July 24, 1998
File: 802700
Formerly MSA
COI1:>ulting cngln99rs
Ms. Donna Kipka
Joint Powers Water Board
P.O. Box 10
Albertville. MN 55301
RE: CENTER OAKS 2ND ADDITION, PHASE II
, FIRST AS-BUIl.T REVIEW
Dear Ms. Kipka:
We have completed our review of the record plans submitted on July 16\h, 1998, and the revised
plans submitted July 1 t'... 1998, for the above referenced project, and offer the following
comments:
· The water services to Lots 1 & 2, Block 1 are not tied on the plans and tie cards" Corrected
plans and tie cards should be submitted.
... . Thewatermain stub at 2+16 Kahler Drive South is not adequately tied. Two ties should be
shown on. the. plans .and tie cards for this stub.
· The block numbering has been changed on the plan sheets since the preliminary plat, but
the numbering was. not updated on the tie cards. Revised tie cards should be submitted that
match the plans.
· The bacteria, tracer wire, and pressure tests have all been conducted and passed,
· Since the wear course paving has not been done on this project. and site grading is
incomplete. it is currently not possible to check: hydrant and gate valve settings.
Based on the i,tems listed above, we'do not recommendapprovaloJthe a~built plans for Center
Oaks Center 2nd Addition, Ph~se II,' tJntil the noted corrections are made If you have any
questions, please call me,
Sincerely I
Howard R. Green Company
f{~j)-~~
Randy D. Su~baugh,.?E '.' ..'
RDS:mW
O:\PROJ\802700j\700-2402.jul