1996-07-22 Final Street & Utility Plan Review
.
.
"'SaJ
113S. FIFTH A VENUE, P. 0. BOX 1717, ST CLOUD, MN56302-1717 320252-4740 800572-0617 320251-8760FAX
ARCHITECTURE ENGINEERING ENVIRONMENTAL TRANSPORTATION
TO:
FROM:
Peter J. Carlson, P.E.
City Engineer
DATE:
July 22, 1996
RE:
Final Street and Utility Plan Review
Parkside 3rd Addition
SEH No. A-ALBEV 9701.00
I have reviewed the final plans and specifications for the above referenced project and have the
following comments:
1. Storm sewer crossings shall be shown on the sanitary sewer and water main sheets. Insulation
is required where the separation is 2 feet or less.
2. On Sheet 4, the high point in the water main at Station 23+50 shall be eliminated.
3. The water main crossing CSAH 19 shall be jacked-in-placed.
4. On Sheet 7, the direction of the sanitary sewer should be reversed to flow towards Kahler Drive.
This would eliminate the need for a drop manhole in Kalenda Drive.
5. On Sheet 8, CB6 shall be relocated to avoid interference with the proposed hydrant.
6. On Sheet 8, CB2 shall be relocated to avoid a future driveway.
7. On Sheet 9, CB 15 shall be relocated to avoid interference with the proposed hydrant.
8. On Sheet 11, CB 25 shall be relocated to avoid interference with the proposed hydrant.
9. On Sheet 11, a catch basin is required in the northwest quadrant of 58th Street NE and 57th
Street NE. This catch basin shall be located to avoid interference with proposed hydrant.
10. Since PVC water main is specified for this project, a tracer wire is required. A section detailing
the installation of a tracer is required in the Specifications.
djg
c: Linda Houghton, City Clerk
Elizabeth Stockman, Northwest Associated Consultants, Inc.
Mike Couri, City Attorney
(G:IALBEVlCORR\JL-22A.96)
SHORT ELLIOTT
HENDRICKSON INC.
ST PAUL, MN
MINNEAPOLIS, MN
CHIPPEWA FALLS, WI
MADISON, WI
LAKE COUNTY, IN
EQUAL OPPORTUNITY EMPLOYER