Loading...
2006-06-27 Outlot B Test Pit Report '; ~ SEH June 27, 2006 RE: Albertville, Minnesota 2004 Prairie Run SEH No. A-ALBEV0409.00 7.00 Mr. Andy Bond Attorney at Law 8441 Wayzata Boulevard, Suite 320 Golden Valley, MN 55426-1344 Dear Mr. Bond: I am in receipt of your letter dated June 22, 2006 regarding the condition of Outlot B in the subject project. For your information, I have enclosed a copy of a test pit report prepared for Outlot B. The report was prepared by Braun Intertec on December 2004 and a copy of the report was forwarded to Mr. Heuring in January 2005. The report outlines the conditions discovered in 4 test pits on the subject property and identifies recommendations for future development of the property. Restoration of the property to parking lot standards was not identified in the report. I have also enclosed a sketch that identifies the portion of the property that will require soil correction for future development. The sketch was also forwarded to Mr. Heuring in January 2005. As discussed previously with Mr. Heuring, had he been able to produce a plan for future development of the property, the City could have worked with its contractor to correct soils in areas where future buildings and parking lots would be constructed. Without a plan from Mr. Heuring, the City was unable to direct its contractor to provide soil correction, as correction of the entire site would not be cost- effective. Please call me at 651.490.2147 if you have questions. Sincerely, !!:!:w~g~ Project Manager Enclosure nm c: Larry Kruse, City of Albertville s:\aelalalbevI040900lwordlbond062706.doc Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive. St. Paul, MN 5511 0.5196 SEH is an equal opportunity employer I www.sehinc.com I 651.490.2000 I 800.325.2055 I 651.490.2150 fax ~ . , , .' A Test Pit Report I 2-/ Z6 / ~'~ e~ b (Y\~ Gw-d- h~s ~ (j)'coy" Proposed Development Northwest of Kyler Avenue and Settlers Path Prairie Run Addition Albertville, Minnesota Prepared for Fehn Gravel and Excavating Professional Certification I hereby certifY that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. }/1 . ti ~,PE Associate - Senior Engineer License Number: 21140 December 17,2004 Project AL-04-06183 Braun Intertec Corporation f6)rn rn 0 W rn~ !n1 DEe 202004 .~ SHOAT. ELLIOTT, HEI\lDRICKSON SAIII.!T GI.OIJO MflJ _.__..-._._--........_~.- ' III BRAUN INTERTEC Braun Intertec Corporation 11001 Hampshire Avenue S Minneapolis, MN 55438 Phone: 952.995.2000 Fox: 952.995.2020 Web: braunintertec.com . December 17,2004 Project AL-04-06183 Mr. Gary F ehn Fehn Gravel and Excavating Box 256 Albertville, MN 55301 Dear Mr. Fehn: Re: Test Pit Observations for the Proposed Development, Northwest of Kyler Avenue and Settlers Path, Prairie Run Addition, Albertville, Minnesota We have completed the test pit observations for the above proposed development. The purpose of the test pits was to assist in evaluating subsurface soil and conditions with regard to site grading for the proposed development. Available Information Test Pits 1 through 4 were taken at the approximate locations shown on the attached sketch and completed using a backhoe supplied by Fehn Gravel and Excavating. Soils Encountered Four test pits were excavated atthe site on October 25, 2004. The test pits generally encountered approximately 1 1/2 feet of claYl?Y topsoil overlying clay glacial till to the termination depths ofthe test pits. The clay glacial till soils consist mainly of sandy lean clay with layers of lean clay, clayey sand and lenses of poorly graded sand. Some of the clay soils nearer the surface were judged to be soft, however, the glacial'till clays appeared to be medium to stiff at depth. Site Grading The topsoil and soft clays