2002-07-16 Punch List ~Sel 1200 25th Avenue South, P.O. Box 1717, Sl. Cloud, MN 56302-1717 320.229.4300 800.572.0617 320.229.4301 FAX PUNCH LIST OWNER CONTRACTOR SEHNO. OWNER NO. PROJECT DATE OF CURRENT ISSUE DATE OF ORIGINAL ISSUE SUBSTANTIAL COMPLETION FINAL COMPLETION 07/16/02 10/30/01 2001 Heuring Meadows, Albertville, Minnesota Below is a list of items which must be completed or corrected prior to final acceptance of the subject project. A completion of these items does not in any way relieve the Contractor of the responsibility to complete the project in accordance with all Contract Documents. Item Date Date No. Item Reviewed Comments Accepted 1. Clean MH benches & inverts. 7/12/02 Not done 2. Clean casting seats of sand & dirt for proper 7/12/02 Not done seal. Replace any seals with rock pits. 3. MH top step (a) 53rd & Kal: bent. 7/12/02 Looks good, seal on MH bad 7/12/02 4. Grade too low around hydrant @ Lot 4/5 7/12/02 Hyd2 Block 2. Box may be busted when plowing. Needs grading 5. Hydrant 3, Lot 8/9 Block 1 too high. 7/12/02 Developer wants to grade around hydrant 6. Place LotIBlock signs behind silt fence. 7/12/02 7/12/02 7. Factory coat hydrant red paint. 7/12/02 Needs touch-up 8. Patch trail to park behind curb - smoother 7/12/02 7/12/02 transition. 9. Remove any fence posts or markings at 7/12/02 7/12/02 back of curb to back of silt fence. 10. Televise sanitary sewer and make 2 tapes. 11. CB 29 at Kal: Kalland doghouse mortar has 7/12/02 No attempt pulled out and tile to be cut back. 12. Place sidewalk on 53rd - fine grade and 7/12/02 Sidewalk done. seed 53rd boulevard for mowing. Needs seed & silt fence. 13. House pad seeding on all lots not 7/12/02 7/12/02 constructed. 14. Sanitary MH's #11 and 12 -- raise to grade 7/12/02 No attempt for access. 15. Hydrant Lot 6/7 Block 3 -- remove light 7/12/02 7/12/02 pole from front of hydrant. 1 Item No. Item Date Reviewed Comments Date Accepted 16. 7/12/02 Not done Not done 23. 7/12/02 No attempt 24. 7/12/02 7/12/02 25. 7/12/02 No attempt 26. 7/12/02 PROVIDE 48 HOURS NOTICE PRIOR TO THE START OF THIS WORK. THIS WORK SHOULD BE COMPLETED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE 3 (CONTRACT TIME) OF THE AGREEMENT. REMARKS: Issued By: Mike Czech Title: RPR sl c: Pete Carlson SEH Mike Czech, SEH Linda Goeb, City of Albertville Tim Guimont, City of Albertville Ralph Munsterteiger, Leuer Munstertieger Properties Scott Dahlke, Quality Site Design Matt Bullock Contracting w:\albevIOllOlspecslpunchlist.doc 2