Loading...
2022-08-15 City Council Agenda Packet City of Albertville Council Agenda Monday, August 15, 2022 City Council Chambers 7 pm 6:15 pm – Council Workshop for 2023 Preliminary Budget – Council Chambers PUBLIC COMMENTS -The City of Albertville welcomes and encourages public input on issues listed on the agenda or of general community interest. Citizens wishing to address the Council regarding specific agenda items, other than public hearings, are invited to do so under Public Forum and are asked to fill out a “Request to Speak Card”. Presentations are limited to five (5) minutes. 1. Call to Order 2. Pledge of Allegiance – Roll Call Pages 3. Recognitions – Presentations - Introductions 4. Public Forum – (time reserved 5 minutes) 5. Amendments to the Agenda 6. Consent Agenda All items under the Consent Agenda are considered to be routine by the City staff and will be enacted by one motion. In the event an item is pulled, it will be discussed in the order it is listed on the Consent Agenda following the approval of the remaining Consent items. Items pulled will be approved by a separate motion. A. Approve the August 1, 2022, City Council Workshop minutes as presented. 3 B. Authorize the Monday, August 15, 2022, payment of claims as presented, except bills specifically pulled which are passed by separate motion. The claims listing has been provided to City Council as a separate document and is available for public view at City Hall upon request. 4 C. Approve a Special Event Permit and Temporary Liquor License for the Albertville Lions for their Annual Cruisin’ & Rock’n Car Show on September 10, 2022 from 2 to 9 pm. 5-7 D. Adopt Resolution No. 2022-26 approving an off-sale lawful gambling permit for the Rockford Lions Club for Cedar Creek Golf Course on September 10, 2022 8-11 E. Approve a Major Temporary Outdoor Music permit for the 152 Club, Inc, located at 5794 Main Avenue NE for their annual Oktoberfest event on September 23 and 24, 2022. 12-14 F. Approve Driveway Replacement Contract for property owner Benita Bramel located at 11710 57th Street NE Albertville, MN 55301. 15-17 G. Approve the Memorandum of Understanding between the City of Albertville, City of St. Michael, STMA School District and Wright County for crosswalk safety improvements at Lansing Avenue NE and 50th Street NE (CSAH 18). 18-19 7. Planning and Zoning A. Albertville Self-Storage – Industrial Developments Applications 20-56 (Motion to adopt Resolution No. 2022-27 and Ordinance No. 2022-12 addressing the following development applications for Darkenwald Corporation to allow for the construction of a Self-Storage Facility in the City of Albertville.) City of Albertville City Council Agenda Monday, August 15, 2022 Page 2 of 2 B.Public Hearing - NJ Properties LLC for a Preliminary/Final Plat, the vacation of a portion of Lambert Avenue NE and Second Street NE, in Albertville MN 57-86 •Mayor to open public hearing •Motion to close public hearing (Motion to adopt Resolution No. 2022-28 and Ordinance No. 2022-13 addressing the following development applications for Particle Control to expand their industrial facility in the City of Albertville.) 8.Wright County Sheriff’s Office – Updates, reports, etc. 9.Department Business A.City Council 1.Committee Updates (STMA Arena, Planning, JPWB, Parks, Fire Board, FYCC, etc) B.Building – None C.City Clerk – None D.Finance – None E.Fire – None F.Public Works/Engineering – None G.Legal – None H.Administration 1.City Administrator’s Update 87-88 10.Announcements and/or Upcoming Meetings August 22 Joint Powers Water Board, 6 pm Parks Committee, 7 pm August 29 Joint Governance Meeting, 6 pm September 5 City Hall closed in observance of Labor Day September 6 City Council, 7 pm (Tuesday) September 12 STMA Arena Board, 6 pm September 13 Planning Commission, 7 pm September 19 City Council, 7 pm 11.Adjournment ALBERTVILLE CITY COUNCIL WORKSHOP DRAFT MINUTES August 1, 2022 – 6:15 pm Council Chambers Albertville City Hall 1. Call to Order Mayor Hendrickson called the workshop to order at 6:16 pm. Present: Mayor Hendrickson, Councilmembers Hudson, Olson and Zagorski. Absent: Councilmember Cocking Staff Present: City Administrator Nafstad, Chief Bullen, Finance Director Lannes and City Clerk Luedke. 2. 2023 Preliminary Budget Presentation Finance Director Lannes presented an overview of the budget process and indicated the preliminary budget must be approved by September 27, 2022. She said once the preliminary levy was approved that it cannot be increased after that; however, it could be reduced. Ms. Lannes also provided the budget history, the overview of 2023 preliminary tax levy and budget and the 2023 revenue and expense changes. She reported that the debt service levy increased by -14.96% ($-112,212), the general operations levy increased by 9.83% ($228,628), the capital levy increased by 9.88% ($143,774) for a total projected levy increase of 5.74% ($260,190). She also provided details where the tax dollars are spent which included the senior center/library operations, debt services and the law enforcement contract. She answered questions from Council. City Administrator Nafstad provided additional information on the 2023 preliminary budget and answered questions from Council regarding the City’s staffing. He said the next City Council Budget Workshop was scheduled for August 15, 2022 at 6:15 pm. There was Council discussion regarding the preliminary 2023 budget presentation. 3. Adjournment Mayor Hendrickson closed the budget workshop at 6:59 pm. Respectfully submitted, _____________________________ Kristine A. Luedke, City Clerk Agenda Page 3 Mayor and Council Request for Action August 15, 2022 SUBJECT: CONSENT – FINANCE – PAYMENT OF BILLS RECOMMENDATION: It is respectfully requested that the Mayor and Council consider the following: MOTION TO: Authorize the Monday, August 15, 2022, payment of the claims as presented except the bills specifically pulled, which are passed by separate motion. The claims listing has been provided to Council as a separate document. The claims listing is available for public viewing at City Hall upon request. BACKGROUND: The City processes claims on a semi-monthly basis. The bills are approved through their respective departments and administration and passed onto the City Council for approval. KEY ISSUES: • Account codes starting with 810 are STMA Arena Expenses/Vendors (bolded) and key issues will be presented in the claims listing document. POLICY/PRACTICES CONSIDERATIONS: It is the City’s policy to review and approve payables on a semi-monthly basis. FINANCIAL CONSIDERATIONS: City staff has reviewed and recommends approval of payments presented. LEGAL CONSIDERATIONS: The Mayor and Council have the authority to approve all bills pursuant to Minnesota State Law, which requires all bills to be paid in a timely manner, generally within 30 days unless one party determines to dispute the billing. Responsible Person: Tina Lannes, Finance Director Submitted through: Adam Nafstad, City Administrator-PWD Attachment: • List of Claims (under separate cover) Agenda Page 4 Mayor and Council Request for Action ______________________________________________________________________________ August 15, 2022 SUBJECT: CONSENT – CITY CLERK – SPECIAL EVENT PERMIT AND TEMPORARY LIQUOR LICENSE APPLICATION FOR THE ALBERTVILLE LIONS RECOMMENDATION: It is respectfully requested that the Mayor and City Council consider the following: MOTION TO: Approve a Special Event Permit and Temporary Liquor License for the Albertville Lions for their Annual Cruisin’ & Rock’n Car Show on September 10, 2022, from 2 pm to 9 pm. BACKGROUND: The Albertville Lions have submitted a special event permit and temporary liquor license application for their annual classic car show scheduled for Saturday, September 10, 2022. The event will be held in the Albertville Central Park area including the Farmer’s Market Pavilion and the Depot. Unlike previous years, the Lions are not requesting any road closures with all of the show vehicles utilizing the paved parking lot located by the baseball fields. The event set up will begin immediately following the Open Streets event. The car show will include a variety of food options and live music. The Albertville Lions have also submitted a temporary liquor license for the event. KEY ISSUES: • The annual car show event will take place in Central Park, the Farmer’s Market Pavilion and the Depot. The Lions are not requesting any road closures during the event. • The event will be held from 2 pm to 9 pm with event tear down to conclude by 9:30 pm. • The Lions have also submitted a one-day temporary liquor license application for the event and has provided the required certificate of liability insurance. • The estimate attendance at the event will be between 300 and 500 people. • Outdoor special events shall only occur between April 1 to November 1 of each year. POLICY/PRACTICES CONSIDERATIONS: Special events permits and temporary liquor licenses are subject to the approval of the Albertville City Council. LEGAL CONSIDERATIONS: The applicant shall comply with the regulations for a special event permit and temporary liquor license. Responsible Person: Kris Luedke, City Clerk Submitted Through: Adam Nafstad, City Administrator-PWD Attachments: • Albertville Lions Narrative and Map • The special event permit and temporary liquor license application are on file in the City Clerk’s Office and are available upon request. Agenda Page 5 Agenda Page 6 Agenda Page 7 Mayor and Council Request for Action August 15, 2022 SUBJECT: CONSENT – CITY CLERK – OFF-SITE GAMBLING PERMIT FOR ROCKFORD LIONS CLUB AT CEDAR CREEK GOLF COURSE RECOMMENDATION: It is respectfully requested that the Mayor and Council consider the following: MOTION TO: Adopt Resolution No. 2022-26 approving an off-site lawful gambling permit for the Rockford Lions Club for Cedar Creek Golf Course on September 10, 2022. BACKGROUND: The Rockford Lions Club has applied to conduct off-site gambling at their annual event to be held at Cedar Creek Golf Course, located at 5700 Jason Avenue NE in Albertville, on Saturday, September 10, 2022. KEY ISSUES: • City approval is required prior to the Rockford Lions Club submitting the application for lawful gambling to Minnesota Alcohol and Gambling Enforcement Division. • This is a permit for a one-time off premise event. • The type of gambling to be conducted is a raffle. POLICY/PRACTICES CONSIDERATIONS: The Mayor and City Council have the authority to either approve or deny any gambling license application received by the City. Responsible Person: Kris Luedke, City Clerk Submitted Through: Adam Nafstad, City Administrator–PWD Attachments: • Resolution No. 2022-26 approving an Off-Site Lawful Gambling Permit • LG230 Gambling Application Agenda Page 8 CITY OF ALBERTVILLE COUNTY OF WRIGHT STATE OF MINNESOTA RESOLUTION NO. 2022-26 RESOLUTION APPROVING AN OFF-SITE LAWFUL GAMBLING PERMIT FOR THE ROCKFORD LIONS CLUB FOR CEDAR CREEK GOLF COURSE ON SEPTEMBER 10, 2022 WHEREAS, the Rockford Lions Club has submitted an application for an off-site gambling permit to conduct lawful gambling activities within the City of Albertville, Minnesota; and WHEREAS, the purpose of the lawful gambling is to raise funds; and WHEREAS, the lawful gambling permit will be for a raffle to be held on September 10, 2022, at Cedar Creek Golf Course, located at 5700 Jason Avenue NE in Albertville; and WHEREAS, the Rockford Lions Club intend to comply with all lawful gambling rules and reporting requirements of the State of Minnesota and the City of Albertville. