Loading...
2001-09-11 Street and Utility Plan Review !~fP H :l ~nny; MEMORANDUM :~,-u ',i~ ~;tii! 1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302-1717 320.229.4300 800.572.0617 320.229.4301 FAX TO: Linda Goeb City Administrator Albertville, Minnesota FROM: Peter J. Carlson, P.E. City Engineer DATE: September 11, 2001 RE: 2001 Cedar Creek South 7th Addition Street and Utility Plan Review Albertville, Minnesota SEH No. A-ALBEV 0202.00 14 I have reviewed the Street and Utility plans for the above referenced project and have the following comments. 1) The easement shown on the preliminary/final platon Lot 26, Block 1 should be described as an Access, Drainage, and Utility Easement. 2) The Typical Entrance Drive and Townhomes Drive Sections thickness should be as follows: 1.5 inches bituminous wear, 2.5 inches bituminous base, 8 inches Class 5, and 12 inches sand. 3) The street sections should also include geotextile fabric throughout. See city plates. 4) Draintile should be placed under the curb 100 feet either direction from all low points, connected to a catch basin. See city plates. 5) A permit should be obtained from Wright County allowing storm water runoff into the county highway right-of-way before construction begins. shlcb c: Mike Couri, City Attorney Cindy Sherman, Northwest Associated Consultants Jon Wilczek, Meyer-Rohlin, Inc. Scott Hedlund, SEH w:\albevI0202Icom091101.-<;ity-m.doc Short Elliott Hendrickson Inc. Your Trusted Resource . Equal Opportunity Employer