2002-07-16 Punch List
~Sel
1200 25th Avenue South, P.O. Box 1717, Sl. Cloud, MN 56302-1717
320.229.4300
800.572.0617
320.229.4301 FAX
PUNCH LIST
OWNER
CONTRACTOR
SEHNO.
OWNER NO.
PROJECT
DATE OF CURRENT ISSUE
DATE OF ORIGINAL ISSUE
SUBSTANTIAL COMPLETION
FINAL COMPLETION
07/16/02
10/30/01
2001 Heuring Meadows, Albertville, Minnesota
Below is a list of items which must be completed or corrected prior to final acceptance of the subject project. A
completion of these items does not in any way relieve the Contractor of the responsibility to complete the
project in accordance with all Contract Documents.
Item Date Date
No. Item Reviewed Comments Accepted
1. Clean MH benches & inverts. 7/12/02 Not done
2. Clean casting seats of sand & dirt for proper 7/12/02 Not done
seal. Replace any seals with rock pits.
3. MH top step (a) 53rd & Kal: bent. 7/12/02 Looks good, seal on MH bad 7/12/02
4. Grade too low around hydrant @ Lot 4/5 7/12/02 Hyd2
Block 2. Box may be busted when plowing. Needs grading
5. Hydrant 3, Lot 8/9 Block 1 too high. 7/12/02 Developer wants to grade
around hydrant
6. Place LotIBlock signs behind silt fence. 7/12/02 7/12/02
7. Factory coat hydrant red paint. 7/12/02 Needs touch-up
8. Patch trail to park behind curb - smoother 7/12/02 7/12/02
transition.
9. Remove any fence posts or markings at 7/12/02 7/12/02
back of curb to back of silt fence.
10. Televise sanitary sewer and make 2 tapes.
11. CB 29 at Kal: Kalland doghouse mortar has 7/12/02 No attempt
pulled out and tile to be cut back.
12. Place sidewalk on 53rd - fine grade and 7/12/02 Sidewalk done.
seed 53rd boulevard for mowing. Needs seed & silt fence.
13. House pad seeding on all lots not 7/12/02 7/12/02
constructed.
14. Sanitary MH's #11 and 12 -- raise to grade 7/12/02 No attempt
for access.
15. Hydrant Lot 6/7 Block 3 -- remove light 7/12/02 7/12/02
pole from front of hydrant.
1
Item
No.
Item
Date
Reviewed
Comments
Date
Accepted
16.
7/12/02
Not done
Not done
23.
7/12/02
No attempt
24.
7/12/02
7/12/02
25.
7/12/02
No attempt
26.
7/12/02
PROVIDE 48 HOURS NOTICE PRIOR TO THE START OF THIS WORK. THIS WORK SHOULD BE
COMPLETED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE 3 (CONTRACT TIME) OF THE
AGREEMENT.
REMARKS:
Issued By: Mike Czech
Title: RPR
sl
c: Pete Carlson SEH
Mike Czech, SEH
Linda Goeb, City of Albertville
Tim Guimont, City of Albertville
Ralph Munsterteiger, Leuer Munstertieger Properties
Scott Dahlke, Quality Site Design
Matt Bullock Contracting
w:\albevIOllOlspecslpunchlist.doc