~~~~i mes G. Vos Engineering Assistant i~ ~ sRauN°- INTERTEC Report of Meld Compaction Tests Date: October 3, 1996 Client: Mr. Greg -Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 'Results: Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 fax: 2533054 Engineers and Scientists Serving the Built and Natural Environments Project : BAXX-9639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN r i Test No. ote Soil I.D.M huirxotiao ~'~ Moisoue~ ~. [~ ~ ~ ~~ ~ (pCF) to Phca % Moisuue« ~ rfooe Dry Dms~ (PCF) Rehtiva K ComPoctim s~eea Arinimum 7f Compoctim omments 204 10/2/96 P-1 SC 15 114 18 114 100 95 A 205 10/2/96 P-1 SC 15 114 19 112 98 95 A v wr.. ,.t,. ~ ~_.L _ ~ Sand Cone Method ~tions: Bench Mark: AJ 1 1Y1 V L7LL-O1 x Jtandard Proctor ASTM D 698-91 ASTM D 1556-82 Modified Proctor ASTM D 1557-91 Test No. Test Lawtim Flevatiao 204 Kalenda Drive Sta. 1 +25 service trench 955 205 Kalenda Drive Sta. 2+ 15 service trench 955 .~. 1W~ a~caulw wmpty wi[n specincaaons. Test Results Do Not Comply With Specifications. Remarks: ' Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz ' Meyer-Rohlin Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place 9~ Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation /~ ~~iti-- es G. Vos /~ ngineering Assistant ~ BRauN°° INTERTEC Report of Field Compaction Tests 'Date: October 4, 1996 Client: Mr. Greg Brown ' Brown & Cris Inc. 19740 Kenrick Avenue ~esults: Lakeville, MN 55044 X Nuclear Method ASTM D 2922-81 X Standard Proctor ASTM D 698-91 Jana Crone Metnoa AJ t M ll 1JJO-tSl MOdtttea YIOCtO[ ASTM ll 1JJ"/-yl ovations: Bench Mark: Tcst No. Test Location Elevation 206 Sbth Street NE, Sta. 6+90, service trench 955'6 207 Kohler Drive, Sta. 4+15, service trench 951 A. Test Results Comply With Specifications. Test Results Do Not Comply With Specifications. Remarks; ~~ n ii 8roun Intertec Corporation 1520 24th Avenue North f P.O. Box 189 r ' ~f ~ St. Cloud, Minnesota 56302-0189 tr 612-253-9940 Fax: 253-3054 Engineers and Scientists Serving the Suilt and Natural Environmentsx Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN i r Test No. Date Soil I.D.4t Classification Optsn:ur. Moisture` Max. l.ab Dr, Density' (PCF) Sn Place ~ Moistre" In Place Dry Iknsity'• (PCF) Relative ~ Compution Specified Minimwn % Compaction Comments 206 10/3/96 P-3 CL 15'h 112'6 19 109 97 95 A 207 10/3/96 P-3 CL 15'h 1121h 19 108 96 95 A I Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH * =Optimum Moisture and Max. Lab Dry Density rounded to neazest 1/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation < / v v es G. Vos ngineering Assistant SM ~~~ I NTE RTEC Report of Field Compaction Tests ' Date: October 7, 1996 Client: Mr. Greg Brown Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 ' R l esu ts: { ' X Nuclear Method ASTM D 2922-81 . Sand Cone Method ASTM D 1556-82 x Jtandard Proctor ASTM D 698-91 Modified Proctor ASTM D 1557-91 ^ Locations: Bench Mark: Tat No. Test L.ecatioo FJmdoa 208 56th Street NE Sta. 2+35 service trench 952'f~ ' 209 56th Street NE Sta. 1 +35 service trench 952 210 56th Street NE Sta. 2+80, service trench 952 n. B. ira~ lcesuits wmpry wI[I] Speclhcatlons. Test Results Do Not Comply With Specifications. Remarks: 'c: Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Roblin ' Attn: Mr. Pete Carlson SEH r*:.`a ...lraun Intertec Corporation 1520 24th Avenue North P.O. Box 189 O ~ St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Engineers and Scientists Serving the Built and Notural £nvironmentss Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN P Tut No. Date Soil LD.M CHassir~rim Optimum Moucue~ t;~. ~ Dry Demiry~ (PCB In Place % MoistumN ~ rye Dry Density" {PCFI Rshrtive % Compactim s~irba Minimum % Compaction Comments 208 10/4/96 P-3 CL 15'~ 112'6 20 108 96 95 A 209 10/4/96 P-2 SC 17 108 21 106 98 95 A 210 10!4196 P-3 CL 15'h 112'f~ 19 112 100 95 A * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation - ~ ~~ es G. Vos ngineering Assistant °.T $M BRAalH NTE RTEC Report of Field Compaction Tests ' Date: October 8, 1996 Client: Mr. Greg Brown ' Brown & Cris Inc. 19740 Kenrick Avenue ' Results. Lakeville, MN 55044 Engineers and Scientists Serving the Built and Natural Environments ~~ n ~ ~Q Project : BAXX-96-639 fV i Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN Tec: No. - Date °..y.! l.D.I C}auific~im Optim.