Loading...
1997-08-25 MDH Report on Plans MINNESOTA DEPARTMENT OF HEALTH Division of Environmental Health REPORT ON PLANS Plans and specifications on watermain: Center Oaks Second Addition Street and Utility Improvements, Albertville, Wright County, Minnesota, Plan No. 980538 OWNERSHIP: City of Albertville, c/o Ms. Linda Houghton, Clerk, Albertville City Hall, 5975 South Main Avenue NE, PO. Box 9, Albertville, Minnesota 55301 SUBMITTER(S): Meyer-Rohlin, Inc., 1111 Highway 25 North, Buffalo, Minnesota 55313 Date Examined: August 25, 1997 Date Received: August 22, 1997 SCOPE: This report covers the design of this project insofar as the safety and sanitary quality of the water for public consumption may be affected, and applies to this project only and not to the entire system or any other part thereof. The examination of plans is based upon the supposition that the data on which the design is based are correct, and that necessary legal authority has been obtained to construct the project. The responsibility for the design of structural features and the efficiency of equipment must be taken by the project designer. Approval is contingent upon satisfactory disposition of any requirements included with this report. Water supply plans are examined with regard to the location, construction and operational features of the design and maintenance of all parts of the system which may affect the safety and sanitary quality of the water. Examination is based on the standards of this department. This project consists of the installation of approximately 600 lineal feet of 8-inch PVC watermain. REQUIREMENT(S): NONE COMPLIANCE: No construction shall take place except in accordance with the approved plans. If it is desired to make deviations from the approved plans, the State Department of Health should be consulted and approval of the changes obtained before construction is started; otherwise, such construction is installed without proper approval, and in addition may create dangers to public health. Authorization for construction in accordance with the approved plans may be withdrawn if construction is not undertaken within a period of two years. The fact that the plans have been approved does not necessarily mean that recommendations or requirements for change will not be made at some later time when changed conditions, additional information, or advanced knowledge make improvements necessary. Approved: Sj'LU~~'>- ~ 111k'4 Douglas J. Mandy, PE. Technical/Administrative Supervisor Public Water Supply Unit Section of Drinking Water Protection 612/215-0757 ~~-:L P - Karla R. Peterson Public Health Engineer Section of Drinking Water Protection 612/215-0761 DJM:KRP:mak cc: City of Albertville ... Meyer-Rohlin, Inc. File