1988-07-05 CC Agenda/PacketCITY OF ALBERTVILLE
P. O. BOX 131
ALBERTVILLE, MINNESOTA 55301
PHONE: (612) 497-3384
COUNCIL AGENDA
JULY 5, 1988
I. CALL MEETING TO ORDER
II. APPROVAL OF THE AGENDA
* III. APPROVAL OF THE COUNCIL MINUTES -- June 6, 1988
-- June 20, 1988
IV. COMMUNITY FORUM
* 7:10 Joint Power's Update -- Approval of Resolutions --
pertaining to the WAC Fees (Update)
7:20 David Vetsch -- Equipment Vehicle
7:45 Ed DeMars -- Community Center
V. DEPARTMENT BUSINESS
a. MAINTENANCE
- Project Updates
* - Central Air for City Hall
* - Overtime Calendars
b. LEGAL
* Resolution Relating to Surface Water in Westwind
Development
Make our City ........ Your City
We invite Home, Industry, Business
•
COUNCIL AGENDA
PAGE 2
C. ENGINEERING
- Study of Surface Water Drainage for the Undeveloped
Areas of Albertville
* - Pay Request for LaTbur
Easement for D.J.'s Total Home Care Center
- Project Updates
- Other Business
d. ADMINISTRATION
- Income Received and Bills to be Paid
Grinding Stump for Gary Barthel (Cont. Discussion)
- SAC RESERVE CAPACITY REPORT AND GUIDELINES
- Other Business
VI. MEMBER'S REPORT
VII. OTHER BUSINESS
VIII. MOTION TO ADJOURN
d
:1
COUNCIL MINUTES
JULY 5, 1988
The regular meeting of the Albertville City Catanci.l was called to
order by Mayor Loretta Roden. Members present included Bob Braun, Don
Cornelius, U_)natufi Vetsch and C3aLy Schwenzfeier. Others present included
Maureen Andrews, Bob Sullentrop, Ken Lindsay and Lorie Villareal.
The agenda for the evening's meeting was reviewed by the CDUTici.l..
UOn Cornelius made a motion to approve the agenda and Gary Schwenzfeier
seconded it. All were in favor and the motion carried.
There were no questions or comments on the C.,oancil minutes of June
6, 1988, so a motion was made by Don Cornelius and seconded by Gary
&,chwenzfeier to approve the minutes. All were in favor and the motion
carried.
Aanatus Vetsch made a motion to approve the C(xancil minutes of June
a), 1988. Bob Braun seconded this motion. All were in favor and the
motion carried.
The G:)unci.l discussed the last Joint Power's meeting dealing mostly
with the issue of the increase of connection charges by $200.00. The
Council was informed by Gary Schwerizfeier and Don Cornelius that there
was still. no agreement regarding the resolution regarding the increase.
In an effort to speed things along it was agreed that the City of
Albertville would prepare three different resolutions regarding the
surp 1 gas funds that will be generated from the $200.00 .
The Council was informed that these resolutions were prepared and
given to Linda so that each of the communities would have a chance to
review and discuss them before the Joint Power's Board meeting. Maureen
reviewed with the Council the differences between the three resolution,
which include the following:
RESOLUTION 1. This resolution stipulates that moneys will be spent
in accordance with the agreement, that is any excess
funds will be used to reduce the lxmded indebtriess.
RE'SOLIJTION 2. This resolution stipulates that money derived from
the increased connection charge can spent as
allowed under the guidelines of the operating and
authorization agreement. provided that the
expenditure is first approved by the unanirrx-xus
consent of the Board and the consent, of the Bond
Holder. It should be noted that the agreement
currently requires the Board to notify the Bold
Holder as to any expenditure of surpl fiaridFs .
RESOLUN ON 3. This resolution clarifies the intent of the
Operating and Authorization Agreement with regards
to how excess fund can be spent. The intent of this
resolution is to assure that in the event that any
of the four communities need to expand their trunk
line system it will be the individual c(Arsreunities
responsibility to finance the expansion. Again this
resolution reiterates the requirement that the bond
holder needs to be notified of any expansion to the
principal system.
After sorr►e additional discussion the C,--)uncil voted on the three
resolutions, approving all of them in a priority order. The following
motions were made:
A motion was made by Donatus Vetsch and seconded by Lon
Cornelius approving Resolution #3. All were in favor and the
motion carried.
A motion to approve Resolution #2 as the second choice was
made by Gary Schwenzfeier and seconded by Don Cornelius. All
were in favor and the motion carried.
.-. The Council approved their third choice when a motion was made
by Don Cornelius and seconded by Bob Braun to approve
Resolution #1. All were in favor and the action carried.
The Council was informed that the Joint Power's Beard would meet on
July 13, 1988 at 8:30 p.m. to discuss and resolve the connection charge
increase.
Fire Chief David Vetsch was present to inform the Council that the
Fire Department will be burning an abandoned house out at Foster Lake on
Saturday, July 16th as part of a fire training exercise. The training
session will be overseen by an instructor frrxn the Anoka Technical
School. The Fire Department has applied for the States approval and the
Sheriff's Department has been notified. Joint Power's is also aware
that the Fire Department will be using approximately 7500 gallons of
water. No problems are anticipated unless there is inclement weather.