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Albertville that the off-site gambling permit for the Rockford Lions Club is hereby approved and the State Gambling Control Board is authorized to process the application. Adopted by the City Council of the City of Albertville this 15th day of August 2022. ______________________________ Jillian Hendrickson, Mayor ATTEST: _________________________ Kristine A. Luedke, City Clerk Agenda Page 9 Agenda Page 10 L,\,3�.,;;iJU "'"'"'"'"'aLIUII LU '-UIIUU\,;L VI ·-�ILt: UdlllUllng 6/15 Page 2 of 2 Acknowledgment by Local Unit of Government: Approval by Resolution CITY APPROVAL for a gambling premises located within city limits City Name: __________________ _ Date Approved by City Council: ____________ _ Resolution Number: _________________ _ (If none, attach meeting minutes.) Signature of City Personnel: Title: ____________ Date Signed: _____ _ Local unit of government must sign. COUNTY APPROVAL for a gambling premises located in a township County Name: _____________________ 1 Date Approved by County Board: ___________ _ Resolution Number: _________________ _ (If none, attach meeting minutes.) Signature of County Personnel: Title: ____________ Date Signed: ______ 1 TOWNSHIP NAME: _______________ _ Complete below only if required by the county. On behalf of the township, I acknowledge that the organization is applying to conduct gambling activity within the township limits. (A township has no statutory authority to approve or deny an application, per Minnesota Statutes 349.213, Subd. 2.) Print Township Name: __________________ 1 Signature of Township Officer: _____________ _ Title: ___________ Date Signed: ______ _ CHIEF EXECUTIVE OFFICER (CEO) ACKNOWLEDGMENT The person signing this application must be your organization's CEO and have their name on file with the Gambling Control Board. If the CEO has changed and the current CEO has not filed a LG200B Organization Officers Affidavit with the Gambling Control Board, he or she must do so at this time. I have read this application, and all information is true, accurate, and complete and, if applicable, agree to the lease terms as stated in this application. /) u/)1�� Signature of CEO (must� CEO's signature; designee may not sign) Date�/ Mail or fax to: Minnesota Gambling Control Board Suite 300 South 1711 West County Road B Roseville, MN 55113 Fax: 651-639-4032 No attachments required. Questions? Contact a Licensing Specialist at 651-539-1900. This publication will be made available in alternative format (i.e. large print, braille) upon request. Data privacy notice: The information requested on this form (and any attachments) will be used by the Gambling Control Board (Board) to determine your organization's qualifications to be involved in lawful gambling activities in Minnesota. Your organization has the right to refuse to supply the Information; however, if your organization refuses to supply this information, the Board may not be able to determine your organization's qualifications and, as a consequence, may refuse to issue a permit. If your organization supplies the information requested, the Board will be able to process your organization's application. Your organization's name and address will be public Information when received by the Board. All other information provided will be private data about your organization until the Board issues the permit. When the Board issues the permit, all information provided will become public. If the Board does not issue a permit, all information provided remains private, with the exception of your organization's name and address which will remain public. Private data about your organization are available to: Board members, Board staff whose work requires access to the information; Minnesota's Department of Public Safety; Attorney General; commissioners of Administration, Minnesota Management & Budget, and Revenue; Legislative Auditor; national and international gambling regulatory agencies; anyone pursuant to court order; other individuals and agencies specifically authorized by state or federal law to have access to the Information; individuals and agencies for which law or legal order authorizes a new use or sharing of information after this notice was given; and anyone with your written consent. Agenda Page 11 Mayor and Council Request for Action August 15, 2022 SUBJECT: CONSENT – CITY CLERK – TEMPORARY OUTDOOR MUSIC PERMIT RECOMMENDATION: It is respectfully requested that the Mayor and Council consider the following: MOTION TO: Approve a Major Temporary Outdoor Music Permit for the 152 Club, Inc. located at 5794 Main Avenue NE for their annual Oktoberfest event on September 23 and 24, 2022. BACKGROUND: The Albertville City defines the definitions of both a Major and Minor Temporary Outdoor Music Permit and the requirements that must be met for each type of permit. The 152 Club, Inc., has applied for a Major Temporary Outdoor Music Permit for September 23 and 24, 2022 for their Annual Oktoberfest. A Major Temporary Outdoor Music Permit must meet the following requirements: 1. Any person, organization, and/or entity shall be limited to a maximum of two major permits per year. No commercial property shall host more than three major events in a calendar year. 2. The permit applicant must pay a permit fee as set by the City Council by ordinance and provide information and/or a plan(s) that demonstrates that the site event will comply with the performance standards of this code. 3. The permit applicant must demonstrate there will be adequate sanitary facilities for the event. 4. The permit applicant must demonstrate there will be adequate security and fencing to control access to the event at the location of the outdoor musical performance. 5. The permit applicant must have sufficient off-street parking. The music event shall not occupy required parking for the principal use of the site. 6. The major outdoor musical performance must not interfere with other commercial and governmental activities or with the quiet enjoyment of residential property. 7. The stage, performers, speakers and amplifiers are located three hundred feet from any residence located in a residential zoning district. 8. The stage, speakers, and amplifiers are arranged in a design and manner that does not directly broadcast music at or toward a residence within three hundred feet of the stage. 9. Major outdoor music events shall be allowed between May 15th and October 15th and the live outdoor musical performance shall only occur on the dates and during the hours designated by the City Council. 10. Major outdoor music events shall not perform beyond 12 midnight. 11. The volume of the outdoor performance must be reasonable. The permit holder shall comply with all requests of the Sheriff’s Department to reduce volumes to mitigate complaints. 12. Failure to abide by these standards or the receipt of nuisance complaints may be grounds for denial of future major outdoor music permits for the property. The applicant has previously held a major temporary outdoor music permit and is familiar with the requirements that must be met. Agenda Page 12 Mayor and Council Request for Action – August 15, 2022 Consent - 152 Club, Inc. Outdoor Music Event Page 2 of 2 KEY ISSUES: • The applicant has submitted a site plan showing the location of speakers, fencing and security, and has indicated adequate sanitary facilities as well as parking. • For the event, the hours for the outdoor musical performances will be 7 pm to 11:59 pm on September 23, and 3 pm to 11:59 pm on September 24. • The applicant has indicated they will abide by the noise requirements. • The applicant has submitted the fee. POLICY/PRACTICES CONSIDERATIONS: The Mayor and City Council have the authority to approve or deny any Temporary Outdoor Music Permit. FINANCIAL CONSIDERATIONS: There is minimal financial revenue collected from the applicant for the music permit. Responsible Person: Kris Luedke, City Clerk Submitted Through: Adam Nafstad, City Administrator-PWD Attachments: • Music Site Plan • Temporary Outdoor Music Permit Application on file in the City Clerk’s office. Agenda Page 13 Agenda Page 14 Mayor and Council Request for Action August 15, 2022 SUBJECT: CONSENT – FINANCE – DRIVEWAY IMPROVEMENT ASSESSMENT RECOMMENDATION: It is respectfully requested that the Mayor and Council consider the following: MOTION TO: Approve Driveway Replacement Contract for property owner Benita Bramel located at 11710 57th Street NE Albertville, MN 55301 - PID 101-011-001050, in the amount of $9,879.00 BACKGROUND: The City offers a driveway replacement program, which provides a financing option for residents to replace their driveway. Generally, the City enters into a special assessment agreement with the resident, pays the resident’s contractor to replace the driveway, and the resident pays the City back through property taxes over a period of 5 years. KEY ISSUES: • The City has the statutory right to special assess improvements. • The terms of the program/special assessment are five years at an interest rate of 5%. • Per policy, the program will finance individual projects up to $8,000; however, the Property Owner is requesting to finance $9,879.00. • An upfront fee of $100 is paid by the property owner to the City. • A Right of Way Permit and associated fee of $25 are required. FINANCIAL CONSIDERATIONS: Per the City’s policy for the program, the City will fund up to $30,000 per year with a maximum principal loan balance of $150,000 at any point in time. Responsible Person: Tina Lannes, Finance Director Submitted Through: Adam Nafstad, City Administrator-PWD Attachments: • McCoy Concrete Quote Agenda Page 15 Agenda Page 16 10 e, 71- O- KDE te_AviLe 5030I OD 1q . / I Agenda Page 17 An Equal Opportunity Employer – www.co.wright.mn.us/189/Highway Wright County Highway Department 3600 Braddock Ave NE Buffalo, MN 55313 Phone: (763)682-7383 Email: HwyAdmin@co.wright.mn.us VIRGIL HAWKINS, P.E. Highway Engineer CHAD HAUSMANN, P.E. Assistant Highway Engr. PATSY WAYTASHEK Highway Accountant NATE HELGESON Maintenance Superintendent BRIAN JANS Shop Maintenance Superintendent JEREMY CARLSON, P.L.S. Right-of-Way Agent SARA BUERMANN, P.E. Traffic Engineer KEVIN JOHNSON Construction Engineer NICK CARLSON Design Engineer MEMO OF UNDERSTANDING FOR INSTALLATION AND MAINTENANCE OF PUSH BUTTON RECTANGULAR RAPID FLASH BEACON (RRFB) SYSTEM ON County State Aid Highway (CSAH) 18 (50th St. NE) @ Lansing Ave NE in the Cities of St. Michael, MN and Albertville, MN Between: the Cities of St. Michael and Albertville, hereafter called the “Cities”, and STMA School District, hereafter called the “School”, and the County of Wright, hereafter called the “County”, WHEREAS; The Cities, School and County are collaborating on a safety improvement to enhance the crosswalk location on the west leg of CSAH 18 (50th St. NE) at Lansing Ave NE. The flash pattern of the RRFB provides higher driver awareness when a pedestrian is present and increases yielding percentage. IT IS HEREBY AGREED AND MUTUALLY UNDERSTOOD THAT; 1. The Cities will provide specifications, obtain cost proposals, inspect and observe the ADA upgrades for both sides of the crossing. The County will review and approve the plans and specifications and issue a permit for work in the County Highway right of way (the permit fee will be waived). The cost of the ADA improvements will be 100% City costs. 2. The County will provide specifications, obtain cost proposals, inspect and observe the installation of the RRFB system. The County will initiate the coordination & installation of the system after this signed memo of understanding is received by the County from the Cities and School. 3. The marked crosswalk located on the west leg of CSAH 18 at Lansing Ave NE is considered an authorized marked crosswalk and is subject to the Wright County Marked Crosswalk Policy, amended March 27, 2018. 4. The Cities are responsible for the maintenance of the static signs and pavement markings. 5. In accordance with the County’s Cost Participation Policy, adopted May 6, 2014; the County will share in the initial cost of the material/installation at a 50% cost for the RRFB system. 6. The pedestrian activated RRFB will be solar powered, and it is estimated that the cost of the system will be approximately $18,000. The County will contribute 50% of the initial cost, estimated to be $9,000 for the County’s share. The City of St. Michael’s share is estimated to be approximately $3,000; The City of Albertville’s share is estimated to be approximately $3,000; and the STMA School District’s share is estimated to be approximately $3,000. 7. County staff time for design, administration and coordination of the sign installations will not be billed (and will be considered an additional county contribution towards the project). 8. In accordance with the County’s Cost Participation Policy, the County will share future maintenance cost at 50%, with the Cities and School sharing equally the other 50%. Agenda Page 18 Page 2 MOU - RRFB System on CSAH 18 @ Lansing Ave NE, St. Michael and Albertville 9. No work described herein will begin until this Memo of Understanding has been signed by all parties. 