Loading...
2022-01-11 Planning Commisson Packet A1bcrtvillf: 5 mail Town Ehrirtg.ft city life. PLANNING COMMISSION MEETING Tuesday January 11, 2022 7:00 PM 1. CALL TO ORDER- ROLL CALL—ADOPT AGENDA 2. MINUTES December 14, 2021 Planning Commission Meeting (pages 1-3) 3. PUBLIC HEARINGS a. Public hearing to consider a request from Scherer Limited Partnership for: • Comprehensive plan amendment • Zoning Map Amendment changing the zoning from B-2A Special Business District to I-2 General Industrial District • Preliminary and Final Plat • Conditional Use Permit for Outdoor Storage • Site and Building Plan Review. (pages 4-30) 4. OTHER BUSINESS None 5. ADJOURNMENT �,lbcrtvillc Steal Town.Uwng.Big CRY Uft. ALBERTVILLE PLANNING COMMISSION TUESDAY, DECEMBER 14, 2021 DRAFT MINUTES ALBERTVILLE CITY HALL 7:00 PM 1. CALL TO ORDER- ROLL CALL -ADOPT AGENDA Chair Buhrmann called the meeting to order at 7:00 p.m. Maeghan Becker conducted roll call. Present: Chair Buhrmann and Commissioners Anderson, Huggins, Smith and Council Liaison Zagorski. Absent: Hayden. Others Present: City Planner Al Brixius, and Building Permit Technician Maeghan Becker, Charlie Pfeffer with Pfeffer Real Estates LLC, and Ian Peterson with Integrate Properties Motioned by Huggins,seconded by Anderson to approve the agenda.Ayes: Buhrmann,Anderson,Huggins and Smith.Nays:None.Absent:Hayden.MOTION DECLARED CARRIED. 2. MINUTES Motioned by Anderson,seconded by Buhrmann to approve the November 9, 2021 Planning Commission meeting minutes.Ayes:Buhrmann,Anderson, Huggins and Smith.Nays:None.Absent:Hayden.MOTION DECLARED CARRIED. 3. PUBLIC HEARINGS A. Public hearing to consider a request from Integrate Properties LLC to amend the Albertville zoning map changing the zoning on Outlots D and F of Preserve of Albertville from PUD Planned Unit Development to P/I Public Institutional District and removing Outlots D and F from the Preserve at Albertville PUD/Development Agreement. Brixius went over the Preserve at Albertville Outlots D and F Zoning Map Amendment request from Integrate Properties LLC to the Commissioners. The intent of this is to provide sufficient land area for the operation and expansion of Joint Powers Water facilities at their present location. Brixius went over the following findings: 1. The change in zoning is consistent with the Albertville Visioning Study policies. 2. The land use is compatible with surrounding land uses. 3. The change in zoning will not overburden City utilities or services. 4. The change in zoning will not result in traffic generation beyond the capacity of streets serving the property. City Staff recommends approval. Motioned by Smith,seconded by Anderson to open the Public Hearing. Ayes:Buhrmann,Anderson, Huggins and Smith.Nays:None.Absent: Hayden.MOTION DECLARED CARRIED. No one wished to speak. Motioned by Anderson,seconded by Huggins to close the Public Hearing. Ayes:Buhrmann,Anderson, Huggins and Smith.Nays:None.Absent: Hayden.MOTION DECLARED CARRIED. Motioned by Anderson,seconded by Buhrmann to approve the request from Integrate Properties LLC to amend the Albertville zoning map changing the zoning on Outlots D and F of Preserve ofAlbertville from PUD Planned Unit Development to P/I Public Institutional District and removing Outlots D and F from the Preserve atAlbertville PUD/Development Agreement.Ayes: Buhrmann,Anderson,Huggins and Smith.Nays:None.Absent:Hayden.MOTION DECLARED CARRIED. IR 4. OTHER BUSINESS A. Updates Brixius gave updates and had discussions with Commissioners on the following topics/properties: 1. Football Training Facility 2. Shoppes at Town Lakes 2 development interests Planning Commission Meeting Minutes 2 Regular Meeting of December 14,2021 3. Scherer Bros Relocation 5. ADJOURNMENT Motioned by Huggins,seconded by Smith to adjourn the meeting at 7:25p.m. Ayes:Buhrmann,Anderson, Huggins and Smith.Nays:None.Absent:Hayden. MOTION DECLARED CARRIED. Respectfully submitted, Maeghan M. Becker, Building Permit Technician Planning Commission Meeting Minutes 3 Regular Meeting of December 14,2021 NORTHWEST ASSOCIATED CONSULTANTS , IN,C,, 4150 Olson Memorial Highway, Ste. 320, Golden Valley, MN 55422 Telephone: 763.957.1100 Website: www.nacplanning.com PLANNING REPORT TO: Adam Nafstad FROM: Logan Brown DATE: January 6, 2022 RE: Albertville — Scherer LP • Comprehensive Plan Amendment • Rezoning • Preliminary Plat • Site and Building Plan Review • Conditional Use Permits FILE: 163.06 — 21.10 BACKGROUND Scherer LP has requested the approval of several applications associated with the proposed construction of a 55,680 square foot manufacturing plant upon a 13.6-acre site located North of Albertville Premium Outlets and South of 671" Street. To facilitate the development proposal, approval of the following development applications have been formally requested: 1. Comprehensive Plan Amendment. To change the guided land use from "Commercial" to "Industrial." 