Loading...
2009-01-20 CC PacketA�bert ijj4E City of Albertville Council Agenda ttrsc. etc JANUARY 20, 2009 7:00 PM PUBLIC COMMENTS -The City of Albertville welcomes and encourages public input on issues listed on the agenda or of general community interest. Advertised public hearings are scheduled as such so that the public is afforded an opportunity to speak. Citizens wishing to address the Mayor and Council regarding specific agenda items, other than public hearings should indicate so and will be afforded an opportunity during the discussion of said item, Council willing and time permitting. Citizens wishing to speak on matters not listed on the agenda (or items on the agenda that did not include an opportunity to speak) are always afforded the opportunity to do so under the heading "Citizens Addressing the Council", usually scheduled at the beginning and end of the agenda. Presentations are limited to five (5) minutes. In any case, citizens are asked to complete a `Request to Speak Card'. 1. PLEDGE OF ALLEGIANCE 2. CALL TO ORDER — ROLL CALL 3. RECOGNITIONS — PRESENTATIONS — INTRODUCTIONS 4. MINUTES A. January 5, 2009 City Council minutes (pgs. 1-8) 5. CITIZENS OPEN FORUM — (time reserved 5 minutes) 6. AMENDMENTS TO AGENDA 7. 0 CONSENT AGENDA All items with an asterisk O are considered to be routine by the City Staff and will be enacted by one motion. There will be no separate discussion of these items unless a Council member so requests. In such event, the item will be removed from the General Order of Business and considered in its normal sequence on the agenda. Items 40 8.D.1. Building Department — 4t" Quarter Update (pgs. 11-13) 8.E.1. Finance — Semi-monthly Payment of Claims (bills) (pgs. 15-28) 8.E.l.a. Finance — Release Escrow T-Square Business Park (B. Heuring) (pgs. 29-30) 8.I.2. Engineering— Amend Towne Lakes 6tn PUD Dev Agree (pgs. 31-33) 8. DEPARTMENT BUSINESS A. Fire Department City of Albertville Council Agenda January 20, 2009 Page 2 of 3 B. Public Works Department C. Utilities Department (WWTP) 1). Accept the Utilities Superintendent's Report dated January 8, 2009 (pg. 9) D. Building Department 1). 0 Accept the Building Official's Report dated January 12, 2009 (pgs. 11-13) E. Finance Department 1). 0 Approve the Tuesday, January 20, 2009 Payment of Claims (bills) for check numbers 026575 to 026627 (pgs. 15-28) a. 0 Included in Payments - approve releasing in full the $5,000 Escrow posted by Mr. Robert Heuring as surety for the T-Square Business Park plat (pgs. 29-30) F. City Clerk G. City Council 1). Oral Update on the STMA Ice Arena Board meeting (Tom Fay and/or Dan Wagner) 2). Oral Update on the FYCC (Larry Sorensen and/or Tom Fay) 3). Oral Update on the Planning and Zoning Commission meeting (Dan Wagner) H. Planning and Zoning L Engineering 1). 0 Directing Staff to amend to the Plan Unit Development (PUD) Agreement for Towne Lakes 6th Addition to extend the completion of the municipal and on- and off -site improvements until October 31, 2010, with the exception of the trunk water extension, which shall be completed by October 31, 2009, and conditioned upon the Developer signing the amendment (pgs. 31-33) 2). Accept the Assistant City Engineer's Report dated January 7, 2009 (pgs.35-37) J. Legal K. Administration 1). Accept the City Administrator's Written Report dated January 14, 2009 (pgs. 39- 40) 9. CITIZENS OPEN FORUM - (continued if necessary) M:\Public Data\City Council\Council Agendas\2009 Agendas\A 0120 2009 only.doc Meeting Date: January 20, 2009 City of Albertville Council Agenda January 20, 2009 Page 3 of 3 10. ANNOUNCEMENTS and or UPCOMING MEETINGS January 2009 22 7:00 p.m. Diversity Strategic Planning Committee -optional (Albertville) TBA 7:00 p.m. Family -Youth Community Cooperative (FYCC) 26 6:00 p.m. Joint Powers Water Board