2024-01-22 Joint Power Water Board AgendaJoint Powers Water Board
AGENDA
Regular Meeting of January 22, 2024
Joint Powers WTP
11100 501h Street NE
Albertville, MN
6:00 PM
Chairperson
Chris Kauffman
Board Members
Tom Dierberger
Ryan Gleason
Joe Hagerty
Rob Olson
Bob Zagorski
1. Call to Order / Roll Call
2. Approve Agenda - Page 1
Enaineer
Chris Larson, SEH
Operations
John Seifert, Veolia
Jennifer Thomas, Veolia
Dustin Carlson, Veolia
Zac Foster, Veolia
Consent Agenda - Page 3
3.1 Approval of November 27, 2023 Regular Board Meeting Minutes - Page 4
3.2 Approval of December 2023 List of Claims - Page 6
3.3 Approval of January 2024 List of Claims - Page 7
3.4 Approval of December 2023 Budget Report - Page 8
3.5 Approval of January 2024 Budget Report - Page 9
3.6 Approval of December 2023 Cash Balances Report - Page 10
3.7 Approval of January Cash Balances Report - Page 11
3.8 Receipt of November 2023 Investment Summary Report - Page 12
3.9 Receipt of December 2023 Investment Summary Report - Page 16
3.10 Approval of November 2023 Monthly Operations Report - Page 20
3.11 Approval of December 2023 Monthly Operations Report - Page 24
3.12 MBI Pay App No. 4 - Filter Rehabilitation - Page 37
3.13 Approval of 2024 JPWB General Engineering Engagement Services for SEH -
Page 50
3.14 Approval of Abdo Audit Engagement Letter for 2024 - Page 55
3.15 Authority to Pay Up to $25,000 to File the 2023 DNR Water Conservation
Report - Page 64
3.16 Appointment of - Page 65
1. Official Newspaper
2. Official Auditor
3. Official Depositor
4. Bank Signatories
Page 1 of 85
Joint Powers Water Board
AGENDA
Regular Meeting of January 22, 2024
Joint Powers WTP
11100 501h Street NE
Albertville, MN
6:00 PM
3.17 Authorizing Investment Agencies - Page 66
1. RBC
2. PMA
3. Wells Fargo
4. Community Development Bank
5. 21n Century Bank
4. General Business - Page 67
4.1 Appointment of Board Positions - Page 68
1. Chairperson
2. Vice Chairperson
3. Treasurer
4.2 Presentation on Capital Improvement Projects from AE2S Engineering
1. Presentation on Storage Tank Siting Study - Page 69
2. Approve Plans and Specs and Authorize Advertising for Bid of Joint
Powers Water Board ASR Watermain Looping Project from AE2S -
Page 72
4.3 Visa / MasterCard Class Action Suit - Page 74
4.4 Authorization to Modify ASR Water Fill Piping - Page 76
5. Engineer - Page 80
5.1 Final Pay Application for the CSAH 19 Watermain Reconstruction Project -
Page 81
6. Operations and Office - Page
7. Other Business / Announcements / Correspondence - Page
8. Adjourn
Page 2 of 85
CONSENT AGENDA
Page 3 of 85
Joint Powers Water Board
Regular Meeting Minutes
November 27, 2023
Page 1
1. Call to Order. The regular meeting of the Joint Powers Water Board was called to order by
Chairperson Kauffman, on Monday, November 27, 2023 at 6:00 p.m, at the Joint Powers Water
Board Water Treatment Plant, 11100 50'^ St NE, Albertville, MN 55301.
Board present: Tom Dierberger, Joe Hagerty, Chris Kauffman, Rob Olson, Keith Wettschreck (for
Ryan Gleason), Bob Zagorski.
Board absent: Ryan Gleason.
Staff present: John Seifert, General Manager; Jennifer Thomas, Office Manager.
Staff absent: Dustin Carlson, Water Department Supervisor / Facilities Manager; Zac Foster,
Project Manager.
Engineering present: Chris Larson, Short Elliott Hendrickson, Inc. (SEH).
Engineering absent: None.
2. Approve Agenda. Hagerty moved, Olson seconded, to adopt the Agenda as presented.
Motion carried 6-0.
3. Approve Consent Agenda. Dierberger moved, Olson seconded, to approve the Consent
Agenda below. Motion carried 6-0.
3.1 Approval of October 23, 2023 Regular Board Meeting Minutes
3.2 Approval of November 2023 List of Claims
3.3 Approval of November 2023 Budget Report
3.4 Approval of November 2023 Cash Balances Report
3.5 Receipt of October 2023 Investment Summary Report
3.6 Approval of October 2023 Monthly Operations Report
3.7 2024 Joint Powers Water Board Fee Schedule
3.8 Approval of Replacement of One Tank Mixer
3.9 Approval of Fifth Amendment to the JPWB Contract Extension
3.10 MBI Pay Application No. 2 for the Filter Rehab
4. General Business.
4.1 Final Abdo Rate Study and Long -Term Plan Document. General Manager Seifert
went over Abdo's final rate study and long-term financial plan model. Seifert told the
Board that after January 1, 2025 there could be additions to the financial model to
show those items that will impact significant annual swings in the budget cycles and
will capture sinking assets by prorating annual costs for assets that are large
expenditures such as roof replacements and repairs or replacement of other major
assets. 2025's rate cycle will have the benefit of a year's worth of data, including what
percentage of water is being used by residents and what percentage is being used by
businesses. This will help review the setting of future tiers with the intent of
accomplishing true conservation rates. Staff recommends formal approval of Abdo's
final 2023 rate study and long-term financial plan model and authorizing the proposed
accounting splits for capital, operations and 50% operating reserve funding. Olson
moved, Hagerty seconded, to approve Abdo's 2023 rate study and long-term plan and
authorization of the proposed accounting splits for capital, operations and 50%
operating reserve funding. Motion carried 6-0. Page 4of 85
Joint Powers Water Board
Regular Meeting Minutes
November 27, 2023
Page 2
4.2 2024 Veolia Budget. General Manager Seifert presented the 2024 operations &
maintenance budget. Seifert reminded the Board that LIM items are reconcilable at the
end of the year according to actual expenses that occurred within the calendar year.
Seifert also explained to the Board that the 2024 budget reflects utilities transferred to
Joint Powers Water Board's monthly payment cycle to take advantage of its sales tax
exemption. The 2024 budget decreased by 14.31% from $1,421,784 in 2023 to
$1,218,336 in 2024. Staff recommends approving the 2024 operations and
management budget as presented. Olson moved, Dierberger seconded, to approve the
2024 operations and management budget of $1,218,336. Motion carried 6-0.
4.3 Proposed 2024 Joint Powers Water Board Budget. General Manager Seifert
provided the Board with details of the proposed 2024 budget of $1,873,211. Staff
recommends acceptance of the 2024 Joint Powers Water Board budget as presented.
Olson moved, Wettschreck seconded, to approve the 2024 Joint Powers Water Board
budget in the amount of $1,873,211. Motion carried 6-0.
S. Engineer.
5.1 ASR Watermain Looping Project Update. General Manager Seifert gave an update
on the ASR watermain looping project. The plan is to have this item ready for the
Board's approval to advertise for bids at the January meeting.
5.2 Filter Rehab Update. Engineer Larson gave an update on the filter rehab project.
One filter (#3), was completed and back online. Filters 1 and 2 are scheduled for
December.
6. Operations and Office. None.
7. Other Business / Announcements / Correspondence. None.
8. Adjourn. Gleason moved, Dierberger seconded, to adjourn the Joint Powers Water Board
meeting at 6:55 PM. Motion carried 5-0.
Jennifer Thomas, Recording Secretary
Page 5 of 85
JOINT POWERS WATER BOARD
CHECK REGISTER SUMMARY
MEETING DATE: 12/25/23
Check
Vendor
Check Date
Amount
Comments
1791le
CITY OF ST MICHAEL
12126/2023
$302.985.36
November 2023 Receipt by Charge
17912e
PAYMENT SERVICE NETWORK
12/26/2023
$5,944.49
November 2023 Web Pay Fees
17913e
MN DEPT OF REVENUE
12/262023
$1,172.00
November 2023 Sales Tax
17914e
CENTERPOINT ENERGY
121262023
$836.36
November 20231nvotces
20879
FEHN COMPANIES
12/142023
54,500.00
Refund RPZ#4707349 Rental Deposit
20880
ABDO
12/272023
$6.250.00
Long Term Plan and Rate Study
20881
ADVANCED ENGINEERING AND ENVIR
1227/2023
$23,940.00
Water Storage Tank & Trunk Walennain Extension
20882
ANGELOIMICHAELA MONTANARI
12/272023
$150.00
Ref creidt bat on 11090201h St NE
20883
BECKY/STEVEN HOOGENAKKER
12/27/2023
$135.00
Ref creidt bat on 1065037th PI NE
208M
BENI MY KUNS
12272023
$35.18
Ref credit bat on 11542 Riverview Rd NE
20885
BRYAN RETZNER
12272023
$63.81
Ref credit bat on 11243 River Rd NE
20886
CAYLA CZECH
12272023
$217.63
Ref credit bat on 12472 43rd St NE
20887
CHARLOTTE BARTYLLA
12272023
$1.00
Ref credit bat on 217 Maple Ln SW
20888
CITY OF HANOVER
12/27/2023
$52.268.95
November 2023 Receipts by Charge
20889
DALE HEWITT
12127/2023
$481.40
Ref creidt bat on 408 Creekside Or BE
20890
DANIELIWENDY SCHAAB
1227/2023
$80.00
Ref credit bat on 284 River Rd NE
20891
ERICAIDAREN BOCKSELL
12/272023
$1.480.45
Refund overpayment
20892
ESTATE OF MICHAEL BURKE
12/272023
$135.00
Ref credit bat on 6003rd St SW
20893
GOLIATH HYDRO -VAC INC.
1227/2023
$1,247.50
Garage Pit Sludge Removal
20894
GREAT NORTHERN ENVIRONMENTAL
12272023
54,795.20
Kasco Municipal Mixer
20895
HDR ENGINEERING INC
12/272023
$727.96
December 2023 Invoices
20896
HOFF, BARRY PA
1227/2023
$117.00
December 2023 Invoice
20897
JAMESIMELISSA HIRSCHEY
1227/2023
$190.12
Ref credit bat on 528 Maple Knoll Cir NW
20898
KRUEGER EXCAVATING
12272023
$2,250.00
Refund RPZ #ACM1834/Meter# 1552678 Deposit
20899
LENNAR
12/272023
$434.24
Ref credit bat on 5038 Jana Ct NE
20900
LORI MCCOV
12272023
547.60
Ref creidt bat on 514 Terrace Rd NW
20901
MATT/SAMANTHA ECKLUND
1227/2023
$76.17
Ref creidt bat on 569 Dogwood Cir NW
20902
MEGAN/THOMAS RECH
12/272023
$97.02
Ref credit bat on 1311 Irvine or
20903
MUNICIPAL BUILDERS INC
1227/2023
$108.585.00
Filler Rehab Project
20904
NORTHWEST ASPHALT INC
1227/2023
$2.250.00
Refund Deposit for Meter # 15351324 / RPZ # 2390778
20905
PAIGE HALLSTROM
12272023
$182.59
Refcreidt bat on 643 Halsey Av BE
20906
PCI ROADS LLC
12/272023
$2,250.00
Refund Deposit for Meter #19166573/RPZ #4866180
20907
PEARSON BROS
12272023
$2.260.00
Refund deposit meter # 19166576 / RPZ # 4820867
20908
RISE CONSTRUCTION
1227/2023
$3,616.41
Refund Overpayment
20909
ROCKUNDERGROUND
12/272023
$2.250.00
Refund deposit meter #4856085/RPZ #19182835
20910
ROGER/RANDIE OLSEN
12272023
$89.65
Ref creidt bat on 229 Cherrywood Av NW
20911
Short Elliott Hendrickson Inc
12272023
54,949.31
December 2023 Invoices
20912
SM HENTEGES & SONS INC
1227/2023
$2,250.00
Refund Deposit for Meter # 19184525 / RPZ # 1661529
20913
TEGRETE
12/272023
5450.00
December 2023 Invoice
20914
TOWDESIREE TATRO
12272023
$149.92
Ref creidt bat on 12744 43rd St NE
20915
TRACY KOCIK/ STACEY ANDERSON
1227/2023
$159.27
Ref credit bat on 525 Dogwood Av NW
20916
VEOLIA WATER NA
1227/2023
5101,528.00
January 2024 Contract Maintenance
20917
WATER CONSERVATION SERVICES
12/27/2023
$2.096.43
Hydrant Leak Survey
20918
WSB
1212712023
$728.50
GIS Services
1 $644,344.52�
Ryan Gleason Rob Olson
Joe Hagerty Bob Zagorski
Chris Kauffman Tom Dierberger Page 6 of 85
JOINT POWERS WATER BOARD
CHECK REGISTER SUMMARY
MEETING DATE: 1/22/24
Check#
Vendor
Check Data
Amoun
I Comments
17915e
CITY OF ST MICHAEL
1/19/2024
$307.Ml.201
December 2023 Receipt by Charge
17916e
PAYMENT SERVICE NETWORK
1/19/2024
$5,563.50
December 2023 Web Pay Fees
17917e
MN DEPT OF REVENUE
1/192024
$1,309.00
December 2023 Sales Tax
17918e
CENTERPOINT ENERGY
1/19/2024
$1,100.54
December 2023 Invoices
20919
CITY OF ALBERTVILLE
1/102024
$397.29
11100 SDth St NE Remodel Permit
20920
BIRCH CAPITAL LLC
1/192024
$145.46
Ref crerlg bat on 4157 Orleans Or NE
20921
CHARLOTTE SARTYLLA
1/192024
$1.00
Ref credit bat on 217 Maple Ln SW
20922
CHRIS KAUFFMAN
1/192024
$300.00
2023 Board Chairperson Stipend
20923
CITY OF HANOVER
1/192024
$53,850.63
December 2023 Receipts by Charge
20924
GREGORY SWANSON
1/192024
$109.24
Ref credit bat on 4557 Landmadc Or NE
20925
HOFF, BARRY PA
1/192024
$272.001
December 2023 Invoice
20926
HP MN 1 LLC
1/192024
$18.24
Ref aedtl bat on 11875 37th St HE
20927
JORIEIDAVID SCHAAF
1/192024
$135.00
Ref crack bat on 4866 Namhv Way NE
20928
Mn HOMES
1/19/2024
$68.98
Ref credd but on 2727 Kama Av NE
20929
MALLORY GRAFF
V192024
$141.86
Ref credit bat on 500 Ash Av NE
20930
MATTHEW/JESSY CRITELLI
1/192024
$143.64
Ref credit bat on 11217161h St NE
20931
MUNICIPAL BUILDERS INC
1/192024
$194,591.01
Pay Apo N- Filter Rehab
20932
NEW LOOK CONSTRUCTION
1/192024
$106,519.87
Final Pay Ape -CSAH 19 Project
20933
OMANN BROTHERS PAVING
1/192024
$2,266.06
Refund deposit for Meter 19166542/RPZ W157760
20934
RED TECHNOLOGIES
1/192024
$150.00
Monthly Webstte Securtly and Hosting
20935
Short Elliott Hendrickson Inc
1/192024
$9.978.02
December 2023 Invoices - Fitter Rehab
20936
SRWEIDEMA
1/192024
$2.250.00
Refund deposit for Meter 19166478/ RPZ 4707349
20937
TEGRETE
1/792024
$462.01
January 2024 Invoice
20938
VEOLIA WATER NA
i/79,2024
$101,528.0D
February 2024 Contract Maintenance
20939
VICTORIA PORTER
1/192024
$174.34
Ref credit bat on 10400 Kalland Ln NE
20940
WSB
1/192024
$1.187.50
CIS Services -November 2023
$790,288.32j
Ryan Gleason Rob Olson
Joe Hagerty Bob Zagorski
Chris Kauffman Tom Dierberger
Page 7 of 85
Joint Water Board
Budget- 2023 JPWB Board Meeting
December 2023 2023
Account Deso, Budget 2023 Amt YTD Budget YID Amt
FUND 101 GENERAL FUND
E 101-00DOO-700 Advertising
$200.00
$0.00
$200.00
$693.52
E 101-00000-704 Bank Charges
$1,D00.00
$0.00
$1,000.00
$180.00
E 101-40000-712 Contract Maintenance
$1,421,784.00
$101,528.00
$1,421,784.00
$1,717,198.84
E 101-40DOO-730 Insurance
$16,000.00
-$1,136.00
$16,000.00
$27,377.00
E 101-40000-749 Credit Card Fees
$30,000.00
$2,525.40
$30,D00.00
$33,296.96
E 10140000-752 Audit Fees
$23,000.00
$6,250.00
$23,000.00
$30,200.00
E 10140DOO-756 General Engineein9 F
$35,000.00
$727.96
$35,000.00
$24,451.65
E 101-00DOD-757 Wellhead Protection En
$1,500.00
$0.00
$1,500.00
$0.00
E 10140000-758 Legal Fees
$3,500.00
$117.00
$3,500.00
$3,816.50
E 10140000-759 ASR-Misc
$5,000.00
$0.00
$5,D00.00
$O.DO
E 10140000-770 System Maintenance
$50,000.00
$111,928.93
$50,D00.00
$231,505.05
E 10140000-771 Well Maintenance
$65,000.00
$0.00
$65,000.00
$56,659.82
E 101-40DOO-785 DNR Water Usage
$15,000.00
$0.00
$15,000.00
$17,486.31
E 101-40000-795 Misc Expense
$2,500.00
$0.00
$2,500.00
-$2,250.00
E 101-40000-796 EDA/RR Fees
$300.00
$0.00
$300.00
$0.00
FUND 101 GENERAL FUND
$1,659,784.00
$221,941.29
$1,669,784.00
$2,140,615.65
$1,669,764.00 $221,941.29 $1,669,7B4.00 $2,140,615.65
01/19124 9:57 AM
Page i
Page 8 of 85
Joint Water Board
Budget - 2024 JPWB Board Meeting
January 2024 2024
Aaount Deco• BuEoe[ 2024 Amt YID Butlnet YID Amt
FUND 101 GENERAL FUND
E 101-40000-700 Advertising
E 101-40GOD-702 Ucense/Fees
E 101-4000D-704 Bank Charges
E 101-40000-712 Contact Maintenance
E 101-40000-730 Iwance
E 101-4000G-734 Meeting Allowance
E 10140000-748 Office Supplies
E 1014000D-749 Credit Card Fees
E 10140DDD-752 Audit Fees
E 101-40000-754 GIS Engineerfees
E 101-40000-755 Project Engineering Fe
E 10140000-756 Geneal Engineering F
E 101-40DOO-757 Wellhead Protection En
E 101-00000-758 Legal Fees
E 101-00000-759 ASR-MIS:
E 1OIA0000-770 System Maintenance
E 10140000-771 Well Maintenance
E 101-40000-772 System Repairs
E 101-40000-773 Facility Mgmt
E 10140D00-774 Utilities
E 10140DOO-785 DNR Water Usage
E 101-4000D-795 Misc E wnse
E 1014OD00-796 EDAIRR Fees
FUND 101 GENERAL FUND
$200.00
$0.00
$200.00
$0.00
$375.00
$150.00
$375.00
$450.00
$500.00
$0.00
$500.00
$0.00
$1,247,045.00
$101,528.00
$1,247,045.00
$101,528.001
$28,000.00
$0.00
$28,000.00
$0.00
$300.00
$0.00
$300.00
$0.00
$500.00
$0.00
$500.00
$0.00
$30,000.00
$2,403.99
$30,000.00
$2,403.99
$24,000.00
$0.00
$24,000.00
$0.00
$7,500.00
$1,187.50
$7,500.00
$1,187.50
$2,500.00
$0.00
$2,500.00
$0.00
$24,000.00
$0.00
$24,D00.00
$0.00
$400.00
$0.00
$400.00
$0.00
$4,000.00
$272.00
$4,D00.00
$272.00
$1,000.00
$0.00
$1,000.00
$0.00
$40,000.00
$206,131.57
$40,000.00
$206,131.57
$100,000.00
$0.00
$100,000.00
$0.00
$35,000.00
$0.00
$35,000.00
$0.00
$25,000.00
$397.29
$25,000.00
$397.29
$330,000.00
$0.00
$330,000.00
$0.00
$18,000.00
$0.00
$18,000.00
$0.00
$2,00.00
$0.00
$2,500.00
$0.00
$1,100.00
$0.00
$1,100.00
$0.00
$1,921,920.00
$312,370.35
$1,921,920.00
$312,370.35
$1,921,920.00 $312,370.35 $1,921,920.00 $312,370.35
0111912410:56 AM
Page 1
Page 9 of 85
m
m
m
m
A
T
t7 Oi
Vl
N
O
O O
W
a
`
Lq
O
m
w
O
-
-
w
N
N
e
0
0
H
w
N
y
R
o u
m
�
m
¢E
j
o'n
C
r
m
m
o
0 0
•0 U
v
-
SY
n
o
n
N
p
�
O
-
N
N
N
b
N
N
m
N
N
N
d
0
Omo�0
2 >zazoz
LJ—J9LL J
IL>LL LL
a gzogzogwmqw
LLzez z3z
LL 0000
Page 10 of 85
Qm
S w
Y
N
T
O
p
O
O
m
a
N N
U
m
n
O a0
�
m
N
_
y
w
w
N
w
O
O
S
O S
N
a
o
S
S
S
y
c
o
o d
w
w
w
w
w w
'o
0
0
0
w
a
�
R y
O U
R
CN
N R
U
m
a m
=
M
>R
o
g
S
o
o
g S
n
o
0
6
6 0
w
w
w
w w
N
Vp
N
pW
m
O OI
N
w
w
y Ow
m
w
V
O
O
uOc0 c
muzSz-Cz
m l=L mLL LL Oz LL
gLLa�m4a9a4
zoz°zmz
w ?w?w
v U U�O�U
LL 0000 O
Page 11 of 85
^\\\
§
\
/\\.....