2. Zoning Map Amendment. To change the zoning of the subject 13.6-acre property from B-2A, Special Business District to 1-2, General Industrial. 3. Preliminary Plat. To allow the allow the creation of buildable lot. 4. Site and Building Plan Review. Review of site and building plans is required for new industrial construction. The applicants have proposed a 55,680 square foot building, of which 51 ,288 square feet is to be devoted to plant activities (manufacturing). The remaining 4150 square feet is to be devoted to office use. 5. Conditional Use Permit. To allow accessory outdoor storage on the site. 4 Attachments: Exhibit A: Site location map Exhibit B: Preliminary Plat Exhibit C: Existing Conditions Survey Exhibit D: Site Plan Exhibit E: Grading & Drainage Plan Exhibit F: Utility Plan Exhibit G: Landscape Plan Exhibit H: Landscape Details Exhibit I: Overall Floor Plan Exhibit J: Enlarged Office Floor Plan Exhibit K: Exterior Elevations Exhibit L: Lighting Plan Exhibit M: Engineer Report ISSUES AND ANALYSIS Comprehensive Plan and Zoning Map Amendments The proposed project site is presently guided for "Commercial" use and zoned B-2A, Special Business by the City's Comprehensive Plan. The City's 1995 Land Use Plan (included in the Comprehensive Plan) directs "Industrial" use of the subject site. In 2009, the Land Use Plan was changed to "Commercial" to attract a greater variety of commercial and industrial uses reflected in a 2009 AUAR concept plan. In anticipation of the "Mall of Entertainment" project in 2013, the subject site was rezoned from I-1, Limited Industrial to B-2A, Special Business. The proposed Scherer Bros use is clearly industrial in nature. To accommodate the use, it is necessary to change the guided land use of the site from "Commercial" to "Industrial" and rezone the property from B-2A, Special Business to I-2, General Industrial. Any change in land use or zoning is considered a policy matter to be determined by the City Council. Thus, the requested change in land use requires the City to formally amend its Comprehensive Plan (Land Use Plan) and change the zoning on the property. Section 300.1 F of the Albertville Zoning Code outlines the following criteria for evaluating a Plan amendment or a zoning change: 2 1 P a g e 5 1. The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. Comment: Changes in commercial development trends, shopping patterns, changes in proposed transportation improvements and the loss of the Mall of Entertainment as an anchor for commercial development in this area of Albertville suggest that this area of the City no longer presents a quality sites for commercial land uses. In considering alternative land uses to commercial development, the Albertville 2030 Vision Study emphasizes the need for continued economic development. The Vision Study Economic Development recommendations include: Define the City's land use goals for commercial and Industrial areas related to: • Location, land supply, variable lot size. • Access. Travel patterns. • Zoning: types of use, site design and architectural quality. • Utility availability and capacity." The proposed Land Use Plan change to industrial use within this area (See Exhibit B) is consistent with the City's Economic Development polices of the 2030 Vision Study and works within context and physical features of this area of Albertville. Previous changes to the Plan in 2009 and 2013 were a response to anticipated development projects which never came to fruition and are no longer viable. The 2021 approval of AVA is reflective of this change in land use direction. 2. The proposed use is or will be compatible with present and future land uses of the area. Comment: Prior to 2009, the Albertville Proposed Land Use Plan had guided the northwest area of the City for industrial use. Changing the proposed land use plan and zoning map back to an industrial use will be consistent with adjacent areas guided and zoned for industrial uses lying the north of the subject site. Land to the south and east of the subject site remain guided for commercial use, however, the city will be reevaluating some of the commercially guided land for additional land use changes. 