•,., Moiaturo• .Mau. [mob Dry D~ei /' (PCB Ia Pty 'K Moiature+' la Pha Dry Demit~"' (PCl7 Re~.uiw P5 Compactim Specified !.lioisev 'K Compxlion ommeats 211 1017/96 P-3 CL 15'h 112'h 20 108 96 95 A 212 10/7/96 P-2 SC 17 108 18 101 94 95 B 213 10I7/9b P-2 SC 17 108 15 104 96 95 A X Nuclear Method ASTM D 2922-81 X Standard Proctor ASTM D 698-91 Sand Cone Method ASTM D 1556-82 Modified Proctor ASTM D 1557-91 ~.ocations• Bench Mark: Test ~. TeR l.oc+tian Ekvatien 211 56th Street NE Sta. 6+ 15 service trench 954'h 212 NE uadrant of 57th Street & 58th Street NE tilit Trench 963 213 SE uadrant of 57th Street & Kalland Avenue South tilit Trench 963 A. Test Results Comply With Specifications. ,B. Test Results Do Not Comply With Specifications. Remarks: ~ : Attn: Mr. Don Jensen Kenco ~Mr Ron Guertz ' . Meyer-Rohlin Attn: Mr. Pete Carlson SEH ~"" ~i , roun lafertet Corpo~ntioa 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax:253-3054 * =Optimum Moisture and Max. Lab Dry Density rounded to nearest 1/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation `' ~~ J ~ G. Vos ngineering Assistant BRAUN'" INTERTEC Report of Field Compaction Tests 'Date: October 9, 1996 Client: Mr. Greg Brown ' Brown & Cris Inc. 19740 Kenrick Avenue Lakeville, MN 55044 'Results: Braun Intertec Corpowtion 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 fax: 253-3054 Engineers and Scientists Serving the Built and Natural Environments'° Project : BAXX-96-639 Project Description: Parkside 3rd Addition Utility & Pavement Construction Albertville, MN 1 P Tat No. Dwe Soil (.D.M Cltiairir~tion Optimum Moistun• tutu. I~b Dry Dea~ity• (PCF] In Place R Mouturc•• In Phoe Dry Dea.ity•• (PCF) Rehtive 9t Compaction SPecifwd Minimum R Compaction Comment 214 10!8!96 P-2 SC 17 108 20 108 100 100 A X Nuclear Method ASTM D 2922-81 X Standard Proctor ASTM D 698-91 C'.....i /~....s 1Ao+1..~.i A C`Tl.f' Tl 1 GG~ 47 71 ,f,..i:C..,i D......r.... A CST\.f Tl 1 GG'7 A t Bench Mark: Tat No. Tat L.oAOau Elevatim 214 Kahler Drive Sta. 2+75 Storm Drain Trench 953'fz ~. iwa l~wuaw wulYly nlw .~Yct:111utuVUJ. B. Test Results Do Not Comply With Specifications. Remarks ~' L Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer-Rohlin Attn: Mr. Pete Carlson SEH ' ~ VI7t11llLLw 1Y1V/JILLIG iLLlti 1YlilA. 1..UU lllr LGUJIt'' 1VLL11LLGLL to nearest 1/2. ** = In Place % Moisture and In Place Dry Density rounded to nearest whole number per ASTM procedures. Braun Intertec Corporation J G. Vos E gineering Assistant gc~r~s' r .~:.~ ~~2n fZ.~~s ' Independent Testing Technologies, Inc. 337 31st Avenue South, P.o. Box 325 REPORT OF F/ELD COMPACTION TESTS Waite Park, MN 56387 Phone: {32D) 253-4338 Fax: (320} 253-4547 Report Date: July 18, 1996 Client Busse Construction cc: Meyer Rohlin Project: 96-202 Paricside 3rd Addition Albertville, Minnesota Testing Specialist: MAL x Nuclear Method ASTM D~922 Sand Cone Method ASTM D1556 Modified Proctor ASTM D1557 x Standard Proctor RSTM D698 ~ Test # Date I Soil IDS j Classitlcaiion Optimum Moisture Max. Lab Dry Density In Place % Moisture In Place j Percent Dry Density Compaction Specified Compaction RESULT 1 7-1-96 P-1 CL 20.6 102.6 18.9 103.7 j '101 95 PASS 2 7-1-96 I P-1 CL 20.6 102.6 16.1 104.0 i 1011/2 95 PASS j i I i - 1 l l i i ~ i BENCH MARK: Test # Test Location Elevation 1 Lot 2, Block 3, Pad Fil! 965 2 Lot 1, Block 4, Pad !=i!! 962' .~ ~I b: d62022. wpl Respectfully Submitted, ~~ ~~ 1 Daryl J. D e ,Project Manager I W ~ C7'7 r` .'T~ CA-0 ~~Gffiv[ ~t 5 Independent Testing Technologies, Inc. 33T 37 st Avenue South, P.o. Box 325 REPORT OF FlELO COMPACTION TESTS Waite Park, MN 56387 Phone: (320) 233-4338 Fax: {320j 253-4547 Report Date: July 18, 1996 Client: Busse Construction cc: Meyer Rohlin Project: 96-202 Parkside 3rd Addition Albertville, Minnesota Testing Specialist MAL x Nuclear Method ASTM D2922 Sand Cone Method ASTM D1556 Modified Proctor ASTM D1557 x Standard Froctor ASTM D69S Test ~ Date I Soil IDA'- Classiflcatlon Optimum Moisture Max. Lab Ory Density In Place % Moisture In Place Dry Oenstty Percent Compaction Specified Compaction RESULT 3 ~ 7-2-96 P-1 CL 20.6 102.6 18.8 102.5 100 95 ~ PASS ~ ~ { ~ I I ~ t I I II I i ~ ~ I ' ~ i 1 t I 1 BENCH MARK: Test ~ Test Location Elevation 3 Kalland Avenue (South), STA: 3+50, On the Center Line 960.5 b:d62023.wp1 Respectfully ubmitted, --~ Dary! in, Project Manager t r Independent Testing Technologies, Inc. 337 31 st Avenue South, P.Q. Box 325 Waite Park, MN 56387 Phone: (320) 253-4338 Fax: (320} 253-4547 Report Date: July 18, 1996 Client: Busse Construction cc: Meyer Rohlin q~tvs REPORT OF FIELD COMPACTION TESTS Project: 96-202 Parkside 3rd Addition Albertvi!!e, Minnesota Testing Specialist: MAL x Nuclear Method ASTM D2922 Sand Cone Method ASTM D1556 Modi;ied Proctor P,STM D1557 x Standard Proctor ASTM D698 ~ 1 j j j Optimum Max. Lab j In Place j In Place j Percent j Specified j Tesr t # ~_ Date j Soil ID# ~ Classification; Moisture {Dry Densiry~ °k Moisture Dry Density Compaction; Compactio n RESULT ' I 4 i 17-15-961 P-1 ! CL 20.6 ! 