!}
ME
9
|
N
N2-
(
\
\
\a\\�\\//\/\\\\|
\
No----,:=::_;
•
|/\\|\
§
}\}/\\E
25!
E;
§;|§§!|)§§!|;|
{
(
k&R\
//9MO
)\,
.
-----.
|\
\
!!!!;!!!l:::;;::
[
!
E
§
Page 12ea
. ...................................
..2p
222��4;,-v v gall.
fu.-G�-
gg— 9 a;; 4 a ag 9 g 91V
--- . . . . . . . . . . . .
----------
rz gs�j
...... .......
a
93
............ ......... a.
-- - -- - - - - - l . S . . . . 9 W-
. . . . . . . . . . Q . . . . . .
CE
9.0
........... ...... ......
......... l .... l ...... ll .............
.......... 9999992999
UNUMPHUMM .
H H § I M, UM
HUMISHMIgHMS
5F - - -
UM999999M P-99MM
iz
0�.
z Hise mz w2..'d zm.,�,�
, - 9 N -*Fz 0
A
t o
s3z .22
a M,
NZ
i t 9 az z z
-6
M38, EN I q
H I 4N.
'I . . . a z A Me
.......... 0000..0 ..................... 0 ... 0 ..........
.......................... ......
Page 13 of 85
0!
Journal Entries
11/30/2023
Date Account Debit lCredit Reason
11/30/2023 2004 Revolving Project
Investment Interest
Revolving Fund Contra
Investment interest
11/30/2023 Wells Fargo
Investment Interest
Wells Fargo Contra
Investment Interest
11/30/2023 RBC
Investment Interest
RBC Contra
Investment Interest
$25,351.81
Record interest earned for November PMA
Record market change for November PMA
Record interest earned for November WF
$9,363.83
38,935.35 Record market change for November WF
$19,571.00
$66,949.55
Record interest earned for November RBC
Record market change for November RBC
Page 14 of 85
a
O
2
[n
O
M
N
m
m
c
d
V
a
m
0
O
m
W
O
b
O
0
D
m
m
m
o
m
m
N
m
m
O
m
n
N
u`6f
N
VO1
O
M
O
d
Yl
Vl
N
f�l
Q
M
C
f-1
rj
ti
f-1
Ci
q
'1
A
O
C
Q
w
�
�
C
�
a
U
w
o
K
C
m
N
O
m
W
o
o
n
v
a
y
a
x
3
m
W
O
o
a
v
n
O
m
m
d
U
y
N
00
d N
3
d
MR
y
o
d
a
D
jd
01
u
$
_
d
3
L
i
E
E 'd
w
EE v
U
O d
Y
a
1 NN
W
n
m.a
rvl
VI
r'1
e1
c�
rn
�
It
Y
N
nl
rl
r
O
W
0
vl
N
r
O
N
m
.ti
ri
O
O
O
O
d
OO
O
O
O
O
O
S
p
O
O
O
O
`
O
O
O
O
n
V1
n
O
N
N
(p
rl
Od
Mw�h
d
is
3
o
F
3
a
N
N
N
L
m
W
m
O
c
z
¢
m
a
d
w
n
N
�
N
J
N
J
p
t-
9
Page 15 of 85
- - -- - - - - - - - - -
Y
E
........ ...
............
- - - - - - - - - - - o
z
EEEEEE5EE
m
�0. 000 11 m
E
T T T 2 9
M-H
z
Page 16 of 95
�2 9 pig.—
g
................. ........
o..-... o.
2. 8.
.......................
- - - - - - - - - - - - - - -
.......... ....... HHW.— ......
...............
.............
. . . . . . . . . . . . . . . . . .
.............
2 ..............
..... .......
W. iz
G 21 im�92 6T 'go
MMMMC
IR, --o
o c E 2
z �E-
azz -- ----
o 2 2
1,20.
. 2 ;�
M22.
Z,
_o8m; H-11H
Z2
0000 00 00 .......................
.....................................
Page 17 of 85
Journal Entries
12/31/2023
Date Account Debit
Reason
12/31/2023
2004 Revolving Project
$15,095.90
Record interest earned for December PIVIA
Investment Interest
$15,095.90
Revolving Fund Contra
$1,047.31
Record market change for December PIVIA
Investment Interest
$1,047.31
12/31/2023
Wells Fargo
$838.20
Record interest earned for December WF
Investment Interest
$938.20
Wells Fargo Contra
$42,500.45
Investment Interest
$42,500.45
Record market change for December WF
12/31/2023
RBC
$7,638.14
Record interest earned for December RBC
Investment Interest
$7,638.14
RBC Contra
$200,313.39
Record market change for December RBC
Investment Interest
$200,313.39
12/14/2023
Undistributed Receipts
$417.01
Reclass Water/Hydrant sales
Water Sales
$190.86
Hydrant Rental
$197.50
MN State Tax
$28.63
12/14/2023
Undistributed Receipts
$2,506.74
Reclass Water/Hydrant sales
WaterSales
$1,922.07
Hydrant Rental
$412.50
MN State Tax
$172.17
12/14/2023 Undistributed Receipts
WaterSales
Hydrant Rental
IVIN State Tax
12/19/2023 Undistributed Receipts
Water Sales
Hydrant Rental
MN State Tax
12/27/2023 Undistributed Receipts
Water Sales
Hydrant Rental
IVIN State Tax
Reclass Water/Hydrant sales
$276.90
$240.00
$38.12
Reclass Water/Hydrant sales
$25.28
$297.50
$23.81
Reclas5 Water/Hydrant sales
$71.50
$230.00
$22.23
Page 18 of 85
Journal Entries
12/31/2023
12127/2023 Undistributed Receipts $713.38
Water Sales $261.89
Hydrant Rental $402.50
MN State Tax $48.99
Reclass Water/Hydrant sales
12/27/2022 Undistributed Receipts $10.00 Reclass Water/Hydrant sales
Water Sales $9.61
MN State Tax $0.39
Page 19 of 85
C.)VEOLIA
Monthly Ooerations Report
John Seifert - General Manager
Operators:
Andrew J. Ahles - Supervisor &Facilities Manager Dustin W. Carlson -SupervIsor& Facilities Manager
Jennifer Thomas - Office Manager
Ruth Klick - Project Associate
Delena Daleiden - Admin. - Finance
Donna Larson -Admin.
November 2023
Joseph Hill - Lead Operator
Fred Hoilles - Operator
Hannah Hoekman . Operator
Zach Blake - Operator
Executive Summary
Joint Powers effectively produced 56,104,000 gallons of water in the report month. All bacteriological samples were negative. The
average fluoride concentration was 0.78 mg/L (Limits am 0.5 & 0.9). The total production to the dishibution system was 55.838,700
gallons and actual consumer use was 55,838.700 gallons, an average daily amount of 1.86
million gallons per day.
Operations
The standard operations of the facilities include:
Daily testing of fluoride and chlorine in the system. 4 Monthly performance inspections on wells.
• Monthly bacteriological sampling (25 samples). A Bulk chemical deliveries.
• ERT missed reads/ meter checks, Chemical feed systems adjustments & maintenance.
4, Laboratory equipment calibrations. Safety and training meetings.
0 MC Lite meter reading mutes for Hanover a St. Michael. Regularly scheduled operations & maintenance meetings.
0 Routine daily rounds, inspections, and security checks
of the water treatment plant.
0 Regular backwashing of fifters, reclaiming and pumping
of backwash sludge.
Routine weekly off -site facilities inspections and security
checks.
Monthly performance inspections of emergency generators.
Monitoring & regulating access to the water towers for
telecommunications companies to make repairs &
upgrades.
Major Activities
Uncommon Operations and Major Corrective Maintenance:
• Completed leak detection survey with Water Conservation Services Inc.
• Repaired leaks found on survey.
• Filter 3 RehabilitaUon Completed
• Filter 1 & 2 Rehabilitation Started
Page 20 of 85
Safety & Training
Each month our staff performs inspections of all safety equipment such as fire extinguishers, eyewash stations, chemical showers, and
emergency fighting- We also have safety meetings during the month that consist of both routine and non -routine topics.
Call -Outs (After -Hours Emergency Calls)
0 None in November
Regulatory Communications
Our monthly regulatory communications were completed satisfactorily and on -time. These were:
• The monthly fluoridation report to the MDH
• The monthly bacteriological test results to the MDH
• The monthly injectionlrecovery report to the EPA
Major Client / Public Relations Issues
* None in November
Distribution System Statistics
Total
Hanover
St Michael
Joint
Comments
Powers
Locates (GSOC)
276
43
231
2
Gopher Slate One Call, Tickets Received
Hydrants Flushed
0
0
0
0
Spring)['all (Joint Powers Am Albertville)
Including water quality issues (Nlbertville), water
Customer Service Visits
11
1
10
0
usage issues, curb stops oNoffwater main
operators. special locates (not through GSOC) &
misc. issues.
Inspections
22
9
13
NA
These include out�of bounds read checks, leaking
Motor/ERT Issues/Repairs
51
11
40
NA
meters, bad ERTkJnsiplecemerds, wiKng issues,
missed fears. monfibly motor ading. etc.
Maintenance Work Orders
41
1
0
40
These include lssuu�sheipalre & regular
maintenance for the dist. systems & JP facilities.
Finals
67
7
60
N/A
VAM
Budgoe,16 I pens.00s Balance
T__ Ej___
LIM 623 $527.0 1 $95,936
available at time of report. Estimated
Appendices
Monthly Fluoride Report, Monthly Bacteriological Report
Page 21 of 85
E E E E
E ZC
<
< <
E
< E M
............... ........
E E
m 0
Page 22 of 85
-Mu
Ej
............
g t t A. � � -,-:I g t t
-a-
a4� m . . . mjiAa,
I I I I I
,A a 5 a 3
2 S 5 22!!�! 2
E ?9. E- E-
... .. ......
I A A 1 —411144
Hu
i4 ��g 54— 1
I-w
Page 23 of 85
JOINT PC
LLL
offl. & Pl�l
11100 �' St NE
N�Itle MN 55:1,
Offic� - 76�,97
1� - 7�97-3611
E,�Y
76�219-5309 ov
Monthly Overations Report
John Seifert - General Manager
Operators:
Andrew J.Ahles - Supervisor &Facilities Manager Dustin W. Carlson -Supervisor& Facilities Manager
Jennifer Thomas - Office Manager
Ruth Klick - Project Associate
Delena Daleiden - Admin. - Finance
Donna Larson -Admin.
December 2023
Joseph Hill - Lead Operator
Fred Hoilles - Operator
Hannah Hoekman - Operator
Zach Blake - Operator
Executive Summary
Joint Powers effectively produced 58,984,000 gallons of water in the report month. All bactenological samples were negative. The
average fluorde concentrabon was 0.79 mg1L (Limits are 0.5 & 0.9). The total production to the disbibubon system was 58,716,100
gallons and actual consumer use was 56,069,100 gallons, an average daily amount of 1.81 million gallons per day.
Operations
The standard operations of the facilities include:
, Daily testing of fluoride and chlorine in the system.
0 Monthly bacteriological sampling (25 samples).
4- ERT missed readst meter checks.
• Laboratory equipment calibrations.
• MC Lite meter reading routes for Hanover & St. Michael.
0 Routine daily rounds, inspections, and secunty, checks
of the water treatment plant.
0 Regular backwashing of filters, reclaiming and pumping
of backwash sludge.
Major Activities
Uncommon Operations and Major Corrective Maintenance:
• Hanover River Landing walifthrough completed.
• Filter Rehabilitation on going
Monthly performance inspections on wells.
Bulk chemical deliveries.
Chemical feed systems adjustments & maintenance.
Safety and training meetings.
Regularly scheduled operations & maintenance meetings.
Routine weekly off -site facilities inspections and security
checks.
Monthly performance inspections of emergency generators.
Monitoring & regulating access to the water towers for
telecommunications companies to make repairs &
upgrades.
Page 24 of 85
Safety & Training
Each month our staff performs inspections of all safety equipment such as fire extinguishers, eyewash stations, chemical showers, and
emergency lighting. We also have safety meetings during the month that consist of both routine and non -routine topics.
Call -Outs (After -Hours Emergency Calls)
0 None In December
Regulatory Communications
Our monthly regulatory communications were completed satisfactorily and on -time. These were:
• The monthly fluoridation report to the MDH
• The monthly bacteriological test results to the MDH
-0- The monthly injection/recovery report to the EPA
Major Client I Public Relations Issues
-I- None in December
Distribution System Statistics
Total
Hanover
St Michael
Joint
Comments
Powers
Locates (GSOC)
175
33
142
0
Gopher State One Call, Tickets Received
Hydrants Flushed
0
0
0
0
Spnng/Fall (Joint powers Are Albertville)
Including water quality issues (AAberville), water
Customer Service Visits
11
0
11
0
usage issues, curb stops orVoffwater main
operations, special locates (not through GSOC) &
misc. issues.
Inspections
21
6
15
NA
These include out -of bounds mad checks, leal,ing
Meter/ERT Issues/Repalrs
39
3
36
NA
meters, bad ERTs/replacements, wiring issues.
missed reads, monthly meler reading. etc.
Maintenance Work Orders
39
1
0
38
These induce Issues/repars & regular
maintenance for the dist. systems & JP facilities.
