Loading...
2008-10-12 BNSF Pipe Line Crossing - E3C::>L -rC::>N &. 1'-/1 E: N I< , Consulting Engineers & Surveyors 7533 Sunwood Drive NW, Suite 206 · Ramsey, MN 55303 phone (7631433-2851 · Fax (7631427-0833 www.bolton-menk.com ~:rnSJ " -=- October 12, 2008 Jones Lang LaSalle Americas, Inc. Attn: Ms. Cynthia Kent 3017 Lou Menk Drive, Suite 100 Fort Worth, Texas 76131-2800 RE: BNSF Pipe line Crossing City Of Albertville, Minnesota Tracking # 08-36989 Dear Ms. Kent: /j,fuMVJ- I Old -::Yo ~ I NC:@ ,bm Enclosed, please find two (2) executed Pipeline License agreements (originals), a check in the amount of $2,500.00 for the contract fees ($1,500) and participation in the BNSF Railroad Protective Policy ($1,000). Please feel free to contact me by phone at (612) 328-0878 or by email at adamna@bolton-menk.com, with any questions or concerns. Sincerely, BOL TON & MENK, INe. ALJfii Adam Nafstad, P.E. City Engineer Enclosures Cc: Larry Kruse, City of Albertville Administrator DESIGNING FOR A BETTER TOMORROW Bolton & Menk is an equal opportunity employer. ~ t\J~~!,.!.,!:iJLE: 5959 Main Avenue NE. P. O. Box 9 · AIDertville, MN 55301 · 763-497-3384. Fax 763-497-3210 CONSTRUCTION NOTICE Date: October 16,2008 To: Old Castle Glass Scherer Bros. Lumber Fraser Steel Mold Tech Vetsch Cabinets Dennis Fehn Ahren's Enterprises Keep it Safe Storage Radiation Products Intex Corporation Steffen Bros. Meats Sunoco From: City of Albertville, City Hall Re: Barthel Industrial Boulevard Construction Dear Albertville Businesses: The City will be extending municipal water and sanitary sewer service to certain Barthel Industrial Boulevard properties located north of the railroad tracks. These and related improvements will require a temporary closure of Barthel Industrial Boulevard and a temporary watermain shutdown. Road Closure: Beginning Friday, October 24th, Barthel Industrial Boulevard will be closed to all through traffic. The closure will take place between the railroad tracks and 55th Street N.E. and will remain in effect for approximately three (3) weeks. Access to all businesses will be maintained at all times. However, between the railroad and 55th Street N.E., the road will not be open to through traffic. For the businesses located south of 55th Street N.E., suggested alternate routes for freeway access include: . Barthel Industrial Blvd to MacIver Ave N.E. to TH 241 to I 94, or . Barthel Industrial Blvd to CSAH 18 (50th Street) to CSAH 19 to CSAH 37 to I 94 Watermain Shutdown: On Saturday, October 25th, the city watermain located in Barthel Industrial Boulevard will be temporarily shut down and all businesses listed above will be without water. The water shut down will occur at 3 :00 A.M. and will remain off until approximately 6:00 P.M. Thank you for your understanding and patience, and please feel free to call me at (612) 328- 0878 with any question and/or concerns. Sincerely, 4/ I~/ /~iAA. /Tv{ ... Adam Na stad, P.E. Project Manager Cc: Albertville City Council City Administrator Kruse Albertville Public Works Dept. ROAD CLOSURE TO BEGIN OCTOBER 24TH AND WILL REMAIN CLOSED FOR APPROXIMETLY 3 WEEKS. ALTERNATE FREEWAY ACCESS POINTS INCLUDE: CSAH 18 (50TH ST.) TO CSAH 19 tt\BOL TON & MENK. INC. Consulting Engineers & Surveyors MANKATO, MN FAIRMONT, MN SLEEPY EYE, MN WILLMAR. MN BURNSVILLE, MN CHASKA, MN RAMSEY, MN AMES, IA @Bolton & Menk, Inc. 2008, All Rights Reserved O:\ALBT\Albt-parcels.dwg 10/17/08 11 :23 am CITY OF ALBERTVILLE BARTHEL INDUSTRIAL DRIVE ROAD CLOSURE OCTOBER, 2008 FIGURE NO. 1