Loading...
2010-05-03 US Army Corp of Eng review of permit applicationDEPARTMENT OF THE ARMY gas ST. PAUL DISTRICT, CORPS OF ENGINEERS �11 / SIBLEY SQUARE AT MEARS PARK 190 FIFTH STREET EAST, SUITE 401 ST. PAUL MN 55101-1638 REPLY TO ATTENTION OF MAY 0 3 2010 Operations Regulatory (2010-00614-ADB) Mr. Michael Potter 11650 57th St NE Albertville, MN 55301 Dear Mr. Potter: REcEry ED 19Y 4O Bot1,o Rig lnspe�tions We have reviewed information about your permit application to place fill material in 192 square feet of wetlands for the purpose of constructing a monopole billboard footing. The project site is in the NW 1/4 of the NW 1/4 Sec. 6, T. 120N., R. 23W., Wright County, Minnesota. Department of the Army Regional General Permit-03-MN (RGP-03-MN) provides authorization under section 404 of the Clean Water Act for certain categories of activities involving the discharge of dredged or fill material into waters of the U.S. We have determined that the described work is authorized by (RGP-03-MN), provided the attached Standard Conditions and the following special conditions are followed: 1. The permittee shall restore the original grades and immediately mulch all disturbed areas once construction is complete. The excavated area including the area excavated for the utilities will then be restored to existing grade level. All areas damaged by equipment will also be restored to the existing grades and all excess material shall be hauled away off site. Seeding in the area shall be accomplished in the spring of the following year. Seed to be utilized shall be Minnesota State Seed Mix 34-271 certified weed free mulch. This determination covers only the project as described above. If the design, location, or purpose of the project is changed, our office should be contacted to make sure the work would not result in a violation of Federal law. If your project will require off -site fill material that is not obtained from a licensed commercial facility, you must notify us at least five working days before start of work. A cultural resources survey may be required if a licensed commercial facility is not used. This General Permit is valid until August 2, 2011, unless modified, reissued, or revoked. The time limit for completing the work described above ends on that day, OR two years from the date of this letter, whichever occurs later. It is the permittee's responsibility to remain informed of changes to the General Permit program. If this authorized work is not undertaken within the above time period, or the project specifications have changed, our office must be contacted to determine the need for further approval or re -verification. Operations - 2 - Regulatory (2010-00614-ADB) It is the permittee's responsibility to ensure that the work complies with the terms of this letter and any enclosures, AND THAT ALL REQUIRED STATE AND LOCAL PERMITS AND APPROVALS ARE OBTAINED BEFORE WORK PROCEEDS. A preliminary jurisdictional determination (JD) has been prepared for the site of your project. The preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps representative identified in the final paragraph of this letter. You also may provide new information for further consideration by the Corps to reevaluate the JD. If this JD is acceptable, please sign and date both copies of the Preliminary Jurisdictional Determination Form and return one copy to the address below within 15 days from the date of this letter. U.S. Army Corps of Engineers St. Paul District 190 5t' Street East, Suite 401 St. Paul, Minnesota 5 5101-163 8 Attn: (Andy Beaudet) If you have any questions, contact Andy Beaudet in our St. Paul office at (651) 290- 5642. In any correspondence or inquiries, please refer to the Regulatory number shown above. Sincerely, Tamara E. Cameron Chief, Regulatory Branch Enclosure Copy Furnish: Wright SWCD — Colleen Allen BWSR — Lynda Peterson