Finals
39
3
36
N/A
YTO Reconcilable Limit
!Zchgat, Ex
npem_ Balance
LIM $ 23.0 $ 557,1: $65,822
Final reconciliation will occur after year-end finances have been processed.*No updates on Ac
available at time of report. EsUmated
Appendices
Monthly Fluoride Report, Monthly Bacteriological Report, Monthly ASIR EPA Report
Page 25 of 85
E E E E E E
Ono
0
.
ts
E
TA
16.6
-
-
R
-
R
-
1�
-
R
-
-
-%
-
-
-
.0
6
ci
C;
C;
Is
ci
6
ci
cs
6
Is
q
9
q
q
q
U?
q
Iq
R
R
R
4,4
r
53
-i
CO
.
.
.
.
.
.
.
.
.
.
3
.12
Nq
.17
.
.
7
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
1.
2,2
.........
01.
0
.10
.1.
0
.
.
.
71.11171.
-
-
-
-
-
-
-
-
-
-
3
C6
Page 26 of 85
CN!
El El
qgo
E
A
H
0
� E E � � 9 9 9 � t 9 t
526�MM�g
AAMIA.1.1"A
'a I I I MAI 742 -A I
f� _H E
9.
ills
A.4
Page 27 of 85
Year: 2023 (2024 Cycle) Month: December
U.S. ENVIRONMENTAL PROTECTION AGENCY MONTHLY MONITORING REPORT
FOR CLASS V INJECTION WELLS
UIC PERMIT NUMBER:
MN-171-5R21-0002
OPERATOR NAME:
Joint Powers Water Board
ADDRESS:
11000 50th St NE WELL NAME: Well 9
CITY/STATE/ZIP:
Albertville, MIN 55301 WELL COUNTY., Wright
PHONE:
(763) 497-3611
MONTHLY REQUIREMENTS
Total Injection Period
Total Report
Total Injection Period
Injection (Gallons)
YTD Volume
Month Volume
2,646,000
1 2,646,000
2.646.000
Injection Pressure &
GPM
Average
Highest Value
Lowest Value
Monthly Injection
Pressure (psig)
8.2
9
7
Monthly Injection Flow
Rate (GPM)
312.8
314
306
Total Recovery Period
TotalReport
% of Injection Period Total
Recovery (Gallons)
YTD Volume
Month Volume
Volume
0
0
0.00%
COMMENTS:
The 2023 ASR cycle began in December 2023, with the injection phase. Test well 6 and ASIR well 9
were flushed to waste and background testing & sampling was performed on both wells and the
injection source, the Joint Powers distribution system, before injection was begun.
CERTIFICATION
I certily under the penalty of law that I have personally examined and am familiar with the information submitted in this
document and all attachments and that, based on my inquiry of those individuals immediately responsible for obtaiing
the infornnation, I believe that the information is true, accurate, and complete. I am aware that them are significant
penalties for submitting false information, including the Possibility of fine and punishment. (Ref. 40 CFR Section 144.32)
Name
Date Signed: 4- ZI
Page 28 of 85
(D
9 E
0
0
E
ci
E
E
o
w
m
C4
08,
Page 29 of 85
2
E
d
E
Lq
E
E
E
E
Page 30 of 85
E
x
a)
LO
C)
�Q� 0 uj
0
.0
.2
E
00
Ing
uj
2
10E
Z E
E
El
E
c
Page 31 of 85
E
83
83
o
uj
P:
<
z
5 z
0
E�l
U�
E
Page 32 of 85
In=
S2
ti
6
E
2 'E
2,E
.�j
Page 33 of 85
.E
16
0
2
0
E2 Z�
0
0
6�
LU 0
<
z z
F— x 0
2 0
ILLI 2
0.
0
�i
"i
"4
"4
"
N
�
"
"
N
cli
C",
cli
'Ni
�i
cq
N
"
N
N
LD
0
UO
0
w
L0
LO
LO
'D
to
to
w
w
w
A
w
LU
W
LU
W
W
W
'.2
(L
23
LO
N
iu�
q
c;
in
M
M
M
M
L)
0
w
0
<
E
E
<
<
0
<
2
2
E
0
0
0
m
E
E
E
2
-802IFit:
0
�
'E60-8.8M
0
0
0
0
—0-0
E
E
o
2
2
z
0
.
0—
�5
0
1 0 101milm
im
2
2
:E 1
()
�12
0
�12
MO
.2
0
2
0
2
Page 34 of 85
Year: 2023 (2024 Cycle) Month: December
UIC PERMIT NUMBER MN-1711�511211-0002
OPERATOR NAME' Joint Pmers Water Board ASIR PTC�3
SAMPLE LOCATION: Well 9 (Mt. Simon)
Constituent
Units
Detection
Limit
Well 9
5%
Recovery
Well 9
30%
Recovery
Well 9
60%
Recovery
Well 9
100%
Recovery
Federal
Drinking
Water
Standard
Method
Date
Temperature
C
pH
Bid Units
Conductivity
ustern
ORP
mv
Dissolved Oxygen (DO)
-A
Chlorine, Total Residual
malt.
0.01
HACH 8167 5th ED 2008
Aluminum
u91L
4
200
EPA 200.8
Arsenic
uq/L
0.5
10
EPA 200.8
Calcium
ug/L
�o
EPA 200.8
Copper
ug/L
0.5
1000
EPA200.8
loan
ug/l.
50
300
EPA200.8
Lead
ugIL
0.1
EPA 200.8
Magnesium
ugdL
100
EPA 200.8
Manganese
UgVL
0.5
59
EPA 200.8
Potamium
ug/L
20
EPA 200.8
Sodium
ug/L
50
EPA 200.8
Aukalinly, Total as CaCO3
nowl,
5
SM 2320B
Chloride
mg/L
2
250
SM 4500-Ci E
Fluoride
mg/L
0.1
2
SM 4500FIC
Nit"en. Ammonia
m /L
0.04
EPA 350.1
Phosphorous
m /L
0.4
EPA 365A
Silica, Dissolved
m IL
IL
1
EPA 200.7
Suffarte
mg/L
2.5
250
ASTM D516-02
Total Hardness by 23408
m IL
1420
EPA 200.8
NitoGger, Kjeldahl, Total
no L
I
EPA 351.2
Total Organic Carbon
2
EPA 9060
Gross Alpha
pCVL
EPA 900.0
Adjusted Gross Alpha
PCVL
15
Ra-226
pCVL
5
EPA 903.1
Ra-228
pCVL
5
EPA904.0
Ra-226 - Ra-228
pCirl.
5
Total Uranium (238)
pCVIL
0.5
EPA 200.8
Bromodichloromethane
ug/L
0.5
EPA 524.2
Bromolorm
uq/I.
4
EPA 524.2
Chloroform
ugIL
0.5
EPA 524.2
Dibromochloromethane
ug]L
0.5
EPA 524.2
Total Triftalomethanes, (Calc.)
ug/L
BO I
EPA 524.2
Dibrorroacelfic, Acid
UgIL
1
EPA552.2
Dichloroacelfc, Acid
ug1
1
EPA552.2
Monothromoacefic Acid
ugiL
1
EPAS52-2
Monochloroaccetic Acid
ug/L
I
EPA552.2
TrichloroaceficAcid
ug/L
I
EPA 552.2
Total Haloacetic Acid
ugIL
60
EPA 6522
n�.--1
U-- __ - ! _
PCVL
I
HSL-300
;4
�w . .2 5
pCVL
HSL-300
Uranium - 238
PCVL
HSL-300
Page 35 of 85
Year: 2023 (2024 Cycle) Month: December
UIC PERMIT NUMBER: MN-171,5R21-0002
OPERATOR NAME: Joint Po"m Wet., Boand ASIR PTC-3
SAMPLE LOCATION: Test Well 6 (Mt. Simon)
Constituent
Units
Detection
Linuit
Test Well 6
Background
Injection
Test Well 6
95%
Injection
Test 116
100
Re
Federal
Drinking
Water
Standard
Method
Dai
VM024
Temperature
C
10.0
PH
Std Units
6A7
Conductivity
us/cm
0.441
ORP
mv
-68.10
Dissolved Oxygen (DO)
mg1l.
1 M81
Chlorine, Total Residual
ug[L
0.01
000
HACH 8167 Sit ED 2008
Aluminum
ua
4
200
EPA 524.2
Arsenic
U91L
0.5
10
EPA524.2
Calcium
ugVL
't0o
5PA524.2
Copper
uq/L
0.5
1000
EPA 524.2
lron
U911-
50
300
EPA 5242
Lead
UB/L
owl
EPA 5242
Magnesium
ug/L
100
EPA5242
Manganese
ug/L
0.5
Sit
EPA5242
Potassium
ugtL
20
EPA5242
Sodimni
U91L
50
EPAS242
Alkalinity, Total as CaGO3
mg/L
5
SM 23208
Chloride
mg[L
2
250
SM 450D.Cl E
Fluoride
mg/L
0.1
2
SM 4500FIC
Nitrogen. Am. nia
g/L
OwG4
EPA 350.1
Phosphorous
mg/L
OA
EPA 365.4
Silica, Dissolved
g/L
1
200.7 MET ICP
Sulfate
gA-
2.5
250
ASTM D516-02
Total Hardness, by 23408
mq1L
1420
ERA200.8
Nitrogen, Kieldahl, Total
mgtL
1
EPA 3512
Total Organic Carbon
mgjL
2
EPA 9060
Gross Apha
pCi/L
EPA 900.0
Adjusted Gross Alpha
pCUL
15
Ra-226
pCVL
5
EPA903.1
Rai
pCVL
5
ERA904.0
Ra�226 + Ra-228
pCVL
5
Total Uranium
ug]L
0.5
EPA 200.8
BromodIchlorometharte
uq/L
0.5
EPA5242
Bromof..
ug/L
4
EPA 524.2
Chloroform,
ug/L
0.5
EPA524-2
01tworrutchbromethane,
ug/L
0.5
EPA524-2
Towl Trihalomethanes (Cali
ug/L
so
EPA524-2
Dirisomoaciatic Acid
ug/L
1
EPA 5522
Dichloroacedc Acid
ugIL
I
EPA5622
Monobromwi Acid
ug/L
I
EPA5522
M.,inchl,acaccatic Acid
ug/L
i
EPA552-2
Trichloroacetic Acid
ug/L
I
EPA5522
Total Haloac.tic Add
ug/L
60
EPA5522
Uranium - 2�
pCUL
HSL-300
Uranium-235
pCV-
HSL-300
Uranium - 238
PCUL I
I
HSL-300
Page 36 of 85
A
SEH MEMORANDUM
TO:
Joint Powers Water Board
FROM:
Christopher Larson, P.E.
DATE:
January 5, 2024
RE:
MBI Pay App No. 4 - Filter Rehabilitation
Attached is Application for Payment No. 4 from Municipal Buders, Inc. This application for payment is
for work on the Filter Rehab Project through December 31, 2023. 1 have reviewed this application for
payment and believe it to accurately reflect work completed through the above referenced date. We
recommend that the Boardpay the roquested amount of $194,591.01.
Attachments: MBI Application for Payment No. 4
ShortElliott HemdrIIka.alr..,3�5V.d,uus Center Drive. St. Paul. VIN 5511M196
SEH is an usual opportunity employer I �.sehlncxomo 1 651.490,2000 1 800.3252055 1 651.490.2150 fiax
Page 37 of 85
0
z
0
z
La
0
z
u
< z
Z
>
0
Z
Hw- z
0 <
L
0
U
z
u
z -0
1 z
0
0
N
0
0
q
q
q
Oi
N
�li
Cri
w
w
z
'Z
0 o
A
E
o
u
m
-6
<
0
0
0
0
0
6
0'
z
0
0
<
o
o
z
<
9�
E
<
E
1 0
Page 38 of
85
LLI
wi
V)
z
0
D
z
P:
z
0
u
0
0
0
� 0
0
0
0
C?
IQ q
q
0
0
D 0
0
0
0
ri q
q
q
0
0
d
-f 's
117
cr
Z9
9
0
0
Z
q
IQ q
0
0
0
0
d
0
0
q
0
q
0
q
cc
q q
0
0
0
0
z
cc
0
00
q
0
q
0
q
0
v 0
0
0
tq q
q
0
0
0
N 0
0
0
0
0
0 0
0
0
0
z
0
0
0
0
0
FZ
0
0
0
z
+
0
0
0
0
00
0
0
0
0
00
0
0
0
0
c;
C; 6
c;
0
0
0
0
0 0
0
0
u
0i
19
z
Z
<
U
Z
z
—0
:2
z
u
0 Z
2
.7
p
(Y
E T
<
z
<
u
c(
z
0
u
0
so
0
z
<
:2
z
2
u
:2 E
0
z
U
0
z
< u
Page 39 of 85
vorco 11, LLU
15301 140th Avenue SE
Becker, MN 55308
PHONE: (763)262-8662
INVOICE MD. V2000QQ77458
FAX: (763) 428-1334
1 PAGE
WfE Nov-30-23
CUSTOMER NO. 14782
REFERENCEW.
MUNICIPAL BUILDERS NC
7900 VPKING BLVD
NOWTHEN, MN 55303
TOTAL INVOICE 00.00
;ERVICE
DATE CODE DESCRIPTION REFERENCE QTY- RATE AMOUNT
10 - NoV
PI
Sherburne County Profile Approval
3153273
1.00
$200.00
23-292-1 )oint Powers Water Board
Nate Neubauer
vv�t,iJ
5�z— fl 10� Z—
or Quesbons all A=unbng at 763-235-1301 or ernail neLte.kuhn@�on�.com
ate fee of 1.5% p/month (18% APR) on all balances over 60 days start 7/l/23.
31 $ 60 DAYS 61 ; 90 DAYS OVER.9.0 DAY TOTALINVOICE 200.007
C= 1 000 1 0.00 1 00 1 1
Page 40 of 85
Vence 11, UC
15301 140th AVenue SE
Becker, MN 55308
PHONE: (763) 262-8662
FAX: (763) 428-1334
MUNICIPAL BUILDERS INC
7900 OLD VD(ING BLVD
NOVVTHEN, MN 55303
SERVICE
INVOICE NO,
V2 0000077614
PAGE
6
DATE
DK-17-23
CUSTOMER NO.
14782
REFERENCE NO.
CONTRACT
TOTAL INVOICE 10,097.45
(�
1 DATE CODE DESCRIPTION REFERENCE QTY. RATE AMOUNT
($1.75 1 TN ) Shebum CDunty - Iw
17 - Dec
13
Industrial Waste.462 T at $0.46/rN on 265.72
$122.22
For Quesbor� call Accounting at 763-235-1301 or ernail nettie.kuhn@vomousa.com
Late fee of 1.5% p/mnth (18% APR) w all balances over 60 da� start 7/1/23.
CURRENT 31 - 60 DAYS 61
$20,232.64 1 $000 1 !:1 ITOTAL INVOICE 1 10,097.45
Page 41 of 85
Vonco 11, LLC
15301 140th Avenue BE
p
Becker, MIN 55308
NONE: (763) 26M662
INVOICE NO.
V2 0000077614
FAX: (763) 428-1334
PAGE
4
DATE
OK-17-23
CUS OMER NO.
14782
REFERENCE NO.
CONTRACT
a�ater Filter saq
MUNICIPAL BUILDERS INC
7900 OLD VIKING BLVD
NOWTrIEN, MN 55303
TOTALINVOICE
10,097.45
SERVICE
DATE
14-DK
14-Dec
14-Dec
14-Dec
14-DK
14-Dec
14-Dec
14 - Dec
14 - DK
14 - Dec
15 - DK
15 - Dec
CODE
DESCRIPTION
REFERENCE
QT`f.
RATE
AMOUNT
Cor,"d. 23-292-1 Joint Povers Water Board
Erovimnitental Fee
SC3161561
1.00
$low
($10.00 / Ticket )Environmental Fee-10
SH
Sherburne County - M
SC3161563
1DD
$23.92
($1.75 M ) Sherburne County - IW
ai
Conlauttrated Soil Torm;
01-9�688511
13.13TN
$35.00
$459.55
Contract: 23-292-1 Joint Pmers Water Board
i
E2
EnArunraental Fee
SC31616601
J.Do
$10.00
($10.00/Tlcket)ErWironmenWI Fee,10
SH
Sherburne County - IW
SC31616621
1
1.00
$22.98
($1.75 / TN I Sherburne County - M
1
m
OU
I Contamiraeted Sal Tons
01-968872
12.06TN
$3 500
$422.10
Contract; 23-292-1 Joint Povem Water Boaal
E2
Environmental Fee
SO 1617�
I.D0
$10.00
($10 00 / Ticket )Envinnarental Fee-10
SH
SherIume County - IyV
SC31617�1
1100
($1.75 / TN ) Shvbu,m County - M
OU
CortarrInated Soil Tons
01-968887
12.06TN
$35.00 1
$422.10
Contract: 23-292-1 JUnt Powers Water Board
EZ
EnmrormenUl Fee
SC3161801
1.01)
$10m
($10.00 /Ticket )Envionorental Fee-10
I
SH
Sherburne County - IW
SC3161803
1.00 11
$21.11
($1.75 / TV ) Sherburne County - IW
(III
Contaminated Soll-Fors
01-968925
12.22TN
S35.00 1
$427.70
Contract: 23-292-1 Joint Powers Water Board
E2
Enwormental Fee
SC3162065
1.00
$10.00
Page 42 of 85
Vonco H, UC
IS301 140th Avenue SE
Be&", MN 55308
PIONE: (763) 262-8662
INVOICE NO. V2 OD00077614
FAX: (763) 428-1334
PAGE 2
DATE Dec-17-23
CUSTOMER NO. 14782
REFERENCE NO.