are judged unsuitable for fill and building support. Table 1 summarizes the depths of topsoil and soft clay and provides recommended excavation depths at the test pit locations. The recommended excavation depths are based on lightly loaded onc;}- to two-story buildings that may have basements or be. slab-on-grade structures. It should be noted that the test pits were performed prior to ariy grading activities and that fill may have been placed to achieve final grades. Test Pit Number. TP-l TP-2 TP-3 TP-4 Topsoil Thickness . feet 1 1/2 1 1/2 1 1/2 1 1/2 Soft Clay Thickness feet 6 21/2 41/2 5 Recommended Excavation Depth feet 7.1/2 . 4 6 61/2 · Providing engineering and environmental solutions s'ince 1957 Fehn Gravel and Excavating Project AL...04-06183 December 17,2004 Page 2 The excavation to remove poor soils should be extended laterally at least 1 foot for each foot of fill required below footings (1: 1 oversizing). Inpavement areas where more than 3 feet of structural fill was required to attain grade, the soil correction work was limited to removing the surficial vegetation. The topsoil ,and soft clays were left in place and fill placed over these soils. Iffuture buildings are located in this area, additional soil correction work may be required under the future buildings. The excavations should then be backfilled where needed with properly compacted fill. The fill needs to be compacted to a minimum of 95 percent of its Standard Proctor density. Where more than 10 feet of fill is needed below foundations, the minimum compaction should be increased to 98 percent. More than 10 feet of fill may also need a construction delay monitored by settlement plates. This could be evaluated on a case-by-:case basis. The remaining natural clays or compacted fill should be suitable for support of lightly loaded structures using typical spread footing foundations sized to exert a maximum net allowable soil bearing pressure of up to 2,000 pounds per square foot. Additional Evaluation and Testing During Construction Grading of some areas of the site can be difficult because oJ high moisture content clay soils. We recommend a geotechnical engineer or his representative be on site during the site grading. At that time, the suitability of the subsurface soils for support of fill and foundation loads can be further evaluated. Excavation depths and provided oversizing can also be documented. Compaction tests should be taken during the site grading operation, utility backfilling within the roadway areas, utility backfilling near building pads areas and foundation wall backfill operations. In general, compaction tests should be taken after about 2 feet of fill has been placed in the excavations and then at about 2-foot vertical intervals thereafter. ~ In parking lot areas, we recommend a proofroll be performed before and after placement of the aggregate base. The proofroll should be pe,rformed by observing the behavior of the subgrade soils when subjected , to the wheel loads of a fully loaded, tandem-axle end dump. These proofrolls should be observed by a geotechnical engineer. General In the absence of our written approval, we make no representation and assume no responsibility to other parties regarding this report. The data, analyses and recommendations may not be appropriate for other structures or purposes. We recommend that parties contempiating other structures or purposes contact us. Service performed by Braun Intertec Corporation personnel for this project have been conducted with that level of care and skill ordinarily exercised by members of the profession currently practicing in this area under similar budget and time restraints. No warrant, expressed or implied, is made. Dec. 1 0 . ..:.? 