Fire Chief Vetsch went on to say that the Fire Department is
looking at purchasing a new equipment/rescue vehicle that would replace
the existing vehicle. The Lions Club has allocated $75M.M towards the
purchase price.
PAGE 2
The vehicle being considered is a 1979 Fond which was previously an
ambulance. The vehicle has 58,000 miles, has good tires, all the lights
world be included, and that it drives well and is in basically good
shape. It was pointed out that the vehicle does not have a cot in it
since the department will be using it to transport its members to the
scene of the accident or fire, once seats have been installed. Dave
also i.nforiwA the Council that the vehicle will care without a radio,
which will need to he added on once it is purchased. It is selling for
$10,V".P.J4J and will be available in thirty days.
There was some discussion whether or not the equipment/rescue
vehicle could be purchased new for a price similar to what the used one
can be puz-(�hased for. It was pointed out that equipped a new vehicle
would cost upwards to $60,000.00.
The Fire Department would like to sell the old vehicle for $15M to
$2000 and use that profit towards the balance of the purchase price. An
ad will be placed in the local newspaper for the sale of the existing
vehicle. The Fire Department is asking the approval of the City to
purchase this new equipment/rescue vehicle.
Donatus Vetsch made a motion to approve the purchase of the new
ecsuipMent/rescue vehicle for the Fire Department. Don Cornelius seconded
this motion. All were in favor and the motion carried.
The G)uncil next heard from the Maintenance Ek.Partment. Ken told
the Council that the removal of the old waste water plant is now
finished and the area has been filled in with sand.
The gravel. on the dikes has been shaped and bladed down. Once it
rains it will help settle the gravel and some additional shaping may
need to tx; done at that time.
The Gotmcil was informed that a cable has been installed in front
of the Beaudry property to detain additional dumping in the area.
The minl..7tes should note that a complaint was registered with the
DNR that the City of Albertville had filled in the wetlands. The
CA-xiservation Officer checking into the situation was assured that all we
did was eliminate the dumping area. The City did not fill in the
wet lands .
The discharging of the Waste Water Treatment Facility ponds has
been completed and approved. The ponds met all limits for the second
time. Ken told the Council that it, appears that the alum was bad because
it had been frozen last winter. It was pointed out that t, eliminate
the problem the City may need to look at a different heating system to
keep the b.iilding at a stable temperature. It will be important to keep
the heat above 65 degrees and as the Council may recall last year there
were times when the temperature got as low as 45 degrees. One of the
PAGE 3
mr,mbers of the Council asked if it would be possible not to carry the
alum over the winter. Ken explained that, 1500 gallons of alum is the
minimum that can be ordered at one time, so it will be to our advantage
to not allow it to freeze this winter.
The next issue discussed was the possibility of installing Central
Air in City Hall. Ken had received information from both W's Total
Home Care Center and B & D Plumbing on the cost of central air and
ceiling fans.
ICJ"S bid on the installation of a 2 ton 9 point ceers air
conditioner was $1,475.00, and $1,650.00 for a 2 1/2 ton 9.7 ceers air
conditioner. A $110.00 rebate is available on the 2 1/2 ton model. DJ is
rec-Nxrunending the 2 ton air conditioner, taking 1 1/2 weeks to install.
For the back and the firebarn, it was recommended tr., get two 56 inch
commercial ceiling fans, costing $96.00 each. A hose will have to be
vented on the outside of the building, costing an extra $225.00.
B & D Plumbing bid $1,435.00 complete for a 2 ton 9 point ceers air
conditioner.
There was discussion concerning the fact that the City could riot
justify spending that kind of money for central air this year. It was
decided to put the issue of central air on a budget item for next year.
The other window air conditioner will be installed in Maureen"s office
for the balance of the summer.
Ken has been asked to speak at the Minnesota Wastewater Operator's
Association on August 4th at 10:30 a.m. He is requesting that fie. be able
to attend the entire conference August 3rd - 5th in Bloomington.
Attending the conference will count towards the wastewater operator's
certificate. The (council made no decision on Ken`s request.
Ken brought up to the Council a personal matter, asking what can be
done about dogs that bark all the time. It was said that the dog catcher
can talk to the people and that there needs to be two signed complaints
to give a fine.
The overtime calendars were reviewed by the Council. There was a
question about Ken`s overtime on May 23rd for checking pumps and
checking at the, lift station. It was discussed and agreed upon that the -
City should pay Ken his overtime in order to bring his hours back down
to 25 hours.
Don Cornelius made a motion to pay Ken his overtime down to 25
hours. Donatus Vetsch seconded this motion. All were in favor and the
motion carried.
PAGE 4
Lorie's overtime was approved.
There was a brief discussion on Comity Ditch #9. It was agreed
that the Council should have a special work meeting to discuss the
impact of the outlet in to the County Ditch and what other alternatives
the City might have for resolving this problem once and for all. It was
agreed that the work meeting be set up for Tuesday, July 12th at 7:00
p.m. to die;cuFcs storm water drainage, provided that the City Attorney
and Engineer could meet that evening.
