Loading...
2024-06-11 Planning Commisision Agenda Packet- PLANNING COMMISSION MEETING Tuesday, June 11, 2024 7 PM 1.CALL TO ORDER - ROLL CALL – ADOPT AGENDA 2.MINUTES a.April 9, 2024, Planning Commission Meeting Minutes (Pages 1-5) 3.PUBLIC HEARINGS a.Public hearing to consider a development application of Insite Development Services LLC. for a PUD /B-2A zoning map and text amendment, PUD Development Stage Site and Building plan for the development of a 10,000 sq. ft. commercial daycare a 5953 Labeaux Avenue NE in Albertville (Pages 6-26) 4.OTHER BUSINESS a.None 5.ADJOURNMENT Planning Commission Meeting Minutes Regular Meeting on April 9, 2024 1 ALBERTVILLE PLANNING COMMISSION TUESDAY, APRIL 9, 2024 DRAFT MINUTES ALBERTVILLE CITY HALL 7:00 PM 1.CALL TO ORDER – ROLL CALL – ADOPT AGENDAChair Buhrmann called the meeting to order at 7 pm. Maeghan Becker conducted roll call. Present: Chair Buhrmann and Commissioners Anderson, Smith, Huggins, Pinski and Council Liaison Hayden. Absent: None. Others Present: City Planner Al Brixius, Building Permit Tech Maeghan Becker, Albertville residents Dan and Debbie Rise and Paul Tucci with Oppidan. Motioned by Huggins, seconded by Anderson to approve the agenda as submitted. Ayes: Buhrmann, Anderson, Huggins, Smith and Pinski. Nays: None. Absent: None. MOTION DECLARED CARRIED. 2.MINUTES Motioned by Buhrmann, seconded by Smith to approve the March 12, 2024, Planning Commission meeting minutes as presented. Ayes: Buhrmann, Anderson, Huggins. Smith and Pinski. Nays: None. Absent: None. MOTION DECLARED CARRIED. 3.PUBLIC HEARINGS Public hearing to consider a development application of Oppidan Holdings LLC. For an administrative subdivision, PUD /CUP amendment, Daycare CUP / site and building plan for the development of a 11,500+ sq. ft. commercial daycare on Lots 2 and 3, Block 1, Shoppes at Towne Lake Two. (Page 6-21, Exhibits A-I).Oppidan Holdings LLC is proposing the construction of a new daycare center on Lot 2 and 3, Block 1 of Shoppes at Towne Lakes Two, which will be called Everbrook Daycare. To facilitate this development, the following applications are required: 1.Subdivision – Lots 2 and 3, Block 1 of Shoppes at Towne Lakes two, will be combined asone lot. Agenda Page 2 Planning Commission Meeting Minutes Regular Meeting on April 9, 2024 2 2.Conditional use permit/PUD site and building plan approval – The current zoning for thissite is B-2A Special Business District which allows for the daycare land use by conditionaluse permit. The Applicant’s is requesting changes to the original PUD agreement to allowproposed use, building and site plan on this proposed site.Brixius went over the subdivision. Lots 2 and 3, Block 1 of Shoppes of Towne Lakes two will be combined into once parcel based on the following findings and conditions: 1.The lot combination results in a new lot that exceeds the lot area and width requirement ofthe B-2A zoning district.2.The proposed building will meet the required B-2A zoning district setbacks.3.There is a sanitary sewer easement that will extend into the lot, which will remain in place.The site plan shows an improved parking lot over this utility easement. This can beacceptable provided the easement agreement is in-place that allows the City to access theutility underlying easement and the property owner would be responsible for the cost ofreplacing the improvements within the easement.4.The water service into the site shall be covered by a utility easement. The easement shall betwenty feet wide centered on the water service.5.Lot access will be via private streets the property and new daycare shall be part of anassociation that contributes to the maintenance, repair, and replacement of the privatestreet. The association membership is also required for the maintenance of other commonelements (ponding, streetlights, etc.).Brixius went over the Planned Unit Development / Conditional Use Permit/ Daycare CUP. In review of the site plan and architectural building plan dated March 6, 2024, staff recommends approval of the conditional use permit for the commercial daycare and CUP/PUD amendments with the following conditions: 1.Approval of the requested subdivision combining Lot 2 and 3, Block 2 Shoppes at TowneLakes Two.2.The Applicant shall enter into an amendment PUD agreement that: removes the land use /zoning restriction on Lot 3, Block 1, Shoppes of Towne Lakes Two allowing the daycare useand removes the site from the required shared parking requirement of the original PUD.CUPagreement.3.The parking lot be shifted west to provide a 10-foot landscape area along the east side of theparking lot to allow landscape screening of the parking lot. The parking stalls shall berevised to provide a 20-foot stall length.4.Applicant shall provide a design elevation of the trash enclosure for City approval.5.The photometric plan shall be revised to illustrate the light levels around the buildingpertaining to the buildings wall mounted light fixtures. Detail cut-sheets of proposed wallmounted and freestanding light fixtures showing that they area has a 90-degree cut-off andshield light source. The lighting plan shall show the pole height and design of thefreestanding lights.6.The Applicant shall provide a detail for each of the proposed fences showing design,materials, gates, and gate latches for City approval.7.The play area fence be shifted south to provide a 25 front yard setback from 69th Streetright-of-way line.8.All ground mounted or rooftop mechanical equipment must be screened from view ofadjoining properties and public streets.9.The Utility plan shall be revised to show potable water and fire suppression being separateservice lines and valves leading into the building. Agenda Page 3 Planning Commission Meeting Minutes Regular Meeting on April 9, 2024 3 10.The Utility plan shall be subject to the review and approval of the City Engineer.11.The Grading and Drainage plan shall be subject to the review and approval of the CityEngineer.Commissioners asked about the multiple conditions listed and if the applicant is willing to meet all of them. Brixius said that he has spoken with the applicant and they are aware of the conditions. Paul Tucci, with Oppidan, took the stand and informed that he is aware of the conditions and building plans are in process with these conditions in mind. Tucci said that they would like to start work on June 1, 2024. Tucci gave some company history, they have been in business for 33 years, developed in 41 states, built the Coborn’s here in Albertville. Commissioners discussed the green space to the south of the property and that may be used in the future. Commissioners discussed the mechanical equipment for the building