102.6 1 19.1 ~ 98.6 96 95 PASS 5 j 7-15-96 P-2 ± CL-ML 20.0 -r- I 106.2 i 20.6 ; 103.1 97 100 i FAIL ', 6 7-15-96 j P-1 ~ CL 20.6 ~ 102.6 j 21.0 99.4 ~ 97 ~ 95 I PASS j I 7 - 1 7-15-96 { t-1 P-1 I i CL 20.6 ~ 102.6 ~ 18.3 ' 100.4 ~ 98 ' 95 ! PASS 8 ! 7-15-96I P-1 1 _ CL ! 20.6 ? 102.6 I 16.4 ! 100.0 i 971/2 ~ 95 ~ PASS i 9 ~ 17 5-961 P-1 ~ CL 20.6 i 102.6 17.5 i 98.4 96 ~ 95 r-PASS BENCH MARK: I Test # j Test Location Elevation I 4 ~ Lot 10, Block ,Pad Fill ~ 956.5 , ~ 5 ~ Kahter Drive, STA: 1+00, On the Center Line j 956 i 6 j Lot 9, Biocki ,.Pad Fill I 957 7 Lot 25, B1ock~j~, Pad Fill ~ 955 8 Lots 23. & 24, Block?6; Pad FiU 953 , 9: ~ Lot 2, Block 2, Pad Fili I 965 ~ b: d62029. wpl RespectFu y Submitted, I ~) F Dary( J. ,Project Manager INDEPENDENT TESTING TECr,~JOLOGIES INC. 337 31ST AVENUE SOUTH, WAITE PARK, MN 56387 LABORATORY MOISTURE-DENSITY RELATION ' CLIENT: Busse Construciton SAMPLE # P-2 PROJECT: 96-202 Parkside 3rd Addition PROCTOR TYPE. Standard Albertville, Minneosta ASTM D 698 ' TESTOATE: 7-16-96 METHOD: A UNIFIED SOILS CLASSIFICATION: CL-ML SILTY LEAN CLAY, w/ a trace of GRAVEL, light brcwn. MAXIMUM DENSITY: 106.2 OPTIMUM MOISTURE CONTENT: 20.0 10. l0E I05 104 19 20 21 22 MOISTURE CONTENT, % a ~. ~ INDEPENDENT TESTING TECH .,~OLOGIES, INC. 337 31ST AVENUE'S~UTH, WAITE PARK, MN 56387 ' LABORATORY MOISTURE-DENSITY RELATION ' CLIENT: PROJECT: Busse Construction P-1 SAMPLE # 96-202 Parkside Addition PROCTOR TYPE. Standard A]bertv111e, Minnecsta ASTM D 698 TEST DATE: 7-2-96 METHOD: A UNIFIED SOILS CLASSlFICATiON: CL SANDY LEAN CLAY, fine to medium grained, w/ a trace of GRAVEL, brown, ' MAXIMUM DE NSITY: i o 2.6 OPTIMUM MOISTURE CONTENT: 20.6 103 ' 102 ~ ' t} 0 101 } 100 t 99 ' 1 8 19 20 2 1 22 23 ,Imdr.wp! MOISTURE CONTENT, % P i "° Braun Intertec Corporation 1520 24th Avenue North I N T E RT E C p.o. Bax 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 engineers and Scient+sis Jervir,g Laboratory Compaction Characteristics of Soil (Proctor)the a~i;t and Narura; cnvironmenrs Date: August 21, 1996 Project: BAXX-96-639 Ctient: Description: Mr. Greg Brown Parkside 3rd Addition Utility & Pavement Brown & Cris Inc. Construction 19740 Kenrick Ave. Albertville, MN Lakeville, MN 55044 Fietd Data: Test Number P-3 Date Sampled 8-19-96 Sampled By JV/Braun Intertec Laboratory Data: ASTM D: 698-91 Procedure: Std. B Date Tested: 8-20-96 As Received Water Content: -- Prep. Method: Wet Rammer Type: Mechanical Sieve Data, % on 3/4": -- % 3/4"-3/8": 0.9 % 318" - //4: 1.7 Classification: CL -Sandy Lean Ctay, a trace of Gravel, brown. Curve Values Corrected ASTM Values Maximum Dry Unit Weight, pcf Optimum Water Content, 114 113 ~ 112 a. en .~ 3 .~ a 111 Q 110 109 Water Content. 13 14 112.7 cf 112'h cf 15.4 % 15'h % 15 16 17 1 WO(t3I3~0 COClOf~0.I1CW B ~ ~ ~ `'" Braun Intertec Corporation 1520 24th Avenue North N T E RT E C P.O. Box 189 St. Cloud, Minnesota 56302-0189 b 12-253-9940 Fax: 253-3054 `ngineers end Scientisis Serving Laboratory Compaction Charac teristics of Soil (Praetor) ;ne 8uiit and Noiurci Environments Date: August 21, 1996 Project: BAXX-96-639 Client: Description: Mr. Greg Brown Parkside 3rd Addition Utility & Pavement. Brown & Cris Inc. Construction 19740 Kenrick Ave. Albertville, MN Lakeville, MN 55044 Field Data: Test Number P-2 Date Sampled 8-14-96 ; - Sampled By 1V/Braun Intertec _ ,Laboratory Data: ASTM D: 698-91 Procedure: Sid. B As Received Water Content: -- Prep. Method: Wet Sieve Data, % on 3/4": 0.0 % 3/4"-3/8": 1.0 Classification: SC -Clayey Sand, a trace of Gravel, brown. Curve Values Maximum Dry Unit Weight, pcf Optimum Water Content, % Date Tested: 8-15-96 Ranuner Type: Mechanical Corrected ASTM Values 107.8 cf 108 cf 16.8 % 17 % 110 109 ~ 108 a oq • a,, .a ~ 107 Q 106 105 Water Content. % 14 15 16 17 18 1~Godata\oroctor\o.new P sM Braun Interte< Corporation 1520 24th Avenue North I N T E RT E C P.a. Sax 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Engineers and Scientists Serving Laboratory Compaction Characteristics of Soil (Proctor) the ~uiit and Natural Environments Date: August 21, 1996 Project: BAXX-96-639 Client: Description: Mr. Greg Brown Parkside 3rd Addition Utility & Pavement Brown & Cris Inc. Construction 19740 Kenrick Ave. Albertville, MN Lakeville, MN 55044 Field Data: Test Number P-1 Date Sampled 8-14-96 Sampled 8y JV/Braun Intertec Laboratory Data: ASTM D: 698-91 Procedure: Std. B Date Tested: 8-15-96 As Received Water Content: -- Prep. Method: Wet Rammer Type: Mechanical Sieve Data, % on 3/4": 0.0 % 3/4"-3/8": 1.2 % 3/8" - /,'`4: 1.9 Classification: SC -Clayey Sand, a trace of Gravel, gray. Curve Values Corrected ASTM Values Maximum Dry Unit Weight, pcf 114.2 cf 114 cf Optimum Water Content, % 15.2 % 15 % 115 114 ~ 113 a av .