C-x Schwenzfeier made a motion and Dori Cornelius seconded it to
set the work meeting for July 12th . All were in favor and the rrx-)tiori
carried. (The records should note that the meeting was held Monday, July
11th instead because of a scheduling problem.)
The Latour pay request was discussed next. Bob Sullentrop reported
that sewer and water is in up to County Road #19 and part of the ditch.
The work meets the approval of the City engineers and they are
recommending that the Council honor Latour`s pay request of $173,771,87.
The issue of W's easement was discussed briefly. There had been
some disciAssion about the possibility of exchanging the blacktop for the
easement, When checking into the cost, Buffalo Bituminous estimated the
blacktoppi.ng cost would run $3,330.00 ($5.50 a square yard). It was the
feelir,; of the City that this was too expensive and the City should not
enter into such agreement. It was pointed out that the City does not
typically pay for an easement because improvement normally provides a
benefit to the adjoining property.
So far, W is not objecting to the work being done but has riot
signed the easement papers either. It was agreed that Maureen, TYlore,
and Bob should meet with DJ and resolve the issue once and for all.
The update on the Westwind sewer project shows that all services
are completed to the ditch and are hooked up to the line at I-94. The
lift station will be started and the work done back towards DJ`s.
The Class 5 gravel is in on the Hackerm-seller project and it will
be paved at the same time that Barthel Manor is done.
The catch basins, curb and gutter are raised and in on the Barthel
Manor project.
The patching is marked on the
streets now. It is
$5.50 a square
Yard
for patching (removal and replacement, 3 inches in,
over layment 1
1/2
inches). Buffalo Bituminous was 12
square yards over
bid. The crown
at
57th and Lander was not included in
the bid. The se.,alcoating will be
held
off 2 to 3 weeks until Latour is
done cutting &?Wh
Street for the
work
they net -ad to get completed in that
area.
PAGE 5
One of the Council members was concerned with the marking for
street repairs. It was agreed that Dori Cornelius would meet with Norm,
Gardner from Meyer--Rohlin and go through the project again before any
work is done.
The incorrx received and the bills to be paid were reviewed by the
fa,iara il.. There was some minor discussion about the Fehn Gravel bill and
T & S Trucking bill. The Council asked what does the income received
from Franklin (,Xatckx)r Advertising include for signs. There were no other
gi.ue:stionFs or comments so AJn Cornelius made a motion to approve the
bills. Gary Schwenzfeier seconded this motion. All were iri favor and
checks 8821 -- 8862 were paid.
Paul. Heinen is making a request, of Franklin Outdcw-)r Advertising to
remove the billboard from their property as the lease is up and is no
longer binding.
The discussion on the grinding stump for Gary Barthel was again
continued. There seems to be too many trees right on the boulevard ]-in(--
throughout town and the discussion was that how many of them are really
on City property and would it be fair to remove Mr. Barthel`s and not
the others. (;xlnci.l member Dori Cornelius will do some calling to see how
much it will cost to have a stump removed. No other decisions were made.
The CAC Reserve Capacity Report and CAiidel.ines was tabled until a
later date.
The Lions requested that the Council acknowledge their renewal
application for their gambling license. Don Cornelius made a motion and
Bob Braun seconded it to acknowledge the Lions gambling license renewal.
Q_mAricil member Gary Schwenzfeier asked if Ken had made a list of
the ,funk Cars within the City. Maureen stated that she will ask Ken
about it but Yx_-li.eved that he had not had time to do it.
The Council. also heard abet -it Ed Hackerumieller`s request to have
local advertising on the pylon sign. He would like to see the
advertising all on one sign; if two separate signs, he, will have to have
a variance.
The issue of. garbage contract hauling was again brought up. Marilyn
x-)rr:oran, from the City of Champlin will meet daytime, preferably, for
.any discussion the Council would like to have. It was agreed to call and
Flee if it would be possible t-6 work it in at the Tuesday night meeting.
Maureen informed the Council that the City will have the Bond
proceeds on July 6, 1988.
There was no other business or comments, so a motion was made by
Gin Cornelius and seconded by Gary Schwenzfeier to adjourn the meeting.
All were in favor and the motion carried.
PAGE 6
r
<
0
>
m
r
r
r
<
N
W
r'f
, /'
r
to
le1
W
n
_
80
r
t
O
4
r
N
�
�
c
—
co
i
C
r
�'
a
091
AUDITOR'S WARRANT
AUDITOR'S WARRANT
AUDITOR'S WARRANT
AUDITOR'S WARRANT
MICHAEL WELTER (Building Permit
FRANKLIN OUTDOOR ADVERTISING
MINNESOTA TITLE
ALBERTVILLE FRIENDLY CITY DAYS
ALBERTVILLE FRIENDLY CITY DAYS
ALBERTVILLE FRIENDLY CITY DAYS
ALBERTVILLE FRIENDLY CITY DAYS
ALBERTVILLE AREA JAYCEES
DAVID TRUENOW (F.C.D.'s T-
REGISTERED CLOSERS
WILFRED LINDENFELSER
GARDNER BROS. CONSTRUCTION,
INCOME RECEIVED
JULY 5, 1988
10,188.32
4,254.23
13,790.50
89,570.10
-Deck) 40.50
702.00
10.00
(Button Sales) 1,248.00
(Petty Cash Repayment) 120.00
(Gary Wick -Magic Show) 234.75
(Park Board) 2,573.50
(T-Shirt/Cap Sales)
1,
Shirts) 4.00
10.00
45.00
INC. 1,221.45
TOTAL $124,400.15
BILLS TO BE PAID
JULY 5, 1988
JOE VILLAREAL/BARB HAGEN (1st. Prize-F.C.D.)