and the location, along with the aluminum fencing. Brixius informed that the fencing is to keep the children from running off the property. Commissioners discussed if there would be any traffic issues with adding this new business to the area. Brixius stated that there will be no traffic concerns. Motioned by Huggins, seconded by Anderson to open the Public Hearing. Ayes: Buhrmann, Anderson, Huggins, Smith and Pinski. Nays: None. Absent: None. MOTION DECLARED CARRIED. Debbie and Dan Riser took the stand and they are representing the Samaritans Hill Church on the lot next door. They are in favor of this being a daycare rather than something else and had a few questions: 1.Street maintenance or any improvements due to the extra traffic.Brixius stated that they will have to join a business group to maintain these private streets.2.Wondering if people will be parking in the empty parking lot.Brixius said they will not be parking in the empty parking lot.3.Wondering if the lot will be grass and if the daycare will maintain and mow the lot.Brixius informed that they will follow the landscape plan and that they will maintain thelots that they own, and Samaritans Hill Church will need to maintain the lots that they own. Motioned by Smith, seconded by Pinski to close the Public Hearing. Ayes: Buhrmann, Anderson, Huggins, Smith and Pinski. Nays: None. Absent: None. MOTION DECLARED CARRIED. Motioned by Huggins, seconded by Anderson to approve the development application of Oppidan Holdings LLC. For an administrative subdivision, PUD /CUP amendment, Daycare CUP / site and building plan for the development of a 11,500+ sq. ft. commercial daycare on Lots 2 and 3, Block 1, Shoppes at Towne Lake Two with the conditions listed in the April 1, 2024 planners report with an amendment to condition number 3 under the PUD/CUP/Daycare CUP revising to the parking lot not being shifted to the west, and just screening on the east side. Ayes: Buhrmann, Anderson, Huggins, Smith and Pinski. Nays: None. Absent: None. MOTION DECLARED CARRIED. Agenda Page 4 Planning Commission Meeting Minutes Regular Meeting on April 9, 2024 4 4.OTHER BUSINESS A.None. 5.ADJOURNMENT Motioned by Huggins, seconded by Anderson to adjourn the meeting at 7:47pm. Ayes: Buhrmann, Anderson, Huggins, Smith and Pinski. Nays: None. Absent: None. MOTION DECLARED CARRIED. Respectfully submitted, ____________________________ Maeghan Becker, Building Permit Tech Agenda Page 5 Abcities LLc PLANNING REPORT TO: Adam Nafstad FROM: Alan Brixius DATE: June 5, 2024 RE: Albertville Plaza 3rd Addition / Kindercare Daycare PUD/B-3 Zoning Amendment FILE NO: 163.06 24.03 BACKGROUND InSite Development Services LLC is proposing three lot subdivision, a zoning map and text amendment to change the zoning on the site from B-2A to PUD/ B-2A and a PUD development stage site and building plan for the construction of a 10,000 square foot Kindercare daycare facility, at 5953 Labeaux Avenue NE. To facilitate this development, the following applications are required: Subdivision: Existing site is a 4.67 acre unplatted parcel which is proposed to be subdivide into three commercial lots. This will require preliminary and final plat approval. PUD Zoning. The proposed subdivision will create three lots that will be accessed via a private street that extends from the Albertville Plaza PUD Subdivision to the north. The provision of a private street may only be approved with PUD zoning district. The PUD/B- 2A zoning district will define the allowed uses within the district and afford the City to approve a private street. PUD Development Stage Site and Building Plan Approval: The site will be zoned PUD/ B-2A Special Business District. The B-2A district allows for the daycare land use by conditional use permit. The site and building plan is being requested for a daycare facility being constructed on the proposed west lot. EXHIBITS Exhibit A Site Survey Exhibit B Project Narrative Exhibit C Site Plan Exhibit D Utility Plan Exhibit E Grading Plan Exhibit F Landscape Plan Exhibit G Lighting Plan Exhibit H Light Fixtures 16405 78th Avenue n. MApLe Grove teL: 763-242-6955 eMAiL ALbrixius@GMAiL.coM Agenda Page 6 Exhibit I Building Floor Plan Exhibit J Building Elevations SUBDIVISION The applicant has indicated that the preliminary and final plat was not complete for the June Planning Commission meeting. The applicant will have this ready for City review in July. The site plan illustrates the proposed lot layout and configuration. In review of the Site Plan lot layout, approval of the proposed lot combination is recommended to be approved based on the following findings and conditions. 1.The B-2A District requires a lot area of 1 acre and lot width of 150 feet. The proposed lot layout lot results in a new lot that exceeds the lot area and width requirement of the B-2A zoning district. 2. The proposed daycare building exceeds the required B-2A zoning district setbacks. A concept plan showing proposed building and parking lot layouts for the eastern two lots is needed to demonstrate the required setbacks and building placement. 3.The preliminary plat requires the submission of a grading and drainage plan for the entire plat. To demonstrate that drainage and stormwater management will work for the entire subdivision. The submitted site plan provided grading plan for just the daycare site. Without the plat grading plan concerns exist as to the build out of the plat and drainage patterns flowing to the southwest into the adjoining single family neighborhood. The grading plan must show finish grades for each lot, drainage patterns and stormwater retention for commercial development build out. 4.The utility plan illustrates services to the eastern two lots along their west lot lines. Concept site plans are needed to illustrate building placement and utility locations. 5. The utilities are located within the private street. The plat must show drainage and utility easements over plat utilities and drainage ponds. 6.Lot access will be via a private street, the plat and new daycare must be part of the Albertville Plaza association that contributes to the maintenance, repair, and replacement of the private street. Association membership is also required for the street maintenance. A shared access easement must be place over the private streets in Albertville Plaza 1st , 2nd, and 3rd Addition to the benefit to each lot in these plats. PUD ZONING. To accommodate the subdivision with a private street for the property, a Planned Unit Development District is being requested. The following criteria must be addressed in considering any zoning map amendment. 