10. Upon completion, the pedestrian activated RRFB systems shall become property of the Cities and School. The County will take the lead on future maintenance (subject to reimbursement by the Cities and School of 50% of future maintenance costs). For the City: __________________________________________ ________________ Steve Bot, P.E. Date City Administrator For the City: __________________________________________ ________________ Adam Nafstad, P.E. Date City Administrator For the School: __________________________________________ ________________ Dr. Ann-Marie Foucault. Date Superintendent St. Michael-Albertville Schools, #885 For the County: __________________________________________ _________________ Virgil Hawkins, P.E. Date Wright County Highway Engineer Agenda Page 19 Mayor and Council Request for Action August 15, 2022 SUBJECT: PLANNING – ALBERTVILLE SELF-STORAGE – INDUSTRIAL DEVELOPMENT APPLICATIONS RECOMMENDATION: It is respectfully requested that the Mayor and Council consider the following: MOTION TO: Adopt Resolution No. 2022-27 and Ordinance No. 2022-12 addressing the following development applications for Darkenwald Corporation to allow for the construction of a Self-Storage Facility in the City of Albertville. BACKGROUND: Darkenwald Corporation has requested the approval of a number of development applications associated with the proposed construction of a multiple building self- storage facility upon a 9.05-acre lot (Lot 1, Block 1 AVA Second Addition proposed) located at the northeast corner of 67th Street and Karmen Avenue. To facilitate the development proposal, approval of the following development applications have been formally requested: 1. Zoning Map Amendment. To change the zoning of the subject property from I-2 General Industrial District and B-2A, Special Business District to PUD/I-2, Planned Unit Development/General Industrial. The PUD district designation is required to allow multiple principal buildings on one lot. 2. Preliminary and Final Plat. To allow the creation of two buildable lots and one Outlot. 3. PUD Site and Building Plan Review. Review of site and building plans is required for new industrial construction. The applicants have proposed a self-storage facility comprised of 8 buildings and an area of outdoor storage on the proposed Lot 1, Block 1 AVA Second Addition (9.05 acres). City Staff has reviewed the aforementioned application and submission materials and prepared the August 3, 2022, planning report. The Albertville Planning Commission held a public hearing to consider the development application and staff reports on August 10, 2022. Upon conclusion of the public hearing, the Planning Commission recommended approval of each of the development applications with the conditions outlined in the August 3, 2022, Planning Report. KEY ISSUES: • Portions of the subject site are presently zoned B-2A, Special Business. To accommodate this industrial use, it is necessary to change the zoning. The requested change in zoning is consistent with the Albertville Vision study which encourages industrial development in this area of the city. The proposed zoning change is consistent with the City’s recent zoning actions for the neighboring AVA and Scherer Bros Industrial Development Agenda Page 20 Mayor and Council Request for Action – August 15, 2022 Albertville Self-Storage Development Page 2 of 2 • The proposed land use is industrial in nature and will be compatible with the adjoining industrial development. The Self-Storage facility will not burden City utilities or services. Anticipated traffic type and volumes from this use are within the capacity of the available streets. • The preliminary and final plats are creating lots that meet the lot area and width requirements of the I-2 General Industrial zoning district. • The August 3, 2022, Planning Report outlines the conditions and PUD flexibilities that are recommended for approval of the PUD Site and Building plans. These conditions have been reviewed and recommended for approval by the Albertville Planning Commission. • The attached Resolution outlines conditions of approval that must be satisfied to bring the preliminary plat, final plat and the PUD site and building plan into compliance with City zoning performance standards. POLICY/PRACTICES CONSIDERATIONS: Any change in zoning is a policy decision for the City Council. The Albertville Planning Commission held a public hearing on August 10, 2022 and agreed with the Zoning Map Amendment Findings outlined in the August 3, 2022 Planning Report and recommended that the City Council approve the change in zoning to the PUD/I-2 Planned Unit Development/General Industrial District. With regard to the applications for preliminary plat, site and building plan, and conditional use permit; the Planning Commission recommended approval of each application with the conditions outlined in the August 3, 2022, Planning Report. These conditions are outlined in the attached Resolution. FINANCIAL CONSIDERATIONS: The developer shall enter into a development agreement that outlines the financial responsibilities for the development including City fees and dedications. All required on-site and off-site improvements shall be the responsibility of developer. LEGAL CONSIDERATIONS: The change in zoning is a policy decision of the City Council. If the project is approved, the applicant will be required to enter into a development contract prepared by the City Attorney which outlines the required development, development schedule, on and off-site improvements and the securities and financing of the required improvements. Responsible Person: Alan Brixius City Planner Submitted Through: Adam Nafstad, City Administrator-PWD Attachments: • August 3, 2022, Planning Report and Exhibits • Resolution No. 2022-27 approving the development applications • Ordinance No. 2022-12 amending the Albertville Zoning Map Agenda Page 21 Planning Report TO: Adam Nafstad FROM: Colton Guarini / Alan Brixius DATE: August 3, 2022 RE: Albertville – Albertville Self- Storage Facility FILE NO: 163.06 – 22.03 BACKGROUND Darkenwald Corporation has requested the approval of several development applications associated with the proposed construction of a new self-storage facility. This development proposes eight (8) separated self-storage buildings. One of which will be a is a climate controlled self-storage, building H, and is proposed to be 42,000 square feet. The other seven garage style buildings are all self-storage but do not have the climate control, the garage type buildings range in size from 4,750 to 14,175 square feet. The interior of the site is intended to include outdoor storage of vehicles and equipment The subject site encompasses 26.78 acres in area. The plat proposes that 2 lots on a 1 outlot for future development. To Facilitate the development proposal, approval of the following development applications have been formally requested: 1.) Zoning Map Amendment. To change the zoning of the subject 26.78-acre property from B-2A Special Business district and I-2 General industrial District to PUD I-2, General Industrial District. The change in zoning is needed to allow the industrial self- storage use. The PUD district overlay is needed to allow for multiple principal buildings on one lot. 2.) Preliminary Plat/ Final Plat. To create two industrial lots and one outlot. Agenda Page 22 2 3.) PUD Site and Building Plan Review. Review of site and building plans is required for all new industrial construction. EXHIBITS Exhibit A: Site location map Exhibit B: Existing Conditions Exhibit C: Preliminary Plat Exhibit D: Final Plat Exhibit E: Site Plan Exhibit F: Grading Plan Exhibit G: Storm Sewer Plan Exhibit H: Utility Plan Exhibit I: Floor Plan, A, B, C, D, E, F, G Exhibit J: Elevations A, B, C, D, E, F, G Exhibit K: Floor Plan H Exhibit L: Elevation H Exhibit M: Photometrics Plan Exhibit N: Landscape Plan ISSUES AND ANALYSIS Zoning Map Amendments Section 300.1F of the Albertville Zoning Code outlines the following criteria for evaluating a Plan amendment or a zoning change: 1. The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. Comment: The requested change in zoning form B-2A business park to PUD I-2 is consistent with Albertville’s goals and policies of the City’s 2030 Vision Study, Promotes industrial use in this area of the city. 2. The proposed use conforms with all performance standards contained herein. Comment: Rezoning the subject site to PUD I-2, general industrial will subject the proposed industrial facility to all the performance standard applicable in the zoning and subdivision codes and standards of I-2, defined through the site plan review. 3. The proposed use will not tend to or actually depreciate the area in which it is proposed. Agenda Page 23 3 Comment: Rezoning of the subject site from B-2A Special Business District to PUD I-2 General Industrial District will change the type of allowed uses in this area of the city. The land use and zoning is consistent with the City’s recent zoning actions for the neighboring AVA, and Scherer Bros Industrial developments. 4. The proposed use can be accommodated with existing public services and will not overburden the city’s service capacity. Comment: Public sewer and water and other utilities exist in this area. The available municipal utilities in this area of the City have the size and capacity to accommodate the change to industrial land use and zoning. Extensions of and connection to the utilities will be evaluated with the subdivision and site plan proposals that have been submitted. Self-Storage facilities will have minimal impact on utilities. 5. Traffic generation by the proposed use is within the capabilities of streets serving the property. Comment: The current streets and the location of the subject site can handle the amount of traffic generated by the proposed use. Self-Storage facilities are low traffic generators. A change of zoning remains a policy decision of the Planning Commission and the City Council. However, City Staff would recommend supporting the land use and zoning change based on the following findings. 1. The City’s 2030 Visioning Study identifies a demand for industrial use expansion in the area. 2. The subject site offers access to major roadways, Labeaux Ave NE and 70th St NE which can accommodate the industrial users and anticipated traffic. 3. As a requirement of site plan review, compatibility issues will be addressed through screening, setbacks, building location and site design. 4. The proposed land uses will not overburden City utilities and sewer capacity. Preliminary / Final Plat Streets. The plan shows the extension of Karmen Avenue right-of-way to meet with 70th St NE. The current plat does not require any new street construction beyond current conditions. Karmen Avenue will be constructed north of the current cul-de-sac with the future platting of Outlot A. Agenda Page 24 4 Lots. As indicated, the preliminary plat includes two lots and one outlot. As shown in the table below both lots exceed the minimum lot area and width requirements of the I-2 zoning district. Lot Area Lot Width Lot 1 9.05 acres 2494 ft Lot 2 3.82 acres 114 ft Outlot A 13.91 acres 2608 ft Outlot A is a future development phase- No building permits will be issued for Outlot A until it’s platted into a Lot and Block description. Wetlands. The plat illustrates existing wetlands and the required wetland buffers. In review of the wetlands, we offer the following comments. 1. Within Outlot A, wetlands and their buffer areas located along the north side of the development area shall be covered by a drainage and utility easement. This is to prevent future intrusion within the wetlands and wetland buffer. 2. The final plat shows a drainage and utility easement from the AVA Addition extending into Lot 1, Block 1 of the new AVA Second Addition. The size and location of the easement will interfere with proposed building placement on Lot 1. A portion of this easement will need to be vacated to accommodate the proposed building placement and site improvements shown on the applicant’s site plan. A description of that portion of the easements to be vacated must be provided by the applicant and public hearing with the city council and council action is needed to vacate the easement. 3. The final plat must be revised to illustrate property line easements. The Subdivision code requires 10-foot drainage and utility easement along all lot lines. On shared side and rear lot lines the easement may be centered on the lot line. 4. The grading plan, drainage plan and utility plan shall be subject to the review and approval of the City Engineer. The City Engineer shall review and approve the size, configuration, and location of all required easements. Park Dedication. According to the 11-7-8-2, a cash in lieu of a land dedication contribution is required for the platting of industrial land. The dedications applies to Lot 1 and 2. Such fee will be calculated based upon rates established by the city and will be imposed as a condition of final plat approval. Agenda Page 25 5 Development Agreement. With the approval of the final plat the Applicant shall enter into a development agreement with the city which will address the required public improvements and site development per the approved plans. Site and Building Plan Review Site Access and Circulation. The site subject is proposed to be accessed from 67th Street. In review of the access and circulation patterns within the site we offer the following comments. 