3 Page 6 The proposed industrial use(s) will be compatible with existing and future land uses in the area. 3. The proposed use conforms with all performance standards contained herein. Comment: The applicant has brought forth applications for subdivision and development review. Rezoning the subject site to 1-2, General Industrial will subject the proposed manufacturing facility to all of the performance standards applicable in the district. 4. The proposed use will not tend to or actually depreciate the area in which it is proposed. Comment: Rezoning of the subject site from B-2A, Special Business to 1-2 General Industrial will change the type of allowed uses in this area. The 1-2 District uses are compatible with adjacent industrial and commercial uses and have been identified as preferred uses for this area in the Proposed Land Use Plan. The proposed uses are not expected depreciate the area in which they are proposed. The new Scherer Bros Manufacturing facility will serve as one of the initial industrial anchors to expand industrial development in this area of the City. 5. The proposed use can be accommodated with existing public services and will not overburden the city's service capacity. Comment: Public sewer and water and other utilities exist in this area. The available Municipal utilities in this area of the City have the size and capacity to accommodate the change to industrial land use and zoning. Extensions of and connections to these utilities will be evaluated with the subdivision and site plan proposals that have been submitted. 6. Traffic generation by the proposed use is within the capabilities of streets serving the property. Comment: 671" Street is suitable for industrial traffic requirements. A change of land use guidance and zoning remains a policy decision of the Planning Commission and the City Council. However, City Staff would recommend supporting the land use and zoning change based on the following findings. 4 1 P a g e 7 1 . The City's 2030 Visioning Study identifies a demand for industrial use expansion in the area. 2. The proposed industrial uses are similar to recent 2021 approval of AVA project to the west of the site. 3. The subject area is not considered ideal for future retail commercial uses (per existing guidance) from both a use demand and site access/visibility perspective. 4. The subject site offers convenient access to major roadways which will be conducive to industrial users and related truck traffic. 5. As a requirement of site plan review, compatibility issues will be addressed through screening, land use transitions, building location and site design. 6. Traffic generated by future industrial uses will be within the capability of existing and future streets which serve the area. Developer shall be responsible for need street improvements identified by City Staff and the traffic Study. 7. The proposed land uses will not overburden City utilities and sewer capacity. Preliminary / Final Plat Need. The land currently exists as an outlot and is required to be platted into a lot and block legal description for issuance of a building permit Streets. The preliminary plat consists of one lot which will accommodate Scherer Bros Manufacturing facility. The lot is proposed to be accessed via 671" Street. Lots. As indicated, the preliminary plat includes one building site (Lot 1, Block 1) The 1-2 zoning district does not impose a minimum lot area requirement. Rather, required lot areas are determined by the criteria for parking, loading, setbacks and building coverage as provided in the Zoning Ordinance. The lot is 13.6 Acres in total area. Lot 1 Block 1 exceeds the minimum 100-foot width requirement. Wetlands. The plat illustrates existing wetlands and required wetland buffers. In review of the wetlands we offer the following comments. 1 . Some wetlands are located within the parcel's site development area and will be removed. The applicant shall provide a wetland mitigation plan that identifies the replacement of these wetlands. 5 1 P a g e s 2. Wetland and buffer areas shall be covered with drainage and utility easements and dedicated to the city. Easements. 1 . The plat shows the required drainage and utility easements along lot lines 2. The plat includes the required drainage and utility easements over proposed storm water ponding areas as well as wetlands and buffer area within the outlots. 