~ 3 .~ a 112 D 111 110 Water Content. % 13 14 15 16 17 lasodaca\oroctor\n.new g ~ ~ ~ ~ sm Braun Intertec Corporation 1520 24th Avenue North I NTE RTEC Po Box 189 St. Cloud, Minnesota 56302.0189 612-253-9940 Fax: 253-3054 ~nJClneef5 and .`xient; c;S Servlny^ Laboratory Compaction Characteristics of Soil (Proctor) ~~e 7uilt anC iVc;urai =nviranmenrs Date: September 10, 1996 Project: BA,YX-96-639 Client: Description: Mr. Greg Brown Parkside 3rd Addition Utility & Pavement Brown & Cris Inc. Construction 19740 Kenrick Ave. Albertville, MN Lakeville, MN 55044 Field Data: Test Number P-5 Date Sampled 9!5/96 Sampled By 1V/Braun Intertec Laboratory Data: ASTM D: 698-91 Procedure: B Date TestCd: 9/6/96 As Received Water Content: -- Prep. Method: Wet Rammer Type: Mechanical Sieve Data, % on 3/4": 0.0 % 3/4"-3/8": .2 % 3/8" -114: 1.1 Classification: CL -Lean Clay, with a trace of Gravel, brown. Curve Values Corrected ASTM Values Maximum Dry Unit Weight, pct 102.8 cf 103 cf Optimum Water Content, % 19.7 % 20 104 103 ~ 102 a oA .y 3 C ~, 101 w. Q 100 99 Water Content, 18 19 20 21 22 23~ pdaW\pro~tor\p.ncw ~"' Braun Intertec Corporation 1520 24th Avenue North N T E RT E C ~.o. Bax 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Engineers and Scierrsts Serving Laboratory Compaction Characteristics of Soil (Proctor}he s~;rt and tJaturor Env;ronmeMs' Date: September 5, 1996 Project: BAXX-96-639 Client: Description: Mr. Greg Brown Parkside 3rd Addition Utility & Pavement Brown & Cris Inc. Construction 19740 Kenrick Ave. Albertville, MN Lakeville, MN 55044 Fietd Data: Test Number P-4 Date Sampled 9-3-96 { Sampled By JVlBraun Intertec Laboratory Data: ASTM D: 698-91 Procedure: C Date Tested: 9-4-96 As Received Water Content: -- Prep. Method: Wet Rammer Type: Mechanical Sieve Data, % on 3/4": -- % 3/4"-3/8": -- % 3/8" - tt4: -- Classification: Class 5 Curve Values Corrected ASTM Values Maximum Dry Unit Weight, pcf Optimum Water Content, 138 137 ~ 136 a nq .~ 3 .~ ~ 135 a 134 133 Water Content. % 5 6 7 8 9 l~p~atalorocior\o.new 136.2 cf 136 cf 6.9 % 7 C g ~ ~ ~ ~ sM Braun Intertec Corporation 1520 24th Avenue North 1 N T E RT E C P.o. 8ox 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Engineers and Scientists Serving Gradation Testing the Built and Noturo( Environments' ASTM C 136 & C 117 Date: September 10, 1996 Project No.: BDXX-96-639 Client: Mr. Greg Brown Project Description: Brown & Cris, Inc. Parkside 3rd Addition U tility and Pavement 19740 Kenrick Avenue Construction Lakeville, MN 55044 Albertville, MN Field Data: Sample No.: G-2 Sampled By: Braun Intertec Date Sampled: 9-3-96 Date Received: 9-3-96 Date Tested: 9-6-96 Classification: Class 5 Sample Location: Kalland Avenue S at Sta. 1+75 Laboratory Results: Sieve Size % Passing Specifications I" 100 100 3/4" 97 90-100 I /2" 90 -- 3/8" 85 50-90 #4 73 35-80 # 10 56 20-65 #20 42 -- #40 3 t 10-35 #80 16 -- #200 8.9 3-10 Remarks: This sample meets Mn/DOT specification 3138 Class 5 material. c: Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer Rottlin, Inc. Attn: Mr. Pete Carlson SEH ~~ ~h~ es G. Vos Engineering Assistant -:~, P Braun Intertec Corporation 1520 24th Avenue North 1 N T E RT E~ p.o_ sox ~ 89 St. Cloud, Minnesota 56302-0189 ~ / 612-253-9940 Fax: 253-3054 ~ / 10 _ncineers ana 5centists Serving (Jf/~ Gradation Testing ~e 3uiit ~~nC Narurci ~nviron,ments ASTM C 136 & C 117 Date: September lb, 1996 Project No.: BDXX-96-639 Client: Mr. Greg Brown Project Description: Brown & Cris, Inc. Parkside 3rd Addition Utility and Pavement 19740 Kenrick Avenue Construction Lakeville, MN 55044 Albertville, MN Field Data: Sample No.: G-3 Sampled By: Braun Intertec Date Sampled: 9-5-96 Date Received: 9-6-96 Date Tested: 9-9-96 Classification: Class ~ Sample Location: Kalland Avenue N at Sta. 2+j0 Laboratory Results: Sieve Size % Passim Specifications 1" l00 100 3/4" 98 90-100 lit" 89 -- 3/8" 84 50-9U #4 72 35-80 # 10 59 20-65 #20 47 -- #40 3 3 ! 0-3 5 # 80 l 5 -- #200 8.4 3- I 0 Remarks: This sample meets Mn/DOT specification 3138 Class 5 material. c: Attn: Mr. Don Jensen Kenco "~:tfn: Mr:~JZt~n~Guertz ~::~Ivleycr, Rohtn,=~iiic: Attn: Mr. Pete Carlson SEH ~-.