Loading...
2002-10-15 Erosion Control MEMORANDUM 1200 25th Avenue South, P.O. Box 1717, St. Cloud, MN 56302-1717 320.229.4300 800.572.0617 320.229.4301 FAX TO: Mike Couri Albertville City Attorney FROM: Peter J. Carlson, P.E. Albertville City Engineer DATE: October 15,2002 RE: Erosion Control Kollville Estates Second Addition Albertville, Minnesota SEHNo. A-ALBEV 0211.00 14 On Thursday, October 11, 2002, I inspected the subject project site and found that the erosion control for the site is not being maintained. Contractors are routinely dragging mud and debris into the streets. This mud is then carried through the storm sewer and into the storm water detention ponds. The ponds were not designed to treat this amount of debris. As it is, the ponds have prematurely filled with debris and need to be cleaned. I am requesting that we implement whatever remedies are available to us through the developer's agreement to ensure that proper erosion control is installed and maintained. cb c: Linda Goeb, City Administrator Jon Sutherland, City Building Official Mike Czech, SEH w:\aIbev\02\\ \corr\\ 0 \S02-m-cQuri.doc I ) / Short Elliott Hendrickson Inc. Your Trusted Resource Equal Opportunity Employer -