Loading...
1998-07-30 As-Built Approval 08/12/1998 14:11 612-497-4908 JOINT POWERS PAGE 02 Howard R. Green Company CONSULTING ENGINEERS July 30, 1998 File: 802700J .~ (lIW,1IURI!IIlllS Formerly MSA CO.1SU(ling EnglnGtllS Ms. Donna Kipka Joint Powers Water Board P.O. Box 10 Albertville. MN 55301 RE: CENTER OAKS 2ND ADDITION AS-BUILT APPROVAL SUPPORTING INFORMATION Dear Ms. Kipka: As you are aware, the revised record plans submitted on July 27, 1998, for the above referenced project met the Joint Powers Water Board's standards, and allowed us to recommend approval to the Board. Since the As-Built plans for this project were then approved at the Board meeting that same day, the following information is hereby provided; · This development was re-platted after the design plans were approved. The information provided in this letter applies to what was called Center Oaks 2M Addition on the project plans as approved, and what is now been re~platted as Center Oaks 2nd Addition, and the following areas of Center Oaks 3rd Addition: Lots 1 & 2 of Block 1; lots 1 through 11 of Block . 2; and Lots 11 through 14 of Block 4. · This project contains 45 residential lots, which will result in an estimated water use of . 5,400,000 gallons per year when all houses are built and occupied. · Based on the pressure contour map of the Joint Powers service area, last updated in 1996, Center Oaks 2nd Addition lies within the 70 to 75 PSI pressure l:one. · There are 8 permanent and 2 temporary hydrants 011 this project, all with auxiliary valves. . There are 7 gate valves on this project. If you have any questions about the information in this letter, please call me. Sincerely. Howard R. Green Company ~~1)'~~(]L-" I Randy D. Surbaugh,iE~ Project Engineer RDS:mw o:\proj\S02700J\700-3001jul 1326 Energy Park Drive · St. Paul, MN 55108 · 612/644.4389 lax 6121644-9446 toll free 8881368-4389