400.00
KIM POULIOT (2nd. Prize-F.C.D.)
100.00
NEW BRIGHTON LUMBER CO.
367.12
ALBERTVILLE AUTO PARTS, INC.
31.01
T & S TRUCKING
258.50
KRWC 1360 AM
250.00
UNITED TELEPHONE SYSTEM
130.70
PERA
146.66
PERA
9.00
WRIGHT COUNTY AUDITOR/TREASURER
1,779.38
STRAIT STUFF SCREEN PRINTING
1,060.85
FEED -RITE CONTROLS, INC.
11.00
SECURITY STATE BANK
634.43
NORWEST BANK
600.35
DJ'S TOTAL HOME CARE CENTER
44.50
LUVERNE FIRE APPARATUS CO., INC.
199.00
MINNESOTA FIRE.
10.70
DENNIS FEHN GRAVEL, INC.
3,417.50
WRIGHT COUNTY AUDITOR/TREASURER
2,560.25
A-1 TOILET RENTAL
180.00
AMERCIAN NATIONAL BANK
175.85
LORETTA RODEN
BOB BRAUN
DON CORNELIUS
110.00
DONATUS VETSCH
GARY SCHWENZFEIER
MAUREEN ANDREWS
MAUREEN ANDREWS
85.00
KEN LINDSAY
KEN LINDSAY
85.00
LORIE VILLAREAL
JIM FARRIS
PETE MERGES
DON KMECIK
TOTAL $12,646.58
TO City Council
City of Albertville
Albertville, Minn. 55301
DARRELL WOLFF
wr4M County ShoNH
BUFFALO, MINN. 55313
REGARDING: Monthly report DATE• 6-20-88
Dear Council:
Enclosed is your monthly report for May, 1988. A total of 93 hours were
worked for the month. Your billing is as follows:
DW:dl
enc.
May, 1988 -- $ 1,779.38
Yours truly,
Darrell Wolff
Wright County Sheriff
5
RUN. 16-a1r-88
INSTALLATION WE --WRIGHT CO. SHERIFF DEPT-
PAGE 1
_FS14 JURIS. 21
* * * * * *
co,
rdMARY ISN'S ONLY? NO
E N F 0 R S
HOW RECEIVED CODES: ALL
ACTIVITY CODES: ALL
CALLS FOR SERVICE
INCIDENT SUMARY BY ACTIVITY
05/01/88
THRU 05/31/88
ACTIVITY CODE/
PRI INCIDENT SEQ
HOW TIME
DATE
PERSON/
DESCRIPTION GRID LOCATION APT
OFF NUMBER NO.
RECV RECV
REPORTED
BUSINESS NAME
09175 0
ALBERTVILLE VILL
280 88006801 01
P 2006
05/05/88
ANONYMOUS
STALLED VEHICLE
09468 MB
11802 50TH ST NE-21297 88007746 01
P 0629
05/21/88
BECKER, RON
H t R ACCIDENT
09470 KILL
I94 E X E MILL-21MW 88 M59 01
P 0044
05/31/88
KING, NATHAN
MV-DEER
09651 0
ALBERTVILLE VILL
MSP 88006496 01
P 2036
05/01/88
HART, PAT
LIQUOR VIOLATION
09685 0
ALBERTVILLE VILL
282 88007666 01
P 0811
05/20/88
YOUNGDAHL, DIANE
PHONE CALL
c ,20 0
ALBERTVIL.LE VILL
299 88006503 01
P 2126
05/01/88
LAMPPOST INN
CHECK ON WELFARE
09730 911
AUUMIL.LE VILL
88006716 01
P 2035
05/04/88
DEACH, BERNIE
MEDICAL
09807 0
ALBERTVILIE VILL
88006873 01
P 2042
05/06/88
HAMM, ELMER
TRAFFIC/PARKING
09922 0
ALBEERIRTVILLE VILL
266 88007737 01
P 0103
05/21/88
BICKING, GAYL.EN
SUSPICIOUS VEHICLE
09945 0
AL.BERTVILLE VILL
287 88006719 01
P 2121
05/04/88
LINDSAY, KEN
MISCELLANEOUS INFORMATION
J3500 0
ALBERTVILLE VILL
271 88006617 01
V 0119
05/03/88
WRIGHT COUNTY SHERIFF'S DEFT
TRAF-ACCID-MIS-DRIVE UNDER INFLUENCE OF LIM
M4106 C&'dAa d44*ie
ALBERTVILLE VILL
271 88006617 02
V 0119
05/03/88
WRIGHT COUNTY SHERIFF'S DEPT
LIQUOR - PROCURING L160 FOR A MINOR