3. The plat shows the required drainage and utility easements over any municipal utilities outside of the street right of way. 4. The location, size and configuration of all required easements shall be subject to the approval of the City Engineer. Park Dedication. According to the Subdivision Ordinance, a cash in lieu of a land dedication contribution is $2,500 per acre is required for the platting of industrial land. This fee applies on to Lot 1 , Block 1 and only to the buildable area of the lot exclusive of wetlands and wetland buffers. Such fee will be imposed as a condition of final plat approval. Site and Building Plan Review Site Access. The subject site is proposed to be accessed from the east via three points along 67t" street. All three access points measure 24 feet in width. The location of these curb cuts is acceptable; however, staff recommends that the curb cuts be increased to no more than 32-ft in width to better accommodate large truck access and egress. Building Setbacks. As shown below, the building proposed upon Lot 1, Block 1 meets applicable 1-2 District setback requirements. Required Proposed Front Yard 30 feet 105 feet Side Yard - interior 10 feet 250 feet Side Yard - interior 10 feet 535 feet Rear Yard 20 feet 248 feet 6 1 P a g e 9 Off-Street Parking. As shown below, a total of 108 off-street parking stalls are required of the proposed manufacturing facility. Use Ratio Required Stalls Production One stall per 350 net 66 (25,528 gross sf) sf (22,975 net sf) Storage One stall per 1000 23 (25,760 gross sf) net sf (23,184 net sf) Office Three stalls, plus at 22 (4150 gross sf) least one space per (3762 net sf) 200 net sf 108 The submitted site plan illustrates a total of 60 stalls upon the site. Per Albertville city code, a minimum of 108 stalls are required for the building based on its uses. The applicant must provide for 108 parking stalls and that can either be done by providing all 108 in initial construction or by providing proof of parking for the remainder. In conformance with American Disability Act (ADA) requirements, a parking lot having 108 spaces will require five ADA disability parking spaces. Three ADA compliant spaces are adequate for 60 total parking stalls. Proposed parking stalls measure 20 feet in depth and 10 feet in width and meet minimum dimensional requirements of the Ordinance. Further, parking area drive aisles appropriately measure 28 feet in width. Traffic visibility is obstructed by the proposed fence location along the north lot line. Loading. The submitted site plan illustrates overhead garage doors on the west, south and east sides of the building. Ample area exists on the west side of the building for truck maneuvering; however, we raise issue to whether a semi-trailer could maneuver on the south and east side of the building. Applicant shall provide details to the type of trucks that will be loading and unloading at the facility, and a maneuverability template to demonstrate ample space for large trucks to maneuver on the south and east side of the building. Trash Handling. A trash/recycling area is not identified on the site plan. If trash will be stored outdoors, details related to trash handling equipment, trash enclosure size and design and related screening will need to be provided. As a condition of site and building plan approval, details related to trash handling activities must comply with Section 1000.14 of the Albertville Zoning Code. The applicant shall provide details on the trash and recycling handling equipment, trash enclosure design, elevations and demonstrate vehicle access to the equipment inside the enclosure. 7 1 P a g e 10 Building Materials. The proposed building is to be a precast concrete structure. The office space component of the building features a ribbon of storefront aluminum windows along the perimeter of office spaces. The building exterior design meets City code requirements. Building Height. The proposed building measures 24-ft in height and a 2-ft parapet. This is well within the maximum 45-foot requirement imposed in 1-2 zoning districts. Rooftop Equipment. Applicant shall provide City with types, sizes, and locations for all mechanical round- mounted or rooftop equipment. All mechanical rooftop equipment shall be properly screened. Landscaping. As shown on the submitted landscape plan, various plantings are proposed along all sides of the site. Front yard shrubs are intended to screen the parking lot from 67t" street. A shade tree is proposed on the East side of the parking lot, and various grasses are proposed along the perimeter of the property. Additional landscaping with the purpose of screening the outdoor storage is required. Staff recommends a staggered row of Conifer trees having a minimum height of 4-ft and spaced 15-ft on center around the entire perimeter of the outdoor storage area. Lighting. The lighting plan is Compliant with City code, as proposed in Exhibit L. Signage. The proposed plans show both a monument sign (future) and