2001-04-05 Final Plan and Spec Review "'SeH MEMORANDUj 1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302-1717 320.229.4300 800.572.0617 320.229.4301 FAX TO: Linda Goeb City of Administrator City of Albertville, Minnesota FROM: Peter J. Carlson, P .E. ike, City Engineer 1\\1 DATE: April 5, 2001 RE: 2001 Heuring Meadows Final Plan and Specification Review Albertville, Minnesota SEH No. A-ALBEV 0110.00 14 I reviewed the final plans and specifications for the above referenced project and have the following comments: Street and Utility Plan Sheet 3 1. The water main connection at County Road 19 shall be revised to installing a 16- inch x 12-inch cross, two 12-inch gate valves, and 20-feet of 12-inch PVC water main to the east. The cost of the additional gate valve and water main pipe would be considered trunk water cost and should be reimbursed from the trunk water main fund. Sheet 4 2. Move the hydrant located between Lots 5 and 6, Block 2 to the lot line between Lots 4 and 5, Block 2. 3. Add an 8-inch gate valve at approximately Station 5+50. 4. Because of the length of the sanitary sewer service, clean outs will be required for Lots 8-10, Block 1. Sheet 5 5. Add an 8-inch gate valve at approximately Station 4+75. Sheet 6 6. Revise curb radius in the southeast comer of the intersection of 53rd Street and Kyler Avenue to 50 feet. Because of this change, the hydrant shall be relocated to approximate station 0+80 along Kyler A venue. Short Elliott Hendrickson Inc. Offices located throughout the Upper Midwest We help you plan, design, and acllieve. . . Equal Opportunity Employer Final Plan and Specification Review April 5, 2001 Page 2 Sheet 7 7. Revise curb radius in the southeast comer of the intersection of 53rd Street and Kyler Avenue to 50-feet. Sheet 8 8. Add 25-feet of drain tile to the upstream side of CB's 10 and II. 9. Revise the entrance and exit radius in the half cul-de-sac area from 15- to 100- feet. Sheet 9 10. Add 25-feet of drain tile to the upstream side of CB's 27, 28, and 29. 11. Provide connections in the rear yard storm sewer to allow for sump pump connection from Lots 2-9, Block 3. Sheet 11 12. Provide connection points in the rear yard storm sewer to allow for sump pump connection for Lots 1-16, Block 2. Sheet 12 1. Improvements to CSAH 19 shall be approved by the Wright County Highway Department. The county requires epoxy paint for striping the road pavement. Grading Plan 1. Drain tile will be required in the rear yard area where there is no storm sewer planned. The drain tile is intended for sump pump connections. Street Lighting Plan 1. Relocate light 3 to the lot line between Lots 5 and 6, Block 4. 2. Relocate light 8 to the lot line between Lots 2 and 3, Block 4. Specifications Special Provisions 1. Revise dates in section 1 to the years 2001 and 2002. Please call me if you have any questions. md c: Mike Couri, Couri & MaCarthur Law Office Cindy Sherman, Northwest Associated Consultants Scott Dahlke, Quality Site Design Wayne Stark, SEH Mike Czech, SEH w:\albcv\OII O\corr\ap05aO I-m.doc