1. The proposed curb cut at the property line is 42 feet in width. By City Code the maximum curb cut width is 24 feet unless otherwise approved by the City Engineer. The City Engineer has reviewed the proposed curb cut and recommend approval of the 42 foot width as a PUD flexibility. 2. The drive aisles widths within the outdoor storage area are generous ranging from 24 feet nearest Building H to 36 and 40 feet. As a condition of the PUD the outdoor storage shall be striped per the approve site plan to delineate and distinguish the storage area stalls from the drive aisles. 3. Staff has concern with traffic movements in the northwest corner of the site around the garage type storage units. The drive aisles between these buildings are 24 feet in width. These units must be accessible to a fire truck. The applicant must demonstrate that the building spacing and drive aisles provide adequate turning radii for a 33-foot-long fire truck to circulate around the buildings. Applicant must overlay the fire truck turning movements onto the site plan to demonstrate their layout is adequate. 4. Applicant shall provide a detail for the proposed site access gate and security measures that will control access to the site. Setbacks. The table below, the building setback proposed on Lot 1 in comparison with the applicable I-2 District Setback requirements. Required Closest Proposed Front (West and South) 30 Feet 30 Feet (Building H) Back (East) 20 Feet 30 Feet (Building G) Side (North) 10 Feet 8 Feet (Building A) Building A. Building A fails to meet the required I-2 district, 10’ side yard setback. The building A is located at the north side of the site near the wetland, currently the building set back is approximately 8’ from the property line. The PUD district allow the city to grant some flexibility from district setbacks. The building at this location will be significantly separated from any future building or site improvements to the north by the permanent easement covering the wetland and wetland buffer. Provided the applicant can demonstrate the needed fire truck circulation around the northwest storage unit Agenda Page 26 6 buildings, staff would recommend approving the 8-foot Building A side yard setback as a PUD flexibility. Off-Street Parking. Currently there is no standard set specifically for a self-storage facility in Albertville zoning code. Provision 1200.9.A states that for uses not specifically identified for parking in the zoning code an individual determination may made based on industrial standards. City Staff believes that the proposed 10 parking stalls are sufficient for the proposed use based on research provided by ITE (Institute of Transportation Engineers) parking generation case studies and research of parking regulations of other communities. All driveways, parking and outdoor storage area shall have perimeter concrete curbing, paved surfacing and stripe parking stalls and outdoor storage area stalls. Trash Handling. The site plan does not illustrate the location of trash handling equipment. The site plan notes refer this issue to the building architectural drawings. Review of the building floor plans does not reveal the location or provision of a trash handling equipment. The plans must be revised to identify the locations trash handling equipment either within the buildings or outdoor trash enclosures. The locations must be convenient to the various buildings and accessible to trash haulers. Details on any outdoor trash enclosures must be provided for city approval. Building Materials. The Building Elevations show the exterior building treatments for each of the buildings. The garage type storage units are intended to have 7-inch vinyl lap siding around all sides of the building. Vinyl is listed as an acceptable exterior building material by code, however, its application around the entire long building facade results in a very bland visual appearance that is inconsistent with the architecture approved for AVA and Scherer Bros. City Staff recommends the provision of a brick, stone or their replicants wainscot covering bottom 4 to 5 feet of the exterior walls of the garage type buildings facing the public streets or adjoining properties. Building H, is the larger climate controlled storage building. The building elevations indicate that the exterior building material for his building will be solely EIFS. The building elevation show a monotonous exterior finish with no architecture relief visible from the street other than the overhead doors on the north and south sides of the building. The west building wall facing Karmen Avenue is 200 feet long. This featureless building is not consistent with the quality of the AVA and Scherer Bros buildings, we would recommend provide some variation in materials, colors and / or landscaping to break up the building mass and provide some visual interest in the building. Building Layout. In review of the building floor plans Staff offers the following comments. Agenda Page 27 7 1. Overhead doors are shown in the elevations for Building H, but do not show up on the floor plan of Building H. Floor plans need to be updated to illustrate the location and dimensions of the overhead doors. The overhead doors will change the building floor plan. If the overhead doors are intended to provide vehicle access inside the building the overall floor plan must illustrate the proposed traffic circulation. 2. The site plan refers to the architectural drawings for the provision of the trash handling equipment neither Building H nor the garage type storage units address the trash handling equipment. 3. All the buildings will be required to have a fire suppression system. The floor plans illustrate utility room for the sprinkler system within the buildings. These rooms near the center of each garage type building, For the single loaded buildings A, D, E, F and G, the sprinkler room is located at the back of the buildings with a access via a man door outside the fenced area of the site. This presents concerns for access to these room without a landing and sidewalk to these doors; these rooms will be inaccessible during winter snow months. The sprinkler rooms must be relocated to have access from inside the fenced area of the site where clear vehicle and pedestrian access to the room entrance is available. Mechanical Equipment. The Applicant shall provide revised site and building plans illustrating the location and screening of any ground mounted or rooftop mechanical equipment. Building Height. The proposed buildings 20 feet in height and each building is one story. All buildings are well within the maximum 45-foot requirement imposed in I-2 zoning districts. Landscaping. Section 1000. 7 outlines the landscaping and screening required for commercial and industrial lots. The landscaping plan that has been submitted, shows only the seeding plan with no shrubs or trees proposed. Base on our review of the site and submitted landscape plan we offer the following comments. 1. The site plan does a good job of using the garage type storage building to screen the interior outdoor storage area. Additional shrub or tree plantings are needed along the west and south fences and between the garage type storage buildings to screen the interior activity areas of the site. 2. Based on our review of the exterior building materials, Staff recommends the addition of tree or shrub clusters (3 to 5 plants) at 50-foot intervals along the perimeter of each building to break up the building mass. 3. The seeding plan shows the same seed mix for the lawn area and around the drainage ponds. The Landscape plan notes reference MNDOT Mix 33-261 Agenda Page 28 8 which is an acceptable storm pond seed mix. The seeding plan must be revised to reflect the appropriate seed mix around the ponds and its rate of application. Lighting. The lighting plan shows a total of 45 total exterior light fixtures on site. 40 wall mounted light fixtures, all installed at 9 feet above the ground. Five free standing light poles are located withing the outdoor storage area. These lights are mounted at 30 feet above the ground, compliant with the code. The light fixtures are all angled at the proper 90 degree cut off angle which is compliant with code. The lighting levels across the site are all compliant with code standards. Signage. The building elevations show wall signs above the entrance of building H, east side, and on the street side of building E, south side. The number and location of signs on these buildings meet code. For building H’s sign the width of the sign is 74 feet and 8 inches, the height of the sign is 1 foot 6 inches, for a total of 112 square feet and the base of the sign will be 10 feet 6 inches off the ground. Building E’s sign will be 60 feet wide, 2 feet tall, for a total of 120 square feet, and will be 8 feet 6 inches off the ground. These signs do not exceed 10% of the wall area. There is no specification for the material or illumination of the signs yet. All proposed signs shall be subject to the issuance of a separate sign permit. Security. Currently there is no details provide as to site security. Staff recommends the applicant provide details on the proposed fence, gates, and security elements, (i.e., key cards, gates, cameras, lighting etc.) that will address site access and security when the office is not occupied. Storage Restrictions. In approving the self-storage facility Staff recommends the following restrictions on the type of storage and uses within the approved facility. The applicant shall provide their standard lease agreement that outlines these prohibitions for the City approval. 1. Prohibited storage a. Explosives b. Hazardous / toxic materials c. Flammable materials d. Materials that are subject to spoilage or deterioration. 2. Prohibited uses of the storage bays. a. Residential living unit. b. Housing of animals c. Conducting a business d. Manufacturing or assembly of a products Grading, Drainage, and Utilities. Grading, drainage, and utilities plans shall be subject to final review and approval by the City Engineer. Agenda Page 29 9 Snow Storage. As a condition of PUD approval, the applicants must address the management of snow storage upon the subject site. The applicant may choose to provide gates at locations in the fence to allow for snow removal and storage outside the fenced areas of the lot. Fire Safety. There must be the inclusion of a fire hydrant at the northwest corner of Building H. The alleys of Buildings B, C, and H may need to be widened for accessibility and turning ability of fire trucks. CONCLUSION Based on our review of the application and the submitted plan sets offer the following recommendations. Zoning Map Amendment Staff recommends approval of the zoning map amendment changing the area zoning from B-2A to PUD/ I-2 based on the following findings. 1. The City’s 2030 Visioning Study identifies a demand for industrial use expansion in the area. 2. The subject site offers access to major roadways, Labeaux Ave NE and 70th St NE which can accommodate the industrial users and related truck traffic. 3. As a requirement of site plan review, compatibility issues will be addressed through screening, setbacks, building location and site design. 4. The proposed land uses will not overburden City utilities and sewer capacity. Preliminary and Final plat Staff recommends approval of the preliminary and final plat subject to the following conditions being satisfied. 1. The City approval of the requested zoning map amendment. 2. The final plat be revised to illustrate required easements over the wetland and wetland buffer in Outlot A and provision of the require lot line drainage and utility easements. The location, configuration and size of all easements shall be subject to the review and approval of the City Engineer. Agenda Page 30 10 3. Applicant shall provide a legal description for the vacation of a portion of the easement from the AVA Addition that encumbers Lot 1 Block 1 AVA 2nd Addition which interferes with the proposed site and building improvements. Applicant shall petition for the vacation of said easement area. 4. The City Engineer review and approval of the grading, drainage and utility plans. 