2000-09-25 Construction Plan Review
~SeJ
1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302-1717 320.229.4300
320.229.4301 FAX
architecture
engineering
environmental
transportation
September 25, 2000
RE: Albertville, Minnesota
Cedar Creek South 6th Addition
SEH No. A-ALBEV 0105.00 14
Jon Wilczek
Proj ect Engineer
Meyer-Rohlin
1111 Highway 25 North
Buffalo, MN 55313
Dear Jon:
I reviewed the construction plans for this project dated September 1, 2000, and have the following
comments:
1) Install cleanouts at all bends in the sanitary sewer services and along any services greater than
100 feet in length.
2) Revise street or storm sewer grades so that catch basins are installed at the low points on both
sides of the street.
3) Rename Townhomes Drive to Jason Court.
4) Revise entrance to CSAH 18 to flatten the grade.
5) Include spot elevations at curb returns to show how the street will drain.
6) Use City standard detail plates for all utilities, not required on street details because it is a
private street.
Revise and resubmit for approval. Call me at 320/229-4373 if you have any questions.
Sincerely,
~I!SlL
Wayne C. Stark, P.E.
Project Engineer
djg
Enclosure: Redlined Drawings
c: Linda Goeb, City of Albertville
Don Jensen, Pilot Land Development
Pete Carlson, SEH
w:\albevIOOlllcorrlse25aOO-l.doc
Short Elliott Hendrickson Inc.
Offices located throughout the Upper Midwest
ffi help you plan, design, and achieve.
Equal Opportunity Employer