Loading...
1995-12-04 Blacktop Lift Correction Letter JOINT POWERS BOARD . Hanover, Frankfort, St. Michael and Albertvi//e Post Office Box 10 . 11100 - 50th Stre~t N.E. . Albertville,Minnesota 55301-0010 . Telephone 612-497-3611 December 4,1995 Kenco Construction 13736 NE Johnson Street Ham Lake,MN 55304 RE: Parkside 1 & 2 Dear Kenco Construction: EncloE;ed is a copy of Brian Miller's letter dated November 21, 1995 regarding his comments of problems in the above Leferenced project upon inspection of the development after the final lift of blacktop was laid. If these items are not corrected by June 15, 1995, the BoaLd will hiLe a contLactoL to correct them at youL expense. Please notify oUL office when the items have been cOLrected. If you have any questions, please contact me weekdays between 8 am and 1 pm. SinceLely, JOINT POWERS BOARD ~1~\J")l. ~ Donna M. Kipka Secretary Enclosure -~ - or 1_.~... u~_....' .....~n ("'1 TV nf' A 1 nor+-... , , Meyer-Rohlin, Inc. OONSULTlNG IGINEERS MD. K' k' S tary s. oona Ip a, ecre Joint Powers Water Board 11100 50th Street NW Albertville, MN 55301 1326 Energy Park Drive SI. Paul, MN 55108 612.644.4389 1.800.888.2923 Fax: 612.644.9446 CIVil ENGINEERING ENVIRONMENTAL MUNICIPAL PLANNING SOLID WASTE STRUCTURAL SURVEYING TRAFFIC TRANSPORTA liON ELECTRICAL! MECHANICAL ENGINEERING HVAC POWER DISTRIBUTION SCADA SYSTEM CONTROLS OFFICES IN: MINNEAPOLIS PRIOR LAKE ST. PAUL W ASECA RE: PARKSIDE I &. II ALBERTVILLE, MINNESOTA Dear Ms. Kipka: We have reviewed the valve boxes for the Parks ide I & II Developments in Albertville. We have the following comments: 1. The valve box at the intersection of County Road 37 and Kahler is above the bituminous pavement. 2. The valve box at Kahler Circle is 11h inches below the pavement surface. 3. Two valves at the intersection of 61st and Kallard are flush with the pavement surface. 4. One valve at the intersection of Kalenda and Kalland is high. 5. One valve at the intersection of61st and Kaiser is flush with the paved surface. 6. Most, if not all, of the valve boxes and valve box lids need to have the bituminous material cleaned. 7. The hydrants at 62nd and Kahler, Kahler Circle, Kahler Drive, and Kahler Circle cul-de-sac have the traffic flange covered. The traffic flange needs to be exposed. The proper valve box setting is Ih to * inches below the paved surface of the street. If you have any qu~stions, please feel free to call. Sincerely, MSA, CONSULTING ENGINEERS tt~ ;!) 7J(~ Brian D. Miller P.E. BDM:pd 024-201O.noY An Equal opportunity Employer