1999-07-16 Bid AbstractMEYER-ROHLIN, INC.
ENGINEERS-LAND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn. 55313 Fax 612-682-9492
Phone 612-682-1781 1-800-563-1781
Don Jensen
Pilot Land Development Company
13736 NE Johnson Street
Ham Lake, MN 55304
Re: Bid Abstract and Recommendation
PAAiI''ot Land D. evelopment Trail Project
tl~,FrtF711e. A'~T
Dear Don,
July 16, 1999
Please find attached a copy of the bid abstract for the above referenced project. Two bids were
received for the project as shown on the abstract.
It is our recommendation that the bid from Omann Brothers, Inc. be accepted for the project.
Since the bid was set up with options, the following items should be accepted:
Bid No. Total Price C'-b ~ .°' ~ ~/~ ~kSte(,~
A 1c $ 47,700.00 C~ ~ ° ~~9, 9 3C. ~• f-y~s
__
B 1c $ 37,500.00 ~~' ..
B 2 $ 3,200.00
C 1 $ 9,600.00
C 2 $ 4,980.00
C 3 $ 4,760.00
Total = $ 107,740.00
Please forward your concurrence with this recommendation and a contract will be forwarded to
Omann Brothers, Inc. for execution.
If you have any questions or comments, please do .not hesitate to contact me.
Sincerely,
cc: Pete Carlson - SEH/RCM
File 99202
MEYER-ROHLI,N'~,~I~NC.
~~~,1 ~~~
Scott Dahlke
Professional Engineer
Thore P. Meyer, Professional Engineer Robert Rohlin, Licensed Land Surveyor
ABSTRACT OF BIDS
FOR
Pilot Land Development Trail Project
,41~ertville, ~~I~
Bid Opening July 15, 1999; 2:00 p.m.
Meyer-Rohlin, Inc., 1111 Highway 25 North, Buffalo, MN 55313
Project No. 99202
BID A : Cedar Creek North -Sheet 2 DMJ Corporation I ~mann Rrntharc
No.
Item
Qty.
Unit Unit
Price Total
Price Unit
Price Total
Price
1a 5' Concrete -Option 1 3180 LF $35.00 $111,300.00
1b 6' Concrete -Option 2 3180 LF $38.00 $120,840.00
1 c 8' Bituminous -Option 3 3180 LF $27.00 $85,860.00 $15.00 $47,700.00
BID B : Parkside 3rd Addition -Sheet 3
No.
Item
Qty.
Unit Unit
Price Total
Price Unit
Price Total
Price
1 a 5' Concrete -Option 4 2500 LF $35.00 $87,500.00
1 b 6' Concrete -Option 5 2500 LF $38.00 $95,000.00
1 c 8' Bituminous -Option 6 2500 LF $27.00 $67,500.00 $15.00 $37,500.00
2 Curb Return Reconstruction 8 EA $700.00 $5,600.00 $400.00 $3,200.00
BID C : Center Oaks -Sheet 4
No.
Item
Qty.
Unit Unit
Price Total
Price Unit
Price To#al
Price
1 8' Bituminous - Detail A 840 LF $33.00 $21,12Q.00 $15.00 $9,600.00
2 8' Bituminous - Detail B .332 LF $35.00 $11,620.00 $15.00 $4,980.00
3 8' Wood Chip - Detail C 560 LF $22.00 $12,320.00 $8.50 $4,760.00
Page 1