Loading...
1992-10-15 Escrow Item Costs MEYER-ROHLIN, INC. ENGINEERS -LAND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn. 55313 Phone 612 - 682-1781 October 15, 1992 Mike Couri Radzwill Law Office PO Box 369 St. Michael, MN 55376 Re: Psyks 5th Addition Dear Mike, The following is a breakdown of the escrow item costs attributed to the above-referenced project. 1. Petition Items (Public a) Sanitary Sewer b) Water Mains c) Storm Sewer d) Streets Improvements) $30,234.50 $45,041.10 $68,174.95 $74,071.80 Subtotal $218,071.80 e) Contingencies (5%) f) Engineering (18%) 10,903.20 39,253.00 Total Improvement Costs $268,228.00 use $268,200.00 2. On- and Off-Site Improvements Based upon the 19-1ot psyk Fifth Addition: a) Boulevard Improvements Topsoil and sodding Front lawn trees Hard surface driveway & b) Grading control $200.00/1ot 30.00/1ot base 130.00/1ot 50.00/1ot $410.00 x 19 lots = $7,790.00 c) Street signs ) d) street cleanup) lump sum for the development 3,000.00 $10,790.00 use $11,000.00 Thore P. Meyer, Professional Engineer Robert Rohlin, Licensed Land Surveyor