PROPOSAL FORM (Accepted 4/7/99)
FOR
Cedar Creek South 3rd Addition
Street and Utility Improvement Project
Albertville, MN
Owner: Pilot Land Development Company Engineer: Meyer-Rohlin, Inc.
13736 NE Johnson St 1111 Highway 25 North
Ham Lake, MN 55304 Buffalo, MN 55313
Bid Submitter: Latour Construction Inc. Date: 4/7/99
The undersigned, as bidder, hereby proposes and, if this proposal is accepted, agrees to
furnish bonds as required and to enter into a contract with the Owner to furnish all mater-
ials, labor, skill, tools and equipment for the complete construction of streets and utilities,
including all accessories as called for by the Specifications herewith, as prepared by
Meyer-Rohlin, Inc., Engineers and Land Surveyors, 1111 Highway 25 North, Buffalo, MN,
55313, acting as and in these contract documents entitled as the Engineer for the
following estimated quantities and unit prices:
BID A - Sanitary Sewer
Unit Total
No. Item Oty. Unit Price Price
1 8" PVC, SDR35, (0-8') 581 LF $ 14.10 $ 8,192.10
2 8" PVC, SDR35, (8'-10') 1582 LF $ 14.50 $ 22,939.00
3 8" PVC, SDR35, (10+') 5 LF $ 16.60 $ 83.00
4 10" PVC, SDR35, (0-10') 56 LF $ 15.80 $ 884.80
5 10" PVC, SDR35, (10+') 5 LF $ 17.80 $ 89.00
6 48" Manhole 12 EA $ 1,250.00 $ 15,000.00
7 Manhole Extra Depth 32 VF $ 69.00 $ 2,208.00
8 Sanitary Service Group 46 EA $ 60.00 $ 2,760.00
9 4" PVC Sanitary Service Pipe 2070 LF $ 6.30 $ 13,041.00
10 8" PVC Clean out 1 EA $ 235.00 $ 235.00
11 8" PVC Cap 2 EA $ 19.30 $ 38.60
TOTAL BID "A" $ 65,470.50
BID B - Water Main
[;J Item I I Unit I Unit I Total I
Qty. Price Price
Page 1 -
BID D - Streets
Unit Total
No. Item Qty. Unit Price Price
1 Subgrade Preparation 11020 SY $ 0.50 $ 5,510.00
2 Geotextile Fabric, Type V (Optional) 11020 SY $ 0.90 $ 9,918.00
3 Granular Borrow (CV) 5510 CY $ 9.20 $ 50,692.00
4 Class 5 Gravel Base (CV) 1836 .CY $ 12.75 $ 23,409.00
5 Concrete Curb & Gutter - All types 5015 LF $ 6.80 $ 34,102.00
6 Type 31 Bituminous Base Course 23310 SY-IN $ 1.40 $ 32,634.00
7 Type 41 Bituminous Wear Course 18025 SY-IN $ 1.70 $ 30,642.50
8 Remove & Dispose Existing Bituminous 40 SY $ 1.60 $ 64.00
9 Adjust Manhole 12 EA $ 240.00 $ 2,880.00
10 Adjust Gate Valve 4 EA $ 135.00 $ 540.00
11 Seed, Mulch & Disk Anchor 6.0 AC $ 510.00 $ 3,060.00
TOTAL BID "0" $ 193,451.50
."
BID E - Trail
TOTAL BID "E"
Unit Total
Qty. Unit Price Price
2270 LF $ 10.90 $ 24,743.00
$ 24,743.00
No. Item
1 8' Bituminous Trail
TOTAL BIDS "An, "B", "C", "D", "E"
$406,654.10 '1
X 4111D~ ::: gBfo
Page 3