~- gmes G. Vos Engineering Assistant r ~~~~~5,~ I NTE RTEC Gradation Testing ASTM C 136 & C 117 Date: September 10, 1996 Project No.: Braun Intertec Corporation 1520 24th Avenue North P.O. Box 189 St. Cloud, Minnesota 56302-0189 612-253-9940 Fax: 253-3054 Engineers and Scientisrs Servino `he Built cnd ,Natural E^vironments° B DXX-96-639 Client: Mr. Greg Brown Project Description: Brown & Cris, Inc. Parkside 3rd Addition Utility and Pavement 19740 Kenrick Avenue Construction Lakeville, MN SSO44 Albertville, MN Field Data: Sample No.: G-1 Sampled By: Braun Intertec Date Sampled: 9-3-96 Date Received: 9-3-96 Date Tested: 9-6-96 Classification: Class S Sample Location: S7th Street NE at Sta. 22+00 Laboratory Results: Sieve Size % Passim Specifications 1" t00 100 3/4" 97 90- 100 1 /2" 89 -- 3/8" 84 SO-90 #4 71 35-80 # 10 S9 20-65 #20 4S -- #40 31 I 0-3 S .#80 16 -- #200 9.2 3-10 Remarks: This sample meets Mn/DOT specification 3138 Class S material. c: Attn: Mr. Don Jensen Kenco Attn: Mr. Ron Guertz Meyer Roblin, lnc. Attn: Mr. Pete Carlson SEH //" v ~' es G. Vos Engineering Assistant SPECIAL PROVISIONS TABLE OF CONTENTS 96105 Page 1 1 . Project ~ _; 2. Foreman & Preconstruction Meeting_ 4 3. Construction Staking ~ Inspections 4. Utilities 5. Contractor-Engineer-Inspector Relationship Page 2 6. Subcontractors 7. Incidental Items 8. Responsibility 9. Starting Time 10. Compaction Page 3 11. Testing 12. Subsurface Exploration Page 4 13. Protection of Existing Utilities 14. Specifications Which Apply 15. Standard Plates 16. Construction Limits 17. Permit Requirement 18. Lien Waivers 19. Water Page 5 20. Test Rolling 21. Building/Debris Removal SPECIAL PROVISIONS PROJECT NO. 96105 1. PROJECT ' The project consists of the site grading and installation of erosion control measures in Albertville, Minnesota. ' The Contractor shall complete the grading, utilities and all restoration by July 10, 1996. The contractor shall be subject to the provisions of Article 15 of the Supplemental conditions for failure to meet these completion dates, as a whole or in part. 2.- FOREMAN AND PRECONSTRUCTION MEETING ' Before work is initiated, a preconstruction meeting shall be held between the Engineer, Contractor, Utility Companies and other involved parties, if any. The Contractor will present to the Engineer an estimated schedule for ' completion of various portions of the project. The Contractor shall inform the Engineer who the foreman on the project will be. The foreman shall be on the job at all times. ' The foreman shall be responsible for all phases of the project, including work done by the General Contractor and the subcontractor. Engineering decisions with regard to the work done by subcontractors shall go through the General Contractor and specifically the foreman for the jab. ' 3. CONSTRUCTION STAKING AND INSPECTIONS The Contractor shall give the Engineer at least two (21 working days notice for any grade and line stakes or inspection that ,he requires for proper execution of any phase of the project. The Contractor shall ' preserve these stakes until the work is completed. Replacement will be at the Contractor's expense. C 4. UTILITIES The Contractor shall be in communication with the respective utility companies to coordinate their schedule with any location work that is required. 5. CONTRACTOR-ENGINEER-INSPECTOR RELATIONSHIP The Engineer will not be responsible for the construction means, controls, techniques, sequences, procedures, or construction safety. All phases of the project shall proceed in accordance with OSHA safety requirements. The presence of the Engineer or his agents or employees on the job site shall not relinquish the Contractor of this responsibility or hold the Contractor harmless for the quality of workmanship or defects in materials. 1 6. SUBCONTRACTORS ' All subcontractors that the General will use shall be shown on the proposal form. Any other subcontractor will not be allowed without explicit written permission by the Engineer. ' The General Contractor shall coordinate all work between his subs and the Engineer. The Engineer will not correspond directly with any subcontractor. Any on-site meetings that are held will be conducted only ' if the General Contractor's foreman is present. fl i J ri n 0 0 7. INCIDENTAL ITEMS Any and all additional items of work or other items that must be done to fully complete this project shall be incidental to the bid items as bid. 8. RESPONSIBILITY The General Contractor shall be fully responsible for all work that is performed on this project. It is the General Contractor's responsibility to see that all specifications and testing requirements are followed. 