2004-07-22 Punch List PUNCH LIST OWNER CONTRACTOR SEH NO. OWNER NO. PROJECT City of Albertville DATE OF CURRENT ISSUE Hennen Construction DATE OF ORIGINAL ISSUE A-ALBEV 0310 SUBSTANTIAL COMPLETION N/A FINAL COMPLETION 2003 Towne Lakes 3rd Addition and Shoppes of Towne Lakes 07/22/04 07/22/04 Below is a list of items which must be completed or corrected prior to final acceptance of the subject project. A completion of these items does not in any way relieve the Contractor of the responsibility to complete the project in accordance with all Contract Documents. Item Date Date No. Item . Reviewed Comments Accepted 1 Wear course. 2 Repair any curb and sidewalk prior to wear course. 3 Regrout catch basins and manholes as needed prior to wear course. 4 Repair settlement prior to wear course. 5 Adjust iron prior to wear course, if not done prior to snowfall, ensure iron is Y2 inch below pavement. 6 Ensure all gate valves and hydrants are in proper working order, City representative must be present, prior to wear course. 7 Touch UP Jaade on boulevards. 8 Ensure tracer wire tied to hydrants, ensure hydrant flags on all hydrants, touch up hydrants with paint as needed. 9 Mandrill and televise sanitary sewer prior to wear course. 10 Clean all pick holes on manholes and gate valves after wear course. 11 Sand and Jaavel existing in manhole #4 from manhole #14. 12 Pour curb that was pulled out on West Lake Towne Drive Station 58+00 to 57+00. 13 Flush and clean storm sewer as needed. 14 Gate valve box 60+25 at intersection of Lamp Light Drive and West Lake Towne Drive needs repair or replacement. 15 Clean existing manhole #43, manhole #1 not balled off during proiect. 16 Install inside drop in existing manhole #43. 17 Locate all gate valves in boulevard area. 18 Replace approximately 20 feet from CBMH. 90 west to pedestrian ramp. 19 Repair hydrant on south comer of round about (Linwood Drive). 20 Make sure all gate valves have nut risers. 21 Install sidewalks as per plan. 22 Mud doghouses in manhole # 1 O. 23 Clean up miscellaneous debris around site. 1 01/03/02 I I Item No. 24 25 26 Item Date Reviewed Comments Date Accepted Overseed whole site. Silt fence removal UDon satisfactory approval of turf restoration. Remove all construction material and debris. PROVIDE 48 HOURS NOTICE PRIOR TO THE START OF THIS WORK. THIS WORK SHOULD BE COMPLETED IN ACCORDANCE WITH THE PROVISIONS OF ARTICLE 3 (CONTRACT TIME) OF THE AGREEMENT. REMARKS: Issued By: Russ Bly Title: RPR tjw c: Pete Carlson, SEH Jim Schulz, SEH Bob Moberg, SEH Russ Bly, SEH Larry Kruse, City of Albertville U:\AIALBEV\031000ISPECSIPUNCH LlST.DOC Johp..~ IisR"City of Albertville Dave Hempel, Contractor Property Developers Co. John Becker, Westwood Professional Services, Inc. Curt Hennen, Hennen Construction 2 01/03/02