a wall sign. As a condition of site and building plan approval, a sign plan should be submitted that specifies sign locations (freestanding, wall signs, directional signs), sign height, sign area, construction materials and illumination. All proposed signs shall be subject to the issuance of a sign permit. Future Development. The submitted site plan reference notes mentions a 24-ft wide storage building (future). The location of this future storage building has not been identified. To be understood is that any approvals granted for the submitted applications should in no way be construed as an approval of the "future development" area as shown on the site plan. Any future development upon the site will be subject to site and building plan approvals based on their compliance with City development code standards. Grading, Drainage and Utilities. Grading, drainage and utilities plans shall address the City Engineers comments in the January 6t", 2022 memorandum and shall be subject to final review and approval of the City Engineer. Conditional Use Permit — Outdoor Storage 8 1 P a g e 11 1. The area occupied is not within a required front or required side yard. Staff Comment: The proposed outside storage area will not occupy a required front or side yard with a relocated fence. 2. The storage area is totally fenced, fully screened and landscaped according to a plan approved by the Zoning Administrator, and a landscape guarantee, as determined by the Zoning Administrator, is provided. Staff Comment: The storage area is to be totally fenced, fully screened and landscaped. In review of your plans we recommend the following conditions be imposed as part of the plan approval. Provide for an 8-ft tall fence Provide a detail on the materials used for the slats to determine durability Relocate the fence to meet a 30-ft setback from the north lot line and move the fence back to the curb on the west side of the outdoor storage. Demonstrate snow storage within the storage area. Consideration should be given to having gates in the south fence, to allow for snow storage outside the outdoor storage area. In addition to the fence and slats, provide a revised landscape plan that provides a staggered row of conifer trees having a minimum height of 4+ feet, spaced 15 feet on center around the entire perimeter of outdoor storage area. The tree plantings shall attempt to be close to the 960 elevation of the outdoor storage area. 3. If abutting a residential district or use, screening and landscaping is provided according to a plan approved by the Zoning Administrator. Staff Comment: The proposed outdoor storage is not abutting a residential district. 4. The storage area is grassed or surfaced with asphalt, concrete, or crushed rock (concrete or granite) to control dust. Should an area surfaced with anything other than hard surfacing prove to be unmaintainable, the City shall require that a hard surface be installed within three (3) months of formal written notice to the property owner. Staff Comment: According to the applicant, the outdoor storage area will be surfaced with 4' of Class 1 surfacing aggregate, 12" of Class 5 aggregate base and 12" of select granular geotextile type V. This meets code for outdoor storage surface. 9 Page 12 5. All lighting shall be hooded and so directed that the light source shall not be visible from the public right of way or from neighboring residences and shall be in compliance with section 1000.10 of this Chapter. Staff Comment: As proposed, the lighting plan is compliant with City code. 6. The storage area does not encroach upon required public or employee parking space(s), required loading space, or snow storage area as required by this Ordinance. Staff Comment: The proposed outdoor storage area may be affected by the number of parking stalls constructed. Ensure proposed outdoor storage area is exclusive the expanded parking lot,or provide proof of parking. 7. A site plan documenting the location and grading of the storage operation shall be submitted and shall be subject to the approval of the City Engineer. Staff Comment: As required, a site grading plan has been submitted for review. Such plan shall be subject to comment and recommendation by the City Engineer. RECOMMENDATIONS Based on the preceding review, the following is recommended: Comprehensive Plan and Zoning Map Amendments. Approval of the requested Comprehensive Plan amendment (to change the guided land use from "Commercial" to "Industrial") and zoning map amendment (rezoning the subject property from B-2A, Special Business to 1-2 General Industrial) based on the following findings: 1 . The City's 2030 Visioning Study identifies a desire for industrial development within the City to expand local employment opportunities, diversify job groups, provide livable wages and increase the local tax base. 2. The proposed industrial uses are similar to proposed land uses located north, and west of the site. 3. The subject area is not considered ideal for future retail commercial uses (per existing guidance) from both a use demand and site access/visibility perspective. 