Loading...
1994-07-21 Grading Plan ~ SEtI MEMORANDUM o ST. PA UL, MN o MINNEAPOLIS, MN 1XI ST. CLOUD, MN 0 CHIPPEWA FALLS, WI 0 MADISON, WI TO: Dale Powers City Administrator Albertville, MN FROM: Peter J. Carlson, If!:. City Engineer rJ G July 21, 1994 DATE: RE: Grading Plan Psyk's 6th Addition SEH No. A-ALBEV 9501.00 I have reviewed the grading plan for the above referenced project, and have the following comments: 1. The upper slope in the detention pond should be revised to a 6: I slope. The width of the bench can be reduced to 7 feet to minimize encroachment on the adjacent lots. 2. Drainage map and design computation used to design the detention pond should be submitted for review. 3. An area for positive overflow should be graded in the berm over the culvert outlet of the temporary detention pond. 4. The outlet for the temporary detention pond will be concentrating storm water runoff in one area. Riprap should be installed at the outlet to help disperse the storm water. This outlet may create some erosion near the outlet before the storm water has a chance to disperse. The property owner to the north should be made aware of this situation. The grading plan is approved with the understanding that the detention pond may be modified further, pending review (of drainage calculations. Dale Powers Page 2 July 21, 1994 I have also reviewed an overall plan of the Psyks' Development and how it would tie together with the Marx property. This plan shows 55th Street being a thru east-west street. It would appear that due to the location of the large wetland on the Marx's property, 55th Street cannot be built as a thru street. Therefore, there would not be any thru street between 53rd Street and at least 57th Street, a distance of approximately 2,500 feet. This may create confusion for the local residents, as well as emergency vehicles. djg c: Michael Couri, City Attorney Linda Houghton, City Clerk (G:\ALBEV\CORR\JL-21 B.94)