June 9, 2003
RE: Albertville, Minnesota
Towne Lakes 3rd Addition
SEHNo. A-ALBEV0310.00 14
Fran D. Hagen IT, PE
Project Manager
Westwood Professional Services, Inc.
7599 Anagram Drive
Eden Prairie, MN 55344
Dear Fran:
I reviewed the street and utility plans for the above referenced project and have the following
comments:
1. Sheet 9: The apron size for FES 83 is shown incorrectly on the plan view.
2. Sheet 11: Increase the storm sewer size to 15-inch from CBMH 90 to CBMH 87.
3. Sheet 5: Add a 6-inch gate valve on easterly side of the hydrant at approximately station
3+25 in private drive 3.
4. Sheet 7: Add a fire hydrant at approximate station 4+90 on Langford Drive.
Please provide updated design calculations for the storm water detention ponds. The ponds have
been modified and the calculations we have do not reflect the changes that have been made. Call me
at 320.229.4320 if you have any questions.
djg
c: Linda Goeb, City of Albertville
Alan Brixius, City Planner
Mike Couri, City Attorney
Dave Hempel, CPDC
x:\ae\a1bev\031 O\eorr\l.we~twood-060903.doe