1.The proposed action has been considered in relation to the specific policies and provisions of and has been found to be consistent with the official city comprehensive plan. Agenda Page 7 Comment: The Albertville Proposed Land Use plan guides the subject site for commercial land uses. The proposed PUD/B-2A zoning district will allow for the subdivision of the site to provide for the creation of three commercial lots. The B-2A district in combination with the PUD is consistent with the guided land use for the area. 2.The proposed use is or will be compatible with present and future land uses of the area. Comment: The current project is an extension of the Albert Plaza 1st and 2nd addition. The Albertville Plaza planned for the extension of their private street and public utilities for this property. The proposed daycare and future commercial development is consistent with the commercial development in the balance of Albertville Plaza and along County 19. The plat also abuts Parkside 4th Addition single family neighborhood. The applicant is locating the Kindercare daycare is proposed on the west lot along the residential neighborhood. This commercial land use and the site design will be compatible with the adjoining neighborhood. 3.The proposed use conforms with all performance standards contained herein. Comment: Additional information is required to evaluate the development for the entire site. The Daycare facility will be evaluated later in this report. 4.The proposed use will not tend to or actually depreciate the area in which it is proposed. Comment: The proposed land use will be compatible with the adjoining commercial land use along County Road 19. The site is separated from the residential neighborhood to the west. Proper site design and screening will not depreciate the area. 5.The proposed use can be accommodated with existing public services and will not overburden the city's service capacity. Comment: The City has capacity within its utilities and to accommodate the proposed three lot commercial subdivision. 6.Traffic generation by the proposed use is within the capabilities of streets serving the property. Comment: The proposed subdivision will be accessed by a private street extending from Albertville Plaza 2nd Addition to County Road 19. This requires the following conditions being met. 1.The establishment of a shared access easement over the proposed private street in all Albertville Plaza Additions. Agenda Page 8 2. The lots in Albertville Plaza 3rd Addition join the Business Association of Albertville Plaza. The Change in zoning to PUD/B-2A district, is needed to facilitate the commercial development of this lot consistent with the City’s land use plan. The proposed change in zoning meets the zoning criteria and may be approved. PUD DEVELOPMENT STAGE PLAN REVIEW. The Applicant has submitted a site plan for the Daycare facility. Staff has indicated to the applicant that the City will need to have a concept plan showing the site grading and development plan for the entire subdivision. The following review comments focus on the daycare development plan. Lot Area and Setbacks. The lot meets the B-2A lot area and width setbacks as follows: Required Proposed Compliant Lot Area 1 acre 1.82 acres Yes Lot Width 150 feet 400 feet* Yes Setbacks: Front (Private Street) Side (North) Side (South) Rear (West) 25 feet 20 feet 25 feet 20 feet 76 feet 144 feet 115 feet 45 feet Yes Yes Yes Yes Parking Setbacks: Front (Private Street) Side (North) Side (South) 20 feet 5 feet 10 feet 10 feet* 12 feet 58 feet No* Yes Yes *The 10 foot parking setback is a PUD setback flexibility. Parking. The daycare floor plan proposes a 10,000 sq. ft. building with a maximum enrollment capacity 131 children and 22 staff people. The City parking standards do not specify the amount of parking required for the proposed use. The ITE standard for daycare centers ranges from 2.7 to 3.6 parking stalls per 1,000 feet of gross floor area. The ITE standard would require 24 to 32 parking spaces. The site plan shows 29 total stalls, which falls within the range ITE suggested range. The parking lot shows bituminous surfacing, concrete curbing, and striping meeting the City zoning standards. Parking spaces are required to be 20 feet in length and 9 feet in width. The site plan shows the parking lot design that meets the City requirements. The site plan also meets the required disability parking stall standards. Loading. The proposed floor plan shows a warming pantry within the building. The applicant must identify the type and size of vehicles that serve the daycare (e.g. food trucks, beverage trucks, office deliveries, garbage trucks, etc.) The site plan must show on-site turning movements for these delivery vehicles and garbage trucks that will not interfere with on-site parking while accessing or egressing the lot. Agenda Page 9 Trash Enclosure. The trash enclosure is located on the north end of the parking lot. This location is acceptable. Plans for trash enclosure including elevations showing materials, gate, and design compatible with the principal structure shall be provided. The City Code requires the exterior walls of the trash enclosure shall be masonry or similar and / or complement the principal building. Outdoor Lighting. The provided photometric plan shows that lighting levels over the parking lot meeting City standards at the property lines. The Applicant has provided cut sheets of the proposed exterior fixtures both wall mounted and freestanding demonstrating a 90-degree cut off and screened light source. The Freestanding light poles shall not exceed a height of 30 feet. The daycare building sits at a higher elevation than the homes to the west. Concern exists with exterior lighting on the west side of the building may have an exposed light source visible to these homes. Lights on the west side of the building shall have the light source shielded from the houses to the west. Fence. The site plan indicates that there will be fencing around the playground and around the west and south side of the building. The fence is intended to be 6-foot-tall chain link. The applicant shall provide details on fence design, materials used, exterior gates and latches, shall be submitted for City approval. Building/Architecture. Exterior materials consist of EIFS panels of various colors and textures and cement panels surround the entrance providing some an attractive building exterior. The exterior wall treatments are composed of preferred materials or replicants that meet the City standards. Any ground mounted or rooftop mechanical equipment must be screened from view of adjoining properties and streets. Landscape Plan. The plantings meet the size and type requirements of the zoning code. In review of the landscape plan we recommend the following. 