N3190 0
ALBERTVILLE VILL
297 SM187 01
P 1251
05/27/88
YOUNGDAHL, DAINE V
DISTURB PEACE-14S ING COMMUNICATIONS
�%
P11l0 0 .,
f^ . DN%GE-fE-PRIVATE-UNC INTENT
kBERTVILLE VILL
271 880079M 01
P 1806
05/23/88
�IOLTZ, CAROL
T2029 Aviv 0
ALBERTVILLE VILL
88007149 01
P 1446 05/11/88 SUNRISE PLUMBING
THEFT-$251-$25p0�0--q-FRM BUILDING-OTH PROP
T2059 "%""' Aricl
.cam 0
ALBERTVILLE VILL
88ON489 01
P 1209 05/31/88 HACKENMUEL-B, ED J
THEFT-$251-425,AO-FE-FRM YARDS-OTH PROP
RUN: 17-JUN-88
ADU02 JURIS: 21
PRIMARY ISN'S ONLY? NO
NAME TYPES: A T B
ACTIVITY CODES: ALL
ACT GRID OFF NAME
CODE NO. TYPE
ACTIVITY DESCRIPTION
INSTALLATION NAME—WRIGHT CO. SHERIFF DEPT-
tttttt
PAGE 1
E N F 0 R S
ADULT SUMMARY BY ACTIVITY - WITHIN 'DATE REPORTED'
05/01/88 THRU 05/31/88
ADULT NAME INCIDENT PER INC DATE OF: DATE OF ARREST
NUMBER SEQ SEA REPORT DISPOS. DISPOSITION
ADDRESS CITY STATE ARREST
09010 TI-MA 280 T
ROSENOWs WAYNE KENNETH
SPEED
RT 3 BOX 75
09011 TI-FA 297 T
VETSCH, BABI LYNNE
SPEED/RADAR
11403 54TH ST NE
09021 TI-MA 276 T
TIERMAN, ROGER GERALD
UNREASONABLE ACCELERATION
12205 60TH ST
09031 TI-MA 271 T
MINGO, THOMAS CHRISTOPHER
STOP SIGN
219-B CANAL RD
_ 09091 TI-MA 280 T
KNUDSON, TODD MITCHELL
OPEN BOTTLE
307 KJELLBERGS
09091 TI-MA 280 B
SEAVEY, KEVIN WAYNE
OPEN BOTTLE
470 KRIESEL PL
09092 TI-MA 280 T
ROSENOW, WAY1,E KENMETH
ALLOWING OPEN BOTTLE
RT 3 BOX 75
J3500 271 A
KINNANDER, AMY SU:
TRAF-ACCID-MS-DRIVE UNDER INFLUENCE OF LIQUOR
3730 LOUISANA AV N
M4106 271 A
KINNANDER, AMY SUE
LIQUOR - PROCURING LIQUOR FOR A MINOR
3730 LOUISANA AV N
P1110 271 A
SCHULTZ, Jam! WILLIAM
PROP DAMAGE-FE-PRIVATE-UNK INTENT
ROUTE 1 BOX 370
JUiIS 21 TOTALS - NUMBER OF INCIDENTS: 10
8896M 1
1
5/06/88
NO ENTRY
LONG PRAIRE
MN
88958851 1
1
5/09/88
NO ENTRY
ALBERTVILLE
MN
88965052 1
1
5/15/88
NO ENTRY
ALBERTVILLE
MN
88964997 1
1
5/05/88
NO ENTRY
BRUNSWICK
GA
88964887 1
1
5/06/88
NO ENTRY
MONTICELLO
MN
88964889 1
1
5/06/88
NO ENTRY
OWATONNA
MN
88964886 1
1
5/06/88
NO ENTRY
LONG PRAIRE
MN
88006617 1
1
5/03/88
5/03/88 REL BAIL OR RO
NEW HOPE
MN
5/03/88
88006617 1
2
5/03/88
5/03/88 REL BAIL OR RO
NEW HOPE
MN
5/03/88
88007935 1
1
5/23/88
5/23/88 REL BAIL OR RG
MONTICELLO
MN
5/23/88
RUM: 16-10- 88
CFS14 JURIS: 21
HIM" ISN'S ONLY? NO
HOW RECEIVED COGES: ALL
ACTIVITY CODES: ALL
ACTIVITY CODE/
DESCRIPTION
INSTALLATION NAPE--WIGHT CO. SHERIFF DEPT-
ENF0RS
CALLS FOR SERVICE
INCIDENT Sl~Y BY ACTIVITY
05/01/88 THiU 05/31/88
PRI INCIDENT SEQ HOW TIME DATE PERSON/
GRID LOCATION APT OFF NUMBER NO. RECV RECV REPORTED BUSINESS NAPE
JUtIS 21 TOTALS - NUMBER OF INCIDENTS:
10 - Car & subject checks
2 - Citizen aids
3 - Motorists warned
1 - Open door checked
7 — Traffic tickets issued.