CONTRACT
MUNICIPAL BUILDERS INC
790D OLD VIKING BLVD
NOVYTHEN, MIN 55303
TOTAL INVOICE 10,097.45
SERVICE
DATE
CODE
DESCRIPTION
11 - Dec
SH
Sh�txune C .. ty, - TV
1($1.75 / TN ) SWbinne County - IW
11 - Dec
CU
Contaminated Sal Ton,
Refinence:
Contract: 23-292-1 Joint Pomm Wate, Boad
11 - Dec
E2
EnlronmmMl Fee
($10-00 1 Ticket)EnA-menal Fm-110
11 - Dec
SH
Shedme County - 1W
($1.75 / TN ) Sherbume County - M
12 - Dec
OU
Contaminaled Soil Tons
12 - Dec
E2
Contract: 23-292-1 Joint Po�em Wt� Boad
EnAmnimental Fee
($10.00 /Ticket)EWmental F�10
12 - Dec
SH
Sherbume County - IW
($1.75 / TN ) Sherbume County - IN
12 - Dec
OU
Conlarrinated Soil Ton�
Contnacc 23-292-1 Joint Po�em Water Board
12 - Dec
EZ
Envin,nme,ital Fee
($10.G) /Ticket )(5wimmerital Fee-11)
12 - Dec
SH
Sherbume County - M
($1.75 / TN ) Sherbunie County - IW
12-Dec
CU
Cwtanihiated Scill Tons
Covitact: 23-292-1 Joint Powem Water Board
12-Dec
E2
EnAronmeriltal Fee
($10.00 / Tcket)Enoironmental Fee-10
12-Dec
SH
Sherb.e county - rw
REFERENCE
RATE AMOUNT
SC3159477
too
$22.12
01 968331
13.37TN'
$35.00
$467.95 1
SC3159478,
1.00
$10.00
SC3159480:
1.00
$23.40 i
01968390
10.HTN
$35.00
$380.80
SC31596221
im
$10.00
50159624�
1.00
$19.04
01-968431
12.63TN
$35.00
W2.05
SC3159800
1.00
$10.00
S0159802
IN
$22.10
01-968473,
13.48TN
$35.00
$471.80
SC3 599721
1.00
1
$10.00
SC3:59974:
1.00
$23.59
- - - m �1�=
Page 43 of 85
15301 140th Avernie SE
;t;
Sacker, MN 55308
PHONE: (763) 262-8662
INVOICE NO.
V2 0000077604
FAX: (763) 428-1334
PAGE
1
DATE
C,,-10
cusTomER No.
REFERENCE NO.
CONTRACT
MUNICIPAL BUILDERS NC
7900 VIKING BLVD
NOWTHEN, MN 55303
LTOTAL INVOICE 9,935.19
3ERVICE
DATE CODE DESCRIPTION REFERENCE QTY- RATE AMOUNT
35 - Dec
CU
Contaminated Soil Tons
01-967451
10.40TN
$35.GG
$364.00
Reference: IYCD61GB
Contrad: 23-292-1 Joint Pmers Water Board
35 - Dec
E2
Environmental Fee
SC3159403
1.00
$10.00
($10-00 / Ticket)(Environmental Fee-10
)S - Dec
SH
Sherburne County - IN
SC3159405
1.00
$18.20
($1.75 / TN ) Sherburne Cwnty - IW
)S - Dec
CU
Contaminated Soil Tons
01-967477
11.46TN
$35.00
$4DI.10
Reference:
Gontract: 23-292-1 Joint Powers Water Board
IS - Dec
E2
Environmental Fee
SC3159409
1.00
$10.00
($10.00 / Mcket)Envirommental Fee,10
)5 - Dec
SH
Sherburne County - IN
SC3159411
1.01)
$20.06
($1.75 / TN ) Sherburne County - IW
35 - Dec
Cu
Contaminated W, Tons
01-967512
12.13TN
$35.00
$424.55
Reference:
Contract: 23-292-1 Joint Po,%iers Water Board
05- Dec
E2
Environmental Fee
5C3159406
1.00
$10.00
($10.00 / Ticket )Environmental F�10
05- Dec
SH
Sherburne County - IW
SC3159408
1.00
$21.23
($1.75 / TN ) Sherburne County - IW
05 - Dec
CU
Contarnmated Soil Tons
01-967561
12.51TN
$35.00
$437.85
Reference:
Cormact: 23-292-1 Joint Powers Water Board
05 - Dec
E2
Environmental Fee
SC3159412
1.00
$10.00
($10.00 / Ticket)Ewircrimental Fea,10
Page 44 of 85
Vanco 11, LLC
15301 140th A�enue SE
Becker, MN 55308
PHONE: (763) 262-8662 INVOICE NO. V20000077604
FAX: (763) 428-1334 PAGE -2
DATE Dec-1D-23
cusroMER No. 14782
REFERENCE N 0.
CONTRACT
MUNICIPAL BUILDERS NC
7900 VKNG BLVD
NOWTHEN, MN 55303 TOTAL INVOICE 9,935.1
SERVICE
DATE CODE DESCRIPTION REFERENCE QTY- RATE AMOUNT
05 - Dec
SH
Sherburne County - IN
SC3159414
1.00
$21.89
($1.75 / TN ) Sherburne County - IN
05 - Dec
CU
Contaminated Soil Tons
01-967605
11.44TN
$35.00
$400.40
Reference:
Contract: 23-292-1 Joint Poers Water Board
05 - Dec
E2
Environmental Fee
SC3159415
1.00
$10.Go
($10.00 / Ticket)Envimmental Fee-10
05 - Dec
SH
Sherburne County - IW
SC3159417
1.00
$20.02
($1.75 / TN ) Sherburne County - rW
06 - Dec
Cli
Contaminated Soil Tom
01-967666
11.09TN
$35.00
$388.15
Reference:
Contract: 23-292-1 Joint Powers Walter Board
06 - Dec
E2
Environmental Fee
SC3159424
1.00
$10.00
($10.00 / Incket)Environmental Fee-10
06- Dec
SH
Sherburne County - ruN
SC3159426
1.00
$19.41
($1.75 / TN ) Sherburne County - IW
06 - Dec
CU
Contaminated Soil Tom
01-967688
II.20TN
$35.00
$392.00
Reference:
Contract: 23-292-1 Joint Powers Water Board
06 - Dec
E2
EnAronrmntal Fee
SC3159433
1.00
$10.00
($10.00 / Ticket )Environmental Fee-10
06 - Dec
SH
Sherburne County - IN
SC3159435
1.00
$19.60
($1.75 / TN ) Sherburne County - IW
06 - Dec
CU
Contaminated Soil Tom
01-967717
12.04TN
$35.00
$421AO
Reference: I
Contract: 23-292-1 Joint Powers Water Board
Page 45 of 85
15301 I�Oth Avenue SE
ILI 11 13
6117
Becker, MN 55308
PHONE: (763) 262�8662
INVOICE No..
FAX: (763) 428-1334
PAGE
3
DATE-
CUSTOMER NO.
-Dec-10-2.
14782
REFERENCE NO.
CONTRACT
MUNICIPAL BUILDERS NC
7900 VIKING BLVD
_�w___-�
NOWrHEN, MN 55303
TOTAL INVOICE 9,93519
I--- 1
3ERVICE
DATE CODE DESCRIPTION REFERENCE QTY. RATE AMOUNrr
)6-Dec
E2
Envinormental Fee
SC3159421
1.00
$10.00
($10.00 / Ticket)[Invironmental Fee,10
16 - Dec
SH
Sherburne County - IN
SC3159423
1.00
$21.07
($1.75 / TN ) Sherburne County - TW
)6 - Dec
CU
Contaminated Soil Tom
01-967740
12.63TN
$35.00
$442.05
Rerwence:
Contract: 23-292-1 Joint Powers Water Board
36 - Dec
E2
Environmental Fee
SC3159430
1.00
$10.00
($10.00 / Ticket)Environmental Fee,10
36 - Dec
SH
Sherburne County - M
SC3159432
1.00
$22.10
($1.75 1 TN ) Sherburne County - IW
36 - Dec
CU
Contaminated Soil Tom
01-967762
12.35TN
$3500
$432.25
Reference:
Contract: 23-292-1 Joint Powers Weber Board
36 - Dec
E2
Environmental Fee
SC3159427
1.00
$10.00
C$10.00/Tlcket)Envimnmental Fee-10
D6 - Dec
SH
Sherburne Cwnty - TW
SC3159429
1.00
$21.61
($1.75 / TN ) Sherburne County - IW
D6 - Dec
CU
Contarnmated Soil Tom
01-967792
12.50TN
$35.00
$437.50
Reference: I
Contract: 23-292-1 Joint Powers Water Board
06- Dec
E2
Environmental Fee
SC3159418
1.00
$10.00
($10.00 / Ticket)Environmental Fee-10
06 - Dec
SH
Sherburne County - IN
SC31S9420
1.00
$21.88
($1.75 / TIN ) Sherburne County - IW
07 - Dec
CU
Contaminated Soil Tom
01-967841
12.40TN
$35.00
$434.00
Page 46 of 85
vorcci if, LLC
15301 140th A,,enue SE
Becker, Mal 55308
PHONE: (763) 262-8662
INVOICE NO.
yQ77604 1
_YZ0009
FW. V63) 428-1334
PAGE
DATE
Dec.-10-23
CUSTOMER NO.
REFERENCE NO,
CONTRACT
mstwaterfilter�,
MUNICIPAL BUILDERS NC
7900 VIKING BLVD
NOWTHEN, MN 553,J3
9,935.19
I
L- _ ___
. - . . - . _
SERVICE
DATE CODE DESCRIPTION REFERENCE QTY. RATE AMOUNT
ReFerence:
Combed: Water Board
07 - Dec
E2
Erwironmental Fee
SC3159448
1.00
$10.00
($10.00/Ticket)Envirowimental Fee-10
07 - Dec
SH
Sherburne County - IN
SC3159450
1.00
$21.70
($1.75 / TN ) Sherburne County - IW
07 - Dec
CU
Contaminated Soil Tom
01-967867
12.09TIN
$35.00
$423.15
Reference:
Owbact: 23-292-1 Joint Poers Water Board
07 - Dec
E2
Environmental Fee
SC3159436
1.00
$10.00
($10.00 / Ticket )Erwircirmaintal Fee-10
07 - Dec
SH
Sherburne County - IN
SC3159438
1.00
$21.16
($1.75 / TN ) Sherburne County - IN
07 - Dec
CU
Contaminated Soil Tom
01-967893
12.90TN
$35.00
$451.50
Rellerence:
Contract 23-292-1 Joint Poe,s Water Board
07 - Dec
E2
Environmental Fee
SC3159439
1.00
$10.00
($10.00 1 Ticket)EnvIronmental Fee -ID
07 - Dec
SH
Sherburne County - 1W
SC3159441
1.00
$22.58
($1.7S / TN ) Sherburne County - IW
07 - Dec
CU
Contaminated Soil Tom
01-967926
12.83TN
$35.00
$449.05
Reference:
Contract: 23-292-1 Joint Powers Water Board
07 - Dec
E2
Environmental Fee
SC3159442
1.00
$10.00
($10.00 / Ticket )Environmental Fee-10
07 - Dec
SH
Sherburne County - IN
SC3159444
1.00
$22AS
Page 47 of 85
;5-3,0-1,1,410-th-Avenue SE
Becker, MN 55308
PHONE: (763) 262-8662
INVOICE NO.
V2 0 73
FAX: (763) 428-1334
PAGE
5
DATE
Dep-16:23
CUSTOMER NO.
... ...
14782
REFERENCE NO.
CONTRACT.
MUNICIPAL BUILDERS NC
7900 VIKING BLVD
NOWTHEN, MN 55303
TOTAL INVOICE 9,935.19
;ERVICE
DATE CODE DESCRIPTION REFERENCE CITY. RATE AMOUNT
($1.75 / TN ) Sherburne County - IW
)7 - Dec
CU
Contaminated Soil Tom
01-967943
12.66TN
$35 Do
$443.10
Reference:
Contract: 23-292-1 Joint Powers Water Board
)7 - Dec
E2
Environmental Fee
SC3159445
1.00
$10.00
($10.00 / Ticket)Ervironmental Fee-10
Y7 - Dec
SH
Sherburne County - IW
S0159447
1.00
$22.16
($L75 / TIN ) Sherburne County - IVV
F - Dec
CU
Contaminated Soil Tons
01-967962
12.93TN
$35.00
$452.55
Reference:
Contract: 23-292-1 Joint Powers Water Board
)7 - Dec
E2
Envir-orimental Fee
SC3159451
1.00
$10.00
($10.00 / Ticket )Emironmental Fee-10
17 - Dec
SH
Sherburne County - rW
S0159453
1.00
$22.63
($1.75 / TIN ) Sherburne County - IN
38 - Dec
CU
Contaminated Soll Tons
01-968006
13.42TN
$35.00
$469.70
Reference: I
Contract: 23-292-1 Joint Powers Water Board
38 - Dec
E2
Environmental Fee
SC3159454
1.00
$10.00
($10.00 / Ticket )Environmental Fee-10
38 - Dec
SH
Sherburne County - IN
SC3159456
1.00
$23.49
($1.75 / TN ) Sherburne County - IN
D8 - Dec
CU
Contaminated Soil Tons
01-968024
13.43TN
$35.00
$470.05
Rellerence:
Contract: 23-292-1 Joint Powers Water Board
08- Dec
E2
Environmental Fee
SC3159457
1.00
$10.00
Page 48 of 85
Vonco 11, LLC
15301 140th Avemue SE
Becker, MN 55308
PHONE: (763)262-8662
INVOICE NO.
FAX: (763) 428-1334
PAGE 6
- - - ------ ---
DATE Dec-10-23
CUSTOMER N 0. 147 82
REFERENCE NO.
CONTRACT
MUNICIPAL BUILDERS NC
7900 VIKING BLVD
NOWTHEN, MN 55303
TOTAL INVOICE 9,935-19
--- - ------------ - — I . —.-
SERVICE
DATE CODE DESCRIPTION REFERENCE QTY. RATE AMOUNT
($10.00 / Ticket )Environmental Fee-10
08- Dec
SH
Sherburne County - IW
SC3159459
1.00
$23.50
($1.75 / TN ) Sherlourrue County - IW
08- Dec
CU
Contaminated Soff Tom
01-968OS1
13.55TN
$35-00
$474.25
Reference:
Contract: 23-292-1 Joint Powers Water Board
08- Dec
E2
Environmental Fee
SC3159460
1.00
$10.00
($10.00 / Ticket )Environmental Fee-10
08- Dec
SH
Sherburne County - IN
SC3159462
1.00
$23.71
($1.75 / TN ) Sherburne County - 1W
08- Dec
OU
Contaminated Soil Tons
01-968084
ISAOTN
$35.00
$539.00
Refer�:
Contract: 23-292-1 Joint Powers Water Board
08- Dec
E2
Environmental Fee
SC3159463
1.00
$10,00
($10.00 1 Ticket)Environmental Fee-10
08- Dez
SH
Sherburne Cwnty - IW
SC3159465
1.00
$26.95
($1.75 / TIN ) Sherburne County - IW
10- Dac
13
Industrial Waste .462 T at $0.461TN on 261.36
$120,19
For Questions all Accounting at 763-235-1301 or email nette.oulin@vorcausa.com
Late fee or 1,5% p/morith (18% APR) on all balan� over 60 days start 7/1/Z3.
ITOTAL INVOICEIEEI
Page 49 of 85
-A
SEH
el,ill a Estill
F�- Ail of Us'
TO:
Joint Powers Water Board
FROM:
Christopher Larson
DATE:
January 16, 2024
RE:
2024 General Engineering Services
MEMORANDUM
Attached is an Agreement for the Board's Consideration to authorize the 2024 General Engineering
Budget for SEH. The proposed time and materials fee is $24,000 which is Consistent with the previously
authorized budget item.
General engineering has typically included tasks such as ASIR Support, WAC calculations, and well
rehabilitations. The tasks will be performed on a time and materials basis and the budget will not be
exceeded without addiltional authorization.
engineers I Architects, I Pianners I Scientists;
Shod i Hendrickson Inc., 35nVadross Center Crive, St. Paul. MN 5511(l
651.490.2000 1 NO.325,2055 1 M.908.8166 fax I sehinc.com
Sl is 100% carriployee-ownear I Afflaral Action-Equo[OpWitunity Erepil
Page 50 of 85
Agreement for Professional Services
This Agreement is effective as of January 22, 2024, between Joint Powers Water Board (Client) and Short Elliott
Hendrickson Inc. (Consultant).
This Agreement authorizes and describes the scope, schedule, and payment conditions for Consultant's work on
the Project described as: 2024 General Engineering Services
Client's Authorind Representative: John SelferL General manager
Address: 11100 50th Street NE, AJbertville, IVIN 55301
Telephone; 619.193,783 email: Johnseifert(iDveoliacorn
Project Manager: Christopher Larsen
Address: 3535 Vadnais Center Drive, Saint Paul, IVIN 55110
Telephone: 952.905.1212 email: clarsonCsehinc.com
Scope: The Basic Services to be provided by Consultant as set forth herein are provided subject to the attached
General Conditions of the Agreement for Professional Services (General Conditions Rev. 05.15.22), which is
incorporated by reference herein and subject to Exhibits attached to this Agreement.
General water engineering consulting on an "as needed" basis on tasks as requested by Joint Powers Water
Board, operations staff, or member communities. The types of tasks could include activities such as well
rehabilitation, ASIR support, WAC determinations, water appropriation support, and other general engineering
tasks.