1. The grading plan extends to the west lot line and near existing tree on the adjoining properties. The landscape plan and grading plan must provide tree preservation fencing located at the dripline of the boundary line trees. 2. The landscape provides conifer street plantings along the west lot line. These trees do not provide screening of the daycare. The trees are 6 feet tall, but are located at a 953 grade elevation with the first floor elevation building elevation being 962 ft. The applicant shall provide a cross section showing the view shed between the homes and commercial building. Utilities. The sanitary sewer, electrical, and storm water systems are subject to the review and approval of the City Engineer. Potable water and fire suppression will require separate service lines and valves leading into the building. Agenda Page 10 Grading/Stormwater. The applicant shall provide a grading plan and drainage plan for the entire Plat. Plat grading and drainage plan shall be subject to the review and approval of the City Engineer. CONCLUSION Subdivision. The applicant will be submitting application for preliminary plat for consideration in July. The subdivision application submission shall include the following 1. The Applicant shall provide a concept plan showing building location and parking lot layout for each lot. 2. The subdivision submission must include a grading and stormwater management plan that establishes finish grades for all the lots. Stormwater calculations based on projected hardcover and stormwater management improvements for the entire subdivision. 3. Shared access easement over the private street and maintenance agreement over the private street. Shared access easement must be extended into the previous Albertville Plaza subdivisions. 4. The lots in the 3rd Addition must be members of the Albertville Plaza association to ensure long-term maintenance of the private streets. 5. The subdivision must provide easement over the utilities and the stormwater ponds. PUD /B-2A zoning/Development Stage Site and Building Plans. City Staff is recommending that the PUD zoning and the site and building plan application be continued until the July planning commission meeting to allow the requested zoning, plat, and site plans to be reviewed with all the needed information. 1. Submission of the Preliminary plat and development plans including grading and drainage plan, Utility plan for the entire plat. 2. Submission of a concept plan showing building locations and parking lot layouts for each of the lots in the plat. 3. Applicant shall identify the types and sizes of delivery vehicles serving the daycare and plan showing the truck maneuvering through the daycare parking lot. 4. Submission of the construction details of the trash enclosure for the daycare 5. Submission of the fence and gate details for the daycare. 6. Exterior lights on the west side of the daycare building shall have the light source shielded from the houses to the west. 7. Ground mounted or rooftop mechanical equipment on the daycare building shall be screened from view of adjoining properties and streets. Agenda Page 11 8. The landscape plan and grading plan for the daycare site must provide tree preservation fencing located at the dripline of the boundary line trees prior to start of grading. 9. The applicant shall provide a cross section showing the view shed between the homes and commercial daycare building. 10. Grading and Utility plan shall be subject to the review and approval of the City Engineer. Cc. Maeghan Becker Kris Luedke Sean Graham Agenda Page 12 MB EX Serv GM ACW EMX XXX XXXX XXXX X XXXXX XXXXUEOE OE OE OE OE OEFBO FBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLT C EX C T C >>>>>>>>>>>>>> >>>>>>>III>>>>>>>>>>IIWETUTILITY EASEMENT PER DOC. NO. 60960920EX 15''EX 6''EX 6''EX 12'' EX 12''IIIIEX STM CB R=965.92 I=961.72 I=961.76 EX STM CB R=966.02 I=961.94 >>>>EX 12''EX STM CB R=964.89 I=961.36 EX Sanitary Manhole R=953.36 I=934.77 EX SAN MH R=959.91 I=933.91 LA BEAUX AVENUE NE (CSAH 19)>>I=952.94 EX STM CB R=959.98 I=955.45 I=955.03 EX STM CB R=960.01 I=955.52 EXISTING BUILDING EXISTING BUILDING SHED 60TH STREET NE ' BUILDING SETBACK10 ' BUILDING SETBACK10 ' BUILDING SETBACK35' PARKING SETBACK5 ' PARKING SETBACK5 960 965 958 959 961 962 963 964 966 966 966 967 967 967 968 969 955 95 5 9 6 0 960 9 6 5 965953954954956 9 5 6 957 9 5 7 9 5 8 958 9 5 9 959 9 6 1 9619 6 2 9629 6 3 9639 6 4 9649 6 6 9669 6 7 9 6 7 960965 965 965 9599619629639649669559609659 5 4 9549549569579589599619 62963964966 9 6 7 ' PARKING SETBACK20' BUILDING SETBACK35PROPERTY LINEPROPERTY LINE' PARKING SETBACK2031013-C2-EXIST DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DWG LOCATION: S:\PROJECTS\31000 PROJ\31000-31099\31013 CHILDCARE FACILITY ALBERTVILLE-ALBERTVILLE MN\31013 PRODUCTION FILES\31013 CIVIL 3D\PRODUCTION DWGS\31013-C2-EXIST.DWG SAVED BY: DOMINIQUE.TURNERSHEET NOT VALID UNLESS THIS TEXT IS COLOR. - 24-31013 05/14/2024 C2-10 EXISTING SITE AND REMOVAL PLAN C2-10 EXISTING SITE AND REMOVAL PLAN ---- ---- C2-10 MNALBERTVILLE 0 SCALE IN FEET 30 60 DST / SMW DST / SMW ARA /RA CHILDCARE FACILITY ALBERTVILLE PLAZA THIRD EDITION PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONPLOT DATE: 5/13/2024 3:15 PM05/14/24 CITY SUBMITTAL #1 ARA INSITE DEVELOPMENT SERVICES, L.L.C. SAW CUT AND REMOVE CURB AND GUTTER PROTECT SIGN REMOVAL LEGEND SYMBOL DESCRIPTION REMOVE BITUMINOUS PAVEMENT REMOVE CONCRETE WALK REMOVE AGGREGATE SURFACING CONTRACTOR SHALL VERIFY EXISTING PAVEMENT SECTION AND NOTIFY ENGINEER OF ANY DISCREPANCIES. PAVEMENT REMOVALS SHALL INCLUDE FULL DEPTH SAWCUT AND SECTION REMOVAL. SAWCUT AND REMOVE EXISTING BITUMINOUS TRAIL REMOVE EXISTING DRIVEWAY SAWCUT AND REMOVE EXISTING BITUMINOUS TRAIL SAWCUT AND REMOVE EXISTING BITUMINOUS TRAIL SAW CUT AND REMOVE CURB AND GUTTER PROTECT EXISTING TREES (TYP) 05/14/24 CITY SUBMITTAL #1 ARA EXHIBIT A Agenda Page 13 Exhibit B Agenda Page 14 Agenda Page 15 Agenda Page 16 InSite Real Estate, LLC 1400 16th Street, Suite 300 | Oak Brook, IL 60523-8854 Phone: 630-617-9100 | Fax: 630-617-9120 | www.insiterealestate.com ENCLOSURES: A – Executed Development Application for PUD Rezoning B – Project Narrative prepared by InSite Development Services, L.L.C. dated May 14th , 2024 C – Civil Site Plans prepared by I & S Group, Inc. dated May 14th , 2024 D – Stormwater Management Report prepared by I & S Group, Inc. dated May 14th , 2024 E – Fit (Floor) Plan prepared by ADA Architects, Inc. dated December 5th , 2023 F – Exterior Elevations prepared by ADA Architects, Inc. dated May 13th , 2024 G – Title Commitment prepared by First American Fina