On Thursday, October 11, 2002, I inspected the subject project site and found that the erosion
control for the site is not being maintained. Contractors are routinely dragging mud and debris
into the streets. This mud is then carried through the storm sewer and into the storm water
detention ponds. The ponds were not designed to treat this amount of debris. As it is, the ponds
have prematurely filled with debris and need to be cleaned.
I am requesting that we implement whatever remedies are available to us through the developer's
agreement to ensure that proper erosion control is installed and maintained.
cb
c: Linda Goeb, City Administrator
Jon Sutherland, City Building Official
Mike Czech, SEH
w:\aIbev\02\\ \corr\\ 0 \S02-m-cQuri.doc
I
)
/
Short Elliott Hendrickson Inc.
Your Trusted Resource
Equal Opportunity Employer
-