Schedule: Through January 31. 2025
Payment: The fee shall be time and materials and is subject to a not -to -exceed! amount of $24,000 including
expenses and equipment. The payment method, basis, frequency and other special conditions are set forth in
attached Exhibit A-1.
This Agreement for Professional Services, attached General Conditions, Exhibits and any Attachments
(collectively referred to as the 'Agreemenf) supersedes all prior contemporaneous oral or written agreements and
represents the entire understanding between Client and Consultant with respect to the services to be provided by
Consultant hereunder. In the event of a conflict between the documents, this document and the attached General
Conditions shall take precedence over all other Exhibits unless noted below under "Other Terms and Conditions".
The Agreement for Professional Services and the General Conditions (including scope, schedule, fee and
signatures) shall take precedence over attached Exhibits. This Agreement may not be amended except by written
agreement signed by the authorized representatives of each party.
Other Terms and Conditions: Other or additional terms contrary to the General Conditions that apply solely to
this project as specifically agreed to by signature of the Parties and set forth herein,
None.
Short Elliott Hendrickson Inc. Joint Powers Water Board
/ -i �--
By:
- 1, ,
—
— By:
Full Name*
Christopher Larson
Full Name:
Title:
Engineer
Title:
Short Elliott Hendrickson Inc. Letter Agreement - 1 Joint Powers Water Board
�rmafive Action, Equal Opp�nity Employer (Rw. 04.01.24)
Page 51 of 85
Exhibit A-1
to Agreement for Professional Sewices
Between Joint Powers Water Board (Client)
and
Short Elliott Hendrickson Inc. (Consultant)
Dated January 22, 2024
Payments to Consultant for Services and Expenses
Using the Hourly Basis Option
The Agreement for Professional Services is amended and supplemented to include the following agreement of the
parties:
A. Hourly Basis Option
The Client and Consultant select the hourly basis for payment for services provided by Consultant. Consultant
shall be compensated monthly. Monthly charges for services shall be based on Consultant's current billing
rates for applicable employees plus charges for expenses and equipment.
Consultant will provide an estimate of the costs for services in this Agreement. It is agreed that after 90% of
the estimated compensation has been earned and if it appears that completion of the services cannot be
accomplished within the remaining 10% of the estimated compensation. Consultant will notify the Client and
confer with representatives of the Client to determine the basis for completing the work.
Compensation to Consultant based on the rates is conditioned on completion of the work within the effective
period of the rates. Should the time required to complete the work be extended beyond this period, the rates
shall be appropriately adjusted.
B. Expenses
The following items involve expenditures made by Consultant employees or professional consultants on
behalf of the Client. Their costs are not included in the hourly charges made for services but instead are
reimbursable expenses required in addition to hourly charges for services and shall be paid for as described
in this Agreement:
1 . Transportation and travel expenses.
2. Fees paid, in the name of the Client, for securing approval of authorities having jurisdiction over the
Project.
3. Plots, Reports, plan and specification reproduction expenses.
4. Postage, handling and delivery.
5. Renderings, models, mock-ups, professional photography, and presentation materials requested by the
Client.
6. Other special expenses required in connection with the Project.
7. The cost of special consultants or technical services as required. The cost of subconsultant services
shall include actual expenditure plus 10% markup for the cost of administration and insurance.
The Client shall pay Consultant monthly for expenses.
C. Equipment Utilization
The utilization of specialized equipment, including automation equipment, is recognized as benefiting the
Client. The Client, therefore, agrees to pay the cost for the use of such specialized equipment on the project.
Consultant invoices to the Client will contain detailed information regarding the use of specialized equipment
on the project and charges will be based on the standard rates for the equipment published by Consultant.
The Client shall pay Consultant monthly for equipment utilization.
Short Elliott Hendrickson Inc. Letter Agreement - 2 Joint Powers Water Board
(R�. (Ni.01.24)
Page 52 of 85
General Corldrdons of the Agreement for Professional Services
SECTtON I — SERVICES OF CONSULTANT
A. Gerearral
I C�ulmtagm�IOPW�V�wimW�Mms�WfoMin�e
Agreement for Professional SmAm� or Soppismantal Letter
Agreement (hSeNces'). Nothing sontmed! in this Agreement shall
oneale a wrtuddlosed relationship wth or a mum of action in fa� a a
tNrdp�yagainMe�er�eCileMaMeConsU�t The
Corsultart's serwes; under Mis Agregarent are being patfooned
solely V the Clients bernallit, and no enter party or enti"a haw
my daim .9mrst ths Commuting theme. of this Agreement or the
perfamante or non,perfornomm ofeerome, hereunder,
B. Schedule
l.UnlenW�opedoft�time�4*esf�pr�ingseM�Me
Is W 8 period o,ish may reasonathty be required forthe mropletion
of said Senrices.
Z IfClient has restested charges in Me empe, mtenl� or character of
the Projeet or the Services to be prowed! by Consultant, has time a
performance and sompereagion for Me Somme step be adjusted
equitablY The Client agrees that Consulate is W res,ponstble for
damages arlefing, dreelly or indkedly Mum delays beyond
Comultant's control. If Me delayonessultire, from such muma
forams Me met or Me hire required! by Consultant to Perporm Me
Services In amordarom m4th professional Wh and game, than
Consultant shall be entitled to a e,usable adjustment in schedule and
compermalkin.
C. Adeftlonal SMMm.
1� If Cormultant determines Met any senAme, ft has been directed or
reseeded! to performl am beyond the mom as ad forth in Me
Agreement M Mat, due to stangedl conditions or changoa In the
method or manner of administration of me Projed, Consultant's afffien
required to perform its sermces mom this Agrees, art tomeds the
stated fee for Me Serwess, than Consonant shall promptly nobly the
Client regarding Me meel Jur additional Services, Upon rimi
and h the absence of a witten objection, consultant Most be entitled]
to additional corepensedon for Me additional Servuums mul to an
andersion of Wee for moplation of sectional Services theme ritten
object. by Client.
2 Additional Sermom, need, dalivery of document, CAD gles, or
information net sapiently Included! as delihenabhes, shall Is billed in
mourd wth agreed upon hame, or if not addressedi Men at
Comulthent's standard rates,
D. Suspension and Termination
1. IfConsultants sermses, am delayed or suspended! in whole M in part
by Client, or K Consultant's setwes are delayed by Moore or
inamons a ogrens for mom Man 60 days through no foult of
Consultant then Consultant shall be enfilged to other laminate its
agreement upon swen days written notes or, at Its option, amept an
equitable adjustment of mopermation prewuledl for eftgu�lhere in this
Agreement to rated cose inwhed by Consultant.
Z This Agreement may be terminated by mther party upon sems, days
enriffien notice dhoutc! he other party fal submudially to perform in
amemance efth IN terms through no foult ofthe party Initialing the
thendration.
3. This Agreement may be terminated by sither party .,pon thirty days'
�nften notice without came. All prowlers of this Agreement
allocaffile, responsibility or liability betemen Me Client and Consultant
shall sunAw Me gornpletion of the services heretuler andfor Me
hammed. orthrefteemerd.
4. In Me owner of teraination, Commment shall be for
SomXces performed prior to tannination clate, Included mar,,ge for
.P.. and equipment mat. Men due and all thenummon
expenges.
SECTION 11 — CLI ENT RESPONSIBILITIES
A. Chirmiral
I.TheCkemshah. inpropertimeardsequeneardwhereawnwrime
to the Project, at no eMpents to Consultant. pr�fdetll irtformation
as to Client's requitements feathe SarrAmeprowedl by Consultant
and amem to at I public and priwtelamis isquingel for consultant to
Pan. its Sande..
(Re, 05.15.22)
2 TIm Command is net a municipal scheme and therefore Client shall
pmmde by oem legal, demanding, financial and insurance counseling,
and Wher almost smwtes as may he requirsel forthe Proeol_ Cherat
shall provid. I. Corsultmt all data (and professional firderPramfl.ne
therool) paparecl by or seNom perform got by others permsent to
conoultant's semma, susilh as previous rep.d.; u,-gurm.
exp(mal laboratory tests and remotion a Munples;
emo . ronmental assessment and issued shatements, surveys, property
deseriptiors, zoning; dem; and other land use rmdrudtons� mIbugg
chmmngs; and demorrie data Imse and numps. The made associated
elin comedfing. chadn, or recormarn, any data that Is ph�dsd by the
Client Mat contains inacturate or umumble Information shall be the
responalelly ofth. Cultist.
3. Client shed! promde prompt written notice to Consultant Whenewr Me
Client obserwa, or otherofise thmseres amare of my changes in Me
Protest a my dahol in Consellort's Sermoes, Offent shall proarptly
emorme all studies, reports. alumhes, opinions of construction costs.
speciffloodarm, snowl,s, ph,osaft, ginang. more, supplemental
agreements, and other docunnents presented by consultant and
hander Me hammer, decisions " Instructions so that Consultant
may pnenW. Senwee in . finally reanner.
4. client shan mum all ufflifies eath impulse Wthin Me Project site to
[=Me and maric aid Wiffies upon moved, rehombe anchor proteet
said Milides to accommoolate � of the Preed, submit a schedule
of Me hummer, aofivim� to the Client for
newe�. and cooply WM agmed upon sdunsule. Coreutrant shall nue
be lines for damages Whith edge out of Conanduht's reasonable
halance on Me Information or serwes furnisined by Willies to Client
or othma hired by Client.
5. Conauttant shall be orbited to rely on Me =mwy and completeness
of Inflarefien or sei sentiment by the Client or others employed!
by Me Client and shall net be liable ger damages arm, froon
reasonable reliance W such materials. Consullars drug them ptly
notly Me Client IT ConstAbuit discowhe Met any Information or
serAme finerishes, by the Client is in wor or Is inadequate for its
,,.a.
made by Cametuftard's employees hill to inappropriate or
unnevelmosec! action; by Client or Client's aroploymes, or agents. This
mot agrees
of ft.
mumotion yrith any merplamis made by Chad's employesis.
Client acloceledges Mat Consultant has experedet! eignificant offied
and vc,perse in hearing and develo,,ing Consultanfs emplo,hesm.
Therefore, cluring the term of this Agmern ent and per a perim of We
years star Me thannimation M this Agreement "a coneplown ofthe
Service� order 019 A,mement, Whichowe is clam shall not
dirmlly or housefly, (1) him, ad elt or encourage my employee of
Consultant to mew the em ploy of Corsudtant; (2) him, solid, or
encourage any consultant or independent contractor to mass worit
�fflh Consultant; or (3) cirournwrt Consultant by concluding, business
dinettly ith im employees The Meyear period! set fern in his
motion shall be eAmdMj sommensmately � any arrount offirre
during which Client has Motated as terms.
SECTION III —PAYMENTS
A. In.k.s;
1. Undisputed Portims ofirwime, am due and payable %Mhn 30 days.
Client mud notify Containing in effing a any disputed gems wiffiin
15da�tommelptath�M.Amomtsd�CmwftN�ibe
incmnedatthe�e&I.Mpwmo�(m�mm�m�eW
int�p�ft�byl..ifl.)f�i.�.30d.y�p�du..
Consultant ressews the told toretain �ma orceirwrables until
Wlhwicw�pa�inUil.Cm��twilndbelloWe�ranydWms
dl.%�i.y.�d..g.byCli.t�..�.f.thhdding
Services. didwrables, ortiestraments ofSerAm urel ad kroaces are
paid in full. Consultant shall be mulled to moowr al reasonable
Page 53 of 85
costs and disbursements, Inducing reasonable afformy's fees,
briciared! In connection aM collecting amounts ceed by Clent.
2 &ould taxes. pass or come be Imposed. they and loe in ellifflon to
Consuftant's agreed! upon con,ensifflon.
3. hlolt�dpstamffng anything to &a contrary berm, Consultant may
pursue collection cdpast due invaces without the recently of any
model. proceedings
SECTION IV — GENERAL CONSIDERATIONS
A. StandardsoliPerikomnam.
I�The standard c4cmefor up professional engineering and heated
semon perforned or furnished by Comi.illard, underhis Agreement
WH be me care and skill ongnarly examsed by members of
Corculthal preassich predicting under similar dicurnstances at Me
wine Ume and in me same locality. Consultant makes no immanifice,
mprees or Implied, under has Agrement a othermse, in connection
Mith He S.N.a.
Z Consultant neither Rumanians Me performance of my Contractor nor
assumes rosporeflaWor any Contodors Nature to furnigi and
conform the � in accordance fth Its construction cormad, or me
comemiction documents prepared by Corauftmt� Client
aclomailedges Consultant will mit dred, supervise orsontrol ffiework
demstrudon contractors orlder au"a"hoome al he afte or
offiergise, Conaliftent Mat hme, no auffirrity inmr or responsibility for
the ads or colsil nor for Is name. in shodece
procedures a construction. Consulount's Services do not holude
revfe� or ei,aluallon & me Cliends, compactvs or subsontrill
safety measures. orjob site as* or furrishing or peroming my of
the Contradur'. aior,�
3. Consultants opinions of Probinle Construction Coal am promed If
agmed! upon M asking and made on the bats offCcruaftera's
experience and quetications. Consultant has no control cnmr the cost
of labor, matmah, es,uipment or ser/ce fimnighed by others, or c,ne
the Contract&s methods of determining ones, a �r compatihm
ladiffing or mark& counfiffims, Consultant cannot and does not
guarantee Mat opposes. bid. or du� coramuchon cost will not
very form opinions of probable Construction Coal prepared by
Consultant If Client entries greater assamme as to construction
costs, Clied strall employ an Independent ocs, estimator.
B. Indemnity for ShWonmental Issues
1. Consultant is not a user. generator handler, operator, manger,
domer. transporter. or disposer of hand1we orloac substances.
Therefore Me Client agrees to hold murgess, Indemnity, and depend
Consultant and Comultant c officars, directors, calloonsliftant(s),
employees and agents from and agained my and all claims; casm;
damages,. liability; and costs, including bid not limited to casts, of
defense, mining out of or In any �ay connected with, he presence,
discharge, meacce, or escape of Insomniacs or maic hbeences,
,ollutarts or containments of any kind at Me site.
C. Limitations on Liability
1. The Clara hardly agnew that to the fulling extend parrodual by lam,
Consument's tood liability to Me Cited for A injurics, gains, losse,
expenses, or dam ages whatecei marm out of or In any ray
related to Me project "is Agreement had my cause or causes
Including, but not limited to, Corawlicart a negligence, more,
ornissione, end ob,[Ay, boach of contract or breach f.t,
shaq not exceed five hundred thousand colors (S�,YX)). In the
ivmt Client desir. finits of liability in an d Mo. prawkded! in
his paragraph, Client gual achin Consithant in manting and agree
Met Cormulands fee shall increase by 1% far each addifticand five
hundred thousand dollars of liability limits. up to a maximum lend a
liability of" million dollars
Z Neither Party sholl be liable to Me other for wranharri . al damages,
Including effiout finnitation lost rentes; Increased metal expenses;
Ion of use loss of Income; log proffit. financing, normal or
reputation; and lose ofmansignment or employee procitmtrAy,
incurred by we mother a theIr subsidiaries or
regardless ofetrethe such damages me foreseeable and are cumead
by breach of contract, mistful misconduct, negligent ad or mission, or
other wongful ad of dher offfienn. Consultant normally disclaims
my duty 1. defend Client for any aimed! actions or darm,..
3. It is intended by Me parties to his Agreement Met Consuland's
Sennne, gat m: gibJect Consuflaint'. employees officers or
clinect. to my concinad legad ,wm for me mka namoded MM
his A,noserent. The Client grace Me a. the ClIent's act. and
exclumie real any dean demand or suit shall be directed andfor
(Rev. 05.15.22)
needed mly agand Consultant, and not stated any of Consultant's
IndWMd amployess. officers ca directors, and Client lonowingly
�msws all won daims against Conslifthand indirMug eamployees,
0. or directors.
4. Causes of ntion betoemn Me parties to his Agreement imagining to
acts in Ishmael to ad Mat be deemed to have accrued, and the
applicable statudes oflimpgons cluall cornmence to hun, not later
Man center Me dide of Eiulbatential Completion for ads or Uterine to
ad occurring prior to sutigaidal completion or Me data of issuance of
the final invoice for ads or falumes to ad ocninn, after Substantial
Completion In no meent mall such stakides of limitations cornmence
to run any War Man Me date v%ihen Me �rmces are substantially
cm, a .
D. Assignment
1. Neither party to this Agreement shop marefter, suble, or assigh my
rights under, a Interests in, this Agreement or claims based on his
Agleam ent witmat Me prior writhen consent of Me offier Isafty. AM
angam ent in violation offlig whsedon shall be null and vog.
E. Dispute Resolution
1.Any dispute beWeen Client and Comintern among out of or misting
to this Agreement or Me �cea (except for whiled irrvoices which
ans ,cemed by Section 111) shall be submitted to negation as a
precondition to litigation unless Me pectin routtialty agree othervispe.
Whiallom shall occur,ghin W days ofa eaffien demand for
madman unless Consultant and Client mutually agree othermse.
ZAry decide not ciabled Mini ined.fim mall be settled through
litigation in Me shathe and county where the project at issue is located.
A. proprietary Information
1. At documents, adualing reports, chl calculations,
Medications, CAD materials, cormucers aofi�rare or handsim or
chair acir, product prnmed by Consultant parsuent to his
Agreement ars, Comickad's Instruments of Smice ('Instruments of
�e`). Consultant Where all �eralvp interests in instruments of
Sewce, Including all armllable cWydghts.