5. The applicant enters into a development agreement with the city. PUD Site and Building Plan Based on our review of the submitted architectural drawings dated 07/18/2022 and the Civil Plans dated 07/12/2022, Staff recommends approval of the Albertville Self - Storage Facility site and building plans with the following conditions. 1. Approval of the 8-foot side yard setback for building A as a PUD flexibility. 2. Approval of the 42-foot width as a PUD flexibility. 3. The outdoor storage shall be striped per the approved site plan to delineate and distinguish the storage area stalls from the drive aisles. 4. The applicant must demonstrate that the building spacing and drive aisles widths provide adequate turning radii for a 33-foot-long fire truck to circulate around the buildings B and C or revise the site plan to accommodate this vehicle. 5. All driveways, parking and outdoor storage area shall have perimeter concrete curbing, paved surfacing and stripe parking stalls and outdoor storage area stalls. 6. The plans must be revised to identify the locations trash handling equipment either within the buildings or outdoor trash enclosures. The locations must be convenient to the various buildings and accessible to trash haulers. Details on any outdoor trash enclosures must be provided for city approval. 7. The provision of a brick, stone or their replicants wainscot covering bottom 4 to 5 feet of the exterior walls of the garage type buildings facing the public streets or adjoining properties. 8. Provide some variation in materials, colors and / or landscaping to break up the building mass and provide some visual interest for building H. 9. Submit a revised Building H floor plan illustrating the location and function of the overhead doors on the north and south sides of the building. Agenda Page 31 11 10. The sprinkler rooms within the garage type storage buildings must be relocated to have access from inside the fenced area of the site where clear vehicle and pedestrian access to the room entrance is available. 11. The Applicant shall provide revised site and building plans illustrating the location and screening of any ground mounted or rooftop mechanical equipment. 12. The applicant shall provide details on the proposed fence, gates, and security elements, (i.e., key cards, cameras, lighting etc.) that will address site access and site security when the office is not occupied. 13. The applicant shall provide their standard lease agreement that outlines the prohibitions outlined in this report for City review. 14. The landscape plan be revised to provide landscape screening along the west and south fence lines and between the garage type storage building to screen the interior activity areas. 15. The landscape plan be revised to provide tree or shrub clusters (3 to 5 plants) at 50-foot intervals along the outer perimeter of each building to break up the building mass visible from the adjoining streets and lots. 16. The seeding plan must be revised to reflect the appropriate seed mix around the ponds and its rate of application. 17. All proposed signs shall be subject to the issuance of a separate sign permit. 18. Applicant site and landscape plan shall illustrate locations for snow storage. 19. The Utility plan shall revised to provide a protected fire hydrant at the northeast corner of Building H. Cc. Maeghan Becker Kris Luedke Casey Darkenwald Nicholas Ouellette Landform. Agenda Page 32 Agenda Page 33 Agenda Page 34 Agenda Page 35 Agenda Page 36 Agenda Page 37 Agenda Page 38 Agenda Page 39 Agenda Page 40 Agenda Page 41 Agenda Page 42 Agenda Page 43 Agenda Page 44 Agenda Page 45 Agenda Page 46 Agenda Page 47 Agenda Page 48 Agenda Page 49 Agenda Page 50 Agenda Page 51 CITY OF ALBERTVILLE COUNTY OF WRIGHT STATE OF MINNESOTA RESOLUTION NO. 2022-27 RESOLUTION APPROVING REQUESTS FOR A ZONING MAP AMENDMENT, PRELIMINARY AND FINAL PLAT, PUD SITE AND BUILDING PLANS FOR DARKENWALD CORPORATION TO CONSTRUCT A MULTIPLE BUILDING SELF- STORAGE FACILITY WITH OUTDOOR STORAGE ON LOT 1, BLOCK 1, AVA SECOND ADDITION WITHIN THE CITY OF ALBERTVILLE WHEREAS, the Darkenwald Corporation has filed applications and submitted plans for the development of a multiple building self-storage facility upon a 9.05-acre site (Lot 1, Block 1 AVA Second Addition) located at the northeast corner of 67th Street and Karmen Avenue. To facilitate the development proposal the following development applications have been requested. 1. Zoning Map Amendment: Changing the zoning from I-2 General Industrial District and B-2A Special Business District to PUD /I-2 Planned Unit Development/General Industrial District. 2. Preliminary/Final Plat creating two industrial lots and one outlot. 3. PUD-Site and Building Plan Review. WHEREAS, City Staff has reviewed the submitted plans and prepared a planning report dated August 3, 2022; and WHEREAS, the Albertville Planning Commission met and held a public hearing on August 10, 2022, to consider the applications for zoning map amendment, preliminary and final plat, PUD site and building plans; and WHEREAS, upon considering the application materials, the August 3, 2022 Planning Report and public testimony, the Planning Commission closed the public hearing and recommended that the City Council approve the requested zoning map amendment, preliminary and final plat, PUD site and building plan with the findings and conditions outlined in the August 3, 2022, Planning Report; and WHEREAS, upon considering the application materials, the August 3, 2022 Planning Report and the recommendations of the Planning Commission, the City Council agrees with the findings and recommendations of City Staff and the Planning Commission. NOW, THEREFORE BE IT RESOLVED, that the City Council of Albertville, Minnesota hereby approves the Zoning Map Amendment, Preliminary and Final Plat, and PUD- Site and Building Plans for the property described on the proposed Preliminary/Final Plat as Lot 1, Block 1, AVA Second Addition based on the following findings and conditions. Zoning Map amendment is approved based on the following findings. 1. The City’s 2030 Visioning Study identifies a desire for industrial development within this area of the City. Agenda Page 52 City of Albertville, MN Resolution No. 2022-27 Meeting of August 15, 2022 Page 2 2. The proposed industrial use is compatible with land uses on properties adjoining the site. 3. The subject site offers convenient access to major roadways which will be conducive to industrial users and related traffic. 4. Traffic generated by self-storage facility will be within the capability of existing and future streets which serve the area. 5. The proposed self-storage use will not overburden City utilities and sewer. Preliminary/Final Plat: The preliminary and final plat entitled AVA Second Addition is approved with the following conditions. 1. The City approval of the requested zoning map amendment. 2. The final plat be revised to illustrate required easements over the wetland and wetland buffers in Outlot A and provision of the required lot line drainage and utility easements. The location, configuration and size of all easements shall be subject to the review and approval of the City Engineer. 3. Applicant shall provide a legal description for the vacation of a portion of the easement from the AVA Addition that encumbers Lot 1 Block 1 AVA 2nd Addition which interferes with the proposed site and building improvements. Applicant shall petition for the vacation of said easement area. 4. The City Engineer review and approval of the grading, drainage, and utility plans. 5. The applicant enters into a development agreement with the City. PUD-Site and Building Plans: Site and building plans (Civil plans dated July 12, 2022 and Architectural Drawings dated July 18, 2022) are approved with the following conditions: 1. Approval of the 8-foot side yard setback for building A as a PUD flexibility. 2. Approval of the 42-foot curb cut width as a PUD flexibility. 3. The outdoor storage shall be striped per the approved site plan to delineate and distinguish the storage area stalls from the drive aisles. 4. The applicant must demonstrate that the building spacing and drive aisles widths provide adequate turning radii for a 33-foot-long fire truck to circulate around the buildings B and C or revise the site plan to accommodate this vehicle. 5. All driveways, parking and outdoor storage area shall have perimeter concrete curbing, paved surfacing and stripe parking stalls and outdoor storage area stalls. Agenda Page 53 City of Albertville, MN Resolution No. 2022-27 Meeting of August 15, 2022 Page 3 6. The plans must be revised to identify the locations trash handling equipment either within the buildings or outdoor trash enclosures. The locations must be convenient to the various buildings and accessible to trash haulers. Details on any outdoor trash enclosures must be provided for City approval. 7. The provision of a brick, stone or their replicants wainscot covering bottom 4 to 5 feet of the exterior walls of the garage type buildings facing the public streets or adjoining properties. 8. Provide some variation in materials, colors and/or landscaping to break up the building mass and provide some visual interest for building H. 9. Submit a revised Building H floor plan illustrating the location and function of the overhead doors on the north and south sides of the building. 10. The sprinkler rooms within the garage type storage buildings must be relocated to have access from inside the fenced area of the site where clear vehicle and pedestrian access to the room entrance is available. 11. The Applicant shall provide revised site and building plans illustrating the location and screening of any ground mounted or rooftop mechanical equipment. 12. The applicant shall provide details on the proposed fence, gates, and security elements, (i.e., key cards, cameras, lighting etc.) that will address site access and site security when the office is not occupied. 13. The applicant shall provide their standard lease agreement that outlines the prohibitions outlined in the August 3, 2022, Planning Report for City review. 14. The landscape plan be revised to provide landscape screening along the west and south fence lines and between the garage type storage building to screen the interior activity areas. 15. The landscape plan be revised to provide tree or shrub clusters (3 to 5 plants) at 50-foot intervals along the outer perimeter of each building to break up the building mass visible from the adjoining streets and lots. 16. The seeding plan must be revised to reflect the appropriate seed mix around the ponds and its rate of application. 17. All proposed signs shall be subject to the issuance of a separate sign permit. 18. The site and landscape plan shall be revised to illustrate locations for snow storage. 