Loading...
2022-07-25 Parks Committee Minutes Albertville Parks Committee meeting 7-25-22 Attendees:Terry James, Larry Boller, Lauryn White,Andy Swanson,Tim Guimont, LeRoy Berning 1. Updates a. Linfield new structure No update. b. Update on replacement—damage at Westwind Park to tube slide and graffiti at Central Park Westwind repair was pushed out to August for ship date for new tube. Skatepark graffiti in Central has been fixed. c. Proposed scoreboard for Angler's ball field No update. 2. Projects for 2023 A. Continue work at Central Park City is working on getting a bid for concrete (trail, "dance floor" and area adjacent to the pavilion). Intent is for work to happen fall 2022. Committee recommends the following: pursuit of a small,train-themed play structure for area to the west of the caboose; small water feature for area near existing playground; replace existing play structure; add sidewalk to along west side of Lander between parking lot and church. B. Water fountains TBD C. Benches A bench has been installed in Four Seasons Park. All other benches in Four Seasons Park were rehabbed and Tim says are now in good shape. Benches in Oakside Park have been painted. A Lions bench has been installed in Central Park, but the eyes have been removed (vandalism). 3. Future parks wish list • Expand Westwind board walk • Naming rights • Shuffle boards • Parks photography contest • Pet waste bags and signage • Grandstand at Central Park ball fields • Ball fields at compost site 4. Westwind Park Larry will contact the University of Minnesota about future work in Westwind Park. 5. Andy Swanson Andy announced his resignation from the committee, effective after delivering the minutes for the July meeting. Next meeting:August 22 Minutes recorded and prepared by Andy Swanson, committee secretary