9. STARTING TIME The Contractor shall not engage in or permit construction activities involving the use of any kind of electric, diesel, or gas powered machine or other power equipment, except between the hours of 7:00 A.M. and 10:00 P.M. on any weekday or between the hours of 9:00 A.M. and 9:00 P.M. on any weekend or holiday. 10. COMPACTION The required compaction of all lot grading shall be 95% of the standard proctor density. The required compaction within roadways shall be 100% of the Standard Proctor Density from finished subgrade to a point three (3) feet below finished subgrade and 95% of the Standard Proctor Density from three (3} feet or greater below finished subgrade. At the time of the compaction, the moisture content of the backfill soils shall be not less than 75% nor more than 115% of optimum moisture content. If moisture content greater than 125% of optimum moisture content is encountered, the Engineer shall revise the compaction requirements to meet the best interests of the Owner and the City of Buffalo. Moisture content versus dry density curves (Proctor Curves) shall be developed utilizing a minimum of six curve points. The curve points shall extend to moisture contents of at least 40%. in addition, the Zero Air Voids curve for the soil shall be developed and shown with the Proctor Curves. All areas not conforming with these requirements shall be excavated and recompacted. The Contractor shall supply the Engineer at the time of the preconstruction meeting a list of equipment that will be used for 2 J backfilling and compaction operation. The Engineer reserves the right to shut down work on the project if this equipment is not utilized during such backfilling and compaction operations. A maximum 12" lift shall be used.. Smaller lifts may be required to obtain the specified density. 0 C C u n l 11. TESTING The Contractor shall supply the Engineer with documented test results by an independent testing laboratory approved by the Engineer on tests required for the sanitary sewer, storm sewer, watermain and street. Density tests shall be paid for on a per test basis. The anticipated number of density tests are shown on the proposal form. The following procedure shall be followed. No exceptions shall be made. An independent testing lab shall test the backfill for the required density as the backfilling compaction progresses. No digging dawn to test densities will be allowed after the backfilling is completed. Therefore, the lab must be present during backfilling to test the soil while the backfilling is proceedins~. Backfilling, compaction, and density testing on these trenches is extremely important. For this reasons, the trench testing is shown as a bid item so all contractors are fully aware of this requirement. Retesting shall not be paid for. All initial tests on the trenches shall be paid for at the unit bid price. If the tests fail, it shall be the Contractor's responsibility to pay for retesting those areas following compaction. All trenches for watermain, sanitary sewer, storm sewer and services shall be tested for the required compaction density in conformance with the compaction requirements previously stated. The trench shall be tested at approximately 100-foot intervals at two to three depth locations, depending on depth. One test shall be taken next to the pipe, the second shall be taken at two feet below subgrade and at the midpoint of the trench. Compaction around every manhole and gate valve shall be the same as for the trenches. Tests shall be taken at every manhole and gate valve at the three depth locations as stated above. It should be noted that the Engineer may change test locations and depths at his discretion. It should also be noted that the Engineer may add or delete tests at his discretion with no change in the unit price. The contractor shall be responsible for coordinating his schedule with the testing firm and all test results shall be documented with respect to plan stationing, depth and location. Copies of all tests shall be liven to the engineer at a minimum of once every week.. 12. SUBSURFACE EXPLORATION No soil borings have been taken on this project. The Contractor shall therefore conduct a thorough subsurface exploration to determine the site's condition. 3 J 13. PROTECTION OF EXISTING UTILITIES ' The Contractor shall use utmost care during his operations and particularly during manhole adjustments to keep gravel and debris from entering sewer manholes. In the event of debris or gravel entering the ' sanitary sewer lines, these lines shall be jetted by Roto-Rooter or other approved company at the expense of the Contractor. Flushing of debris or gravel down the sanitary sewer or storm sewer lines will not be allowed. 