1998-07-30 As-Built Approval
08/12/1998 14:11
612-497-4908
JOINT POWERS
PAGE 02
Howard R. Green Company
CONSULTING ENGINEERS
July 30, 1998
File: 802700J
.~
(lIW,1IURI!IIlllS
Formerly MSA
CO.1SU(ling EnglnGtllS
Ms. Donna Kipka
Joint Powers Water Board
P.O. Box 10
Albertville. MN 55301
RE: CENTER OAKS 2ND ADDITION
AS-BUILT APPROVAL SUPPORTING INFORMATION
Dear Ms. Kipka:
As you are aware, the revised record plans submitted on July 27, 1998, for the above
referenced project met the Joint Powers Water Board's standards, and allowed us to
recommend approval to the Board. Since the As-Built plans for this project were then approved
at the Board meeting that same day, the following information is hereby provided;
· This development was re-platted after the design plans were approved. The information
provided in this letter applies to what was called Center Oaks 2M Addition on the project
plans as approved, and what is now been re~platted as Center Oaks 2nd Addition, and the
following areas of Center Oaks 3rd Addition: Lots 1 & 2 of Block 1; lots 1 through 11 of Block .
2; and Lots 11 through 14 of Block 4.
· This project contains 45 residential lots, which will result in an estimated water use of
. 5,400,000 gallons per year when all houses are built and occupied.
· Based on the pressure contour map of the Joint Powers service area, last updated in 1996,
Center Oaks 2nd Addition lies within the 70 to 75 PSI pressure l:one.
· There are 8 permanent and 2 temporary hydrants 011 this project, all with auxiliary valves.
. There are 7 gate valves on this project.
If you have any questions about the information in this letter, please call me.
Sincerely.
Howard R. Green Company
~~1)'~~(]L-" I
Randy D. Surbaugh,iE~
Project Engineer
RDS:mw
o:\proj\S02700J\700-3001jul