Loading...
2000-06-07 Site Plan Amendment . N NORTHWEST ASSOCIATED CONSULTANTS COMMUNITYPLANNII'IG - DE$IGN - MARKET RESEARCH MEMORANDUM TO: Albertville Mayorand City Council Albertville Planning Commissibn FROM~ DATE: Deb Garross June 7, 2000 RE: Albertville - Mooney Addition / Mobile Site Plan Amendment FILE NO: 163.06 ~ 00.19 The purpose of this item .is for the Planning Commission ~ndCityCouncil to review site plan changes proposed for the gas station/car wash/convenience store (former C- Store/Holiday Station) for Mooney Development corporation. The City Council approved a Conditional Use Permit (CUP) and site plans for Lot 1, Block 1, Mooney Addition. on December 6, 1999. ,Since the original.site plan and CUP approval, the tenant for the site has changed. to Mobile as opposed to Holiday. With the change of tenant; several minor modifications to the site plan and modification of the building are proposed. Our office has reviewed the proposed modifications and believes that the majority of changes are minor and that the. building plans are an improvement over the original approved plans. All commercial and industrial site plans must be reviewed and approved by the Planning Commission and City Council. Staff believes that the modifications will result in a superior plan. However, the applicant was advised that the Planning Commission and CityCouncit would need to review the plan changes to assure that the buildingfayade, roof/inesand site plan modifications are acceptable to the City. It is important to note that the modifications will not result in any changes to the. landscape plan and that the site plan is consistent.with all setback, parking, loading, . screening and other applicable requirements of the Zoning Ordinance. The following modifications to the approved site plan for . Lot 1, Block. 1, Mooney Addition are outlined as follows: 1. The C-Store/Holiday Station.has been changed to a Mobile Station. 2. The roof/ines and building have been modified to add a front, glass atrium and pitched roof on the car wash to screen the car wash equipment 5775 WAYZATA BOULEVARD, SUITE 555 ST. LOUIS PARK, MINNESOTA 55416 PHONE 6 12-595-9636 FAX 6 12-595-9.837. . ~ 3. The car wash equipment has been relocated from the ground area west of the building, to the roof of the building (said equipment will be screened by the revised roofJine ). 4. The trash enclosure has been relocated from the middle of the parking lot to a location adjacent to the west side of the building. (The trash enclosure is proposed to be located in the are formerly occupied by the car wash equipment. The sight lines have been reviewed based upon the current proposal and found to be acceptable). 5. The vacuum and air service equipment has been relocated from the east side of the building to a location north of the canopy in the easterly part of the parking lot. 6. One additional parking space has been added. 7. The gas pumps have been set at an angle as opposed to perpendicular to CSAH 19. 8. A telephone booth area has been added on the most westerly parking lot island. 9. Additional sidewalk is proposed adjacent to west and south sides of the building. 10. The canopy lighting is proposed to be a system similar to that recently installed at Pats Phillips 66 as opposed to recessed lighting. RECOMMENDATION: If the site and building plan modifications are acceptable to the Planning Commission, a motion to recommend approval of the revised plans would be in order. Attachments: 1. Original approved site plan. 2. Proposed site plan. 3. Original approved building elevations. 4. Proposed building elevations. 5. Color front (north side) building elevation drawing. pc Linda Goeb, Pete Carlson, Kevin Mealhouse, Mike Couri