Loading...
1995-11-17 Valve Box Review )1 S l\wj rONSlLTING ENGlNEEIt~ 1326 Energy Pork Drive St. Paul, MN 55108 612.644.4389 1.800.888.2923 Fox: 612.644.9446 ENGINEERiNG i>NiRONMENTAL MU~.~iCIPAL PlANNING WASTE STRUCTURAL SURVEYiNG TRAFFiC i RANSPORT A)IOf EIECTRICAL/MECHN,ICM ENGINEERI~~G H\',t;C POWER DISTRIBUTION S:4DA SYSTEM CONTROLS OFFICES IN: MINNEAPOLIS PRIOR LAKE ST. PAUL WASECA November 17, 1995 File: 745-031-11 Ms. Donna Kipka, Secretary Joint Powers Water Board P.O. Box 10 11100 - 50th Street NE Albertville, MN 55301 RE: PYSK'S 6TH Dear Ms. Kipka: We reviewed the valve box settings in the Pysk's 6th development in Albertville. We have the following concerns: 1. The valve box at Lachman Circle is I1h inches below the finished pavement. 2. The valve on Lachman at the south end of the project needs to be raised and needs the bituminous cleared off the valve box. 3. The two valves at the intersection of Lachman and 541h need the bituminous cleared off the valve box. Sincerely, MSA, CONSULTING ENGINEERS ~l~~~ BDM:pd 031-1714.noY An Equal Opportunity Employer