16
��
ADDITIONAL INCOME RECEIVED
JULY 5, 1988
SEWER ACCOUNTS
FRANKLIN OUTDOOR ADVERTISING COMPANY
TRI COUNTY ABSTRACT & TITLE
DISPLAY SALES
175.00
1,352.80
10.00
323.84
TOTAL $1,861.64
ADDITIONAL BILLS TO BE PAID
JULY 5, 1988
DJ'S TOTAL HOME CARE CENTER
LEAGUE OF MINNESOTA CITIES
G.D. LaPLANT SANITATION, INC.
DON'S AUTO SERVICE
SCHARBER & SONS, INC.
CENTURY LABS/PRO CLEAN, INC.
LEFEVERE, LEFLER, KENNEDY, 0"BRIEN
LORETTA RODEN
38.19
355.00
35.00
109.84
41.11
527.61
& DRAWZ 15.00
30.00
TOTAL $1,196.25
-'/IEYER-ROHLIN, INC.
ENGINEERS -LAND SURVEYORS 1111 Hwy. 25 N., Buffalo, Minn.55313 Phone 612-682-1781
July 1, 1988
City of Albertville
c/o Maureen Andrews, Administrator
Box 131
Albertville, MN 55301
Re: 1988-3A Improvement Project
Albertville, Minnesota
Partial Payment #1
Honorable Mayor & City Council:
The contractor for the above referenced project has requested partial
payment for the work completed to date. Below you shall find the
quantities for the work performed.
CSAH INTERCEPTOR AND WATERMAIN
BID "A" Watermain
Item
Bid
No.
Item
Qty.
1.
12" DIP
1740
2.
6" DIP
20
3.
Wet tap with 12" gate
valve
valve box & riser
1
4.
12" gate valve with
valve box & riser
4
5.
6" gate valve with
valve box & riser
1
6.
Hydrant
1
7.
12" ll'o bend
l
8.
12" 222o bend,
1
9.
12" x 12" x 8" tee
2
Inst.
Qty. Unit
1630 l.f.
38 l.f.
Unit Price
$ 18.55
$ 10.17
Total Price
$30,236.50
$ 386.46
each $ 1920.00 $
4 each $ 670.00 $ 2,680.00
2 each
$
290.00
2 each
$
1000.00
each
$
145.00
each
$
145.00
2 each
$
200.00
Thore P. Meyer, Professional Engineer Robert Rohlin, Licensed Land Surveyor
$ 580.00
$ 2,000.00
$
$ 400.00
Item
No. Item
10. 12" x 12" x 6" tee
11. Crushed rock
12. Density testing
13. Class 5 aggregate
(cv)(inplace)
14. Bituminous patch 4"
(2" base, 2" wear)
15. 12" plug
Bid Inst.
Qty.
Qty. Unit
Unit
Price
Total Price
1
2 each
$
195.00
$ 390.00
200
ton
$
.01
$
35
each
$
19.00
$
20
C.Y.
$
10.00
$
50 s.y. $
1 1 each $
TOTAL BID "A"
BID
"B"
Sanitary
Sewer
1.
12"
PVC
(12'-141)
750
748
l.f. $
2.
12"
PVC
(14'-161)
495
518
l.f. $
3.
12"
PVC
(16'-181)
400
259
l.f. $
4.
12"
PVC
(18'-201)
50
136
l.f. $
5.
12"
PVC
(20'-221)
165
l.f. $
6.
12"
DIP
(20'-221)
52
l.f. $
7.
Boring-24" casing
w/12" carrier pipe
86
8.
12" DIP (28'-301)
dead lead to L.S.
20
9.
Submersible pump L.S.
w/valve MH,
2-5 hp pumps, piping,
controls,
valves (complete)
1
10.
6" PVC F.M., AWWA C900,
Class 150, DR 18
1280
11.
Class 5 aggregate
(cv)(inplace)
200
12.
Bituminous patch 4"
2" base, 211 wear
270
13.
Black dirt
1050
8.00 $
76.00 $ 76.00
$36i748.96
17.20
$12,865.60
18.20
$ 9,427.60
19.20
$ 4,972.80
20.70
$ 2,815.20
22.20
$
29.80
$
130.00 $
l.f. $ 34.60 $
each $45,734.00 $
l.f. $ 7.35 $
c.y. $ 10.00 $
s.y. $ 8.00 $
c.y. $ .01 $
-2-
Item
No. Item
14. Seeding
15. Sodding
16. Crushed rock
17. Density testing
18. Manholes
19. Manhole extra depth
20. 6" 450 PVC bend
21. 6" 1110 PVC bend
22. Bituminous patch 3"
1i" base, 12" wear
23. Bituminous patch 2"
2" wear
24. 12" plug
25. 12" end cap
WESTWIND DEVELOPMENT
Bid "C" Watermain
1. 6" DIP
2. 8" DIP
3. 6" gate valve
w/box & riser
4. 8" gate valve
w/box & riser
5. Hydrant
6. 8" x 8" x 6" tee
7. 8" x 8" x 81 tee
8. 6" x 6" x 6" t e e
Bid
Inst.
Qty.
Qty.
Unit
Unit
Price
Total Price
1.85
acre
$
950.00
$
480
S.Y.
