1998-02-18 Prelim Plat, Grading, & Utility Plan Review
....SBt
MEMORANDUM
o ST. PAUL, MN
o MINNEAPOLIS, MN
. ST CLOUD, MN 0 CHIPPEWA FALLS, WI 0 MADISON, WI
o LAKE COUNTY, IN
TO:
Dave Lund
City Administrator
Albertville, Minnesota
FROM:
Peter 1. Carlson, P .E.
City Engineer
DATE:
February 18, 1998
RE:
Preliminary Plat, Grading and Utility Plan Review
Parkside Commercial Center
Albertville, Minnesota
SEH No. A-ALBEV 9801.00
I have reviewed the revised plans referenced above and have the following comments:
1. The 45-foot wide access easement should be platted as an access and utility easement.
2. The proposed easterly driveway is too wide and shall be reduced to 30 feet. This driveway
is intended as a right-in only driveway. Even though the driveway will be signed as "no
exit", the proposed 40-foot width would be too tempting for costumers to use as an exit.
3. There is a conflict between the proposed fire hydrant and storm sewer. The plan shall be
revised.
4. Show the size ofthe proposed storm sewer on the plan.
Please call me if you have any questions.
c: Linda Goeb, City Clerk
Mike Couri, City Attorney
Liz Stockman, City Planner
Meyer-Rohlin, Inc.
J:\ALBEV\CORRIFB 18A-98.WPD
An Affirmative Action,
Equal Opportunity Employer