2 hictoviffistanch, anything to the contray, Consultant shol reign all of
its rigints in its proprietary information Including without Inflotion he
medhooloNles am methods of arralpis, wen, concepts.
.preamon., imention., know h., method., tecthrikun, dalls,
Rnmiedge, and eponerms possamand by Comehand prior to, or
acquired by Consultant during, me performance of me Agnsen end
and Me sam a shall not be devoted to be work, product or eoil, for him
and Constilhant glaq not be regarded In my � wiffi rasped Margo.
Consonant shall main full rights to electronic date and Me dramims,
specifications. Including those in electronic fionn. prepared by
Consultant and its subconsucants am the night to reuse component
information contained in them in the normal course of Connitant's
Professional activities.
B. Clinrldtlim.finstrumentsoftlemice
1. Prormed Met Consultant has been paid In Nil for its �oes, Client
shall Niw Me right m he Nod of a nonexclusive license to on
Instruments of Scroll delivered to Client eschughmy for purposes of
cohnniefing. using, mahmaI aftering and adding to Me project.
Consultant athall be cleared to be the author of such Instruments of
�e, electronic can or documents, and shall be given appropriate,
credit In my public display of such Instruments of Service.
Z Records recluses w rexpieds, for additional copies of Instruments of
SerMcce wWde of the scope of Senices, Including subpoenas
directed from or on behalf of Client are an,gable to Client subject to
CmWtwt*s darent We smeckle. Consultant chat! not be rmuirm
to proiM. CAD has or docurnents und., ledecall, ligneed to in
anitting.p.d.ftmaAgnmerent.
C. Reus.ofD.c.m.nta
l.Alin�m�sd$�epwwedbyConsdtwtpum=ttothIs
Agreement ars, notintended orrepremartedtobasuitablefor reuse
byMeCflmt crollmers onextensionsome Forclector on my other
Pr��t�yremed�el�mWsdS�e�oU�m
concert a adaptation by Consultant for Me specific notion intended!
Wlbeg�CUmVs�e�mdW�MliabOkyorlegalenwumto
Consultant and Me Client sinall release Consultant Man all daime
willing form such on. Chand shall also defend, indemnify, and hold
harmless; Consultant from all claims, damages, loans. and expenses
including alficanneys' fees maing old of or resulting firan muse off
Conedtard documents �fthout �rfflan consent
Page 54 of 85
Decembei-7,2023
Board of Directors
Joint Powers Board of Albertville, Hanover and St. Michael
Albertville, Minnesota
We are pleased to confirm our understanding of the services we are to provide the Joint Powers Board of Albertville,
Hanover and St. Michael (the JPWB) forthe year ended December 31, 2023.
Audit Scope and Objectives
We will audit the financial statements of the business -type activities and the aggregate remaining fund information, and
the disclosures, which collectively comprise the basic financial statements of the JPWB as of and forthe year ended
December 31, 2023. Accounting standards generally accepted in the United States of America (GAAP) provide for certain
required supplementary information (RSI), such as management's discussion and analysis (MD&A), to supplement the
JPWB's basic financial statements. Such information, although not a part of the basic financial statements, is required by
the Governmental Accounting Standards Board who considers it to be an essential part of financial reporting for placing
the basic financial statements in an appropriate operational, economic, or historical context. As part of our engagement,
we will apply certain limited procedures to the JPWB's RSI in accordance with auditing standards generally accepted in
the United States of America (GAAS). These limited procedures will consist of inquiries of management regarding the
methods of preparing the information and comparing the information for consistency with management's responses to
our inquiries, the basic financial statements, and other knowledge we obtained during our audit of the basic financial
statements. We will not express an opinion or provide any assurance on the information because the limited procedures
do not provide us with sufficient appropriate evidence to express an opinion or provide any assurance. The following RSI
is required by GAAP and will be subjected to certain Ilm lied procedures, but will not be audited:
. Management's Discussion and Analysis
In connection with our audit of the basic financial statements, we will read the following other information and consider
whether a material inconsistency exists between the other information and the basic financial statements, or the other
information otherwise appears to be materially misstated. If, based on the work performed, we conclude that an
uncorrected material misstatement of the other information exists, we are required to describe it in our repo rt. .
. Introductory Section
The objectives of our audit are to obtain reasonable assurance as to whether the f inancial statements as a whole are free
from material misstatement, whether due to fraud or error, issue an auditor's report that includes our opinion about
whether your financial statements are fairly presented in all material respects, in conformity with GAAP, and report on the
fairness of the supplementary information referred to in the second paragraph when considered in relation to the financial
statements as a whole. Reasonable assurance is a high level of assurance but is not absolute assurance and therefore is
not a guarantee that an Bud it conducted in accordance with GAAS wil I always detect a material misstatement when it
exists. Misstatements, including omissions, can arise from fraud or error and are considered material if there is a
substantial likelihood that, individually or in the aggregate, they would influence the judgment of a reasonable user made
based on the financial statements.
Edina office Mankato Office Scottsdale Office
5201 Eden Avenue, Ste 250 100 Warren Street, Ste 500 14500 N Nonnsight Blvd, Ste 233
Edina, MN 55436 Mankato, MN 56001 Scottsdale, AZ 85260
1 whi in,) i h, poth fu,,,,u,d P 952S35MIA) P 507625.2727 P 48oS64SS79
Page 55 of 85
December7,2023
Page 2
Auditor's Responsibilities for the Audit of the Financial Statements
We will conduct our audit in accordance with GAAS and will include tests of your accounting records and other
procedures we consider necessary to enable us to express such opinions. As part of an audit in accordance with GAAS,
we exercise professional judgment and maintain professional skepticism throughout the audit.
We will evaluate the appropriateness of accounting policies used and the reasonableness of significant accounting
estimates made by management. We will also evaluate the overall presentation of the financial statements, including the
disclosures, and determine whether the financial statements represent the underlying transactions and events in a
manner that achieves fair presentation. We will plan and perform the audit to obtain reasonable assurance about whether
the financial statements are free of material misstatement, whether from (I ) errors, (2) fraudulent financial reporting, (3)
misappropriation of assets, or (4) violations of laws or governmental regulations that are attributable to th e government
or to acts by management or employees acting on beha If of the government.
Because of the inherent limitations of an audit, combined with the inherent limitations of internal control, and because we
will not perform a detailed examination of all transactions, there is an unavoidable risk that some material misstatements
may not be detected by us, even though the audit is properly planned and performed in accordance with GAAS. I n addition,
an audit is not designed to detect immaterial misstatements, or violations of laws or governmental regulations that do not
have a direct and material effect on the financial statements. However, we will inform the appropriate level of
management of any material errors, fraudulent financial reporting, or misappropriation of assets that comes to our
attention. We will also inform the appropriate level of management of any violations of laws or governmental regulations
that come to our attention, unless clearly inconsequential. Our responsibility as auditors is limited to the period covered
by our audit and does not extend to any later periods for which we are not engaged as auditors.
We will also conclude, based on the audit evidence obtained, whether there are conditions or events, considered in the
aggregate, that is ise substantial doubt about the JPWB's ability to continue as a going concern for a reasonable period of
time.
Our procedures wil I i nclude tests of documentary evidence supporting the transactions recorded in the accounts, tests of
the physical existence of certain assets, and direct confirmation of receivables and certain assets and liabilities by
correspondence with selected customers, creditors, and financial institutions. We will also request written representations
from your attorneys as part of the engagement, and they may bill you for responding to this inquiry.
We may, from time to time and depending on the circumstances, use third -party service providers in sewing your account.
We may share confidential information about you with these service providers but remain committed to maintaining the
confidentiality and security of your information. Accordingly, we maintain internal policies, procedures, and safeguards to
protect the confidentiality of your personal information. In addition, we will secure confidentiality agreements with all service
providers to maintain the confidentiality of your information and we will take reasonable precautions to determine that they
have appropriate procedures in place to prevent the unauthorized release of your confidential information to others. I n the
event that we are unable to secure an appropriate confidentiality agreement, you will be asked to provide your consent prior
to the sharing of your confidential inform ation with the third -pa rty service provider. Furthermore, we wi 11 remain responsi ble
for the work provided by any such third -party service providers.
Our audit of the financial statements does not rel ieve you of your responsibilities.
Abd.S.M,.�� ��,
IM
Page 56 of 85
December 7,2023
Page 3
Audit Procedures -Internal Control
We will obtain an understanding of the government and its environment, including the system of internal control, sufficient
to identify and assess the risks of material misstatement of the financial statements, whether due to error or fraud, and to
design and perform audit procedures responsive to those risks and obtain evidence that is sufficient and appropriate to
provide a basis for our opinions. The risk of not detecting a material misstatement resulting from fraud is higher than for
one resulting from error, as fraud may involve collusion, forgery, intentional omissions, misrepresentation, or the override
of internal control. An audit is not designed to provide assurance on internal control or to identify deficiencies in internal
control. Accordingly, we will express no such opinion. However, during the audit, we will communicate to management
and those charged with governance internal control related matters that are required to be communicated under AICPA
professional standards.
We have identified the following significant risk(s) of material misstatement as part of our audit planning, however, 11
should be noted that our planning procedures are not concluded and therefore additions or modifications may be made to
the below significant risks:
• Management Override of Controls
• Improper Revenue Recognition
Audit Procedures -Compliance
As part of obtaining reasonable assurance about whether the financial statements are free of material misstatement, we
will perform tests of the JPWB's compliance with the provisions of applicable laws, regulations, contracts, and
agreements. However, the objective of our audit will not be to provide an opinion on overall compliance and we will not
express such an opinion.
Other Services
We will also prepare a general ledger trial balance for use during the audit. Our preparation of the trial balance will be
limited to formatting information in the general ledger into a working trial balance. As part of the audit, we will assist with
preparation of your financial statements of the JPWB in conformity with U.S. generally accepted accounting principles
based on information provided by you. We will also use the financial statements to complete the Office of the State
Auditors' Reporting Form s. We will accumulate capital asset information and calculate the depreciation based on lives
and methods determined by management. We will also assist with year end accrual entries from information provided by
management.
We will perform the above services in accordance with applicable professional standards. The other services are I imited
to the financial statement services previously defined. We, in our sole professional judgment, reserve the rig ht to refuse to
perform any procedure or take any action that could be construed as assuming management responsibilities.
We may advise management about appropriate accounting principles and their application, and we may assist you in the
assembly of your financial statements. However, management has the final responsibility for the selection and
application of accounting policies and the fair presentation of financial statements that reflect the nature and operations
of the JPWB. You agree to assume all management responsibilities for the financial statement preparation services and
a ny other nonattest services we provide, oversee the services by designating an individual, preferably from senior
management, with suitable skill, knowledge, or experience; evaluate the adequacy and results of the services; and accept
responsibility for them.
Abd.S.1.;,.,�� �.�
Page 57 of 85
December7,2023
Page 4
Responsibilities of Management for the Financial Statements
Our audit will be conducted on the basis that you acknowledge and understand your responsibility for designing,
implementing and maintaining internal controls relevant to the preparation and fa ir presentation of financial statements
that are free from material misstatement, whether due to fraud or error, including monitoring ongoing activities; for the
selection and application of accounting principles; and for the preparation and fair presentation of the financial
statements in conformity with accounting principles generally accepted in the United States of America, with the oversight
of those charged with governance.
Management is responsible for making drafts of financial statements, all financial records and related information
available to us and for the accuracy and completeness of that information (including information from outside of the
general and subsidiary ledgers). You are also responsible for providing us with (1 ) access to all information of which you
are aware that is relevant to the preparation and fair presentation of the financial statements, such as records,
documentation, identification of all related parties and all related party relationships and transactions, and other matters
(2) additional information that we may request for the purpose of the audit, and (3) unrestricted access to persons within
the government from whom we determine it necessary to obtain audit evidence. At the conclusion of our audit, we will
require certain written representations from you about the financial statements an d related matters.
Your responsibilities include adjusting the financial statements to correct material misstatements and confirming to us in
the management representation letter that the effects of any uncorrected misstatements aggregated by us during the
current engagement and pertaining to the latest period presented are immaterial, both individually and in the aggregate, to
the financial statements of each opinion unit taken as a whole.
You are responsible for the design and implementation of programs and controls to prevent and detect fraud, and for
informing us about all known or suspected fraud affecting the government involving (1) management, (2) employees who
have significant roles in internal control, and (3) others where the fraud could have a material effect on the financial
statements. Your responsibilities include informing us of your knowledge of any allegations of fraud or suspected fraud
affecting the government received in communications from employees, former employees, grantors, regulators, or others
In addition, you are responsible for identifying and ensuring that the government complies with applicable laws a nd
regulations and for inform ing us of any events encountered subsequent to the period under audit that may require
adjustment to or disclosure in the financial statements.
With regard to including the auditor's report in an exempt offering document, you agree that the aforementioned auditor's
report, or reference to Abdo, will not be included in any such offering document without our prior permission or consent.
Any agreement to perform work in connection with an exempt offering document, including an agreement to provide
permission or consent, wi 11 be a separate engagement.
You are responsible for the preparation of the supplementary information in conformity with accounting principles
generally accepted in the United States of America (GAAP). You agree to include our report on the supplementary
information in any document that contains and indicates that we have reported on the supplementary information. You
also agree to include the audited financial statements with any presentation of the supplementary information that
includes our report thereon. Your responsibilities include acknowledging to us in the representation letter that (1) you are
responsible for presentation of the supplementary information in accordance with GAAP, (2) you believe the
supplementary information, including its form and content, is fairly presented in accordance with GAAP; (3) the methods
of measurement or presentation have not changed from those used in the prior period (or, if they have changed, the
reasons for such changes); and (4) you have disclosed to us any significant assumptions or interpretations underlying the
measurement or presentation of the supplementary information.
With regard to the electronic dissemination of audited financial statements, including financial statements published
electronically on your welosite, you understand that electronic sites are a means to distribute information and, therefore,
we are not required to read the information contained in these sites or to consider the consistency of other information in
the electronic site with the original document.
A�d�S�Iutior coni
Page 58 of 85
December 7, 2023
Page 5
Engagement Administration, Fees, and Other
We understand that your employees will prepare all cash, accounts receivable, or other confirmations we request and will
locate any documents selected by us for testing.
The audit documentation for this engagement is the property of Abdo and constitutes confidential information. However,
subject to applicable laws and regulations, audit documentation and appropriate individuals will be made available upon
request and in a timely manner to any Regulator or its designee. We will notify you of any such request. If requested,
access to such audit documentation will be provided under the supervision of Abdo personnel. Furthermore, upon request,
we may provide copies of selected audit documentation to any Regulator or its designee. The Regulator or its designee
may intend or decide to distribute the copies or information contained therein to others, including other governmental
agencies.
Andrew K. Berg, CPA is the engagement partner and is responsible for supervising the engagement and signing the report
or authorizing another individual to sign it. We expect to begin our audit in January, 2024 and to issue our reports no later
than June 30, 2024.
Our fee for these services will be as follows:
Audit 16,200
2023 Office of the State Auditor's Reporting Form 875
SASE 87 Leases 2,000
Total
Abdo is offering a discount of $500 should the JPW8 elect to have a pre-recorded audit presentation sent to them in
replacement of a live virtual or in -person presentation at a Board meeting.
American Rescue Plan Act Compliance Testing (if applicable) $ 1,000
SBITA's GASB 96 Implementation (if applicable) $ 2,000
There have been several new accounting standards issued in recent years which will begin taking effect in the current and
following years. These new standards may require substantial changes to your financial statements. We will review with
you during the planning stage and if changes are substantial and you would like our firm to complete this work we will
agree at that time to a separate fee and engagement to complete that work.
The newest standard that will have an effect on the JPWB that is effective for this year's financial statement is GASB's
Accounting Standards number 96 - Accounting for subscription -based information technology arrangements (SBITA).
This new standard is effective for fiscal years starting after June 15, 2022. Given this new standard will have an effect on
your financial statements, there will be additional time spent to adopt this standard in year one. We will assist
management with the implementation of this standard and anticipate that our non -recurring implementation fee for these
procedures will not exceed the tots I shown above. In addition, Abdo has partnered with an accounting software known as
"LeaseCrunch"to assist in the implementation of the new standard and to be utilized on an ongoing basis to ensure you
are in compliance with the new standard post -implementation. The cost of this service is a discounted price of $78 per
SBITA that is in the "LeaseCrunch" system and is billed directly to Abdo from LeaseCrunch on an annual basis. Abdo will
bill you the same amount charged from LeaseCrunch based on the number of SBITA's in your amount. Abdo plans to
utilize this software as part of our procedures and Abdo can either enter information into the system for you to review or
we can give you access to the system to input your own data for which we will review and ensure it is correct. We will
discuss this with you as part of our planning procedures.
In an effort to reduce environmental impact, you will receive printable, downloadable PDFs of your report. To receive one
(1) paper report, you will be charged $150 for a set-up fee. Additional paper copies will be charged at the rate of $50 per
report.
A bd � 3� [� � . ,
Page 59 of 85
December 7, 2023
Page 6
You may also be billed for travel and other out-of-pocket costs such as report production, typing, postage, etc. if not
included in the fee listed above. The fee is based on anticipated cooperation from your personnel and the assumption that
unexpected circumstances will not be encountered during the engagement. If significant additional lime is necessary, we
will discuss it with you and arrive at a new fee before we incur the additional costs. Our invoices for these fees will be
rendered each month as work progresses and are payable on presentation. Amounts not paid within 30 days from the
invoice date will be subject to a late payment charge of.66 percent per month (8 percent per year). Ifforanyreasonthe
account is turned over to collections, additional fees will be added to cover collections cost. In accordance with our Firm
policies, work may be suspended if your account becomes 60 days or more overdue and may not be resumed until your
account is paid in full. If we elect to terminate our services for nonpayment, our engagement will be deemed to have been
completed upon written notification of termination, even if we have not completed our report. You will be obligated to
compensate us for all time expended and to reimburse us for all out-of-pocket costs through the date of termination. The
above fee is based on anticipated cooperation from your personnel and the assumption that unexpected circumstances
will not be encountered during the audit. If significant additional time is necessary, we will discuss it with you and arrive at
a new fee estimate before we incur the additional costs.