meeting 26 7:00 p.m. Committee of the Whole Workshop (tentative) February 2009 2 7:00 p.m. City Council meeting 9 6:00 p.m. STMA Ice Arena Board meeting 10 7:00 p.m. Planning and Zoning Commission meeting 16 all day Presidents' Day observed — City Offices closed 17 7:00 p.m. City Council meeting WISDOM 23 6:00 p.m. Joint Powers Water Board meeting 23 7:00 p.m. Committee of the Whole Workshop (tentative) March 2009 2 7:00 p.m. City Council meeting 9 6:00 p.m. STMA Ice Arena Board meeting 10 7:00 p.m. Planning and Zoning Commission meeting 16 7:00 p.m. City Council meeting 23 6:00 p.m. Joint Powers Water Board meeting 30 7:00 p.m. Cities of Albertville & St. Michael and STMA School Board Joint Workshop (location TBD-last mtg. was held at the School) April 2009 6 7:00 p.m. City Council meeting 13 6:00 p.m. STMA Ice Arena Board meeting 13 7:00 p.m. Family -Youth Community Cooperative (FYCC) 14 7:00 p.m. Planning and Zoning Commission meeting 20 7:00 p.m. City Council meeting 27 6:00 p.m. Joint Powers Water Board meeting 27 7:00 p.m. Committee of the Whole Workshop (tentative) 11. ADJOURN INTO A WORKSHOP TO DISCUSS THE FOLLOWING A. I-94 Ramp (request for a cost estimate to develop Plans and Specifications to bid the westerly 1-94 phase) B. City Council 2009 Goals and Expectations C. Albertville Wireless Committee 12. ADJOURNMENT M:\Public Data\City Council\Council Agendas\2009 Agendas\A 0120 2009 only.doc Meeting Date: January 20, 2009 �b£r`tV1ll£ T— UAMI. so Ckv ur. Mayor and Council Communication January 8, 2009 SUBJECT: CITY COUNCIL MINUTES RECOMMENDATION: It is respectfully requested that the Mayor and Council consider the following motion: Motion to approve the Monday, January 5, 2009 regular City Council minutes as presented, which a final copy will be printed and signed; the signed copy will be scanned; the electronic scanned version will be kept on file in the office of the City Clerk and serve as the official record. BACKGROUND: City staff attends the regular City Council meetings and records any action taken or motions made during the meeting for Council review in the form of Minutes. KEY ISSUES: • Approve the minutes as prepared by City staff with no amendments. POLICY/PRACTICES CONSIDERATIONS: It is at the discretion of the Mayor and Council whether the City Council minutes that have been prepared and submitted should be amended. FINANCIAL CONSIDERATIONS: There are no financial considerations as it relates to approval of the City Council minutes. LEGAL ISSUES: In accordance with Council practices, the Mayor, Council, and staff members have the ability to amend minutes, which requires a consensus of the City Council. Respectfully submitted, Larr C Rse Y City Administrator Department/Responsible Person: Administration/Bridget Miller, City Clerk Attachments: January 5, 2009 regular Council minutes M:\Public Data\Requests for Council Actions (RCA)\2009\01 20 2009 4-A City Council minutes.doc Agenda Item No. 4. Meeting Date January 20, 2009 'i 1 ALBERTVILLE CITY COUNCIL JANUARY 5, 2009 MINUTES ALBERTVILLE CITY HALL PLEDGE OF ALLEGIANCE — CALL TO ORDER Mayor Klecker called the Albertville City Council Pledge of Allegiance. 7:00 PM at 7:00 p fin, followed by the ROLL CALL PRESENT: Mayor Ron Klecker, Council Xxtembers Tom Fay; � Wagner, and Larry Sorensen, Finance Director Tina Lannes, City Admn�strat�z Larry Kruse, Clerk Bridget Miller ABSENT: Council member John Vetsch, City, Attorney M k Couri, City Planner Al Brixius, Assistant City Engineer Adam Nafstad RECOGNITIONS — FRU-S.ENTAtIONS — INTRODUCTIONS Mayor Kleckerktovledgeil`th .two m�rnbeis in the audience who were Ms. Arvilla Klecker and Deb Schreiner With the Crow River News. Mayor Klecker a W if therez Vas anyone in the audience that wanted to discuss an item with the Council that was no i eat on the