2003-12-04 Punch ListPUNCH LIST OWNER City of Albertville (Kenco) DATE OF CURRENT ISSUE 12/04/03 CONTRACTOR SEH NO. OWNER NO. PROJECT 08/28/02, 07/03/03, LaTour Construction DATE OF ORIGINAL ISSUE 11/25/03 A-ALBEV 0213.00 SUBSTANTIAL COMPLETION N/A FINAL COMPLETION 2002 Cedar Creek South Sa' Addition, Albertville, MN Below is a list of items which must be completed or corrected prior to final acceptance of the subject project. A completion of these items does not in any way relieve the Contractor of the responsibility to complete the project in accordance with all Contract Documents. Any questions call Russel Bly at 651.308.5462. Item Date Date No. Item Reviewed Comments Acce ted 1 Hydrants need hydrant flags and wires tied. Wires not tied - 08/28/02 check h Brant 1 2 Hydrant at end of culdesac needs raising to grade and gate valve located. 08/28/02 12/04/03 3 Sanitary sewer has water in it beginning at MH2 -needs pumping. 08/28/02 11!24/03 4 Sanitary sewer needs flushing and cleaning. 08/28/02 12/04/03 5 Catch basin 3 -mud needed around rings Catch basin 2 -same. 08/28/02 12/04/03 6 Hydrants need touch-up paint. 08/28/02 10/29/03 7 Need extension rods in all valve boxes. 08/28/02 12/05/03 8 CBI needs mudd around rings. 08/28/02 No CBI 12/04/03 9 ls` step needs repair in MH2. 08/28/02 12!05/03 Items Added 07/03/03 10 Hydrant 4 requires a 6" extension for grade. 07/03/03 10/20/03 11 Need valve rod extensions for all valves and raise valve boxes for hydrants 1 &2 for access. 07/03/03 12/05/03 Item Date Date No. Item Reviewed Comments Acce ted 12 Clean all manholes and valve box covers for easy access. Pick holes. 07/03/03 11/24/03 13 Locate detection wire for hydrants 1 & 2. 07/03/03 10/20/03 Manholes 2 & 6 need work on adjustment rings. Lack of grout 14 or rough. 07/03/03 11/24/03 15 All manhole inverts and benches can be cleaned. 07/03/03 12/04/03 16 Manhole 6 is leaking. 07/03/03 11/24/03 Televise the sewer main -may require further cleaning after 17 review. 07!03/03 12/05/03 18 All catch basin rings need to be grouted. 07/03/03 12/05/03 Some storm sewer lines are. filled with gravel, etc. Cleaning 19 required. Contact field inspector. 07/03/03 10/20/03 Wear course. All iron raised with casting cover adjustment rings 20 only. 07/03/03 10/20/03 PROVIDE 48 HOURS NOTICE PRIOR TO THE START OF THIS WORK. THIS WORK SHOULD BE COMPLETED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE 3 (CONTRACT TIlVIE) OF THE AGREEMENT. REMARKS: Cannot check any sanitary sewer items until pickholes are clean. Pickholes full of blacktop 10/20/03. Ok at 11/24/03. Issued By: Russ Bly Title:- RPR cah c: Pete Carlson SEH Mike Czech, SEH Larry Kruse, City of Albertville Tim Guimont, City of Albertville W:\ALBEV \0213\SPECS\PUNCHLIST-082802.DOC Don Jensen, Woodside Northridge, LLC. Meyer-Rohlin Inc. LaTour Construction