4. The subject site offers convenient access to major roadways which will be conducive to industrial users and related truck traffic. 5. As a requirement of site plan review, compatibility issues will be addresses 10 Page 13 through screening, land use transitions, building location and site design. 6. Traffic generated by future industrial uses will be within the capability of existing and future streets which serve the area. 7. The proposed land uses will not overburden City utilities and sewer. 8. The proposed land use will contribute to the City tax base and will generate significant fees for the City utility and park funds. Preliminary Plat. 1 . The final plat must be renamed from Outlot B to Lot 1 Block 1 Scherer Limited Partnership addition 2. The applicant shall provide park dedication, or cash in lieu of land dedication at $2500 per buildable acre as a condition for final plat approval. 3. City engineer approval of the size and location of all required easements. Site and Building Plans. Approval of site plan dated 12/13/2021 and building plans dated 12/14/2021 subject to the following conditions: 1 . The applicant shall provide 108 parking stalls either as a site plan revision or by designating proof of parking. The number of disability stalls shall be reflective of the parking lot size. 2. Due to the limited amount of available truck maneuvering space on the east and south side of the building, the intent of loading activities on the south side of the building shall be clarified by the applicant. 3. Details related to trash handling activities shall be addressed by the applicant. 4. Please provide a description of the maintenance and up-keep of the stormwater catch basins to prevent erosion and sedimentation within the catch basins and storm sewer. 5. 24-ft curb cuts should be increased to no more than 32' in width to provide better truck maneuvering. 6. A sign plan shall be submitted which specifies sign locations (freestanding and wall signs and directional signs), sign height, sign area, construction materials and illumination. All proposed signs shall be subject to the issuance of a sign permit. 111 Page 14 7. The applicant acknowledge that any approvals granted for the submitted applications shall in no way be construed as an approval of the "future development" as depicted on the site plan. Any future development upon the site shall minimally be subject to subdivision and site and building plan approvals. 8. The site plan shows a retaining wall. A detail of the retaining wall will be required. 9. The grading, drainage and utilities shall address the comments of the City Engineer's Memorandum dated January 6, 2022. All grading, drainage and utility plans are subject to the review and approval of the City Engineer. Conditional Use Permit for Outdoor Storage. Approval of a conditional use permit to allow accessory outdoor storage in the east, south and west area of the site per the site plan dated 12/13/2021 subject to the following conditions: 1 . Provide a description of the materials and equipment that will be stored in the outdoor storage area. 2. Details related to the type of fence, gate and slats shall be provided subject to City approval. The fence shall be 8-ft in height located at the back of the curb surrounding the entire outdoor storage area. 3. Landscape plan shall be revised showing row of staggered conifer trees, at a minimum height of 4-ft and spaced 15-ft on center along the entire perimeter of the fenced storage area. 4. The applicant shall demonstrate snow storage within the outdoor storage area or provide gates to allow snow to be stored within the ponding area outside of the fence. C: Adam Nafstad Mike Couri Maeghan Becker Kris Luedke Dave Olson Tim Knutsen 121 Page 15 w re hfje .off F 57 1l 10 - LL Li. T'• ' J- LL I r LE pLL I 41 F _ -- ' oilI I I ! I I— � — � — Lam'' � �: �J"� �� '� �---•_L k Mj IF I F J raw w t rK �' " A 1AA N� 33 dL air I � m r � � O � N � �� LL I I I ' I I I ' I I I � gal I � i 4 I n I I b -:5E ; e jp dt f= U 's .1. t Ya � � 1 rig Z.