$
2.00
$
800
ton
$
.01
$
100
each
$
19.00
$
7
4
each
$
890.00
$ 3,560.00
70
31
l.f.
$
59.00
$ 1,829.00
1
each
$
60.00
$
1
each
$
60.00
$
140
S.Y.
$
7.00
$
50 s.y. $
1 each $
1 1 each $
TOTAL BID "B"
5.00 $
80.00 $
50.00 $ 50.00
$35i520_20
1500
1458
l.f.
$
9.95
$14,507.10
1975
1983
l.f.
$
12.25
$24,291.75
14
13
each
$
290.00
$ 3,770.00
12
12
each
$
390.00
$ 4,680.00
8
7
each
$
1000.00
$ 7,000.00
11
10
each
$
120.00
$ 1,200.00
2
2
each
$
125.00
$ 250.00
2
2
each
$
95.00
$ 190.00
-3-
Item
Bid
Inst.
No.
Item
Qty.
Qty.
Unit
Unit Price
Total Price
9.
8" 1110 bend
5
5
each
$
80.00
$
400.00
10.
8" 22'o bend
2
2
each
$
80.00
$
160.00
11.
6" ll'o bend
4
4
each
$
60.00
$
240.00
12.
6" 222o bend
2
2
each
$
60.00
$
120.00
13.
6" 450 bend
5
4
each
$
60.00
$
240.00
14.
1" water service group
52
each
$
69.00
$
15.
1" copper
1800
l.f.
$
5.30
$
16.
8" plug
3
3
each
$
55.00
$
165.00
17.
Density testing
67
each
$
19.00
$
18.
Flushing hydrant
1
each
$
175.00
$
19.
Crushed rock
200
ton
$
.01
$
20.
6" hydrant extension
5
each
$
143.00
$
21.
12" hydrant extension
5
each
$
163.00
$
22.
6" plug
4
4
each
$
25.00
$
100.00
Extra:
2" insulation
24
l.f.
$
2.60
$
62.40
8" x 6" reducer
1
1
each
$
100.00
$
100.00
TOTAL
BID "C"
$57i476125-
BID
"D" Sanitary Sewer
1.
8" PVC (8'-101)
1192
1451
l.f.
$
10.85
$15,743.35
2.
8" PVC (10'-121)
890
756
l.f.
$
11.85
$
8,958.60
3.
8" PVC (12'-141)
490
738
l.f.
$
12.85
$
9,483.30
4.
8" PVC (14'-16')
394
45
l.f.
$
13.85
$
623.25
5.
4" PVC F.M., Class 150
AWWA C900, DR 18
dead lead to MH
35
38
l.f.
$
5.70
$
216.60
.l
6.
48" manhole (comp.)
12
12
each
$
830.00
$
9,960.00
-4-
Item
No. Item
7. Manhole ex. depth
8. 4" service conn.
9. 4" PVC
10. Drop section
11. 6" service conn.
12. 6" PVC
13. Density testing
14. Crushed rock
15. 6" end cap
16. 8" end cap
BID "E" Storm Sewer
1.
12"
RCP,
CL III-C
2.
15"
RCP,
CL III-C
3.
18"
RCP,
CL III-C
4.
21"
RCP,
CL III-C
5.
24"
RCP,
CL III-C
6.
33"
RCP,
CL III-C
7.
48"
catch
basin
complete
8.
60"
catch
basin
complete
9.
72"
catch
basin
complete
10.
33"
RCP apr9n
11.
Ditch excavation
Bid Inst.
Qty.
Qty.
Unit
Unit
Price
Total Price
47
40.3
l.f.
$
59.00
$
2,377.70
52
52
each
$
27.00
$
1,404.00
1820
51
l.f.
$
5.30
$
270.30
6.5
5.1
l.f.
$
160.00
$
816.00
4
4
each
$
38.00
$
152.00
180
175
l.f.
$
6.75
$
1,181.25
100
each
$
19.00
$
200
ton
$
.01
$
4
4
each
$
3.00
$
12.00
1
1
each
$
10.00
$
10.00
TOTAL
BID "D"
$511208.35
122
l.f.
$
13.85
$
890
l.f.
$
14.90
$
190
l.f.
$
16.20
$
247
l.f.
$
17.60
$
80
l.f.
$
18.80
$
200
l.f.
$
27.20
$
11
each
$
880.00
$
1
each
$
1300.00
$
1
each
$
1665.00
$
1
each
$
375.00
$
1450 1100
l.f.
$
1.24
$ 1,364.00
-5-
Item
No. Item
12. Density testing
13. Erosion control
barrier
14. Crushed rock
15. 18" flared end
sections
Extra
12" PVC culvert
Bid Inst.
Qty. Qty. Unit Unit Price Total Price
33 each $ 19.00 $
100
200
5
l.f. $ 1.50 $
ton $ .01 $
each $ 190.00 $
l.s. $ 600.00 $ 600.00
TOTAL BID "E" $1964.00
_Z
BID
"F" Streets
1.
Class 5 aggregate
(cv)(inplace)
5260
2.
Surmountable curb
-�
and gutter
6040
3.
Bituminous base 1i"
MnDOT 2331
12585
4.