agenda. Neither of the two indjIiduals had questions or concerns that were not already on the agenda. AMENDMENTS TO THE AGENDA Mayor Klecker asked if there were any amendments to the agenda, which no items were added or removed from the agenda. Klecker then asked for a motion to approve the agenda as presented. M:\Public Data\City Council\Council Minutes\2009 Minutes\Drafts\M 01-05-09 B-drafts.doc Agenda Item NA.A. Meeting Date January 20, 2009 City of Albertville City Council Minutes January 5, 2009 Page 2 of 7 MOTION BY Council member Wagner, seconded by Council member Sorensen to approve the Monday, January 5, 2009 regular Albertville City Council agenda as presented. Motion carried unanimously. MINUTES December 15, 2008 regular City Council minutes Mayor Klecker asked the Council if there were any changes to City Council minutes. Hearing no comments regarding the D2 Council minutes, Klecker entertained a motion to approve they Council packet. MOTION BY Council member Wagner, seconded b Co Monday, December 15, 2008 regular City Council minute and signed; then the signed copy will be scanned and the f on file in the office of the City Clerk that>wll serve as the unanimously. CONSENT AGENDA CONSENT AGES All items with an asteri enacted by one motion. member or c*tin rE of Business and conslt Mayor Kle&ker inquired January 5 09 Consent further discussiba and or 001 entitled a Resolution ,. i of Albertville for than Legal Holidays and LpC )er 15, 2008 regular 2008 regular City ubmitted in the fiber Fay to app"JibVe the rated, which will be printed scanned version will be kept Motion carried are cdnsidered to bevutine in nature by the City Staff and will be illae no separate discussion of these items unless a Council >fs I�rAsuch e enl,` te'`item will be removed from the General Order in its rural sequence on the agenda. Councilembers or staff wanted any of the items pulled from the ,da. The following item was pulled from the Consent Agenda for pcation on appointments: 8.F.1. Approve Resolution No. 2008- ng Appointments to Certain Offices and Positions within the City 8 and Re -scheduling City Council meetings that Conflict with Elections. Mayor Klecker invited a Council member to make a motion to approving the January 5, 2009 Consent Agenda pulling the item 8.F.1. MOTION BY Council member Wagner, seconded by Council member Fay to approve the January 5, 2009 Consent Agenda pulling item 8.F.1., which the items will be removed from the General Order of Business and considered in its normal sequence on the agenda and will require a separate motion. Motion carried unanimously. M:\Public Data\City Council\Council Minutes\2009 Minutes\DraftS\M 01-05-09 B-drafts.doc Agenda Item NA.A. Meeting Date January 20, 2009 3 City of Albertville City Council Minutes January 5, 2009 Page 3 of 7 DEPARTMENT BUSINESS FIRE DEPARTMENT — no comments PUBLIC WORKS DEPARTMENT — no comments UTILITIES DEPART BUILDING DEPART FINANCE DEPARTI Approve the Mc to 026572 MOTION BY Coi Monday, January s as presented excel authorize payment the bills specificall discussion from the authorize payment checks willsbe slgn electrompally scan serve the City's Approve Reft, lr Authorized Sinners 026565 the 72 lnd; except crate id; I. The nts; the hat will No 2999-002 entitled a Resolution Making Appointments to Corporate the G* of Albertville for the Year 2009 MOTION BY Council member Wagner, seconded by Council member Fay to approve Resolution No. 2009-002 entitled a Resolution Making Appointments to Corporate Authorized Signers for the City of Albertville for the Year 2009 as presented except those items specifically pulled, which if pulled from the Consent Agenda will require a separate discussion from the Consent Agenda and a separate motion from the Consent Agenda; which will be printed and signed; then the signed