Loading...
1996-03-25 Preliminary Utility Plan . . "'SaJ 113 S. FIFTH AVENUE, Po. BOX 1717, ST CLOUD, MN 56302-1717320252-4740 800572-0617 320251-8760FAX ARCHITECTURE ENGINEERING ENVIRONMENTAL TRANSPORTATION TO: Garrison Hale City Administrator Albertville, MN FROM: Peter J. Carlson, P.E. City Engineer DATE: March 25, 1996 RE: Preliminary Utility Plan Summerfield Addition SEH No. A-ALBEV 9601.00 I have reviewed the above referenced Drawings and found them to be too incomplete for review. Required information includes; grading and drainage plan, erosion control plan, and a preliminary plat for the entire parcel of property owned by the seller of the land. The developer of the land should note that they will be required to extend lO-inch sanitary sewer, at minimum grade, to the west property line, and that drain tile will be required in the rear yard area of the lots along the north side of 61 st Street. These Drawings should be revised and a complete set submitted for review in accordance with the City requirements. Please call me if you have any questions. djg c: Linda Houghton, City Clerk Elizabeth Stockman, Northwest Associated Consultants, Inc. (G:\ALBEV\CORR\MR-25A.96) SHORT ELLIOTT HENDRICKSON INC. ST PAUL, MN MINNEAPOLIS, MN CHIPPEWA FALLS, WI MADISON, WI LAKE COUNTY, IN EQUAL OPPORTUNITY EMPLOYER