7 0 0 u I _ _' u 14. SPECIFICATIONS WHICH APPLY The Minnesota Department of Transportation "Standard Specifications for Construction", 1988 Edition, together with all supplements thereto, shall govern except as superseded by the attached general Conditions or modified herein ~y the Special Provisions and attached specifications. 15. STANDARD PLATES All references to standard plates MHD shall mean the "Standard Plates" of the Minnesota Department of Transportation. All other reference to standard plates shall mean those details attached to the plans. 16. CONSTRUCTION LIMITS The Contractor shall confine his activities to the right-of-way or designated construction area. Equipment and material storage or deposition of excavated materials on private property must be approved in writing by the property owners, a copy of which shall be presented to the Engineer prior to such storage or deposition. Failure to do so will result in immediate suspension of work until such approval has been obtained or materials removed, and area restored to its previous condition or better. 17. PERMIT RE62UIREMENT Permit applications have been submitted to the Minnesota Pollution Control Agency and the Wright County Highway Department in order to minimize any potential delays in the project. The Contractor should therefore contact these agencies to determine if there are any special conditions they may have which should be included in the bid. The Contractor will be required to comply with all the requirements that these agencies may have. No change orders will be considered for complying with these requirements. 18. LIEN WAIVERS The Contractor shall furnish partial or complete lien waivers along with each payment request. The lien waivers shall be submitted by the Contractor, all subcontractors, and all material suppliers on the project. No payment will be authorized unless the lien waivers are received. 19. WATER Water for construction purposes may not be taken from any hydrant within the city limits. Water may be purchased and obtained from the Joint Powers ' 4 Water Board at the hydrant in front of the Board's pumphouse and office, ' located at 11100 50th Street NE in the City of Albertville. The fee for use of this hydrant is $50.00 per day, plus $2.00 for each thousand gallons used. A permit per day must be obtained from the clerk of the Joint Powers Water Board after paying the required fee. Water may be obtained from this hydrant only after prior arrangements have been made with the clerk of the Joint Powers Water Board for each day it is to be used. 20. TEST ROLLING The contractor shall be required to test roll the street subgrade in accordance to MnDOT Specification 2111. The subgrade shall pass the test rolling prior to acceptance of the project. C C L i ~I r J i i r 21. BUILDING/DEBRIS REMOVAL Building, farmsite structures, and all miscellaneous debris found on the project site other than those designated to remain, are to be demolished and removed from the project site. This is to include all concrete footings, wiring, plumbing, fencing, miscellaneous concrete and miscellaneous debris. All demolition/debris materials are to be disposed of at an approved demolition landfill facility. Buildings not to be removed are the house, garage, small shed attached to the garage, and chicken coop. The Contractor shall be responsible for maintaining electrical power, water, telephone and any other existing utility service to the remaining buildings. 5 C ' DIVISION 2 SECTION 02200 - EXCAVATION AND EMBANKMENT ' PART 1 GENERAL ' 1.01 DESCRIPTION OF THE WORK This work shall consist of constructing all excavations and embankments for buildings, roadways, drainage and site grading within the right-of-way, easements and property in ' the project area. ' 1.02 RELATED WORK OF OTHER SECTIONS The following items of related work are co~rered under other sections: ' ' A. Bidding Requirements, Conditions of the Contract and pertinent portions of the Special Provisions apply to the work of this section. B. Seeding: Section 02930 ' 1.03 APPLICABLE PUBLICATIONS The following publications of the issues listed below, but referred thereafter by basic designation only, form a part ' of this specification to the extent indicated by the references thereto: A, Minnesota Department of Transportation, Standard Speci- ' fications for Construction, 1988 Edition, including Supple- mental specifications thereto. (MnDOT) ~. MnDOT 2105 - Excavation and Embankment ' 2. MnDOT 1803.5 - Erosion Control 3. MnDOT 2101 - Clearing and Grubbing 4. MnDOT 2573 - Temporary Erosion Control u J i J B. Minnesota Pollution Control Agency, General Contractor's Copy, "General Permit, Authorization to Discharge Storm Water Associated With a Construction Activity Under the National Pollutant Discharge Elimination System/State Disposal System Permit Program" (NPDES/SDS permit). The contractor shall carefully review the~ermit and shall implement all conditions listed. Special conditions have been identified under the permit for erosion control measures, inspection and record keeping. PART 2 - MATERIALS 2.01 GENERAL Excavation and Borrow materials shall conform to MnDOT 2105.2 02200-1 ' PART 3 - CONSTRUCTION REQUIREMENTS ' 3.01 GENERAL A. All construction to be done in conformance to MnDOT 2105.3, 2573.3 and 2101.3. B. Disposal of timber, roots and other debris shall be the responsibility of the contractor. No disposal on the ' project site shall be allowed. C. All erosion control barriers shall be installed rior to initiating grading operations. D.i Protect X11 existing improvements to remain, including st~'uctures,,pavements, utilities, trees, shrubs, and lawn ' areas. The~Contractor is liable for damage he causes outside of the "construction limits" designated on the site plan. ' E. Construction shall be done in conformance to MnDOT 2105.3 and shall include excavation of unsuitable soils designated by the Owner's representative. Pumping as required to maintain dry excavations. Protection of excavations from freezing. Provisions for surface runoff and erosion control. The Contractor shall complete grading ' operations in any given area prior to starting another area. F. Compaction for embankment materials shall be by the specified density method specified in MnDOT 2105.3F1. Density tests shall be taken by an Independent Testing Lab ' retained by the Owner, at the rate of one test per 2 feet of fill placed for every 100 feet of roadway and 10,400 square feet for building areas. ' G. The Contractor shall locate all existing underground utilities prior to excavation. ' H. Before commencing excavation or embankment construction, the Contractor shall remove all topsoil and sod from building pad and street areas. Sufficient topsoil shall be ' salvaged or provided from an off -site source to restore all disturbed areas with a minimum of 4 inches. The topsoil shall be placed prior to commencing the turf restoration. The stripping, salvaging, stockpiling and placement of the ' topsoil shall be incidental to the common excavation (EV) bid item. ' I. The Contractor shall grade all roadways to within plus or minus 0.1 feet. C 02200-2 fl 3.02 EXCESS MATERIAL Excess material not used on the of on-site by the Contractor, at project shall be disposed a location designated by the Engineer. The Contractor will deliver and stockpile the material to the location at no additional cost to the ' Owner. The stockpile shall have slopes no greater than 3:1 upon completion. r C~ ~~ I ~~ n 3.03 SOIL CORRECTION AREAS Removal of unsuitable materials has been included in the soil correction excavation quantity. Actual soil correction volumes are to be determined during construction and an adjustment made to the excavation quantity before final payment is made. The Engineer's estimate of unsuitable material to be removed is 7,355 cubic yards (c.y.), separate from and not included in the common excavation bid quantity. Soil correction may include excavation for house pad correction and street correction. PART 4 - MEASUREMENT AND PAYMENT The work of this section shall be measured and paid for pursuant to MnDOT 2105, 2573 and 2101, except where modified below. It shall include the following bid items: 1. Common Excavation: Will be measured by the cubic yard in the original, unexcavated position, using the Prizmoidal Method as provided in the Eagle Point Computer Program, using original ground survey data. Final surveys shall be used for authorized over-depth excavation. Except for authorized over-depth excavation, no allowance will be made for materials removed outside of lines and grades shown. 2. Clearing and Grubbing: acre 3. Silt Fence: Linear Feet (LF) ' 4. Soil Correction Excavation: Will be measured by the cubic yard based upon the void size remaining once the material has been removed. In-field measurements or survey will be completed by the Engineer or field representative ' prior to filling and compaction. No payment will be authorized for any unseen, uninspected, or unapproved-for- filling soil correction excavations. J 02200-3