Loading...
1996-07-22 Final Street & Utility Plan Review . . "'SaJ 113S. FIFTH A VENUE, P. 0. BOX 1717, ST CLOUD, MN56302-1717 320252-4740 800572-0617 320251-8760FAX ARCHITECTURE ENGINEERING ENVIRONMENTAL TRANSPORTATION TO: FROM: Peter J. Carlson, P.E. City Engineer DATE: July 22, 1996 RE: Final Street and Utility Plan Review Parkside 3rd Addition SEH No. A-ALBEV 9701.00 I have reviewed the final plans and specifications for the above referenced project and have the following comments: 1. Storm sewer crossings shall be shown on the sanitary sewer and water main sheets. Insulation is required where the separation is 2 feet or less. 2. On Sheet 4, the high point in the water main at Station 23+50 shall be eliminated. 3. The water main crossing CSAH 19 shall be jacked-in-placed. 4. On Sheet 7, the direction of the sanitary sewer should be reversed to flow towards Kahler Drive. This would eliminate the need for a drop manhole in Kalenda Drive. 5. On Sheet 8, CB6 shall be relocated to avoid interference with the proposed hydrant. 6. On Sheet 8, CB2 shall be relocated to avoid a future driveway. 7. On Sheet 9, CB 15 shall be relocated to avoid interference with the proposed hydrant. 8. On Sheet 11, CB 25 shall be relocated to avoid interference with the proposed hydrant. 9. On Sheet 11, a catch basin is required in the northwest quadrant of 58th Street NE and 57th Street NE. This catch basin shall be located to avoid interference with proposed hydrant. 10. Since PVC water main is specified for this project, a tracer wire is required. A section detailing the installation of a tracer is required in the Specifications. djg c: Linda Houghton, City Clerk Elizabeth Stockman, Northwest Associated Consultants, Inc. Mike Couri, City Attorney (G:IALBEVlCORR\JL-22A.96) SHORT ELLIOTT HENDRICKSON INC. ST PAUL, MN MINNEAPOLIS, MN CHIPPEWA FALLS, WI MADISON, WI LAKE COUNTY, IN EQUAL OPPORTUNITY EMPLOYER