19. The Utility plan shall be revised to provide a protected fire hydrant at the northeast corner of Building H. Agenda Page 54 City of Albertville, MN Resolution No. 2022-27 Meeting of August 15, 2022 Page 4 Adopted by the City Council of the City of Albertville this 15th day of August 2022. _____________________________ Jillian Hendrickson, Mayor ATTEST: __________________________ Kristine A. Luedke, City Clerk Agenda Page 55 CITY OF ALBERTVILLE COUNTY OF WRIGHT STATE OF MINNESOTA ORDINANCE NO. 2022-12 AN ORDINANCE AMENDING THE OFFICIAL ZONING MAP OF THE CITY OF ALBERTVILLE, RELATING TO THE FINAL PLAT ENTITLED AVA SECOND ADDITION IN THE CITY OF ALBERTVILLE, MINNESOTA The City Council of the City of Albertville, Minnesota hereby ordains: Section 1. The Albertville Zoning Map shall be amended changing the zoning on property legally describe below from I-2 and B-2A Special Business District to PUD/I-2 Planned Unit Development/General Industrial District: Legal Description. AVA Second Addition in Albertville MN. Section 2. This amendment shall be in full force and effective immediately following its passage, publication and the recording of the Final Plat. Adopted by the City Council of the City of Albertville on this 15th day of August 2022. _____________________________ Jillian Hendrickson, Mayor ATTEST: __________________________ Kristine A. Luedke, City Clerk Agenda Page 56 Mayor and Council Request for Action August 15, 2022 SUBJECT: PLANNING – PUBLIC HEARING – PARTICLE CONTROL – INDUSTRIAL DEVELOPMENT APPLICATIONS RECOMMENDATION: It is respectfully requested that the Mayor and Council consider the following: MOTION TO: Adopt Resolution No. 2022-28, and Ordinance No. 2022-13 addressing the following development applications for Particle Control to expand their industrial facility in the City of Albertville. BACKGROUND: Particle Control has requested the approval of a number of development applications associated with the proposed construction of a 24,000 sq. ft. warehouse expansion at their site at 6062 Lambert Avenue in Albertville. To facilitate the development proposal, approval of the following development applications have been formally requested: 1. Zoning Map Amendment. To change the zoning of the subject property from B-3, Highway Commercial District to Particle Control PUD / B-3 district. This expands the Particle Control PUD/B-3 zoning district over newly acquired lots adjoining their current site. 2. Preliminary Plat/ Final Plat. To combine all the Particle Control property into one lot. 3. Street Vacation. Vacation of portions of Lamont Avenue and Second Street to allow the combination of the Particle Control properties into one lot. 4. PUD Site and Building Plan Review. Review of site and building plans is required for all new industrial construction. City Staff has reviewed the aforementioned applications and submission materials and prepared the August 5, 2022, Planning Report. The Albertville Planning Commission held a public hearing to consider the development application and staff reports on August 10, 2022. Upon conclusion of the public hearing, the Planning Commission recommended approval of each of the development applications with the conditions outlined in attached resolution. KEY ISSUES: • In 2011, the City of Albertville changed the zoning on the Particle Control site from B-3 Highway Commercial District to PUD/B-3 district to allow the Particle Control Industrial uses within this zoning district and to allow the business to grow on-site. In Agenda Page 57 Mayor and Council Request for Action – August 15, 2022 Public Hearing - Particle Control Industrial Development Page 2 of 3 making the zoning change the City recognized Particle Control as a valued, clean, manufacturing business that the City want to retain and grow within the Community. • Particle Control has now purchased two vacate lots to the east of their current site to construct a warehouse expansion for their growing business. A zoning change over these newly acquired lot in needed to allow the industrial expansion. • The proposed land use is industrial in nature and will be compatible with the adjoining Particle Control industrial development. The orientation of the proposed building and site use to the north will buffer the single-family homes to the south. • The expanded industrial use will not burden City utilities or services. Anticipated traffic from the new warehouse will be oriented to County Road 37 away from the residential uses to the south. The type and volume of traffic from the warehouse is within the capacity of the available streets. • Lamont Avenue and Second Street are unimproved local street rights-of-way. The vacation of a portion of Lamont Avenue is needed to allow the building expansion. A portion of Lamont Avenue and 2nd Street Right-of-way cannot be vacated to preserve street access to the lot east of the Particle Control lot. • The preliminary and final plats combine all the Particle Control properties into one lot. • The August 5, 2022, Planning Report outlines the conditions and PUD flexibilities that are recommended for approval of the street vacation, preliminary and final plat and the PUD Site and Building plans. These conditions have been reviewed, amended and recommended for approval by the Albertville Planning Commission. • The attached resolution outlines conditions of approval recommended by the Planning Commission that must be satisfied allow for the street vacation, preliminary and final plat and the PUD site and building plans to proceed to development. POLICY/PRACTICES CONSIDERATIONS: Any change in zoning is policy decision for the City Council. The Albertville Planning Commission held a public hearing on August 10, 2022 and agreed with the Zoning Map Amendment Findings outlined in the August 5, 2022 Planning Report and recommended that the City Council approve the change in zoning to the Particle Control PUD/B-3. With regard to the applications for street vacation, preliminary and final plat, PUD site and building plans the Planning Commission recommended approval of each application with the conditions outlined in the August 3, 2022, planning report as amended by the Planning Commission. These conditions are outlined in the attached resolution. FINANCIAL CONSIDERATIONS: The developer shall enter development agreement that outlines the financial responsibilities for the development including City fees and dedications. All required on-site and off-site improvements shall be the responsibility of developer LEGAL CONSIDERATIONS: The change in zoning is a policy decision of the City Council. If the project is approved, the applicant will be required to enter into a development contract prepared by the City Attorney which outlines the required development, development schedule, on and off-site improvements and the securities and financing of the required improvements. Responsible Person: Alan Brixius City Planner Submitted Through: Adam Nafstad, City Administrator-PWD Agenda Page 58 Mayor and Council Request for Action – August 15, 2022 Public Hearing - Particle Control Industrial Development Page 3 of 3 Attachments: •August 5, 2022, Planning Report and Exhibits •Resolution No. 2022-28 approving the development applications •Ordinance No. 2022-13 amending the zoning map Agenda Page 59 Planning Report TO: Adam Nafstad FROM: Alan Brixius DATE: August 5, 2022 RE: Albertville – Particle Control PUD / Building Expansion FILE NO: 163.06 – 22.04 BACKGROUND In 2011, the City of Albertville changed the zoning on the Particle Control site from B-3 Highway Commercial District to PUD / B-3 district to allow the Particle Control Industrial uses within this zoning district and to allow the business to grow on-site. In making the zoning change the City recognized Particle Control as a valued, clean, manufacturing business that the City want to retain and grow within the Community. Particle Control has now purchased two vacate lots to the east of their current site to construct a warehouse expansion for their growing business. To accommodate this expansion, they have requested the following development applications: 1.) Zoning Map Amendment. To change the zoning covering the two newly purchased lot from B-3 Highway Commercial District to PUD / B-3 Highway Commercial District. The change in zoning is needed to allow for the expansion of the Particle Control industrial use. 2.) Preliminary Plat/ Final Plat. To combine all the Particle Control property into one lot. 3.) Street Vacation. Vacation of portions of Lamont Avenue and Second Street to allow the combination of the Particle Control properties into one lot. 3.) PUD Site and Building Plan Review. Review of site and building plans is required for all new industrial construction. Agenda Page 60 2 EXHIBITS Exhibit A: Site location map Exhibit B: Existing Conditions Exhibit C Right-of-Way Vacation Exhibit D: Preliminary Plat Exhibit E: Final Plat Exhibit F: Site Plan Exhibit G: Grading Plan Exhibit H: Utility Plan Exhibit I: Floor Plan Exhibit J: Elevations ISSUES AND ANALYSIS Zoning Map Amendments Section 300.1F of the Albertville Zoning Code outlines the following criteria for evaluating a Plan amendment or a zoning change: 1. The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official City Comprehensive Plan. Comment: The requested change in zoning form B-3 Highway Commercial District to PUD / B-3 is consistent with Albertville’s goals and policies of the City’s 2030 Vision Study. This promotes the growth of a valued industrial use in this area of the city. 2. The proposed use conforms with all performance standards contained herein. Comment: Rezoning the subject site to PUD / B-3 will subject to all the performance standards established in the 2011 Particle Control PUD / B-3 zoning district. Greater detail of zoning compliance will be demonstrated through the site plan review. 3. The proposed use will not tend to or actually depreciate the area in which it is proposed. Comment: Rezoning of the subject site will change the type of allowed uses in this area of the city. The land use and zoning is consistent with the City’s 2011 zoning actions to memorialize the Particle Control industrial use and allowing for the business expansion. Agenda Page 61 3 4. The proposed use can be accommodated with existing public services and will not overburden the city’s service capacity. Comment: Public sewer and water and other utilities exist in this area. The available municipal utilities in this area of the City have the size and capacity to accommodate the change to industrial land use and zoning. The connection to the utilities will be evaluated with the site plan proposals that have been submitted. 5. Traffic generation by the proposed use is within the capabilities of streets serving the property. Comment: The proposed warehouse expansion will take access via County Road 37. This roadway can handle the amount of traffic generated by the proposed use. Any access to a County Road is subject to a County access permit. A change of zoning remains a policy decision of the Planning Commission and the City Council. However, City Staff would recommend supporting the land use and zoning change based on the following findings. 1. The City’s 2030 Visioning Study allow for expansion this industrial use in the area of the City. 2. The subject site will take access from County Road 37 which can accommodate the anticipated traffic. 3. As a requirement of site plan review, compatibility issues will be addressed through screening, setbacks, building location and site design. 4. The proposed land uses will not overburden City utilities and sewer capacity. Street Vacation The applicant has requested the City vacate portions of Lamont Ave NE and Second Street. In review of the requested vacation, we offer the following finding and conditions. 1. That portion of Lamont Avenue NE lying between Lot 6 Block A and lot 10 Block B of the Townsite of Hamburg is unimproved, contains no utilities and will not limit access to other adjoining properties. Staff recommend the vacation of this Street Right-of-Way. 2. The portions of Lamont Avenue NE and Second Street lying north of Blocks A and B to the Townsite of Hamburg provide street right-of-way frontage to Lot 8 Agenda Page 62 4 Block A of the Townsite of Hamburg which is outside of the project area. This portion of the street Right-of-Way cannot be vacated at this time. 3. Lamont Avenue and Second Street rights of way lying north of Block A of the Townsite of Hamburg may still be included in the development project with the following conditions. a. The Particle Control shall enter into a right-of-way encroachment agreement prepared by the City Attorney grant the right to make private improvements within the City right-of-way. b. The Particle Control grant right of access over the City right-of-way to the property owner of Lot 8, Block A Townsite of Hamburg of allow access to this lot over the private improvements within the City right-of-way Preliminary / Final Plat Streets. The plat abuts County Road 37. Any plat abutting a county right-of-way shall be subject to County review and approval. Site access via the County Road is subject to County approval. The developer shall be responsible for any required County Road improvements (i.e. turn lanes, bypass lanes) required to allow for the new construction. Lots. As indicated, the preliminary plat combines all the Particle Control properties into one lot and Block description. The preliminary plat identifies the lot area to be 3.64 acres including the vacated proposed vacated street rights-of-way. Both the preliminary plat and final plat must be revised to remove those portions of the Lamont Avenue and 2nd Street that will not be vacated. Easements: The final plat illustrates property line easements complying with the required 10-foot drainage and utility easement along all lot lines. The grading plan, drainage plan and utility plan shall be subject to the review and approval of the City Engineer. The City Engineer shall review and approve the size, configuration, and location of all required easements. Development Agreement. With the approval of the final plat the Applicant shall enter into a development agreement with the city which will address the required public improvements and site development per the approved plans. Site and Building Plan Review Site Access and Circulation. The site subject is proposed to be accessed from County Road 30. These access points are subject to the approval of Wright County. In review of the access and circulation patterns within the site we offer the following comments. Agenda Page 63 5 1. The proposed curb cuts at the property line are 30 and 31.8 feet in width. By City Code the maximum curb cut width is 24 feet unless otherwise approved by the City Engineer. The City Engineer has reviewed the proposed curb cuts and approves the requested widths. 