ncial Corporation dated April 8th , 2024 Agenda Page 17 PROPOSED BUILDING 10,000 SQ. FT. FFE = 962.25 15 14XXX STORMWATER DETENTION BASIN PROPOSED PROPERTY LINE (TYP)XXXXXXXXXXXXXXXXXX X X X XXXXXXXXXXXXXXST-4 ST-3 S-3 CO-1 ST-2 S-2 MB GM ACW EMX XXX XXXX XXXX X XXXXX XXXXT C EX C T C WETUTILITY EASEMENT PER DOC. NO. 60960920 LA BEAUX AVENUE NE (CSAH 19)EXISTING BUILDING EXISTING BUILDING SHED 60TH STREET NE ' BUILDING SETBACK10 ' BUILDING SETBACK10 ' BUILDING SETBACK35' PARKING SETBACK5 ' PARKING SETBACK5 ' PARKING SETBACK20' BUILDING SETBACK35PROPERTY LINEPROPERTY LINE' PARKING SETBACK2024'8'8'8'20'12'20'24'10'30' 12'24'FES-2 FES-1B FES-1A 30'11'13' 8'24'9'20'24'10'30' COTG R10'R10'R4'R4'R3'R3'9'R4'80'60'R3'R3 ' R 1 0 'R4'3' ST-5ST-3A 31013-C3-SITE DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DWG LOCATION: S:\PROJECTS\31000 PROJ\31000-31099\31013 CHILDCARE FACILITY ALBERTVILLE-ALBERTVILLE MN\31013 PRODUCTION FILES\31013 CIVIL 3D\PRODUCTION DWGS\31013-C3-SITE.DWG SAVED BY: DOMINIQUE.TURNERSHEET NOT VALID UNLESS THIS TEXT IS COLOR. - 24-31013 05/14/2024 C3-10 SITE PLAN C3-10 SITE PLAN ---- ---- C3-10 MNALBERTVILLE 0 SCALE IN FEET 30 60 DST / SMW DST / SMW ARA /RA CHILDCARE FACILITY ALBERTVILLE PLAZA THIRD EDITION PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONPLOT DATE: 5/13/2024 3:16 PM05/14/24 CITY SUBMITTAL #1 ARA PAVEMENT LEGEND SYMBOL DESCRIPTION BITUMINOUS PAVEMENT CONCRETE PAVEMENT CONCRETE WALK AGGREGATE SURFACING TRASH ENCLOSURE (SEE ARCH. PLANS) CHAIN LINK FENCE (TYP) GRAVEL ACCESS GATE (TYP) B618 (8") CONCRETE CURB AND GUTTER (TYP) CONCRETE TURNDOWN WALK (TYP) PLAYGROUND TRAFFIC DIRECTION ARROW (TYP) HEAVY DUTY BITUMINOUS PAVEMENT LOT 2 ZONING: B-2A PUD LOT 1 ZONING: B-2A PUD LOT 3 ZONING: B-2A PUD 30' PYLON SIGN (UNDER SEPARATE PERMIT) 6' HIGH FENCE (TYP) (SEE ARCH. PLANS) ACCESSIBLE PARKING SYMBOL (TYP) NO PARKING STRIPING ACCESSIBLE PARKING STALL SIGN (TYP) ACCESSIBLE AISLE NO PARKING SIGN (TYP) STOP BAR AND SIGN BUILDING TO REMAIN BUILDING TO REMAIN PLAYGROUND AREA BITUMINOUS TRAIL BITUMINOUS RIGHT TURN LANE PAINT TRAFFIC ARROWS - WHITE LAYTEX PAINT 4" WIDE SOLID STRIP - WHITE LAYTEX TRANSFORMER PAD (REFER TO ELECTRICAL) PAINT PARKING CROSSWALK STRIPING - WHITE LAYTEX 05/14/24 CITY SUBMITTAL #1 ARA Exhibit B Exhibit C Agenda Page 18 PROPOSED BUILDING 10,000 SQ. FT. FFE = 962.25 15 14XXX STORMWATER DETENTION BASIN PROPOSED PROPERTY LINE (TYP)XXXXXXXXXXXXXXXXXX X X X XXXXXXXXXXXXXXMB EX Serv GM ACW EMX XXX XXXX XXXX X XXXXX XXXXUEOE OE OE OE OE OEFBO FBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLT C EX C T C >>>>>>>>>>>>>> >>>>>>>III>>>>>>>>>>IIWETUTILITY EASEMENT PER DOC. NO. 60960920EX 15''EX 6''EX 6''EX 12'' EX 12''IIIIEX STM CB R=965.92 I=961.72 I=961.76 EX STM CB R=966.02 I=961.94 >>>>EX 12''EX STM CB R=964.89 I=961.36 EX Sanitary Manhole R=953.36 I=934.77 EX SAN MH R=959.91 I=933.91 LA BEAUX AVENUE NE (CSAH 19)>>I=952.94 EX STM CB R=959.98 I=955.45 I=955.03 EX STM CB R=960.01 I=955.52 EXISTING BUILDING EXISTING BUILDING SHED 60TH STREET NE ' BUILDING SETBACK10 ' BUILDING SETBACK10 ' BUILDING SETBACK35' PARKING SETBACK5 ' PARKING SETBACK5 ' PARKING SETBACK20' BUILDING SETBACK35PROPERTY LINEPROPERTY LINE' PARKING SETBACK20>>>>>>>>>>>IIIIIIIIIIIIIII>>>>>>>>>>>>>>>>>>>>>>>>>>>>>G GG G G G G G G G G G G G G G G G G >>>>>>>>>>>>>>>>>>UEUEUE UE UE UE UE UE UE UE UE UE UEUEUEST-3 R=961.58 I=955.44 (8'') P-5A I=955.44 (15'') P-4 I=955.39 (18'') P-3 ST-2 R=960.36 I=958.83 (12'') STM SERV. TO LOT 2 I=954.38 (18'') P-3A I=954.38 (24'') P-2 FES-2 I=954.00 ST-4 R=960.97 I=955.39 (15'') P-4 I=955.44 (12'') P-4A S-2 R=960.89 I=952.47 (4'') SP-3A I=952.47 (4'') SP-2 EX-SAN MH R=953.69 I=950.68 (4'') SP-1 CO-1 R=961.49 I=955.59 (4'') SP-3B1 I=963.34 (4'') SP-3B2 S-3 R=960.77 I=956.82 (4'') SP-3C1 I=954.93 (4'') SP-3C FES-1B I=952.91 FES-1A I=952.18 COTG 8"X8" TEE P-3 (18")P-2 (24") SP-3B1 SP-2 SP-3B SP-3C1 P-4 (15")P-4A (12")P-1 (15")SP-3B2 STM SERV. TO LOT 2 (12")SP-3ASP-3A1SP-3CSP-1P-5A (8") ST-3A R=960.96 I=955.01 (15'') P-5 I=955.01 (18'') P-3 I=955.01 (18'') P-3A P-3A (18")ST-5 R=960.18 I=955.98 (15'') P-5 P-5 (15") STORM DRAIN APRON SCHEDULE APRON NO. FES-1A FES-1B FES-2 APRON SIZE (IN) 15 15 24 APRON MATERIAL HDPE HDPE HDPE INVERT ELEVATION 952.18 952.91 954.00 PIPE NO. P-1 P-1 P-2 STORM DRAIN PIPE SCHEDULE PIPE NO. P-1 P-2 P-3 P-3A P-4 P-4A P-5 STM SERV. TO LOT 2 DRAIN FROM FES-1B ST-2 ST-3 ST-3A ST-3 ST-81 ST-5 ST-70 INLET ELEVATION 952.91 954.38 955.39 955.01 955.44 955.85 955.98 959.08 DRAIN TO FES-1A FES-2 ST-3A ST-2 ST-4 ST-4 ST-3A ST-2 OUTLET ELEVATION 952.18 954.00 955.01 954.38 955.39 955.44 955.01 958.83 PIPE SIZE (IN) 15 24 18 18 15 12 15 12 MATERIAL HDPE HDPE HDPE HDPE HDPE HDPE HDPE PVC PIPE CLASS HDPE HDPE HDPE HDPE HDPE HDPE HDPE PVC PIPE GRADE 1.57% 0.50% 0.50% 0.50% 0.50% 1.00% 0.50% 0.50% PIPE LENGTH (FT) 47 76 77 125 10 41 195 51 STORM DRAIN STRUCTURE SCHEDULE STRUCTURE NO. ST-2 ST-3 ST-3A ST-4 ST-5 STRUCTURE TYPE CATCH BASIN (TYPE 1) CATCH BASIN (TYPE 1) CATCH BASIN (TYPE 1) CATCH BASIN (TYPE 1) CATCH BASIN (TYPE 1) STRUCTURE SIZE (IN) 36 x 24 36 x 24 36 x 24 36 x 24 36 x 24 STRUCTURE MATERIAL RC RC RC RC RC CASTING CURB CASTING CURB CASTING CURB CASTING CURB CASTING CURB CASTING STRUCTURE HEIGHT (LN FT) 8.98 9.19 8.95 5.35 7.20 * TOP OF CASTING ELEVATION 960.36 961.58 960.96 960.97 960.18 OUTLET INVERT 951.38 952.39 952.01 955.61 952.98 OUTLET PIPE P-2 P-4 P-3 P-3A P-5 31013-C3-UTILITY-OA DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DWG LOCATION: S:\PROJECTS\31000 PROJ\31000-31099\31013 CHILDCARE FACILITY ALBERTVILLE-ALBERTVILLE MN\31013 PRODUCTION FILES\31013 CIVIL 3D\PRODUCTION DWGS\31013-C3-UTILITY-OA.DWG SAVED BY: DOMINIQUE.TURNERSHEET NOT VALID UNLESS THIS TEXT IS COLOR. - 24-31013 05/14/2024 C3-20 UTILITY PLAN C3-20 UTILITY PLAN ---- ---- C3-20 MNALBERTVILLE 0 SCALE IN FEET 30 60 DST / SMW DST / SMW ARA /RA CHILDCARE FACILITY ALBERTVILLE PLAZA THIRD EDITION PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONPLOT DATE: 5/13/2024 3:16 PM05/14/24 CITY SUBMITTAL #1 ARA INSITE DEVELOPMENT SERVICES, L.L.C. CONNECT TO 6" EXISTING WATER (VERIFY SIZE, DEPTH, AND LOCATION) CONNECT TO EXISTING 12" SANITARY SERVICE (VERIFY SIZE, DEPTH, AND LOCATION) CONSTRUCT WATER SERVICE TO WITHIN 5' OF BUILDING - CONTINUATION TO BUILDING BY OTHERS CAP 4" SANITARY SERVICE CAP 4" SANITARY SERVICE 6"X45° BEND 6"X45° BEND 6"X45° BEND 6" WATERMAIN CAP 6" WATER SERVICE CAP 8" STORM SERVICE HYDRANT 6" WATERMAIN 6" WATERMAIN ROOF DRAIN LEADER (TYP) (SEE DETAIL) 6" SUBDRAIN CONNECT 6" SUBDRAIN TO OUTLET STRUCTURE GAS METER TELECOM SERVICE (BY CENTURYLINK) CONDUIT (BY INSITE) GAS SERVICE (BY CENTERPOINT ENERGY) CONDUIT (BY INSUTE) GAS SERVICE CONNECTION BY