�---j } 4 a � ■ Y S ~ M1 -L y i 1 9 y ,ol' el 'j a �a� j � � i a � 6Y �J� � f � Y @ ti �F � � _ ■ Ir Ir # + l�M1x f ! •r � W W � s '� � !M� � W I � 3 � �G �' ry � �S ,-r' �+1 ��i.G 7y�� � g� o ,� 0 c ¢ _ Y 3FE x n AQ .J gg 8 o 1 - •;}r r _ 8 _ i 1 �I I - ITI • r r 4.° Y. �� � f. *�� I � o$ •r•- � I I � 4 � Ei. I I 4 u o m I,I•a� st I• .1 �' W W m 11 •� i_r. I h ` InwW v R Ll QF :r. . f- c �x4477 P I +•-. r 1 1 ki ' sa w 41 M L W � cu ra 0 �cm o n aQ 40 IL KS'o 92 2 2 2 2 2 yM ci 6 23r w `KNA r s' r — 9 , r 2 I I I 1 � e •'4`� • f � i� �' of r+� y}, � � I �Vie• �r y . `" l--' '�� � '. •� I — r A. XLDI _ _ r I 5 i I y I t I ± IS I I itFit I y tilf v • I 3 f , I S W { _ V r' ' i � I14J fp� Yr 5a_J �uu .L.�rfa■,��� d a■ ryl � i�ea�e.■.7ti++�+ram I � r 11 i - ■ I Ar - r 6 e Y• ffi as •.xi. l t� I- 1 ST _ rt •I I I " are c. 1 '�1 I F qr jam wag S 'I •r �� fi41 rxF f141 IF �` I •• I Fes. k �`4Sf � � ti f Fes, I4 ' R Iy 4? ■ � -� � �II■� 1 I ' �. v � a _ ry Q ? 0 C acL 13 H o a u m r. w � � .°-�� � � ��[ �- *• ;�,�; � � � � ,dry 1�: �5�5rL C C + k tr � r r •, �0 -_-...- e 1 i k r ��11"�'...- 41L JII Y •I fl'k II•� �'•.• •,•.".'.•_•.• .'. '•�, :I rfiJJ i J - t .�• 171����'nli Ili i �__�__� � • I �li,yll. 11 il,l 1 f i II 1 1 1 1 II �I I I I l�i�A till 1 II. 1 1 1 1 1 1J 1 5 A A f 1 i4' ` 1'1'11111'r 1 J'I'HAiil�•I�1 l711111•"IA'�^,FI ,III1'lllll 1. 1'1'Inl iY 1`ll � i II,II�II,I II,I IIIIIIIIY IYPoi i l l l l l l l l l l l _ 4' _ 111. 1111111 : 1� �~� k � =,lilll,l'11111111111111 y� {� •y + r Lu CP ��J,°, .:L •'C'I 1'1'1'tl,llll','1' M �111't 1 1,11 rl I 111111111 Y '•' � L'� L�;1111,i 1 -'L;i;b,Al ll'I k `��$dd ,"•A b o Illilt 11 li „+,'aF a 1,11. t�6�*F.r I . E ='1'1�1 :il,••6",1'1 y a I,I,'I',1 SI I'I'I pp I Y `,4�•y C ... "li 11'li �I'''1 1'1'e 1 I r�r� 'I'1'''1'1�11'1 1 1'I P• G� IpIyI �� '�-'1'1'll1'�I'1,1'1 ,11�• 4 -•_t I y ,e•I'#4 klwlllll l'I! F 1 1 1 1 1 I 1 4 ' _ !1 I'Irl'1=1'1'III' 1 I — J •; _ I "l� + Jd :�1 1-i�l�l�l illli 1 .Po •. � •- � - 1 I ' l i l l l l l l _ 1'1'. II11�11 1 111:�1�1�1 v F IIIIIII I II'J', • I I I A • i s m t, ?T� � .• .. - e• �I�I i1I�i I�i�J�1.;l;I�I�l�I ■ � _ ° - 11111111111AY In l,�,,®,�Y11 _s N ��Pv' a gi : on wi e g � r asp f y Y 4jai li• � 5 a }},. s n — 6 45 G � $ e f� l I 4 d w ® .�' € � Tad �� 'r° � r � 6 8 nI RIF— LU a LU d r f 4 11 � J 75 LJ J I � ■ I I i 1 I I _ PUN .�MIMI lm I S I is ilia!MI l Ii iow e — 1 ,�� 1= ssni sib � 4 Lu . . V �VY0 0V 1 I v.� V e e�_ 1 ]e••� e5 I 1 1 �4 _ 1 1 � � 4 1 5 � J .. 1 1 5 n •r'- ; •r��•y II I I L_J-I r � I ......e.e.. t I I L+ I �O 1 W C � 4fI IE9 'L J. L A 2 3 . . . . . . . . . . . . . p. "k A A 3 A 7 . . . . . . . . . 2 A i y p X i I I A k r 0 7 1 p j F F F a. i i i j I j I a a b / ! I I •. . . . . . 7 j j a j j i F 0 0 A F 0 f L A 2 3 a a j Li Lj u a i 1 2 1 1 3 3 1 3 y r r A M IF S i 3 J. j j A 1 3 a i 1 3 1 b a ] 3 j 3 X j ; 11 i , f - 0 I i A F i r J ! 0 0 d A 3 3 J -3 r 1 j F 3 OF--IF—j F 0 f j J3 J. j r 0 A A a A A x a S a a 3 a a a 3 k j a 7 y j A f } �F p 2 A j F ! 0 A I dhr d j F p A y F b x 'F j 3 'Pa J 3 j r . . . . . . . . . --r' j d ! 3 1 a a 3 J a j F o r d o o o r-- - - - - - - - - - j I L I j 1 2 X j 0 P a J ] ] kot m 1T l r ! o o m i j p p r P, . . . . . . . U j - - j j j j 3 j f J J 3 1 1 3 1 a 3 A :-1 0 j j e j j x j j o I . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . .. i x i p p r :ra 3 3 1 d I 1 2 = 3 1 X 3 1 J a ] 3 1 J ;3. i x x 4 Y 11, 1 J 1 a 3 7 a S a I i a k k A a i i J, J i 3 J . 9 a . 1 10, 1 r I I I A 1 3 1 A A a 0 - A A 0 . . . . . . . . . . 1 0 x j k a } A F I d ! - r 3 r s J a 3 L J a ] } i i y p J ! F ! A 0 i V a-.-#_ A d } p p L'ro .0 b r it A A d e 1. 0 p ZP I k2 7 a d ! 0 1 1 L 3 1 F p Of J ! p e p A '5 A O -F ILE- I p I I I I + I j 3 x p 11 1 p p r I p 0 L k } P 1 J 9 9Y b j 3 j A 9 A,lbertville Small living.Big City life. MEMORANDUM Date: January 6, 2022 To: Al Brixius, City Planner Cc: Paul Heins - Building Official Eric Bullen - Fire Chief Jeff Prasch, P.E. —Demarc Land Surveying and Engineering From: Adam Nafstad, P.E., City Engineer Subject: Scherer Bros. Truss Manufacturing Plant (2022 Relocation) Preliminary Plat Review The following engineering documents have been submitted by Demarc Land Surveying and Engineering and are currently being reviewed for compliance with the City of Albertville requirements: • Civil Drawings, Cl to C10, dated 12/13/21 • Existing Conditions Survey, dated 09/17/21 • Draft Final Plat • Stormwater Management Plan including, Drainage Analysis, Preliminary Geotechnical Evaluation; dated 12/14/21 A Wetland Conservation Act(WCA)Notice of Decision for the site has been approved conditioned on conservation easement being recorded over the existing mitigation sites. The hydrology review has been completed