Except in the event of your failure to make a payment when due, in the event of a dispute related in any way to our
services, our Firm and you agree to discuss the dispute and, if necessary, to promptly mediate in a good faith effort to
resolve. We will agree on a mediator, but if we cannot, either of us may apply to a court having personal jurisdiction over
the parties for appointment of a mediator. We will share the mediators fees and expenses equally, but otherwise will bear
our own attorri and mediation cost. Participation in such mediation shall be a condition to either of us initiating
litigation. In order to allow time for the mediation, any applicable statute of limitations shall be tolled for a period not to
exceed 120 days from the date either of us first requests in writing to mediate the dispute. The mediation shall be
confidential in all respects, as allowed or required by law, except our final settlement positions at mediation shall be
admissible in litigation solely to determine the prevailing party's identify for purposes of the award of aftorneys� fees. In
the event you fail to make a payment for services or to reimburse for costs advanced by the Firm on your behalf, the Firm
reserves the right to take all legally permissible action, including commencement of litigation in lieu of mediation, and
shall have the right to collect its costs, including reasonable attorney's fees, incurred in any such collection or litigation
activities.
The JPWB acknowledges and agrees that Abdo's (the Contractor) workforce, including employees assigned to staff the
engagement provided for under this Agreement, constitutes an important and vita I aspect of Contractor's business. In
recognition of the foregoing and the harm that Contractor will suffer in the event of the loss of one or more of its
employees, the JPWB agrees that during the Term of this Agreement and for a period of six (6) months following the
termination of this Agreement for any reason (the "Restrictive Time Period") the JPWB shall not, directly or indirectly, on
behalf of itself or any person, firm, corporation, association or other entity, (a) recruit solicit, or assist anyone else in the
recruitment or solicitation of, any of Contractors employees to terminate their employment with Contractor and to
become employed by or otherwise engaged with or by the JPWB in any capacity independent of Contractor, (b) hire or
engage any Contractor employee, or (c) otherwise encourage or induce any of Contractors employees to terminate their
employment with Contractor (collectively the *Contractor Employee Restrictive Covenant').
Notwithstanding the foregoing, Contractor may (but shall not be obligated to) consent to the JPWB's recruitment,
solicitation, employment or other engagement of a Contractor employee otherwise prohibited by this paragraph provided
that (a) the JPWB discloses to Contractor in writing its desire to recruit, solicit, employ or otherwise engage the
Contractor employee independent of Contractor before engaging with the Contractor employee regarding any such
potential relationship; (b) the JPWB agrees to pay Contractor a Restrictive Covenant Exception Fee (as hereafter defined)
in the event the Contractor employee becomes employed by or otherwise engaged with the JPWB independent of
Contractor, and (c) Contractor provides written consent to the JPWB to engage with the Contractor employee regarding
any such relationship. For purposes of this Agreement, the Restrictive Covenant Exception Fee shall be the greater of: (I)
200% of the annual contracted cost of Contractor's services under this Agreement in addition to the annual contracted
cost paid or due Contractor hereunder, or (1!) 200% of the fees pai d or due Contractor for services provided under this
Agreement during the twelve (12) month period immediately prior to the termination of this Agreement or, in the event the
Agreement has not been terminated, during the twelve (12) month period immediately prior to Contractor's provision of
written consent to the J PWB to engage in the recruitment, solicitation, employment or other engagement of a Contractor
employee otherwise prohibited by this paragraph.
Abd�S.Wn.,,� �.r,
Page 60 of 85
December 7,2023
Page 7
In the event Contractor is unwilling to consent to the JPWB's recruitment, solicitation, employment or other engagement
of a Contractor employee otherwise prohibited by this paragraph and/or agree on the JPWB's payment of a Restrictive
Covenant Exception Fee, then the Contractor Employee Restrictive Covenant shall remain in full force and effect. If the
JPWB breaches or threatens to breach the Contractor Employee Restrictive Covenant, Contractor shall be entitled to
injunctive and other equitable relief from a court of competent jurisdiction restraining the JPWB's breach of said covenant
in addition to such other remedies as may be available to Contractor in law and equity, as JPWB as the recovery from
JPWB of Contractor's reasonable attorneys'fees and costs incurred in any such legal action. The JPWB also
acknowledges, understands, and agrees that although the harm Contractor will suffer as a result of the JPWB's breach of
the Contractor Employee Restrictive Covenant cannot be or is very diff icuft to accurately estimate, the sum which is the
greater of (1) 200% of the average annual fees paid by the JPWB to Contractor for services under this Agreement during
the three-year period preceding the breach, or (b) 200% of the employee's average annual compensation during the thre�
year period preceding the breach represents and constitutes a reasonable estimation of the damages to Contractor
caused by JPWS's breach (the "Liquidated Damages Amount"). Therefore, at its sole election, Contractor may elect to
enforce a nd compel the J PWB's compliance with the Contractor Employee Restrictive Covenant or to seek an award from
J PWB of the Liquidated Damages Amount, together with the reasona ble attorneys' fees and costs incurred by Contractor
in connection with any legal action to obtain such relief.
Professional and certain regulatory standards require us to be independent, in both fact and appearance, with respect to
the JPWB in the performance of our services. The JPWB shall not, during the term of this agreement and for the twelve
months following its termination for any reason, without the prior written consent of the Firm, solicit for employment, or
hire any current or former partner or professional employee of the Firm, or any affiliate thereof, if such partner or
professional employee has been involved in the performance of any audit, review, or attest service for or relating to the
J PWB at any time during the then current fiscal year of the JPWB up to and including the date of the audit report for that
year, or in the twelve months preceding the audit report date for the immediately preceding year.
In connection with this engagement. we may communicate with you or others via email transmission. As emails can be
intercepted and read, disclosed, or otherwise used or communicated by a n unintended third party, or may not be delivered
to each of the parties to whom they are directed and only to such parties, we cannot guarantee or warrant that entails
from us will be properly delivered a nd read only by the addressee. Therefore, we specifically disclaim and waive any
liability or responsibility whatsoever for interception or unintentional disclosure of emails transmitted by us in connection
with the performance of this engagement. In that regard, you agree that we shall have no liability for any loss or damage
to any person or entity resulting from the use of email transmissions, including any consequential, incidental, direct,
indirect, or special damages, such as loss of revenues or anticipated profits, or disclosure or communication of
confidential or proprietary information.
We will utilize a portal which is a collaborative, virtual workspace in a protected, online environment. The portal permits
real-time collaboration across geographic boundaries and time zones and allows us and you to share data, engagement
information, knowledge, and deliverables in a protected environment. In order to use the portal, you may be required by
the provider of the portal to execute a client portal agreement and agree to be bound by the terms, conditions, and
limitations of such agreement. You agree that we have no responsibility for the activities of the portal and agree to
indemnify and hold us harmless with respect to any and all claims arising from your misuse of the ponal.
We are not a host for any of your information. You are responsible for maintaining your own copy of this information. We
do not provide back-up services for any of your data or records, including information we provide to you. Portals are
utilized solely as a method of transferring data and are not intended for the storage of your information. Information on a
portal may be deleted by us.
A�d.S.M,�,, �
56:0
Page 62 of 85
December7,2023
Page 8
If you decide to transmit your confidential information to us in a manner other than a secure portal, you accept
responsibility for any and all unauthorized access to your confidential information. If you request that we transmit
confidential information to you in a manner other than a secure portal, you agree that we are not responsible for any
liability, including but not limited to, (a) any loss or damage of any nature, whether direct or indirect, that may arise as a
result of our sending confidential information in a manner other than a secure portal, and (b) any damages arising as a
result of any virus being passed on or with, or arising from any alteration of, any email message.
State, federal and foreign regulators may request access to or copies of certain workpapers pursuant to applicable legal
or regulatory requirements. Requests also may arise with respect to peer review, an ethics investigation, the sale of your
organization, or the sale of our accounting practice. If requested, access to such workpapers will be provided under the
supervision of firm personnel. Regulators may request copies of selected workpapers to distribute the copies o r
information contained therein to others, including other governmental agencies.
If we receive a request for copies of selected workpapers, provided that we are not prohibited from doing so by applicable
laws or regulations, we agree to inform you of such request as soon as practicable. You may, within the time permitted for
our firm to respond to any request, initiate such legal action as you deem appropriate, at your sole expense, to attempt to
limit the disclosure of information. If you take no action within the time permitted for us to respond, or if your action does
not result in a judicial order protecting us from supplying requested information, we may construe your inaction or failure
as consent to comply with the request.
If we are not a party to the proceeding in which the information is sought, you agree to reimburse us for our professional
time and expenses, as well as the fees and expenses of our legal counsel, incurred in responding to such requests.
We have the right to withdraw from this engagement, at our discretion, if you do not provide us with any information we
request in a timely manner, refuse to cooperate with our reasonable requests or misrepresent any facts; we have reason
to believe you may have engaged, or may be planning to engage, in conduct that is unethical and/or unlawful; you engage
in conduct directed toward or affecting firm personnel that is disrespectful, inappropriate, and/or potentially unlawful; or
we determine that continuing the engagement is not in the best interests of the firm or threatens legal or repurtational
harm to the firm. In the event of withdrawal under any of these circumstances, such withdrawal will release us from any
obligation to complete your report and wil I constitute completion of our engagement.
Assisting you with your compliance with the Corporate Transparency Act ('CTA), including beneficial ownership
information ("BOI") reporting, is not within the scope of this engagement. You have sole responsibility for your compliance
with the CTA, including its BOI reporting requirements and the collection of relevant ownership information. We shall have
no liability resulting from your failure to comply with CTA. Information regarding the BOI reporting requirements can be
found at https://�.fincen.gov/boi. Consider consulting with legal counsel if you have questions regarding the
applicability of the CTA's reporting requirements and issues surrounding the collection of relevant ownership information.
Reporting
We will issue a written report upon completion of our audit of the JPWB's financial statements. Our report will be
addressed to the Board of the J PWB. We cannot provide assurance that an unmod !tied opinion will be rendered.
Circumstances may arise in which our report may differ from its expected form and content based on the results of our
audit. Depending on the nature of these circumstances, it may be necessary for us to modify our opinions, add a separate
section, or add an emphasis -of -matter or other -matter paragraph to our auditors report, or if necessary, withdraw from
this engagement. If our opinions are other than unmodified, we will discuss the reasons with you in advance. If, for any
reason, we are u nable to complete the audit or are unable to form or have not formed opinions, we may decline to express
opinions or withdraw from this engagement. You agree to include our audit report in any document containing financial
statements that indicate that such financial statements have been audited by us and, prior to inclusion of our audit report,
to ask our permission to do so.
Abd�S�U,� �. .,
WJ
Page 62 of 85
December7,2023
Page 9
We appreciate the opportunity to be of service to the JPWB and believe this letter accurately summarizes the significant
terms of our engagement. If you have any questions, please let us know. If you agree with the terms of our engagement
as described in this letter, please electronically sign this letter.
Sincerely,
-11W
Abdo
RESPONSE:
This letter correctly sets forth the understanding of the Joint Powers Board of Albertville, Hanover and St. Michael.
By: '11h, sellely
Title: General Manager
'bdoSol
-!Lor s c o -
Page 63 of 85
JOINTPOWERS WATERBOARD
ALSMVI�. RRAOMM. �- mf�a
0 MEMO
To:
Joint Powers Water Board
From:
John Seifert
Date:
January 3, 2024
Subject:
2023 DNR Water Conservation Report
The Minnesota DNR Water Conservation Report is due by February 15- each year. While the well data is
already available, there is additional data that is gathered and submitted that takes time to accumulate.
Since the invoice for the DNR report is due within days of submittal, we are requesting approval to
process a check electronically for no more than $25,000. It is anticipated the invoice will be similar in
cost based on flow data and the higher amount will allow for inflation of cost if necessary. The actual
amount paid will be submitted to the Board with the February packet.
Year
MG
Cost
2010
839.990,000
$ 12,736.00
2011
707,952,000
$ 12,910.00
2012
980,904,000
$ 16,146.00
2013
852,084,000
$ 11,889.52
2014
736,136,000
$ 8.938.37
2015
773,217.000
$ 9,549.49
2016
781,474.000
$ 8.458.53
2017
822.961.000
$ 9.964.06
2018
892,596,000
$ 10,868 . 09
2019
772,555.000
$ 10,645.82
2020
971,999,000
$ 13.506.35
2021
1.180.264,000
$ 18,834.24
2022
1,142,078,000
$ 17,486.31
2023
1,255,953.000
Please feel free to contact me with any questions.
Best Regards,
John Seifert
General Manager
11100 50- Street NE, Albertville, MN 55301
(763)497-3611 Fax:(763)497-4908
www.jointpowerswater.com
Page 64 of 85
KtN"T POWERS WATER BoARD
klL�ALR�FMVF - �HAWVER - ��7
Joint Pomrs Water Board Tel. 763-497-3611
11100 50P st NIW Fax 763-4974908
Albertville MIN 55301 �jointp,:nNers,NatertoDardorg
EMEMO
TO:
Joint Powers Water Board
FROM:
John Seifert
DATE:
January 17, 2024
SUBJECT:
Approval of Newspaper, Auditor, Depositor and Bank Signatories
John Seifert will discuss and look for recommendations and approval for the following:
2023
2024
Official Newspaper
Crow River News
Official Auditor
Abdo
Official Depositor
Community Development Bank
Bank Signatories
Ryan Gleason, Chris Kauffman,
Rob Olson, Bob Zagorski, Jennifer
Thomas, Delena Daleiden
THIS TRANSNISSION CONrUNSCONRDENTU� INFORNKTION INTENDED FOR USE ONLY BY THE MOW NANED RECIPIENT READING,
DISCUSSION, DISTRIBUTION. OR COPYING OF THIS MESSME IS STRICTLY PROHIBITED BY MYONE OTHERTHAN THE �Eo RECIPIENT
OR HIS OR HER VAPLOYEES OR A�& IF YOU HAVE RECEIVED THIS FAX IN ERROR, PLEASE IMMEDIATELY NOTIFY US BY TELEPHONE
(CULECT).MDRMRN�EORIGI�MES�ETOUSAT�EMO��ORESS�US POSL�SERWE Page 65 of 85
KINT POWERS WATER BoARD
ka-.�AL-9f�-Owtv - �,,AWVCR - �STFI"�,Acf-
Joint PoNrers Water Board Tel. - 763-497-3611
11100 50- st NW Fax: 763�9749GII
Alter,,ille MN 55301 iNYnN.joflnrDoVaUSwaterlDoard.org
EMEMO
TO: Joint Powers Water Board
FROM John Seifert
DATE: January 17, 2024
SUBJECT: Authorizing Investment Agencies
As an upgrade to our current investment agencies (RBC, PMA and Wells Fargo) staff is
recommending inclusion of additional authorized investment agencies (Community Development
Bank and 21s' Century Bank). Both banks have a local presence and finance several community
development activities for new construction within the service area of Joint Powers Water Board.
Recommended Motion
Staff recommends formal acceptance of Community Development Bank and 2151 Century Bank
as additional authorized investment agencies for Joint Powers Water Board.
THIS TRANSMISSION CONTAINS CONFIDENTUJ- INFORWTION INTENDED FOR USE ONLY BYTHE ABOVE NAMED RECIPIENT READING,
DISCUSSION, DISTRIBUTION. OR COWING OF THIS MESSAGE IS STRICTLY PROHIBITED By ANYONE OTHER � THE NAMED RECIPIENT
OR HIS OR HER EMPLOYEES ORAGENTS IFYOUNAVERECEIVEDTHISFAXINERROR PLEASEIMMEDUITELYNOTIFYUSBYTELEPHONE
(COLLECT. AND RETURNITHE ORIGINAL MESSAGE TO USAT THE ABOVE ADDRESS VIA US POSTALSERVICE Page 66 of 85
GENERAL BUSINESS
Page 67 of 85
11
1jT PCWERS WATER BoARD
- �HAAJOVCR - �ST 11,41(�,Hllrf
Joint Pommers Water Board
11100 50- St NW
Alloaftille MIN 55301
MEMO
TO: Joint Powers Water Board
FROM John Seifert
DATE: January 17, 2024
SUBJECT: Approval of Board Positions
Tel. 763497-3611
IF=: 7634974908
VoBVIjointpomanvaterboard.org
John Seifert will discuss and look for recommendations and approval for the following
Position
2023
2024
Board Chairperson
Chris Kauffman
Board Vice Chairperson
Joe Hagerty
Board Treasurer
Rob Olson
�lS�SMISSIONCOWMNSCONFIDEW�INFO�TIONt�NDEO FORUM ONLY BY THE MOVE NANEDRECIPIENT READING.