Bituminous wear 1"
MnDOT 2341
12585
5.
Black dirt
900
6.
Seeding with mulch
1.7
7.
Subgrade preparation
14090
8.
Density tests
31
9.
Common borrow
1200
TOTAL BID "F"
C.Y•
$
5.30
$
l.f.
$
3.95
$
S.Y•
$
1.60
$
S.Y•
$
1.82
$
C.Y•
$
1.50
$
acre
$
950.00
$
S.Y.
$
.79
$
each
$
19.00
$
C.Y.
$
1.80
$
-6-
BRAUN'S PHASE I
BID
"G" Watermain
Item
Bid Inst.
No.
Item
Qty. Qty.
Unit
Unit Price
Total Price
1.
6" DIP
1210
l.f.
$
10.10
$
2.
6" gate valve
w/box & riser
4
each
$
290.00
$
3.
Hydrant
2
each
$
1000.00
$
4.
Flushing hydrant
1
each
$
155.00
$
5.
6" x 6" x 6" tee
2
each
$
95.00
$
6.
6" 450 bend
2
each
$
60.00
$
7.
6" 900 bend
1
each
$
65.00
$
8.
6" plug
1
each
$
25.00
$
9.
1" water service
group
23
each
$
69.00
$
10.
1" copper
720
l.f.
$
5.60
$
11.
Density testing
24
each
$
19.00
$
12.
Crushed rock
100
ton
$
.01
$
13.
6" hydrant extension
2
each
$
143.00
$
14.
12" hydrant extension
2
each
$
163.00
$
15.
8" x 8" x 6" tee
1
each
$
124.00
$
16.
8" sleeve
1
each
$
60.00
$
TOTAL BID "G"
$
BID "H" Sanitary Sewer
1.
8"
PVC
(0'-81)
150
l.f.
$
10.55 $
2.
8"
PVC
(8'-10')
345
l.f.
$
11.55 $
3.
8"
PVC
(10'212')
73
l.f.
$
12.55 $
4.
8"
PVC
(12'-14')
112
l.f.
$
14.05 $
-7-
Item
No. Item
5. 8" PVC (14'-161)
6. 8" PVC (16'-181)
7. 48" manhole compl.
8. Manhole extra depth
9. 4" service conn.
10. 4" PVC
11. Density testing
12. Crushed rock
BID "I" Storm Sewer
12" RCP, CL III-C
2. 15" RCP, CL III-C
3. 27" catch basin
(complete)
4. 48" catch basin
complete
5. 12" RCP apron
w/trash guard
6. Crushed rock
7. Black dirt
8. Seeding with mulch
9. Density testing
BID "J" Streets
1. Class 5 aggregate
(cv)(inplace)
Bid Inst.
Qty. Qty.
Unit
Unit
Price
Total Price
273
l.f.
$
15.05
$
83
l.f.
$
16.05
$
5
each
$
851.00
$
18.5
l.f.
$
59.00
$
23
each
$
26.80
$
760
l.f.
$
5.60
$
31
each
$
19.00
$
100
ton
$
.01
$
TOTAL BID "H"
$
525
l.f.
$
17.10
$
205
l.f.
$
18.15
$
3
each
$
540.00
$
4
each
$
825.00
$
1
each
$
270.00
$
100
ton
$
.01
$
310
C.Y.
$
.01
$
.60
acre
$
950.00
$
15
each
$
19.00
$
TOTAL BID "I"
$
2100
c.y. $ 5.30 $
-8-
Item
Bid Inst.
No.
Item
Qty. Qty.
Unit
Unit Price
Total Price
2.
Bituminous base la"
MnDOT 2331
4650
s.y.
$
1.60
$
3.
Bituminous wear lilt
4650
s.y.
$
1.82
$
4.
Surmountable curb
and gutter
2350
l.f.
$
3.95
$
5.
Curb removal
90
l.f.
$
1.00
$
6.
Curb replacement B618
30
l.f.
$
6.30
$
7.
Bituminous patch 4"
(2" base, 2" wear)
155
s.y.
$
8.00
$
8.
Black dirt
350
c.y.
$
1.50
$
9.
Seeding with mulch
.65
acre
$
950.00
$
10.
Density testing
17
each
$
19.00
$
11.
Adjust manholes
4
each
$
100.00
$
12.
Adjust gate valves
1
each
$
75.00
$
13.
Adjust catch basins
4
each
$
100.00
$
14.
Subgrade prep.
6050
s.y.
$
.79
$
TOTAL BID "J"
$
TOTAL PROJECT
COST
$182,917.76
LESS 5% RETAINAGE
$ 9,145.89
LESS PREVIOUS
PARTIAL
PAYMENTS
$ 0.00
PARTIAL PAYMENT #1
$173,771.87
We therefore recommend Partial Payment #1 to Latour Construction, Route
#1, Box 7C, Maple Lake, MN 55358, in the amount of $173,771.87.
If you have any questions, please feel free to contact me.
Sincerely,
MEYER-ROHLIN, INC.
Bob Sullentrop
sl Professional Engineer
File: 8801-A, 8801-D, 8801-F
cc: Latour Construction
W