November 17, 1995
File: 745-031-11
Ms. Donna Kipka, Secretary
Joint Powers Water Board
P.O. Box 10
11100 - 50th Street NE
Albertville, MN 55301
RE: PYSK'S 6TH
Dear Ms. Kipka:
We reviewed the valve box settings in the Pysk's 6th development in Albertville. We have
the following concerns:
1.
The valve box at Lachman Circle is I1h inches below the finished pavement.
2.
The valve on Lachman at the south end of the project needs to be raised and needs
the bituminous cleared off the valve box.
3.
The two valves at the intersection of Lachman and 541h need the bituminous cleared
off the valve box.
Sincerely,
MSA, CONSULTING ENGINEERS
~l~~~
BDM:pd
031-1714.noY