1997-05-13 MPCA App for Sanitary Sewer permit
Mirlesota Pollution ctntrol Agency
520 Lafayette Road North, St. Paul, Minnesota 55155-4194
APPLICATION FOR PERMIT FOR SANITARY SEYER EXTENSIONS' AND/OR CHANGES
Instructions:
FOR MPCA USE ONLY
I. Da t e
II. File No.
1. Submit one completed application with one set of
plans and specifications for each sanitary sewer
extension and/or change.
2. ALL portions of this application MUST be completed
and signed if the sewer extension and/or change is
to be considered.
3. An application fee is required under Minnesota Statutes section 116.07, subd. 4d
(1990) and Minnesota Rules chapter 7002 (Permit Fee Rules). The fee is $240.00 per
permit application and must be submitted with the application. Please make your
check payable to the Minnesota Pollution Control Agency.
III. CITY: Albertville COUNTY: Wright
IV. ENGINEER, FIRM: Bonestroo Williamson Kotsmith
DATE: 5-13-97
PHONE: 320-251-4553
ADDRESS: 2008 8th Street North, St. Cloud. MN 56303
V. SEYAGE TREATMENT PLANT, Name: Albertville Wastewater Treatment Facility
Is the proposed sewer project in accord with the City of District Comprehensive Sewer
Plan?
x
(Yes)
(No)
Fairfield Addition Improvements
VI. Title of Plans and Specs:
Developer/Owner Name: Little Mountain Development, LLC
Address: 111 Thomas Park Drive
City: Monticello, MN 55362 Phone: 612-295-3292
VII. DESIGN OF GRAVITY SANITARY SEYER:
Total Length of Pipe: 1528 feet Pipe Diameter(s):
VIII.DESIGN OF PUMP STATION(S), No. of Pumps: NA
10
inches
STATION U
PUMP #1 PUMP #2
STATION #2
PUMP #1 PUMP #2
IX.
Pump Capacity (gpm)
Total Dynamic Head (ft)
Length of Forcemain (ft)
Forcemain Diameter (in)
Forcemain Material
Friction Factor (C)
ESTIMATED FLOV INCREASE: Initial: 0 MGD Project: 0.006 MGD Ultimate: 0.047
Project - 24 nomes x 100 g/d/cap. x 2.5 cap/hOffie
Basis for estimate: UltlmRtp - 187 h()mp~ x 100 Velle-rlp x 2.5 cap/home
The project flow should represent the design daily average flow from the completed
project as proposed in this application. The ultimate flow should represent the
design daily average flow from the proposed development and any areas that will
ultimately be served by the proposed sewer extension.
MGD
PQ-00139-07
1993
.
.
X. ESTIMATED BODS INCREASE: Ini tial: 0 #/day Project: 10.2 #/day Ultimate: 79 5 #/day
Project - 0.1/ Ib/cap/day x 24 homes x 2.5 caplhome .
Basis for estimate: Ultimate - 0.17 Ib/cap/day x 1R7 homes x 2.5 capfhome
XI. NATURE OF AREA TO BE SERVED BY THE PROPOSED SEVER EXTENSION:
(a) Residential: Number of New Homes: 23
Number of Existing Homes: 1
(b) Commercial/Industrial (Describe):
(c) Other (Describe)
XII. ViII the proposed sewer project be designed and constructed as described in
Standard Utilities Specifications prepared by the City Engineers Association of
Minnesota? Yes
XIII.DETERMINATION AS TO THE NEED FOR AN ENVIRONMENTAL ASSESSMENT VORKSHEET:
(Minnesota Environmental Quality Board Regulation)
Please check as appropriate:
Yes No
Is the ultimate flow increase 500,000 gallons per day (gpd) or more
and is the project service area within a city served either by the
Metropolitan Vaste Control Commission (MVCC)or the Yestern Lake
Superior Sanitary Sewer District System (YLSSD)? X
Is the ultimate flow increase 500,000 gpd or more and is the project
service area within a city with a population of 20,000 or more not
served by either MVCC or VLSSD? X
Is the ultimate flow increase 100,000 gpd or more and is the project
service area within a city not served by MVCC or YLSSD with a
population less than 20,000 but at least 10,000? ~
Is the ultimate flow increase 50,000 gpd or more and is the project
service area within an incorporated city not served by MYCC or
VLSSD with a population less than 10,000? ~
Is the ultimate flow increase 50,000 gpd or more and is the project
service area in an unincorporated sewered area? ~
If a yes answer was appropriate for any of the above conditions, then the
preparation of an EAV is mandatory. Do you anticipate that a draft
Environmental Assessment Vorksheet (EAV) will be prepared by the city or
county? Approximate date of completion of EAV
NO SEVER CONSTRUCTION FOR THE REFERENCED EXTENSION MAY BE UNDERTAKEN UNTIL YOU ARE IN
RECEIPT OF THE REQUIRED PERMIT(S) ISSUED BY THIS AGENCY AND AS DEFINED BY LAV UNDER
MINNESOTA STATE STATUTE 115.07, SUBDIVISION 3.
Signed:
,
~?r:a/dL~__
(Engineer) .
Reg. No.
10918
Printed:
Sidney P. Williamson
~~/U-
(Authorized City Representative)
Ti tIe: LfTP M,I//ItJ/.sI,e'IJ;f'6'~
. Signed:
Printed: 6A-~ ISON L ///JL:G.