by Bolton and Menk, Inc. and comments are included below. Proposed site improvements generally consist of the following: Mass grading, site clearing, soil corrections, and import of suitable grading materials; sanitary sewer, watermain, and storm sewer construction; stormwater pond and parking lot construction; and, erosion and sediment control, landscaping, and turf restoration. Work on 67th Street NE will be limited and generally will include driveway construction and street patching. The lot will be platted as a numbered lot the addressed will be: 10751 67th Street NE Based on the preliminary review of the above materials, it is recommended that the plans be approved subject to the following general conditions: General Conditions of Approval 1. Engineering plan review comments shall be addressed to the satisfaction of the Fire Chief and City Engineer. Albertville City Hall•5959 Main Avenue NE,PO Box 9•Albertville,MN 55301 •(763)497-3384 28 Preliminary Plat Review Memo— Scherer Bros. 01/06/22 Page 2 of 3 2. Plans shall comply with Minnesota State Fire Code (MSFC) for fire flows and Fire Features found in Chapter 5 (verify hydrant spacing, Fire flow requirements). 3. The Applicant secures are necessary construction permits required for the improvements and provides the City with a copy of the permits prior to the start of construction. Permits include NPDES (storm water), Mn Department of Health (watermain), and Mn Department of Labor and Industry. 4. All Improvements are constructed in accordance with the latest edition of CEAM's Standard Utility Specifications and Albertville City Standards. 5. Signing and striping of the parking lots shall be in accordance with the latest edition of the MMUTCD and as required by fire regulations. 6. All sidewalks,pedestrian ramps, handicap stalls and accessible routes shall be compliant with ADA standards. Final Plat 7. Include lot and block number for the platted lot. 8. D &U easements will be required over water shut offs and on-site hydrants, if any. Civil Design/Construction Plans 9. Shift driveway locations to avoid the existing catch basins on 67t' Street. 10. Show the 6" drain tile inlet and elevation on detail 1/C4. 11. On the plans call out the retaining wall and include top and bottom elevations on the grading plan. 12. Include in the SWPPP all the requirements in Section 5 of the current Construction Stormwater General Permit(MNR100001). 13. The disturbed area on sheet C10 is 1.75 acres,while the disturbed area in the Storm Water Management Plan says 21.8 acres. Please update these numbers accordingly. 14. The ditch leaving this site drains into School Lake,which is an impaired water for construction related parameters. Please update the SWPPP accordingly. 15. Show the pond emergency overflow location on the grading plan. 16. Redirect the pond outlet pipe to the SW (downstream). 17. Call out the pond NWL and 100-year HWL on the grading plan. 18. On the grading plan,place the following information in the west side wetland area: HWL 956.6(Based upon TP-40) 19. On the grading plan,place the following information in the east side wetland area: HWL 954.2 (Based upon TP-40) Albertville City Hall•5959 Main Avenue NE,PO Box 9•Albertville,MN 55301 •(763)497-3384 29 Preliminary Plat Review Memo— Scherer Bros. 01/06/22 Page 3 of 3 20. Call out the quantity and class of riprap at each FES on the utility plan. 21. A gate valve at the water connection may be required at the property line (city to review). 22. Ensure the 6"water service is adequate for the fire protection system. 23. The domestic water service shall be copper or C900 (not HDPE) 24. Note on plans: All utility improvements shall be constructed in accordance with the latest edition of CEAM's Standard Utility Specifications and Albertville City Standards. 25.Note on plans: All watermain fittings shall be epoxy coated and all fittings and valves shall be secured utilizing stainless steel bolts, or approved equal, with the use of sacrificial zinc anode caps 26. Tracer wire per City Standards shall be included on both water and sewer services. 27. In the existing HydroCad model calculate the time-of-concentration for each catchment using the Sheet Flow method. 28. A Stormwater Management Agreement will be required for this development for future maintenance of the stormwater pond. The City will provide a copy of this agreement, which will need to be recorded with the County. Please update plans accordingly and submit for final review. Please let me know if you have any questions. Albertville City Hall•5959 Main Avenue NE,PO Box 9•Albertville,MN 55301 •(763)497-3384 30