copy will be scanned and the electronic scanned version will be kept on M:\Public Data\City Council\Council Minutes\2009 Minutes\Drafts\M 01-05-09 B-drafts.doc Agenda Item No. 4.A►. Meeting Date January 20, 2009 City of Albertville City Council Minutes January 5, 2009 Page 4 of 7 file in the office of the City Clerk that will serve as the City's official record. Motion carried unanimously. Accept Semi-monthly Financial Reports Finance Director Lannes began by reporting as of December 30, 2008 the accounts receivable outstanding is $109,637.48. Lannes went on to say the majority of the Omer 90 days are due from Albertville Holdings, Edina Development, Gold Key, Schuett Group (Seiiibr Housing Development), Terra Development (LaBeaux Station), and Towne°Lakes. The two that may not be collected are Edina Development and Gold Key. City Administrator Kruse asked Lannes to report on the ret e proceeded to inform the Council that The State of Minnesota not be making the second half of the Market Value Credit, w December. The amount the City will loose is $48,436 whicl to minimize the impact on the reserves. \ Council questioned how the State calculates the amount of determined by the Levy. It is based on a percent4ge, which Council approved. Council summarized by amount that is lost in St, CITY CLERK the larger the levy,tliat is „which staff agreed with ate Aid ENs. Lannes notified the sty that they will is generally payW J n City will have to work on how Lannes explained it is 4. of the levy that the d results in a bigger hit on the 's interpretation. Approve R o1 t � 2009 W( ,entitled a Resolution Making Appointments to Certain Offices and Posa ns within iNNOt of,40%yille for the Year 2009 and Re -Scheduling City Council meetings �zat Conflict wit gal Ho zday Mayor KlecW*anted to clay his intentions on the appointment to the STMA Hockey Board representat>ves �K ticker stat6, he wanted Tom Fay to remain on the board from January to June, at which time Dan 1_gner uld take over and Larry Sorensen act as the second representative from July to Decembe `.:J, Fay would serve as an alternate on the board from July to December. <;<> Council member Wagner had a question regarding the Joint Powers Water Board appointment. It was Wagner understands that he was supposed to have been appointed to the JPW Board. Council member Fay explained that it was originally suppose to have been Larry Sorensen, who commented that he was being appointed to quite a few Boards and Commissions; therefore, Fay said he would be the representative on the Joint Powers Water Board. M:\Public Data\City Council\Council Minutes\2009 Minutes\Drafts\M O1-05-09 B-drafts.doc Agenda Item NA.A. Meeting Date January 20, 2009 5 City of Albertville City Council Minutes January 5, 2009 Page 5 of 7 Upon hearing the clarification and discussion from the Council; Klecker made a motion to approve Resolution No. 2009-001 as amended, and was looking for a second. The following motion was then made: MOTION BY Mayor Klecker, seconded by Council member Fay to approve Resolution No. 2009-001 entitled a Resolution Making Appointments to Certain Offices and Positions within the City of Albertville for the Year 2009 and Re -Scheduling City Council meetings that Conflict with Legal Holidays as amended except those items specifically pulled, uuich if pulled from the Consent Agenda will require a separate discussion from the Consent Aeiida and'a separate motion from the Consent Agenda; which will be printed and signed, then the signed copy will be scanned and the electronic scanned version will be kept on file >ti`the office of the City Clerk that will serve as the City's official record. Motion carried unanimously. CITY COUNCIL Oral Update on the December 22, 2008 Joint Powers Teter Bc John Vetsch) Ron Klecker stated there was