Loading...
2005-01-20 TEP Site Visit ..Jt.. SEH January 20, 2005 RE: Albertville, Minnesota Prairie Run Development SEH No. A-ALBEV0409.00 Ms. Laura Eklov Svoboda Ecological Resources 2477 Shadywood Road Excelsior, MN 55331 Dear Ms. Eklov: The Technical Evaluation Panel (TEP) conducted a site visit on January 18, 2005 and observed that wetland fill has still not been removed from the wetland area in the northwest corner of the site. The fill material was placed within the delineated wetland boundary and inside the silt fence that was installed during mass grading operations in September 2004. It appears that the wetland fill occurred along the south and east sides of the wetland. A site visit by two of the TEP members occurred on September 17, 2004. At that time, both Hedlund Engineering and Svoboda were informed that wetland filling had occurred at these locations prior to approval of the wetland replacement plan for the site. Since that time, Gold Key Development has withdrawn their wetland replacement application and submitted a "No-Loss" Certification Application. The certification has been approved; however, the wetland fill must be removed immediately or a cease and desist order will be issued. If you have any questions, please feel free to contact me. T dd Udvig, CPSS ity of Albertville LGU Administrator nn c: Larry Kruse, City Administrator Pete Carlson, City Engineer Mike Couri, City Attorney Colleen Allen WSWCD Brad Wozney, BWSR Jason Neuman, MnDNR Randy Hedlund, Hedlund Engineering x:\aelalbev\0409OO\corr\eklov012005.doc Short Elliott Hendrickson Inc., 3535 Vadnais Center Drive, St. Paul, MN 55110-5196 SEH is an equal opportunity employer i www.sehinc.com t 651.490.2000 i 800.325.2055 I 651.490.2150 fax