0 0 4 1 2 : 2 B P M No.2254 p. 2 '. ,1 _.-- . ....--.-..... .,. . "......--.-.' ..... ...:....", ;: ''''"'' ...u...... - -.,..~....... .......-.........._ i' ~ { I t I J I ~,-- ';--... . .-....-..:.-..! ,----096------__, I ~... ,----~--~----~ ---~~~---- !J ... '... ..,. , CD " ! '" ... ... 0> :... \ \ - -.:,-~'!"'" =.~..... ~._. ..,.... ''''-., '\ ~ .. ^ , ;S f. 1""1 . ~/ IX' ~.... r.= .. .. I~ I' n i . . _. ,"j . ........( . ;' ~ J .1 l' 1 - f: ~ I: t ~ , ~ /' ,li i .i Jl .,. t " BRAUN J INTERTEC Prarie run test pit locations Albertville Mn_ AI.04.06183 FIGURE NO: PDH 1 BRAUNSM :/NTERTEC Braun Project AL-04-06183 GEOTECHNICAL EVALUATIQN ProPllsed Development, Prairie Run Addition Kyler Avenue and Settlers Path Albertville, Minnesota DRILLER: METHOD: Elev. feet 954.5 Depth feet ASTM 0.0 Symbol CL 953.0 1.5 CL rIl s:: ',9 -tJ .;; 12 .0 ~ 'E to: .0 ~~ fij ...... 947.0 7.5 CL .t: U rIl o 945.5 ., ., en 9.0 ~ ~ ... ;!i ~ I-< g ~ ~ ~ ..; ~ '0 o ~ 8 ..l U ~ !Xl ~ !Xl AL-04-06183 Description of Materials (ASTM D2488 or D2487) LEAN CLAY, with organics, black, wet. (Topsoil) LEAN CLAY, brown, wet, soft. SANDY LEAN CLAY, brown, wet, medium. END OF TEST PIT. Braun Intertec Corporation BORING: LOG OF BORING LOCATION: See attached sketch. TP-l DATE: SCALE: 1":;= 2' BPF WL Tests or Notes TP-I page lof 1 BRAUNSM INTERTEC Braun Project AL-04-06183 GEOTECHNICAL EVALUATION , Proposed Development, Prairie Run Addition Kyler Avenue and Settlers Path Albertville, Minnesota DRilLER: METHOD: Elev., . Depth feet feet ASlM 952.0 0.0 Symbol CL 950.5 1.5 rn = o .~ .;; ] 948.0 ~ . """ o = o .~ ] 946.0 . 6.0 >0 M ~ e M ~ @ ~ lCI ~ .,; .. ~ '" o 8 o-l U c;; < lCI S ;;1 lCI AL-04-06 HI3 CL 4.0 CL Description of Materials (ASlM D2488 or D2487) LEAN CLAY, with organics, black, wet. . (Topsoil) LEAN CLAY, brown, wet, soft. SANDY LEAN CLAY, brown, wet, medium. END OF TEST PIT. Braun Intertec Corporation BORlNG: LOG OF BORING LOCATION: See attached sketch. TP-2 DATE: SCALE: 1" =2' . BPF WL Tests or Notes TP-2 page 1 of 1 BRAUNSM I NTE RTEC Braun Project AL-04-06183 GEOTECHNICAL EVALUATION Proposed Development, Prairie Run Addition KylerAvenue and Se~lers Path Albertville, Minnesota DRILLER: METHOD: . Elev. feet 952.5 Depth, feet 0.0 951.0 1.5 {IJ ~ o .~ :s: ~ ,0 .g .... o ~ .9 t;; ] 946.0 6.5 944.5 8.0 '" '" :!i ... ~ '" E I- (5 . .~ ~ It:l ~ ,.; DO ~ ~ o o ..l U U; ..: It:l ~ lQ AL-04-06183 CL CL Description of Materials (ASTM D2488 Or D2487) LEAN CLAY, with organics, black, wet. (Topsoil) LEAN CLAY, brown, wet, soft. .LOG OF BORING BORING: TP-3 LOCA nON: See attached sketch, DATE: SCALE: 1" =2' BPF WL Tests or Notes SANDY LEAN CLAY, brown, wet, medium to rather stiff. END OF TEST PITS. Braun Intertec Corporation . IP-3 page I of J .BRAUNSM I NTE RTEC Braun Project AL..04-06183 GEOTECHNICALEV ALVA TION Proposed Development, Prairie Run Addition Kyler Avenue and Settlers Path Albertville, Minnesota DRILLER: MElROD: Elev. feet 954.5 Depth feet ..0.0 953.0 1.5 '" s::: o .~ ';> ",. .... .0 .;! ..... o s::: o ~~ s::: oS 948.0 6.5 .0 g 'g ~ .~ 946.5 8.0 '" M ~ ... ~ !:l i::J g ~ ~ ~ ...; DO :0 '" ... '" o g ~ rn <( ~ ~ ~ AL-04-06183 CL CL Description of Materials (ASTM D2488 or D2487) LEAN CLAY, with organics, black, wet. (Topsoil) . LEAN CLAY, brown, wet, soft. SANDY LEAN CLAY, brown, wet, medium to rather stiff. . . END OF TEST PIT. Braun Intertec Corporation BORING: LOG OF BORING LOCATION: See attached sketch. . TP-4 DATE: SCALE: 1" =2' BPF WL Tests or Notes TP-4 page 1 of] -, x '" 0'> 0 ... "0 ,/ 2) :0 :c x w ,/ 0 0 0'> I 0 I ... 0 ,/ > '" I .0 I "0 ~ I ,/ '" I w -' J c;: I / w U1 iD -:; 0'> Ll) o o N "- Ll) ;::: Jt. SEH \ \ n.-.-_ o 20 40 FUTURE SITE CORRECTION FOR BUILDING PAD 2004 PRAIRIE RUN ALBER1VILLE, MINNESOTA