Loading...
1997-04-07 Revised Prelim Grading and Utility . . "'SaJ 113 S. FIFTH AVENUE, Po. BOX 1717; Sf CLOUD, MN 56302-1717320252-4740 800572-0617 320251-8760FAX ARCHITECTURE ENGINEERING ENVIRONMENTAL TRANSPORTATION TO: Garrison Hale City Administrator Albertville, MN Peter J. Carlson, P.E. RrG City Engineer FROM: DATE: April 7, 1997 RE: Revised Preliminary Grading and Utility Plan Cottages of Albertville SEHNo. A-ALBEV 9701.00 I reviewed the revised preliminary grading and utility plan, dated 04/02/97, and have the following comments: Preliminary Grading and Drainage Plan 1. Drainage calculations have been submitted. However, the 0.25 "c" value used is appropriate for single family residential development and not for a high density, high runoff development like Cottages of Albertville. Therefore, the drainage calculations shall be recomputed and the storm sewer revised if necessary. 2. To minimize the potential for erosion, storm water runoff from the parking lots and driveways that is to drain into the CSAH 19 ditch shall first be collected in a catch basin and outlet through a storm sewer into the ditch. Revise the drainage plan accordingly. 3. Eliminate bituminous swales and replace with concrete valley gutters. 4. The snow storage issue, as outlined in my previous memo, has not been addressed. Preliminary Utility Plan 1. The plan indicates a 1-1/2 inch water service will be installed for each building. The developer should verify with the building inspector that the proposed water service size is adequate for the building. The above stated comments shall be addressed and the preliminary plans resubmitted for review. Please call me if you have any questions. djg c: Linda Houghton, City Clerk Elizabeth Stockman, Northwest Associated Consultants, Inc. Mike Couri, City Attorney (J:\ALBEV\CORR\AP-07 A.97) SHORT ELLIOTT HENDRICKSON INC. Sf PAUL, MN MINNEAPOLIS, MN CHIPPEWA FALLS, WI MADISON, WI LAKE COUNTY, IN EQUAL OPPORTUNITY EMPLOYER