03SCUMION DISTRIBUTION OR COPYING OF THIS WEEMS IS STRICT-Y PROHIS"D BY ANYONE OTHER THAN THE NANED RECIP4ENT
ORHISORHEREMPLOYEESORMENTS IF YOU HAVE RECEIVEDTHIS FM IN ERROR PLEBSE IMMEDATELY NOrFY US BY TELEPHONE
�COLLECD,MDRMM�EORIGI�MESMGETOUSAT�EMOW�DRESSVMUS POST&SERVICE, Page 68 of 85
CJOINTPOWEPSWATERBoARD
) ALMRV/�. MMUt4ER. ST- MIC04REL
STORAGE TANK SITING STUDY
Summary
The Capital Improvements Plan (CIP) Update Report completed in 2023
dentified that the Joint Powers Water Board (JPWB) water system has a current
jV water storage deficit of 2.59 million gallons (MG) to meet emergency
storage recommendations. The CIP recommended the addition of a 3 MG
storage facility to rectify the existing deficit and meet additional short-term
growth. After further technical analysis of size, type. and location for additional
storage. this summary provides a snapshot of recommendations.
e
SIZE TYPE LOCATION COST
Evaluate if 3MG is the Evaluate the differences Compare storage options
Provide both capital costs
appropriate size to rectify between ground storage at two potential sites for
and a 50-yr life cycle cost
existing deficit and meet and elevated storage. construction of new storage.
analysis for the preferred
short-term growth needs,
storage tank options.
Page 69 of 85
VA
HE
?d
0
LU
F-
2 ra
E
E
0,
&
Page 70 of 85
GOAL: Capital costs and a 50-yr
COST: life cycle cost analysis.
Capital Cost Estimates
(3 MG composite water tower and a 3 MG prestressed ground storage tank on Site 1)
Construction Costs $7.1 M S13 2 M
Legal, Adel Engineering Fees $1.1 M $2 M
Contingencies $1.6 M $3 2 M
TOTAL Capital Cost Estimate $9.8 M $18.3 M
Additional Cost Consideration for Site 2:
5 acre land purchase is estimated at $125,000 for both a water tower or a ground storage tank
A Ground Storage Tank at Site 2 requires 2.000 ft of 16-inch main estimated a SIM including contingencies
A water tower at Site 2 would not require the additional 2,000-ft of 16-inch main.
50-Year Life Cycle Cost Analysis
(3 MG composite water tower and a 3 MG prestressed ground storage tank on Site 1)
40 0 Paint Coating
35
30
.2
25
20
is
E
to
5
0
2025
Repair Project
a Paint
Replacement
Paint Coating Pump & Electrical
Repair Projects_,OP' Gear Replacement
Pump & Electrical
Gear Replacement
50-Year Life
Cycle Cost:
$345M
$23.8M
2030 2035 2040 20115 2050 2055 20,50 2055 2070 2075
FINAL RECOMMENDATION:
Construct a 3 MG prestressed concrete ground storage tank with a firm pumping
capacity of 4,000 gallons per minute and on -site emergency power systems on Site 1.
Page 71 of 85
YXNT POWERS WATER BoARD
kL�ALJR�CMILtF - �WWVCR - �ST
Joint Pomrs Water Board Tel.: 763497-3611
1 1100 50- St NVI Fax: 763-4974908
Abeftille MN 55301 ~vjointpomrswaterboard.org
MEMO
TO: Joint Powers Water Board
FROM: John Seifert
DATE : January 17, 2024
SUBJECT: Approve Plans and Specs and Authorize Advertising for Bid of Joint Powers Water
Board ASR Watermain Looping Project from AE2S
The second portion of the Request for Proposal ("RFP") performed by AE2S was to design the
ASIR watermain looping project for Joint Powers Water Board. At this time the final plans and
specs are available for the Board's review and approval that would include authorization to
advertise and set a bidding date for the project. These plans and specs have also been
reviewed by the member Cities engineering staff and comments have been incorporated in this
final design. Attached is the exhibit representing the watermain looping project. Staff is
recommending approval of the final plans and specs as presented.
Recommend Motion:
Staff recommends approving the final plan and specs as presented and authorization to
advertise and set a bidding date for the ASR watermain looping project.
THIS TRANSMISSION OONTNNS CONFIOENTU� INFORWTION INTENDED FOR USE ONLY BY THE ABO� NAMED RECIPIENT R�ING
DISOUSSION DIS�lB�ION,MCO"INGOF�ISM�GEISSTRICnYPROHIB�DBY�ONEO�ER��E�EonCIPIEW
ORHISORHEREWLOYEESORAGENTS IF YOU HAVE RECEASED THIS FM IN ERROR, PLIDUE HAMEDATELY NOTTF� Us BY TELEPHONE
(COLLEC�,MDRMRN�EORIGI�MESMGETOUSAT�EMO��RESSMUS POST�SEWCE Page 72 of 85
LI
L)
LU
u Q�'
0
(L
0
co z
of co n-
L :5 o
z 0 Z.
U
F-
< Oz
F- 0 of
.Wg�g :1
U) L) LL LLI
LLI
U) 0;
LU
0 0 w
0 of
U)
F- 2:
z
0
U)
ill, I IIJ HI SH H i I
"Im oll
tev i -06
Page 73 of 85
KIN"T POWERS WATER BoARD
kL�ALX�FwvraF - �"Awvcp- - �ST "K�IHAFL
Joint Po*ons Water Board Tel. 763-497-3611
11100 50- St NW Fax: 7634974908
Albeftille MN 55301 �Jointpomrswaterl,oardorq
EMEMO
TO:
Joint Powers Water Board
FROM
John Seifert
DATE:
January 17, 2024
SUBJECT:
Visa and MasterCard Class Action Suit
Joint Powers Water Board's attorney recommends participation in the attached
Visa and MasterCard class action lawsuit for any potential gains.
Recommended Motion:
Staff recommends authorization to participate in the Visa and MasterCard class
action lawsuit.
THIS TRANSMISSION CONTAINS CONFIDENTUL INFORWTION INTENDED FOR USE ONLY BY THE MOVE �EO RECIPIENT READING.
DISCUSSION, DISTRIBUTION, ORCO�INGOF�ISMEWGEISS�iCnYPROHIB�O 8YANYONEOTHERTHANTHENNNEDRECIPIENT
ORHISORHEREMPLOYEESORAGENTS IFYOU HAVE RECEIVVEDTHISFAXIN ERROR. PLEASE IMMEDATELYNOTIFYUSaYTELEPHONE
(COU-ECTI. AND RETURN THE OFUGIN� MESSAGE TO USAT THE MOW ADDRESSMU 8 POST�SERWE Page 74 of 85
1".." .. �� axo.'�
Payment Card Interchange Fee Settlement
Metal CourtAuthorlbecl Settlement Website
Merchant Portal - Login/Create Account
Welcome to the Merchant Portal for the Payment Card Interchange Fee
Settlement.
The Claim Filing Deadline is May 31, 2024.
Enter Claimant ID and Control Number:
You can enter the Claimant 10 and Control Number ceided in the middle of the Care Form you were mailed elow 0 view
your transaction fee information and file a claim.
Claimant W
XXXXXXXXXX
ccvtol rlurr�
re not a rat,ot
11�1 T 11�
Mat ift cannot find my Claimant to and Central Number orhave multiple Claimant Me?
Provide TIN:
If this is your first time visiting this site and you do not have a Claimant ID and Control Number you can Provide your Taxpayer
Identification Number along with some additional information, and the Class Adminishator will attempt W determine whether
you are a merchant that is eligible to file a claim in this Settlement.
Please note that the Class Administrator is mailing Claim Forms directly to merchants throughout this month. The
fastest and easiest way to submit your Claim Is to wait for the Claim Form to arrive In the real I and use the Claimant ID
and Control Nu mber provided to log into this site.
Mat ifl ham multiple TiNs?
Log in to Your Account:
If you previously created an account with us, you can log into your account below and vim information about the status of your
claim, as well as Wks actions in response to communication from the Class Administrator.
userrom,:'
�XMXU(XX
Pawwrml
How do I reset my password?
Page 75 of 85
X)rN"T POWERS WATER BoARD
- �H/Ilwvcg - �STI "K�IHACL
JO`Tt P.". Wate, Boand Tel . 763497-3611
1 1 100 5W st Yw Fa. 763-4974908
Albarmile MN 55301 �Jaintpi:FNerswateftard,rg
EMEMO
TO: Joint Powers Water Board
FROM: John Seifert
DATE: January 17, 2024
SUBJECT: Authorization to Modify ASIR Water Fill Piping
The first attached drawing represents removal of some undersized water piping and the second
drawing demonstrates installing improved piping to increase water volume for filling the ASIR in a
more efficient manner. Staff is estimating each month saved in the "injection" or filling phase
would include pumping time and monthly contract testing of supply water in the amount of
$4,300 a month. This improvement is expected to reduce annual injection phase by as much as
two months per year.
Staff has solicited for competitive bids from two suppliers for the necessary parts and attached is
a recommendation to authorize the purchase of pipe and fittings from the low bidder in Core 8,
Main. In addition to the material costs staff would work with onsite contractor MBI for a one day
removal and installation of the piping. Time and materials on the labor assistance from MBI is
approximately $1,000.
Recommended Motion:
Staff recommends authorizing the purchase of pipe and fittings from Core & Main and to work
with MBI for a one day removal and installation of the piping for approximately $1,000.
TRUE TRVVISNUSSION CONTMNSCONFIDENTVL INFORNATION INTENOE0 FOR USE ONLY BY THEABOVE NMIEO RECIPIENT R�ING,
DISCU�ION�DIMIS�ON,ORCO"INGOF�ISMESMGEISS�ICTLYPROHIB�DBYMYONEG�ER��E�ED�CIPIEw
OR H ISORHEREMPLOVEESORAGENTS IF YOU HAW RECEIVEOTHIS FM IN ERROR PLEASEIMMEDIATELYNOTIFYUSBYTELEPHONE
(COLLEC�.MD�RN�EORIGI�MES�GETOUSAT�EMO��DRESSMUS POSTaSEWCE Page 76 of 85
A
SNOUVDIJICON ONIdid G 3SnOH'n3M
(af)
Page 77 of 85
CL
%A
SNOLLVOWIGOW ONIdId 6 3snoH ram
ri
Page 78 of 85
NECE. WEEN. . LEE
Wb UNNEWN: ME— I I UN
ad LIMIT a NZUI
ONUILAMILIUSEPICE
UNNE ZEN UNIT, I Ta.
EMIL Ma.
FWMW,MII,
FIT
E
LIFE N."CoNINUCLE.
I
ZZLEM
1.
EC
I
I I MI .1
27,76
1111
L
I.-FLECILLUNC1.
I
I
III
.
rmwmmmm
1.
1
LE
1-ITIMETEIII
LIF
LE I,
NZ
E
111"I'Ll-METECUTE.
I,L`
1, 11
E
1
2,32
No
"L-FaC,
Ilo
I
VFUNTLETIEFRIMEDC110
322 67
12111
I.
E
I..To IUNNI
E.
I'.
1.
24
EIN � E In - 1, 1. .1 IN,
I
I M
NU ELE
I BUT
1.
V` N I NUT ZINC 'I
F1
I BEE
I.
ST71LINATUDIBUINEDFLUENCIF
LIZZ
E
IFLUBUDI NI
I
I. ZE
Z11 NE
1.
1
E' . ILITTE AT
NU
. 111
11 .
1.
TIC
ETI E E 1/2' NE. .1 INC
E .
I'M
IFE
VI UTZ NUT ZINC FUMED
4 U4
..Co....
FILT
D
6 FLUNCE BLECTLEFULLY VI
CU
INIEW
. Ca
1.
No"WELENIB","'E.E.
E.
WoUNNEWMENCEEI
Ll�
COUPLING WONTHERES IF NEEDED.
U.
CUTEELFUMFULEFUN....
Loo
,To
.I I, BE NINE NEINEFEENCLUNCE
U.
I � � 11. . BE I I I
1
.114
.11
Ta
I
I BIUCCUUNT,
I.
MIT
I- I
T',
o
111.1.1MUNUININ
U. 11
0 CIE
ME LE
NEELL
oFENT.
IT.
ILLEMEMEDIFELI
1.
E
I . I I I I. . 1. IM
III EN
.1.
IC �E45�MESEND
4.
1
CUUMTSEAS IFENCRIMETUCIIII
I
III
EM
E
1.11UNNUECUTENT
CA
TELET
�CZ
16
VAI ECTUCKBOCITZINC
I"
Fl.
MED
16
V11H. NUIIINCILMC.
IF
4TU
WT
UNMI.Laa IUMUDWEE,
5111
E
EI FU,XpEop 1
.111.
FIT
.1 E BE I VENNUMMUNI
FEE
E
E- . II E GUEZIET
EU
6.
F
L' PaCUSLUENZ C
1.
U. BE
11.
0
1 LEETICE 1-11 MT
EU
LULT
D LET
MET
IT
I C. 1. NU, .., C'EMET
1
2776
D Co
1.
C MENUTTE FULLECT ZMBU7
Total Bid
UN THIS �E� MINI HI BEFECTS CUNINECE AUT WELLUD IF ACULFTED III TooNEMBE MILE
ME RUCLUXED
P CUBIGNMER NER FULNUFACTURE
... THUNEV 11 CMEMMR . No. THE . I THEL .. .146 11
FUESEFFNEE To ..
TO INCRE. UUMUE To AUDDRELLE FECTONEE, I . CLELF .. . 5 LEE I .... BELL GOWNEWELIKE FUEM%UWNI CLUFFS. TFULUNSUNDENTELON,
NUI AM) Ma MUMMULL C.IENU DI a WILL CONMENCI BUSED UPON MAUWFMEURNR UNED
TWII MY MATTERMEN. DELMETURE
DILUTED SUMNED �UF�URER LEAD TI I MUFF BE a ELECT To BRUCE UNCREANUES AN DI JUPPOCEUBLE U.
To C S�a�DF����R��DCGN�NSOF�E,�MOMFIEDF��ME��M��l�CEN
DFUELWN�I
Page 79 of 85
ENGINEER
Page 80 of 85
MNIT POWERS WATER BoARD
41-gr�-OVfLtE - �HANOVC9 - �STHWH�Aft
Joint PoNaers Water Board Tel. - 763-497-3611
11100 50- st NUN, Fax 7634974908
Albeftille MN 55301 MnNarjointpoarennNatertoardong
EMEMO
TO: Joint Powers Water Board
FROM: John Seifert
DATE: January 17, 2024
SUBJECT: Final Pay Application for the CSAH 19 Waterman Reconstruction Project
Chris Larson will be available at the meeting to go over a recommendation to close out the final
pay application for New Look Construction on the CSAH 19 reconstruction project started in
2022.
As a condition of the project close out the contractor will be providing a two year warranty bond
on the entire project prior to distribution of the check.
Recommended Motion:
Staff recommends final payment to New Look Construction on the CSAH 19 reconstruction
project with the stated conditions.
THIS TRINNISMISSION CONTAINS CONFIOENTVIL INFORMANTION INTENDED FOR USE ONLY BY THE MOW KkMED RECIPIENT REMING,
DISCUSSION DISTRIBUTION OR COPYINGOF THIS MESSAGE ISSTRUCTLYPROHISITEDaYANVOINEOTHER7+0UN THENAMEDRECIPIENT
OR HIS OR HER EMPLOYEES ONAGENTS IF YOU HAW RECEIMIDTHIS FAX IN ERROR, PUEASE IMMEORTELY NOTIFY US BY TELEPHONE
ZILLECT),AND RETURN THE ORIGINkLMESSMETOUSATTHEABOVEADDRESSMUS POSTALSEWCE Page 81 of 85
SEH MEMORANDUM
TO: Joint Powers Water Board
FROM: Christopher Larson, P.E.
DATE: January 16, 2024
RE: CSAH 19 - New Look Contracting — Final Application for Payment
Attached is the Final Application for Payment from New Look Contracting for work on the CSAH 19
Wartermain Replacement Project. The work on this project has been completed. This application for
payment is releasing the retainage on the project. We recommend that the Board pay the requested
amount of S 106,519.87.
The contract for this project requires that New Look Construction provide a 2-ycar maintenance bond
from the agreed upon Substation Completion date of August 25,2023. The final check to New Look will
be withheld until we receive the maintenance bond and closeout paperwork (IC-134 forms, lien waivers).
Attachments: New Look Contracting — Final Application for Payment
Shod Elliott Hendrickson Inc.. 3535 Valencia Center Drive, St. Paul. MN 5511OZ196
SEH is an scual opportunity employer I armn.sehinc.com 1 651.40.20M I SM.325.W55 I 65i.4W.2150 fir,
Page 82 of 85
0
C.)
0
Q1
tat
HIS
I
Page 83 of 85
'IT
TIT
1411T
TT
-
1
1
a
2 A
a 2
a
a 2
a
a 3
a
9
a
a 1
2
a
a
a
5
a
2
"a
i 11 - a g - -
. . . .
1'.
-a
us
36 8198
879
a
N
a gl"
N 2
. .
a a
. .
2 3
. .
'a
. .
31
a
a a
3 8
2 3182182182
82
82 as
a a
9i a
s a
12128198
Igi.
7
*19*19T
91919311219141111all
9
4
ass
a
a
18
9 9
9 49.4
T
I
.66 6666666— ......
2��aamag
lan-
w�u
49999�e
2 4 8 2 a 8 3 5 9 S 8 . S S 8 S 8 S . 8 Z S 9
- - - Avg., I - - a
a
§
u
111
ITIT
a 3
�RaY aRA
4 dams
�t n ARQU
V a
< 21 n 6 4 6 n �F n g; 2S b n h 6 6 9
51
M
M
OMAN
:';
NO
WRIM
99
RAININIER
MhR-M�--NN��
my
k
191
Page 84 of 85
a T
17�T�#T
TT
I
I
MINE
88 a 8
26
9
8.
a sa 42
�s
as 219
a
1 2
a
I
I
a
I
72
a
3 3
I
8
R
818TO
8
T�T
a
R
8
8
e
Isla
I
I
'i
N
6
V
2t
Page 85 of 85