Loading...
1992-09-22 Watermain Review CONSULTING ENGINEERS Maier Stewart & AssociatesInc. September 22, 1992 File: 745-007-11 Honorable Chairperson and Board Members loint Powers Water Board P.O. Box 10 11100 - 50th Street NE Albertville, MN 55301 RE: PSYCHS 5TH ADDmON Dear Board Members: We have reviewed the Psychs 5th Addition watermain plans and specifications. The plans and specifications generally conform to the Board's requirements. One noted concern is the alignment of the watennain on 53rd Street NE west of Lachmann Avenue NE. We recommend the watermain be located no closer than two feet from the curb and gutter to allow for ease of future maintenance. The alignment as shown crosses the curb and gutter into the boulevard area. This will cause a conflict with other utilities such as telephone, gas, cable television, or electricity for future repair work. Sincerely, MAIER STEWART & ASSOCIATES~ INC. e~~~ Brian D. Miller, P .E. BDM:tp 007-230....., 1959 SLOAN PLACE, SUITE 200, ST. PAUL, MINNESOTA 55117 612-774-6021 9800 SHELARD PARKWAY, SUITE 102, MINNEAPOLIS, MINNESOTA 55441 612.546-0432 . Equal Opportunity Employer MINNESOTA DEPARTMENT OF HEALTH Division of Environmental Health REPORT ON PLANS Plans and specifications on watermain: 1992-3 Improvement Project, Albertville, Wnght County, Minnesota, Plan No. 930520 Submitted by: Meyer-Roblin, Inc., c/o Mr. Norman Gartner, P.E., 1111 Highway 25 North, Buffalo, Minnesota 55313 . Ownership: City of Albertville, c/o Ms. Linda Houghton, Clerk-Treasurer, Albertville City Hall, Albertville, Minnesota 55301 Date Examined: September 9, 1992 Date Received: September 4, 1992 SCOPE: This report covers the design of this project insofar as the safety and sanitary quality of the water for public consumption may be affected, and applies to this project only and not to the entire system or any other part thereof. The examination of plans is based upon the supposition that the data on which the design is based are correct, and that necessary legal authority has been obtained to construct the project. The responsibility for the design of structural features and the efficiency of equipment must be taken by the project designer. Approval is contingent upon satisfactory disposition of any requirements included with this report. Water supply plans are examined with regard to the location, construction and operational features of the design and maintenance of all parts of the system which may affect the safety and sanitary quality of the water. Examination is based on the standards of this Department. This project consists of the installation of the following watermains: 1. 468 lineal feet of 6-inch ductile iron pipe. 2. 1,107 lineal feet of 8-inch ductile iron pipe. REQUlREMENT(S): 1. A minimum vertical separation of 18 inches is required at all watermain and sewer main (house, storm and sanitary) crossings. COMPLIANCE: No construction shall take place except in accordance with the approved plans. If it is desired to make deviations from the approved plans, the State Department of Health should be consulted and approval of the changes obtained before construction is started; otherwise, such construction is installed without proper approval, and in addition may create dangers to public health. Authorization for construction in accordance with the approved plans may be withdrawn if construction is not undertaken within a period of two years. The fact that the plans have been approved does not necessarily mean that recommendations or requirements for change will not be made at SOme later time when changed conditions, additional information, or advanced knowledge make improvements necessary. Approved: .~?~ ~; ~JU/U Richard D. Clark, P ,E., Supervisor Public Water Supply Unit Section of Water Supply and Well Management 612/627-5180 Robert H. Smude Public Health Engineer Section of Water Supply . and Well Management 612/627-5128 RDC:RHS:lmk cc: City of Albertville V Meyer-Rohlin, Inc. File