Loading...
1998-02-18 Prelim Plat, Grading, & Utility Plan Review ....SBt MEMORANDUM o ST. PAUL, MN o MINNEAPOLIS, MN . ST CLOUD, MN 0 CHIPPEWA FALLS, WI 0 MADISON, WI o LAKE COUNTY, IN TO: Dave Lund City Administrator Albertville, Minnesota FROM: Peter 1. Carlson, P .E. City Engineer DATE: February 18, 1998 RE: Preliminary Plat, Grading and Utility Plan Review Parkside Commercial Center Albertville, Minnesota SEH No. A-ALBEV 9801.00 I have reviewed the revised plans referenced above and have the following comments: 1. The 45-foot wide access easement should be platted as an access and utility easement. 2. The proposed easterly driveway is too wide and shall be reduced to 30 feet. This driveway is intended as a right-in only driveway. Even though the driveway will be signed as "no exit", the proposed 40-foot width would be too tempting for costumers to use as an exit. 3. There is a conflict between the proposed fire hydrant and storm sewer. The plan shall be revised. 4. Show the size ofthe proposed storm sewer on the plan. Please call me if you have any questions. c: Linda Goeb, City Clerk Mike Couri, City Attorney Liz Stockman, City Planner Meyer-Rohlin, Inc. J:\ALBEV\CORRIFB 18A-98.WPD An Affirmative Action, Equal Opportunity Employer