1993-07-01 Amending Feasibility Report
MEYER-ROHLIN, INC.
ENGINEERS -LAND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn. 55313 Phone 612 - 682-1781
July 1, 1993
City of Albertville
c/o Linda Houghton, Clerk
Box 131
Albertville, MN 55301
Re: Parks ide Addition
Honorable Mayor and City Council:
As per the Council's directions, we are amending the Parks ide
Addition feasibility report by the addition of a gravity sanitary
sewer from the proposed lift station site to the southerly boundary
of the Westwind Park area. This will provide for a future gravity
flow conduit fromthe Parks ide Addition at such time the collector
trunk line is constructed to serve the southwest area of
Albertville (west of County Road 19). Any future assessment for the
sewer line at the time of hookup would then be eliminated.
The estimated addi tional cost, including engineering fees, would
be:
Gravity sanitary sewer
Contingencies & engineering
Addendum to Parkside feasibility
$7,000
$1,600
$8,600
The above estimate does not include bonding,
fees. These should be added to the figure
addendum cost.
financing and legal
to provide a total
The above addendum is feasible as proposed, will benefit the
abutting Parks ide Addition, and should be fully assessed to the
developer.
Respectfully submitted,
cc: File E-9201-Q
Thore P. Meyer, Professional Engineer Robert Rohlin, Licensed Land Surveyor
MEYER-ROHLIN, INC.
ENGINEERS-LAND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn.55313 Phone 612-682-1781
City of Albertville
c/o Linda Houghton, Clerk
Box 131
Albertville, MN 55301
PROFESSIONAL SERVICES RENDERED:
Re: Parkside Feasibility Report
Engineering Staff Time:
Engineer I: 9.5 hrs @ 24.04 x 2.75 =
$628.05
Draftsman: 4.25 hrs @ 18.50 x 2.75 =
$216.22
TOTAL TO DATE.... $~~~~~Z
E-9201-Q
Thore P. Meyer, Professional Engineer Robert Rohlin, Licensed Land Surveyor
June 30, 1993
MEYER-ROHLIN, INC.
ENGINEERS-LAND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn.55313 Phone 612-682-1781
June 23, 1993
Mike Couri
Radzwill Law Office
PO Box 369
st. Michael, MN 55376
RE: Parkside Addition
Dear Mike:
The following is a break-down of the escrow item costs attributed to
the above-referenced project.
On- and Off-Site Improvements
Based upon the 90-lot addition:
a) Boulevard improvements
topsoil and sodding
front lawn trees
hard surface driveway and base
b) Grading control
$200.00/lot
30.00/lot
200.00/lot
50.00/lot
$480.00 x 90 lots = $43,200.00
c) Street signs )
d) Street cleanup)
lump sum for the development
6,000.00
$49,200.00
use $49,000