2. All operations are on the north side of the propose building, using the building to screen the traffic and outdoor operations from the homes to the south. 3. The area north of the building is intended to accommodate truck shipping and receiving and 5 parking stalls. In examining the truck movements in this area, we offer the following recommendations. a. Relocate the parking stalls from this area to the west side of the building to have the area north of the warehouse exclusive for truck maneuvering. b. The depth of the warehouse is 150 feet, a shallower building design (120 or 130 feet) will provide additional on-site area for semi-truck and trailer maneuvering. c. Backing into the site from County Road 37 shall be prohibited. Setbacks. The table below, the building setback proposed on Lot 1 in comparison with the applicable PUD /B-3 District Setback requirements. Required Closest Proposed Front (North) 35 Feet 27 Feet Back (South) 20 Feet 14.5 Feet Side (East) 20 Feet 10 Feet As illustrate above the proposed warehouse building fails to meet the required setbacks established in the 2011 PUD / B-3 District approved for the Particle Control site. In review of the site plan and building setbacks we offer the following recommendations. 1. Reduce the building depth to meet or exceed the required 35-foot setback from the County Road 37 right-of-way. This will bring the building into compliance with the required setback and improved on-site truck movements. 2. The rear yard setback is 14,5 feet from south property line. The new building aligns with the existing building to the east. Staff is concerned having a 24-foot- high wall running 180 feet in length in close proximity to the single-family homes to the south. The City may require compliance with the 20 foot setback or the City may approve the 14.5 foot setback as a PUD flexibility provided the applicant provide some tree or shrub clusters (3 to 5 plants) at 50 intervals to break up the building mass. Agenda Page 64 6 3. The side yard setback is 10 feet from the east lot line. This holds the same concern as the rear yard setback and may be treated in the same manner. Off-Street Parking: The site plan does not provide a parking layout for the entire site. The applicant shall provide a breakdown of uses within the building (office, production, warehousing, locker rooms, etc.) and provide a parking count that demonstrates that adequate parking is available for the size and type of uses within the building. A reduction in the required parking may be allowed if actual employee counts and work shifts are less than the required parking count. The parking stalls shown on the site plan north of the new warehouse shall be relocated to west side of the existing building. All new driveways, and loading areas shall have perimeter concrete curbing, paved surfacing. Trash Handling. The site plan does not illustrate the location of trash handling equipment. The plans must be revised to identify the locations trash handling equipment either within the buildings or outdoor trash enclosures. The locations must be convenient to the various buildings and accessible to trash haulers. Details on any outdoor trash enclosures must be provided for city approval. Building Materials. The Building Elevations show the exterior building treatments for each of the buildings. Through the approved PUD / B-3 District, the Particle Control industrial buildings may have a metal exterior finish provided the color of any new building or structure matches the color and design of the principal building on the site. The building elevations match the current buildings in design and color. Building Layout. Exhibit I illustrates the proposed floor layout of the new warehouse facility in review of the building floor plans Staff offers the following comments. 1. The building shall have fire suppression, the sprinkler room is located at the north side of the building. Water service to the building shall have separate service lines for fire suppression and potable water as it enters the building. 2. The floor plan and building elevation shows a man door on the south building wall for fire exiting. The site plan must provide a landing outside of the door and an exit path for this door. The landing and exit path must be kept clear of snow and other debris to ensure passage at all times. Mechanical Equipment. The Applicant shall provide revised site and building plans illustrating the location and screening of any ground mounted or rooftop mechanical equipment. Agenda Page 65 7 Building Height. The proposed buildings 24 feet in height and each building is one story. All buildings are well within the maximum 35-foot requirement imposed in the PUD/ B-3 zoning district. Landscaping. Section 1000. 7 outlines the landscaping and screening required for commercial and industrial lots. Based on our review of the site plan we offer the following comments. 1. The site plan does a good job of using the storage building to screen the outdoor activities to the north of the buildings from the homes to the south. 2. Based on our review of the building size, its exterior materials and reduced setbacks, Staff recommends the addition of tree or shrub clusters (3 to 5 plants) at 50-foot intervals along the perimeter of each building to break up the building mass. 3. A landscaped hedge shall be required within the 10-foot green area between the pavement and the County Road 37 right-of-way to screen loading areas. . Lighting. An exterior lighting and photometric plan shall be provided prior to building permit showing the location and design of all outdoor light fixtures and light levels across the site. All exterior light fixtures shall have a 90-degree cut off and shielded light source to prevent nuisance glare to surrounding properties and streets. Grading, Drainage, and Utilities. Grading, drainage, and utilities plans shall be subject to final review and approval by the City Engineer. Snow Storage. The site plan shows building and pavement covering most of the new development site. As a condition of approval, the applicants must address snow removal and storage upon the subject site. CONCLUSION Based on our review of the applications and the submitted plan sets offer the following recommendations. Zoning Map Amendment Staff recommends approval of the zoning map amendment expanding the Particle Control PUD / B-3 zoning district to include all the land in the new plat based on the following findings. 1. The City’s 2030 Visioning Study allow for expansion this industrial use in the area of the City. Agenda Page 66 8 2. The subject site will take access from County Road 37 which can accommodate the anticipated traffic. 3. As a requirement of site plan review, compatibility issues will be addressed through screening, setbacks, building location and site design. 4. The proposed land uses will not overburden City utilities and sewer capacity. Street Vacation Based on Staff review of the requested street right-of-way vacation we recommend. 1. That portion of Lamont Avenue NE lying between Lot 6 Block A and lot 10 Block of the Townsite of Hamburg is unimproved, contains no utilities and will not limit access to other adjoining properties. Staff recommend the vacation of this Street Right-of-Way. 2. The portions of Lamont Avenue NE and Second Street lying nor of Blocks A and B to the Townsite of Hamburg provide street right-of-way frontage to Lot 8 Block A of the Townsite of Hamburg which is outside of the project area. This portion of the street Right-of-Way cannot be vacated at this time. 3. Lamont Avenue and Second Street rights of way may still be included in the development project with the following conditions. a. Particle Control shall enter into a right-of-way encroachment agreement prepared by the City Attorney grant right to allow private improvements within the City right-of-way. b. Particle Control grant right of access over the City right-of-way to the property owner of Lot 8, Block A Townsite of Hamburg of allow access to this lot over the private improvement within the City right-of-way Preliminary and Final plat Staff recommends approval of the preliminary and final plat subject to the following conditions being satisfied. 1. The City approval of the requested zoning map amendment. 2. The final plat be revised to remove the Lamont Avenue NE and Second Street right-of-way that will not be vacated. 3. Subject to Wright County review and approval of the plat. The developer shall be responsible for any required County Road improvements (i.e., turn lanes, bypass lanes) required to allow for the new construction. Agenda Page 67 9 4. The City Engineer review and approval of the grading, drainage, and utility plans. 5. The City Engineer review and approval the location, size, and configuration of required easements. 6. The applicant enters into a development agreement with the city. PUD Site and Building Plan Based on our review of the submitted architectural drawings dated 07/11/2022 and the Civil Plans dated 07/12/2022, Staff recommends approval of the Particle Control site and building plans with the following conditions. 1. Wright County approval of site access 2. Approval of the 30 and 31.8-foot curb cut widths as a PUD flexibility. 3. Relocate the parking stalls from this area to the west side of the building to have the area north of the warehouse exclusive for truck maneuvering. 4. Reduce the depth of the warehouse to meet the required 35-foot front yard setback and provide additional on-site area for semi-truck and trailer maneuvering. 5. Backing into the site from County Road 37 shall be prohibited. 6. The City approval of the reduced 14.5 rear yard setback and 10-foot side yard setback as a PUD flexibility. Applicant shall provide a landscape plan that provides tree or shrub cluster (3 to 5 plants) at 50-foot intervals around the south and east sides of the of the new warehouse building to break up the building mass. 7. The applicant shall provide a breakdown of the building floor area by use and prepare a require parking calculation. The site plan must demonstrate sufficient on-site parking for the Particle Control operations with the new building addition. 8. The parking stalls shown on the site plan north of the new warehouse shall be relocated to west side of the existing building. 9. All new driveways, and loading areas shall have perimeter concrete curbing, paved surfacing. 10. The plans shall be revised to identify the locations trash handling equipment either within the buildings or outdoor trash enclosures. The locations must be Agenda Page 68 10 convenient to the various buildings and accessible to trash haulers. Details on any outdoor trash enclosures must be provided for city approval. 11. Water service to the building shall have separate service lines for fire suppression and potable water as it enters the building. 12. The site plan shall show a landing and exit path for the door on the south wall of the warehouse building. Said landing and exit path shall be kept clear of snow and or other debris that may obstruct exiting from this door. 13. Applicant shall provide revised site and building plans illustrating the location and screening of any ground mounted or rooftop mechanical equipment. 14. A landscaped hedge shall be required within the 10-foot green area between the pavement and the County Road 37 right-of-way. 15. Applicant shall provide a lighting and photometric plan for all proposed exterior lighting both wall mounted and freestanding light for review and approval by the City. 16. Grading, drainage, and utilities plans shall be subject to final review and approval by the City Engineer. 