CENTERPOINT ENERGY TELECOM. DEMARC 6"X45° BEND CAP 6" WATER SERVICE CAP 12" STORM SERVICE 6" WATERMAIN CONNECT TO 6" EXISTING WATER (VERIFY SIZE, DEPTH, AND LOCATION) XFMR(BY XCEL) XFMR PAD (BY INSITE) ELECTRIC METER PRIMARY SERVICE (BY CENTERPOINT ENERGY) CONDUIT (BY INSUTE) 05/14/24 CITY SUBMITTAL #1 ARA Exhibit D Agenda Page 19 PROPOSED BUILDING 10,000 SQ. FT. FFE = 962.25 15 14XXX STORMWATER DETENTION BASIN PROPOSED PROPERTY LINE (TYP)XXXXXXXXXXXXXXXXXX X X X XXXXXXXXXXXXXXMB GM ACW EMX XXX XXXX XXXX X XXXXX XXXXUEOE OE OE OE OE OEFBO FBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLT C EX C T C >>>>>>>>>>>>>> >>>>>>>III>>>>>>>>>>IIWETUTILITY EASEMENT PER DOC. NO. 60960920 IIII>>>>LA BEAUX AVENUE NE (CSAH 19)>>EXISTING BUILDING EXISTING BUILDING SHED 60TH STREET NE 960 965 958 959 961 962 963 964 966 966 966 967 967 967 968 969 955 95 5 9 6 0 960 9 6 5 965953954954956 9 5 6 957 9 5 7 9 5 8 958 9 5 9 959 9 6 1 9619 6 2 9629 6 3 9639 6 4 9649 6 6 9669 6 7 9 6 7 960965 965 965 9599619629639649669559609659 5 4 9549549569579589599619 629639649669 6 7 PROPERTY LINEPROPERTY LINE>>>>>>>>>>>IIIIIIIIIIIIIII>>>>>>>>>>>>>>>>>>>>>>>>>>>>>G GG G G G G G G G G G G G G G G G G >>>>>>>>>>>>>>>>>>UEUEUE UE UE UE UE UE UE UE UE UE UEUEUE-2.4%-2 . 9 %-2.2%-5.4%- 3 . 4% -2.0% -2.0% -30.5%-1.5%-7.2%-3:1-4:1 -4:1-1.5% -1.5%-3:1-1.0%-28.9%-17.3%961962963 964 955 954 956 957 955 960 956 957 958 959 961962963965964955956957958 959 961961962962 960961962963964966967955960 953954956957958 959 961961.00961.69961.59961.6996 1 . 5 9 964.21964.1596 0 . 9 2 963.91 9 6 3 . 9 9 961.45 960.87 9 6 1 . 4 7 9 6 0 . 9 0 9 6 1 . 4 5 961.47 9 6 4 . 5 2 9 6 4 . 1 9 9 6 1 . 6 4 964.41964.23965.149 6 5 . 0 0 961.14961.39961.45961.56961.56961.36961.36961.36962.1496 1 . 6 0 961. 6 0 96 1 . 6 0 96 1 . 5 4961.64962.19961.64962.079 6 2 . 5 8 962.10962.10962.1996 2 . 1 9 9 6 1 . 9 3 9 6 2 . 0 2 9 6 1 . 9 7 961.569 6 0 . 8 7960.35961.48964.07961.489 6 4 . 5 1 9 6 4 . 3 3 964.48964.359 6 4 . 9 3 9 6 5 . 4 8 9 6 6 . 0 2 961.30961.30961.61961.389 6 1 . 4 2 96 2 . 0 4 9 6 2 . 0 2 9 6 2 . 6 8 961.51961.919 6 1 . 9 1 9 6 1 . 3 8 9 6 3 . 7 2 963.729 6 4 . 8 7MATCH 964.65MATC H 965964966967965961962963964966962 . 1 9 962 . 1 6 96 2 . 1 6 96 2 . 0 6 962 . 0 6 962.71MATC H963.72MATC H 9 6 3 . 9 8MA TCH 9 6 2 . 4 3 9 6 2 . 3 8 96 2 . 1 0 9 6 2 . 4 0 962.689 6 2 . 9 3 9 6 2 . 8 6 9 6 3 . 1 9 9 6 3 . 5 3 9 6 3 . 6 7 963.05963.39963.55961.62961.43961.67961.9 2 961.9 2 961.51MATC H ? ? ?MA TCH 961.74961.80962.35962.48962.629 6 3 . 1 8 9 6 1 . 2 7 962.57960.6731013-C4-GRADE DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DWG LOCATION: S:\PROJECTS\31000 PROJ\31000-31099\31013 CHILDCARE FACILITY ALBERTVILLE-ALBERTVILLE MN\31013 PRODUCTION FILES\31013 CIVIL 3D\PRODUCTION DWGS\31013-C4-GRADE.DWG SAVED BY: DOMINIQUE.TURNERSHEET NOT VALID UNLESS THIS TEXT IS COLOR. - 24-31013 05/14/2024 C4-10 GRADING PLAN C4-10 GRADING PLAN ---- ---- C4-10 MNALBERTVILLE 0 SCALE IN FEET 30 60 DST / SMW DST / SMW ARA /RA CHILDCARE FACILITY ALBERTVILLE PLAZA THIRD EDITION PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONPLOT DATE: 5/13/2024 3:16 PM05/14/24 CITY SUBMITTAL #1 ARA INSITE DEVELOPMENT SERVICES, L.L.C. GRADING LEGEND EXISTING CONTOUR (MINOR INTERVAL) EXISTING CONTOUR (MAJOR INTERVAL) PROPOSED CONTOUR (MINOR INTERVAL) PROPOSED CONTOUR (MAJOR INTERVAL) PROPOSED SPOT ELEVATION PROPOSED TOP BACK OF CURB / TOP OF TURNDOWN WALK SPOT ELEVATION SURFACE GRADE / DIRECTION GENERAL GRADING NOTES PROPOSED CONTOURS SHOW FINISHED GRADE ELEVATIONS. BUILDING PAD AND PAVEMENT HOLD DOWNS ARE NOT INCLUDED. WHEN CONSTRUCTING BUILDING PADS WITH A HOLD DOWN, GRADE AREAS TO ENSURE POSITIVE BUILDING PAD DRAINAGE. 101 100 101 100 XXX.XXXXX.XX-X.X% 05/14/24 CITY SUBMITTAL #1 ARA Exhibit E Agenda Page 20 PROPOSED BUILDING 10,000 SQ. FT. FFE = 962.25 15 14XXX STORMWATER DETENTION BASIN PROPOSED PROPERTY LINE (TYP)XXXXXXXXXXXXXXXXXX X X X XXXXXXXXXXXXXXMB GM ACW EMX XXX XXXX XXXX X XXXXX XXXXUEOE OE OE OE OE OEFBO FBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLT C EX C T C >>>>>>>>>>>>>> >>>>>>>III>>>>>>>>>>IIWETUTILITY EASEMENT PER DOC. NO. 60960920 IIII>>>>LA BEAUX AVENUE NE (CSAH 19)>>EXISTING BUILDING EXISTING BUILDING SHED 60TH STREET NE PROPERTY LINEPROPERTY LINE>>>>>>>>>>>IIIIIIIIIIIIIII>>>>>>>>>>>>>>>>>>>>>>>>>>>>>G GG G G G G G G G G G G G G G G G G >>>>>>>>>>>>>>>>>>UEUEUE UE UE UE UE UE UE UE UE UE UEUEUE965962963964966967965 962 962 963964 966 955954956957 958 965961961962963964961961 961 961 961 962 962 962 962 963 963 963 963 963964964 964 964 SYMBOL QTY BOTANICAL / COMMON NAME GROUND COVERS 363 SF DOUBLE SHREDDED HARDWOOD MULCH SEEDING 20,404 SF SEED MIX MNDOT 3876.2 SOD 26,932 SF SOD MNDOT 2575.2 C STORMWATER POND 7,421 SF POND MIX SITE RESTORATION SCHEDULE 31013-C5-LAND DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DWG LOCATION: S:\PROJECTS\31000 PROJ\31000-31099\31013 CHILDCARE FACILITY ALBERTVILLE-ALBERTVILLE MN\31013 PRODUCTION FILES\31013 CIVIL 3D\PRODUCTION DWGS\31013-C5-LAND.DWG SAVED BY: PARKER.WANGSHEET NOT VALID UNLESS THIS TEXT IS COLOR. - 24-31013 05/14/2024 C5-10 SITE RESTORATION PLAN C5-10 SITE RESTORATION PLAN ---- ---- C5-10 MNALBERTVILLE 0 SCALE IN FEET 30 60 DST / SMW DST / SMW ARA /RA CHILDCARE FACILITY ALBERTVILLE PLAZA THIRD EDITION PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONPLOT DATE: 5/13/2024 3:17 PM05/14/24 CITY SUBMITTAL #1 ARA INSITE DEVELOPMENT SERVICES, L.L.C. 05/14/24 CITY SUBMITTAL #1 ARA Exhibit F Agenda Page 21 PROPOSED BUILDING 10,000 SQ. FT. FFE = 962.25 15 14XXX STORMWATER DETENTION BASIN PROPOSED PROPERTY LINE (TYP)XXXXXXXXXXXXXXXXXX X X X XXXXXXXXXXXXXXMB GM ACW EMX XXX XXXX XXXX X XXXXX XXXXUEOE OE OE OE OE OEFBO FBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLT C EX C T C >>>>>>>>>>>>>> >>>>>>>III>>>>>>>>>>IIWETUTILITY EASEMENT PER DOC. NO. 60960920 IIII>>>>LA BEAUX AVENUE NE (CSAH 19)>>EXISTING BUILDING EXISTING BUILDING SHED 60TH STREET NE PROPERTY LINEPROPERTY LINE>>>>>>>>>>>IIIIIIIIIIIIIII>>>>>>>>>>>>>>>>>>>>>>>>>>>>>G GG G G G G G G G G G G G G G G G G >>>>>>>>>>>>>>>>>>UEUEUE UE UE UE UE UE UE UE UE UE UEUEUE(2) GT-H (2) GT-H (4) PG-D (3) PG-C (1) GT-H (13) SH-P (4) SR-C (4) HP-I (6) SR-C 965962963964966967965 962 962 963964 966 955954956957 958 965961961962963964961961 961 961 961 962 962 962 962 963 963 963 963 963964964 964 964 CODE QTY BOTANICAL / COMMON NAME SIZE ROOT EVERGREEN/CONFEROUS TREES PG-D 4 PICEA GLAUCA DENSATA / BLACK HILLS SPRUCE 6` HT. MIN.B & B PG-C 3 PICEA PUNGENS / COLORADO SPRUCE 6` HT. MIN.B & B SHADE TREES GT-H 5 GLEDITSIA TRIACANTHOS / HONEY LOCUST 3" CAL B & B DECIDUOUS SHRUBS HP-I 4 HYDRANGEA PANICULATA 'ILVOBO' / BOBO® PANICLE HYDRANGEA3 GAL CONT SR-C 10 