Loading...
1998-07-27 Second As-Built Review 08/12/1998 14:11 512-497-4908 JOINT POWERS PAGE 03 Howard R. Green Company CONSULTING ENGINEERS July 27, 1998 File: 802700 'US,j ! 1 lt1 L j m'Stlt'D~.ms Form9r!y MSA Consulting Engin"f8 Ms. Donna Kipka Joint Powers Water Board P.O. Box 10 Albertville, MN 55301 RE: CENTER OAKS 2ND ADDITION, PHASE II SECOND AS-BUILT REVIEW Dear Ms. Kipka: We have completed our review of the revised record plans submitted on July 23rd. 1998, for the above referenced project, and offer the following comments: · The water services to Lots 1 & 2, Block 1 are now tied on the plans, and matching tie cards have been submitted. · The revi$ed plan's block numbering is now consistent with the tie cards, but the numbering now causes another problem. Center Oaks has apparently been fe-platted, and part of the development that was covered by the plans for Center Oaks 2nd Addition, Phase II, is now shown on these as-built plans as part of Center Oaks 3rd Addition. This creates a very confusing situation, since'the title block on the as-built plans submitted do not describe the development as now platted. · The bacteria, tracer wire, and pressure tests have all been conducted and passed. · Since the wear course paving has not been done on this project. and site grading is . incomplete, it is currently not possible to check hydrant and gate valve settings. · For the Board's information, this development contains 44 lots, which will result in an estimated water usage of 5,280,000 gallons per year when all houses are built. Based on the second item listed above, we do not recommend approval of the as-built plans for Center Oaks Center 2nd Addition, Phase II, until the project and block numbering situation can be resolved, If you have any questions, please call me. Sincerely, Howard R Green Company an~h~~ Project Engineer , Cc: Scott Dahlke, Meyer-Rohlin RDS:mw 1326 Energy Park Drive · St. Paul, MN 55108 · 612/644-4389 fax 612/644-9446 toll tree 888/366-4389