17. Applicant shall provide a snow removal and snow storage plan identifying snows storage area on the site. Cc. Maeghan Becker Kris Luedke Keith Arns Scott Dahlke Agenda Page 69 Agenda Page 70 Agenda Page 71 Agenda Page 72 Agenda Page 73 Agenda Page 74 Agenda Page 75 Agenda Page 76 Agenda Page 77 Agenda Page 78 Agenda Page 79 Agenda Page 80 Agenda Page 81 CITY OF ALBERTVILLE COUNTY OF WRIGHT STATE OF MINNESOTA RESOLUTION NO. 2022-28 RESOLUTION APPROVING REQUESTS FOR A ZONING MAP AMENDMENT, PRELIMINARY AND FINAL PLAT, STREET VACATION AND PUD SITE AND BUILDING PLANS FOR PARTICLE CONTROL FOR THE EXPANSION OF THE INDUSTRIAL USE AT 6062 LAMBERT AVENUE WITHIN THE CITY OF ALBERTVILLE WHEREAS, Particle Control has filed applications and submitted plans for the development of a 24,000 square foot warehouse expansion for their business located at 6062 Lambert Avenue. To facilitate the development proposal the following development applications have been requested. 1. Zoning Map Amendment: Changing the zoning from B-3 Highway Commercial District to Particle Control PUD /B-3 Planned Unit Development / Highway Commercial District. 2. Vacation of portions of Lamont Avenue and Second Street rights of way. 3. Preliminary/Final Plat combining all Particle Control properties into one lot. 4. PUD-Site and Building Plan Review WHEREAS, City Staff has reviewed development applications and the submitted plans and prepared a planning report dated August 5, 2022; and WHEREAS, the Albertville Planning Commission met and held a public hearing on August 10, 2022, to consider the applications for zoning map amendment, street vacation, preliminary and final plat, PUD site and building plans; and WHEREAS, upon considering the application materials, the August 5, 2022 Planning Report and public testimony the Planning Commission closed the public hearing and recommended that the City Council approve the requested zoning map amendment, preliminary and final plat, street vacation, and PUD site and building plan with the findings and conditions outlined in the August 3, 2022, Planning Report as amended by the Planning Commission; and WHEREAS, the Albertville City Council has held a public hearing to consider the vacation of portions of Lamont Avenue and Second Street platted rights-of way, to solicit public comment and consider the City Staff and Planning Commission review recommendation the requested street vacation; and WHEREAS, the City Council upon closing their public hearing on the vacation of the public street rights-of-way and considering the application materials, the August 5, 2022 Planning Report and the recommendations of the Planning Commission, the City Council agrees with the findings and recommendations of City Staff and the Planning Commission. Agenda Page 82 City of Albertville, MN Resolution No. 2022-28 Meeting of August 15, 2022 Page 2 NOW, THEREFORE BE IT RESOLVED, that the City Council of Albertville, Minnesota hereby approves the Zoning Map Amendment, Preliminary and Final Plat, Street Vacation and PUD-Site and Building Plans for the property described on the proposed Preliminary/Final Plat the Particle Control Addition based on the following findings and conditions. Zoning Map amendment is approved based on the following findings. 1. The City’s 2030 Visioning Study allows for expansion this industrial use in the area of the City. 2. The subject site will take access from County Road 37 which can accommodate the anticipated traffic. 3. As a requirement of site plan review, compatibility issues will be addressed through screening, setbacks, building location and site design. 4. The proposed land uses will not overburden City utilities and sewer capacity. Vacation of portions of Lamont Avenue are approved with the following conditions. 1. The vacation of at portion of Lamont Avenue NE lying between Lot 6 Block A and lot 10 Block of the Townsite of Hamburg. The City finds that this street right-of-way is unimproved, contains no utilities and will not limit access to other adjoining properties. 2. The portions of Lamont Avenue NE and Second Street lying north of Blocks A and B to the Townsite of Hamburg provide street right-of-way frontage to Lot 8 Block A of the Townsite of Hamburg which is outside of the project area. This portion of the street right-of-way shall not be vacated at this time. Applicant shall provide a new legal description for the requested street vacation that excludes this portion of the Lamont Avenue and 2nd Street. 3. Lamont Avenue and Second Street right-of-way may still be included in the development project with the following conditions. a. Particle Control shall enter into a right-of-way encroachment agreement prepared by the City Attorney granting right to allow private improvements within the City right-of-way. b. Particle Control shall grant right of access over the City right-of-way to the property owner of Lot 8, Block A Townsite of Hamburg of allow access to this lot over the private improvements within the City right-of-way. This shall be a separate private access easement recorded at the same time as the final plat. Preliminary / Final Plat: The preliminary and final plat entitled Particle Control Addition is approved with the following conditions. Agenda Page 83 City of Albertville, MN Resolution No. 2022-28 Meeting of August 15, 2022 Page 3 1. The City approval of the requested zoning map amendment. 2. The final plat shall be revised to remove the portions of Lamont Avenue NE and Second Street right-of-way that will not be vacated. 3. Subject to Wright County review and approval of the plat. The developer shall be responsible for any required County Road improvements (i.e., turn lanes, bypass lanes) required to allow for the new construction. 4. The City Engineer review and approval of the grading, drainage, and utility plans. 5. The City Engineer review and approval the location, size, and configuration of required easements. 6. The applicant enters into a development agreement and encroachment agreement with the City. PUD-Site and Building Plans. The Particle Control Site and building plans (Civil plans dated July 12, 2022 and Architectural Drawings dated July 11, 2022) are approved with the following conditions: 1. Wright County approval of site access 2. Approval of the 30 and 31.8-foot curb cut widths as a PUD flexibility. 3. Relocate the parking stalls from this area to the west side of the building to have the area north of the warehouse exclusive for truck maneuvering. 4. Backing into the site from County Road 37 shall be prohibited. 5. The City approval of the reduced 12.8 rear yard setback and 10-foot side yard setback as a PUD flexibility. Applicant shall provide a landscape plan that provides tree or shrub cluster (3 to 5 plants) at 50-foot intervals around the south and east sides of the of the new warehouse building to break up the building mass. 6. The applicant shall provide a breakdown of the building floor area by use and prepare a require parking calculation. The site plan must demonstrate sufficient on-site parking for the Particle Control operations with the new building addition. 7. The parking stalls shown on the site plan north of the new warehouse shall be relocated to west side of the existing building. 8. All new driveways, and loading areas shall have perimeter concrete curbing, paved surfacing. 9. The plans shall be revised to identify the locations trash handling equipment either within the buildings or outdoor trash enclosures. The locations must be convenient to the various Agenda Page 84 City of Albertville, MN Resolution No. 2022-28 Meeting of August 15, 2022 Page 4 buildings and accessible to trash haulers. Details on any outdoor trash enclosures must be provided for city approval. 10. Water service to the building shall have separate service lines for fire suppression and potable water as it enters the building. 11. The site plan shall show a landing and exit path for the door on the south wall of the warehouse building. Said landing and exit path shall be kept clear of snow and or other debris that may obstruct exiting from this door. 12. Applicant shall provide revised site and building plans illustrating the location and screening of any ground mounted or rooftop mechanical equipment. 13. A landscaped hedge shall be required within the 10-foot green area between the pavement and the County Road 37 right-of-way. 14. Applicant shall provide a lighting and photometric plan for all proposed exterior lighting both wall mounted and freestanding light for review and approval by the City. 15. Grading, drainage, and utilities plans shall be subject to final review and approval by the City Engineer. 16. Applicant shall provide a snow removal and snow storage plan identifying snows storage area on the site. Adopted by the City Council of the City of Albertville this 15th day of August 2022. _____________________________ Jillian Hendrickson, Mayor ATTEST: __________________________ Kristine A. Luedke, City Clerk Agenda Page 85 CITY OF ALBERTVILLE COUNTY OF WRIGHT STATE OF MINNESOTA ORDINANCE NO. 2022-13 AN ORDINANCE AMENDING THE OFFICIAL ZONING MAP OF THE CITY OF ALBERTVILLE, RELATING TO THE FINAL PLAT ENTITLED PARTICLE CONTROL IN THE CITY OF ALBERTVILLE, MINNESOTA The City Council of the City of Albertville, Minnesota hereby ordains: Section 1. The Albertville Zoning Map shall be amended changing the zoning on property legally describe below from B-3 Highway Commercial District to Particle Control PUD/B-3 Planned Unit Development /Highway Commercial District: Legal Description. Lot 6, Block A, Lot 10 Block B Townsite of Hamburg and portions of Lamont Avenue and Second Street rights-of-way in Albertville Minnesota. Section 2. This amendment shall be in full force and effective immediately following its passage, publication and the recording of the Final Plat. Adopted by the City Council of the City of Albertville on this 15th day of August 2022. _____________________________ Jillian Hendrickson, Mayor ATTEST: __________________________ Kristine A. Luedke, City Clerk Agenda Page 86 City Administrator’s Update August 11, 2022 GENERAL ADMINISTRATION Parks Committee Opening: Long time Park Committee Member Andy Swanson announced at their July 25 meeting that he would be stepping down. Andy served on the Committee for many years and oversaw many great park improvements and events. The committee opening will be posted on the City’s website and in the upcoming newsletter. Thank you, Andy, for your dedication and contributions to the City! Commission and Committee Appreciation Event: We are working on potential dates for the appreciation event for our Commissioners and Park Committee members. 2022 Primary Election: Albertville had 350 voters at the polls on Election Day and 61 absentee voters leading up to the election for a total of 8% voter turnout. Joint Governance Meeting: The Joint Governance meeting with the City of St. Michael and the STMA School Board is scheduled for August 29, 2022 at 6 pm at Albertville City Hall. Lansing Ave NE Crosswalk: Included on the consent is an MOU between Albertville, St. Michael, STMA School District and Wright County Highway Department to add flashing beacons at the crosswalk. Albertville’s cost is estimated to be $3,000 plus the cost of any needed ADA ped ramp improvements on the Albertville side of 50th Street NE. Gas Franchise Fee: We have sent the letter of intent and the draft ordinance to CenterPoint for review and expect to hear back from them next week. The ordinance and any CenterPoint comments will be on the September 6 agenda. Using a fee calculator provided by CenterPoint, it is estimated a 5% fee would generate approximately $129,000. ENGINEERING/PUBLIC WORKS 2022 Overlay Project: All paving is scheduled to be completed yet this week. Barthel Industrial Dr. Project: Work is underway, and milling and reclamation is scheduled for next week. 53rd and CSAH 19 Signal: Plans are complete and the project will be advertised within the next week. Central Park: We are getting quotes to construct a parking lot, plaza areas, and a walkway through the park. Ideally work could begin this fall around September 15 once the Thursday concert series are complete. Agenda Page 87 City Administrator’s Update Page 2 of 2 August 11, 2022 Lift Station Upgrades: Public Works is working on 4 lift station upgrades. Generally, upgrades are related to control panels and electrical components. Eligible expenses can be paid with ARPA funds otherwise are paid with enterprise capital reserves. WWTP Reed Bed Elimination: Final design is scheduled to be completed by the end of the year. Upcoming August Events: • August 29 – Joint Governance Meeting, 6 pm Agenda Page 88