SYMPHORICARPOS RIVULARIS / COMMON WHITE SNOWBERRY3 GAL CONT ORNAMENTAL GRASSES SH-P 13 SPOROBOLUS HETEROLEPIS / PRAIRIE DROPSEED 1 GAL CONT PLANT SCHEDULE 31013-C5-LAND DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DWG LOCATION: S:\PROJECTS\31000 PROJ\31000-31099\31013 CHILDCARE FACILITY ALBERTVILLE-ALBERTVILLE MN\31013 PRODUCTION FILES\31013 CIVIL 3D\PRODUCTION DWGS\31013-C5-LAND.DWG SAVED BY: PARKER.WANGSHEET NOT VALID UNLESS THIS TEXT IS COLOR. - 24-31013 05/14/2024 C5-20 PLANTING PLAN C5-20 PLANTING PLAN ---- ---- C5-20 MNALBERTVILLE 0 SCALE IN FEET 30 60 DST / SMW DST / SMW ARA /RA CHILDCARE FACILITY ALBERTVILLE PLAZA THIRD EDITION PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONPLOT DATE: 5/13/2024 3:17 PM05/14/24 CITY SUBMITTAL #1 ARA INSITE DEVELOPMENT SERVICES, L.L.C. ZONING LANDSCAPE REQUIREMENTS ZONING: B-2A INTERIOR PARKING LOT LANDSCAPING: 1. ALL PARKING LOTS SHALL BE DESIGNED TO INCORPORATE UNPAVED, LANDSCAPED ISLANDS AS REQUIRED BY THE CITY. 2. ALL LANDSCAPED ISLANDS SHALL CONTAIN A MINIMUM OF ONE HUNDRED EIGHTY (180) SQUARE FEET. 3. ALL LANDSCAPED ISLANDS SHALL BE PROVIDED WITH DECIDUOUS SHADE TREES, ORNAMENTAL OR EVERGREEN TREES, PLUS GROUND COVER, MULCH OR SHRUBBERY. 4. PARKING LOT LANDSCAPE TREES SHALL BE PROVIDED AT THE RATE OF ONE TREE FOR EACH FIFTEEN (15) PARKING SPACES, OR MAJOR FRACTION THEREOF. 5. PARKING LOT ISLANDS MUST HAVE A RAISED CONCRETE PERIMETER CURB FENCING AND SCREENING: 1. WHERE ANY BUSINESS OR INDUSTRIAL USE (I.E., STRUCTURE, PARKING OR STORAGE) ABUTS PROPERTY ZONED FOR RESIDENTIAL USE, THAT BUSINESS OR INDUSTRY SHALL PROVIDE SCREENING ALONG THE BOUNDARY OF THE RESIDENTIAL PROPERTY. SCREENING SHALL ALSO BE PROVIDED WHERE A BUSINESS OR INDUSTRY IS ACROSS THE STREET FROM A RESIDENTIAL ZONE, BUT NOT ON THAT SIDE OF A BUSINESS OR INDUSTRY CONSIDERED TO BE THE FRONT (AS DEFINED BY THIS ORDINANCE). 2. ALL FENCING AND SCREENING SPECIFICALLY REQUIRED BY THIS ORDINANCE SHALL BE SUBJECT TO SECTION 1000.8 OF THIS CHAPTER AND SHALL CONSIST OF EITHER A FENCE OR A GREENBELT PLANTING STRIP AS FOLLOWS: A GREENBELT PLANTING STRIP SHALL CONSIST OF EVERGREEN TREES AND/OR DECIDUOUS TREES AND PLANTS AND SHALL BE OF SUFFICIENT WIDTH AND DENSITY TO PROVIDE AN EFFECTIVE VISUAL SCREEN. THIS PLANTING STRIP SHALL BE DESIGNED TO PROVIDE COMPLETE VISUAL SCREENING TO A MINIMUM HEIGHT OF SIX FEET (6'). EARTH MOUNDING OR BERMS MAY BE USED BUT SHALL NOT BE USED TO ACHIEVE MORE THAN THREE FEET (3') OF THE REQUIRED SCREEN. THE PLANTING PLAN AND TYPE OF PLANTINGS SHALL REQUIRE THE APPROVAL OF THE COUNCIL. 05/14/24 CITY SUBMITTAL #1 ARA Exhibit F Agenda Page 22 PROPOSED BUILDING 10,000 SQ. FT. FFE = 962.25 15 14XXX STORMWATER DETENTION BASIN PROPOSED PROPERTY LINE (TYP)XXXXXXXXXXXXXXXXXX X X X XXXXXXXXXXXXXX>>>>>>>>>>>IIIIIIIIIIIIIII>>>>>>>>>>>>>>>>>>>>>>>>>>>>>G GG G G G G G G G G G G G G G G G G >>>>>>>>>>>>>>>>>>UEUEUE UE UE UE UE UE UE UE UE UE UEUEUEMB GM ACW EMX XXX XXXX XXXX X XXXXX XXXXUEOE OE OE OE OE OEFBO FBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOFBOUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLUTLT C EX C T C >>>>>>>>>>>>>> >>>>>>>III>>>>>>>>>>IIWETUTILITY EASEMENT PER DOC. NO. 60960920 IIII>>>>LA BEAUX AVENUE NE (CSAH 19)>>EXISTING BUILDING EXISTING BUILDING SHED 60TH STREET NE PROPERTY LINEPROPERTY LINE0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.4 0.4 0.4 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.6 0.8 0.7 0.7 0.7 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.4 0.7 0.9 1.1 1.2 1.1 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.5 0.8 0.9 1.0 1.3 1.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.2 0.2 0.2 0.3 0.6 0.8 1.0 1.1 1.6 1.5 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.1 0.3 0.3 0.4 0.3 0.3 0.4 0.6 0.9 1.1 1.2 1.8 2.0 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.3 0.4 0.1 0.4 0.4 0.5 0.4 0.4 0.4 0.6 1.0 1.1 1.2 1.8 1.9 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.3 0.6 0.1 0.4 0.7 1.0 0.7 0.5 0.4 0.8 1.1 1.3 1.4 1.7 1.5 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.4 0.9 1.4 1.7 1.9 1.8 1.9 1.5 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.3 0.8 2.4 2.5 2.4 2.3 2.2 1.8 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.3 0.5 3.0 2.7 2.3 2.2 2.1 1.7 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.2 0.2 3.7 2.7 2.0 1.9 1.8 1.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.3 0.3 0.3 3.3 2.5 1.9 1.8 1.9 1.6 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.3 0.4 0.5 2.7 2.5 2.0 1.9 2.3 2.2 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.3 0.5 0.8 3.5 2.5 2.3 2.7 2.3 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.3 0.6 0.8 5.4 6.2 3.0 2.8 2.9 2.2 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.3 0.4 0.5 5.3 6.5 3.0 2.9 3.0 2.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.4 0.4 0.4 3.7 5.4 3.0 2.8 2.9 2.1 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.3 0.4 0.4 4.2 3.7 2.7 2.4 2.7 2.1 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.3 0.4 0.6 3.2 3.1 2.3 2.1 2.4 2.0 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 0.5 1.0 2.3 2.4 1.8 1.8 2.1 1.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.3 0.4 0.8 1.4 1.7 1.6 1.6 1.6 1.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.3 0.4 0.5 0.4 1.2 1.9 2.7 2.4 1.8 1.1 1.0 1.1 1.3 1.5 1.4 0.9 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.2 0.5 0.9 1.1 1.4 1.4 1.2 1.1 0.9 0.9 0.9 1.0 1.0 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.4 0.6 0.7 0.8 0.8 0.7 0.9 0.9 0.7 0.7 0.5 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.3 0.4 0.5 0.5 0.5 0.5 0.7 0.8 0.8 0.7 0.6 0.5 0.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.2 0.2 0.2 0.3 0.5 0.7 0.9 1.0 0.9 0.9 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.2 0.4 0.6 0.9 1.0 1.2 1.3 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.7 0.9 0.9 1.2 1.4 0.8 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.7 1.0 1.0 1.3 1.8 0.9 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.7 1.0 1.1 1.4 2.1 1.0 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.7 1.0 1.0 1.4 1.9 0.7 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.7 0.9 0.9 1.3 1.4 0.5 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.6 0.9 1.0 1.2 1.3 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.6 0.9 0.9 1.0 1.0 0.4 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.3 0.4 0.5 0.5 0.5 0.4 0.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.2 0.2 0.2 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2 1 0.4 z z z z 31013-C5-LIGHTING DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DWG LOCATION: S:\PROJECTS\31000 PROJ\31000-31099\31013 CHILDCARE FACILITY ALBERTVILLE-ALBERTVILLE MN\31013 PRODUCTION FILES\31013 CIVIL 3D\PRODUCTION DWGS\31013-C5-LIGHTING.DWG SAVED BY: DOMINIQUE.TURNERSHEET NOT VALID UNLESS THIS TEXT IS COLOR. - 24-31013 05/14/2024 C6-10 SITE PHOTOMETRICS PLAN C6-10 SITE PHOTOMETRICS PLAN ---- ---- C6-10 MNALBERTVILLE 0 SCALE IN FEET 30 60 DST / SMW DST / SMW ARA /RA CHILDCARE FACILITY ALBERTVILLE PLAZA THIRD EDITION PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONPLOT DATE: 5/13/2024 3:17 PM05/14/24 CITY SUBMITTAL #1 ARA INSITE DEVELOPMENT SERVICES, L.L.C. 05/14/24 CITY SUBMITTAL #1 ARA Exhibit G Agenda Page 23 31013-C5-LIGHTING DATE DESCRIPTION BY PROJECT TITLE SHEET REVISION SCHEDULE PROJECT NO. FILE NAME DESIGNED BY ORIGINAL ISSUE DATE DRAWN BY CLIENT PROJECT NO. REVIEWED BY WITHOUT PRIOR WRITTEN CONSENT. INC. AND MAY NOT BE USED, COPIED OR DUPLICATED THIS DOCUMENT IS THE PROPERTY OF I & S GROUP,DWG LOCATION: S:\PROJECTS\31000 PROJ\31000-31099\31013 CHILDCARE FACILITY ALBERTVILLE-ALBERTVILLE MN\31013 PRODUCTION FILES\31013 CIVIL 3D\PRODUCTION DWGS\31013-C5-LIGHTING.DWG SAVED BY: DOMINIQUE.TURNERSHEET NOT VALID UNLESS THIS TEXT IS COLOR. - 24-31013 05/14/2024 C6-20 SITE PHOTOMETRICS DETAILS C6-20 SITE PHOTOMETRICS DETAILS ---- ---- C6-20 MNALBERTVILLE DST / SMW DST / SMW ARA /RA CHILDCARE FACILITY ALBERTVILLE PLAZA THIRD EDITION PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION OR REPORT WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PRELIMINARY NOT FOR CONSTRUCTIONPRELIMINARY NOT FOR CONSTRUCTIONPLOT DATE: 5/13/2024 3:17 PM05/14/24 CITY SUBMITTAL #1 ARA INSITE DEVELOPMENT SERVICES, L.L.C. 05/14/24 CITY SUBMITTAL #1 ARA Exhibit H Agenda Page 24 10 TOILETS / SINKSINFANT 1ROOMNAEYCMAXRATIOMN AGERANGEbirth-12mKCE/FFGAGERANGESTAFFREQ. PERPLANSF/CHILDREQ.AREAREQ.ACT.AREATODDLER 1TOTAL·BUILDING DATAPROPOSED BUILDING AREA:PROPOSED BUILDING CAPACITY:BUILDING AREA PER CHILD:TOILETS/SINKS REQUIREMENT:TOILETS/SINKS PROVIDED:DISCOVERY PS 1 2y-3y·CLASSROOM OCCUPANCYAGESRATIOSGROUP SIZEACTUALMAXRATIOKCE/FFGMAXRATIOMNMAXRATIOKCE/FFGMAXGROUPNAEYCMAXGROUPMNMAXGROUPACTUALMAXGROUPSTAFFAREA·SEE SITE PLAN FOR MORE INFORMATION·LAYOUT HAS BEEN DESIGNED USING KCE STANDARD AGE GROUPS.·NAEYC INFORMATION IS PROVIDED FOR REFERENCE ONLY.·KCE MAX RATIO AND MAX GROUP SIZES ARE BASED ON FIT FOR GROWTH.·BUILDING YIELDS ARE BASED ON FIT FOR GROWTH AND LICENSING CRITERIA REQUIRE FINAL DETERMINATION BYOPERATIONS.·SQUARE FOOTAGES HAVE BEEN CALCULATED TO EXCLUDE A FIXTURE ALLOWANCE AND CRIBS.·*ASSUMPTION·PLAYGROUND REQUIREMENTSTOTAL: ±10,00014768.03INFANT 2 birth-12mINFANT 3TODDLER 2 12m-24mTODDLER 3 12m-24mDISCOVERY PS 2PRE-K 12y-3y4y-5y·A CENTER MUST HAVE AN OUTDOOR ACTIVITY AREA OF AT LEAST 1,500 SQUARE FEET, AND THERE MUST BE AT LEAST 75SQUARE FEET OF SPACE PER CHILD WITHIN THE AREA AT ANY GIVEN TIME DURING USE.PLAYGROUND REQUIREMENTS:12m-24mbirth-12m5,145147 245,543·REVISION NOTES--·-·CRITICAL NOTES·FOR PRE-K 2 OPTION AN ADDITIONAL HAND SINK WILL NEED TO BE ADDED TO THE PRESCHOOL 1 TOILET ROOM.·THE CENTER MUST HAVE AT LEAST ONE HAND SINK AND ONE TOILET FOR EACH 15 CHILDREN OR PORTION OF 15 CHILDRENSPECIFIED IN THE LICENSED CAPACITY.±10,147 SFPLAYGROUND PROVIDED:PRESCHOOL 1 3y-4y10 TOILETS / SINKSTOILETS/SINKS REQUIRED:PRE-K 2 4y-5y3y-4yPRESCHOOL 210 TOILETS / 9 SINKSINFANT 1ROOMNAEYCMAXRATIOMN AGERANGEKCE/FFGAGERANGESTAFFREQ. PERPLANSF/CHILDREQ.AREAREQ.ACT.AREATODDLER 1TOTAL·BUILDING DATAPROPOSED BUILDING AREA:PROPOSED BUILDING CAPACITY:BUILDING AREA PER CHILD:TOILETS/SINKS REQUIREMENT:TOILETS/SINKS PROVIDED:DISCOVERY PS 1·CLASSROOM OCCUPANCYAGESRATIOSGROUP SIZEACTUALMAXRATIOKCE/FFGMAXRATIOMNMAXRATIOKCE/FFGMAXGROUPNAEYCMAXGROUPMNMAXGROUPACTUALMAXGROUPSTAFFAREA·LAYOUT HAS BEEN DESIGNED USING KCE STANDARD AGE GROUPS.·NAEYC INFORMATION IS PROVIDED FOR REFERENCE ONLY.·KCE MAX RATIO AND MAX GROUP SIZES ARE BASED ON FIT FOR GROWTH.·BUILDING YIELDS ARE BASED ON FIT FOR GROWTH AND LICENSING CRITERIA REQUIRE FINAL DETERMINATION BYOPERATIONS.·SQUARE FOOTAGES HAVE BEEN CALCULATED TO EXCLUDE A FIXTURE ALLOWANCE AND CRIBS.·*ASSUMPTIONTOTAL: ±10,00013176.34INFANT 2INFANT 3TODDLER 2TODDLER 3DISCOVERY PS 2PRE-K 14,585131 224,955PRESCHOOL 19 TOILETS / SINKSTOILETS/SINKS REQUIRED:PRESCHOOL 2birth-12m2y-3ybirth-12m12m-24m12m-24m2y-3y4y-5y6w-16m*12m-24m6w-16mbirth-12m6w-16m6w-16m16m-33m*16m-33m*16m-33m16m-33m2 35 2802 35 2801:41:41:41:41:41:488882 35 2801:41:4 1:48882 35 2801:41:4 1:48882 35 4551:71:6 1:6132 35 4551:71:6 1:61212132 35 4902 35 4201:71:101:61:101:81:121624122014122 35 4901:71:6 1:81612142954782912864744714977594415031:101:481:481:481:481:7141:7141:7141:714203y-4y 33m-kinder.2 35 7001:101:10 1:122420201:10204603y-4y2 35 4551:101:10 1:122420131:1020881212PLAYGROUND REQUIRED:LICENSING MINIMUM: 1,500 SFFULL CAPACITY: 9,825 / 11,025 SF33m-kinder.33m-kinder.6w-16m*6w-16m6w-16m6w-16m16m-33m*16m-33m*16m-33m16m-33m2 35 2802 35 2801:41:41:41:41:41:488882 35 2801:41:4 1:48882 35 2801:41:4 1:48882 35 4551:71:6 1:6132 35 4551:71:6 1:61212132 35 4902 35 4201:71:101:61:101:81:121624122014122 35 4901:71:6 1:81612142954782912864744714977594415031:101:481:481:481:481:7141:7141:7141:7142033m-kinder.2 35 7001:101:10 1:122420201:10204602 35 4551:101:10 1:122420131:102088121233m-kinder.33m-kinder.2 35 5601:101:10 1:122420165881:102033m-kinder.·THE CENTER MUST HAVE AT LEAST ONE HAND SINK AND ONE TOILET FOR EACH 15 CHILDREN OR PORTION OF 15 CHILDRENSPECIFIED IN THE LICENSED CAPACITY.VESTIBULELOBBYCHILDTOILETCHILDTOILETCHILDTOILETELECINFANT 18 CHILDREN(280 SF REQ'D.)295 SF ACTUALINFANT 28 CHILDREN(280 SF REQ'D.)291 SF ACTUALINFANT 38 CHILDREN(280 SF REQ'D.)286 SF ACTUAL20 CHILDREN(700 SF REQ'D.)759 SF ACTUALTODDLER 18 CHILDREN(280 SF REQ'D.)478 SF ACTUALTODDLER 213 CHILDREN(455 SF REQ'D.)474 SF ACTUALTODDLER 313 CHILDREN(455 SF REQ'D.)471 SF ACTUAL14 CHILDREN(490 SF REQ'D.)497 SF ACTUAL12 CHILDREN(420 SF REQ'D.)441 SF ACTUALDISCOVERYPRESCHOOL 114 CHILDREN(490 SF REQ'D.)503 SF ACTUALUPCHILDTOILETCHILDTOILETCHILDTOILETPRESCHOOL 1DISCOVERYPRESCHOOL 2PRE-K (1)CLOSETCLOSETADULTTOILETCHILDTOILETCHILDTOILETCHILDTOILETPRESCHOOL 213 CHILDREN(455 SF REQ'D.)460 SF ACTUALGYM612 SF ACTUALPRE-K 216 CHILDREN(560 SF REQ'D.)588 SF ACTUALWARMINGPANTRYLAUNDRYOFFICECLOSETSTAFFCLOSET 5953 LABEAUX AVENUE ALBERTVILLE, MNJOB NO.DATE2355512/05/2023SHEET NO.#DATE TYPE 1 2 3 4 5 6 7 8 9 REVISIONS17710 Detroit Avenue Lakewood, Ohio 44107 Phone (216) 521-5134 Fax (216) 521-4824 www.adaarchitects.com THESE DOCUMENTS CONTAIN INFORMATION PROPRIETARY TO ADA ARCHITECTS, P.C. UNAUTHORIZED USE OF THESE DOCUMENTS IS EXPRESSLY PROHIBITED UNLESS AGREED UPON IN WRITING.10 ADA ARCHITECTS, P.C. PROPOSED DAYCARE LOCK PLAN ASCALE: 1/8"=1'-0"NORTHNFIT PLANFP-1.01 OF 2Exhibit IAgenda Page 25 05/08/2024RENDERED ELEVATIONSExhibit J Agenda Page 26