not too much to report from the I Water Board meeting. The one subject that was>) fbaterest was is the first time something like this has been' neWel�, No-9 which will store treated water, Over the winter months the 164i will treat water and when water usage is the lines to the resid Council did ftrq best to was created and a Muir: t into Well No. 9. at whlti point V ,busmeses to use. to eting (Ron Klecker and or 'eber22, 2008 Joint Powers to=l'ddition of Well No. 9. This 1E, erve as a holding Well, Powers Water Plant (Veolia) there until the summer months pump the water from the Well and down Ding to work. Council inquired how the Well level. Kleck+er " lained the Weil has emptied oT the current water supply and will be replenished with treated wtir , Again, this is,4, ew wa'of storing water and unknown if there is the slight potential of o er entities to ` 4.., into the water. p � pl?g ," PLANNING AND ZONING do comments ENGINEERING — no comments LEGAL — no comments M:\Public Data\City Council\Council Minutes\2009 Minutes\Drafts\M 01-05-09 B-drafts.doc Agenda Item NA.A. .A. Meeting Date January 20, 2009 6 City of Albertville City Council Minutes January 5, 2009 Page 6 of 7 ADMINISTRATION Accept the City Administrator's Written Report City Administrator Kruse began by complimenting staff on a job well done. Kruse informed the Council that City Attorney Couri prepared and or recorded approximately 20 documents with the Downtown Railroad Plat. It was somewhat of a challenge to obtain all of,the property owners' signatures for the Plat, as staff discovered one property owner's health iv" -=not good. Staff did; however, hear from another individual who was Power of Attornelxand Couri coordinated obtaining the appropriate paperwork to document the signature Kruse went on to discuss I-94 by informing the Council that Mif DOT disftict Engineer signed Albertville's Layout approval. Kruse inquired if the C, ncil would be intere§t d in meeting with Tinklenberg and setting a workshop regarding the 19 ramp project. Kruse reported that he has put in a request for a cost estimate to develop plans ark- specifictpns to bid the Overly I-94 phase. Council reviewed the calendar and came a the consensus of da cussing the I-94 following the next regular Council meeting, which is sef forTuesday, January 201.1,„ Another suggestion made by Kruse was to se expectations. Again, it was recommended to 20 regular Council meeting an outcome Council's goals and eNp�ctations ar to be di; CITIZENS Mayor Jan rkM ta: discussCouncil's goals and he meeting following the Tuesday, January meeting, si ff could compile a list of what d at future workshops. TINGS the Council to review the upcoming meetings and calendar of events. 5 6 15F n1 "` Swearing in of the newly elected Council members 5 7 0 p m. City Council meeting 12 6:O p.m. STMA Ice Arena Board meeting 13 7:00 p.m. Planning and Zoning Commission meeting 1.9 all day Martin Luther King, Jr Day observed — City Offices closed 20 7:00 p.m. City Council meeting � 26 6:00 p.m. Joint Powers Water Board meeting 26 7:00 p.m. Committee of the Whole Workshop (tentative) M:\Public Data\City Council\Council Minutes\2009 Minutes\Drafts\M 01-05-09 B-drafts.doc Agenda Item NA.A. Meeting Date January 20, 2009 7 City of Albertville City Council Minutes January 5, 2009 Page 7 of 7 February 2009 2 7:00 p.m. City Council meeting 9 6:00 p.m. STMA Ice Arena Board meeting 10 7:00 p.m. Planning and Zoning Commission meeting 16 all day Presidents' Day observed — City Offices closed 17 7:00 p.m. City Council meeting 011 23 6:00 p.m. Joint Powers Water Board meeting 23 7:00 p.m. Committee of the Whole Workshop (tentative) March 2009 2 7:00 p.m. City Council meeting 9 6:00 p.m. STMA Ice Arena Board i 0g1dg 10 7:00 p.m. Planning and Zoning 6mmission meeting 16 7:00 p.m. City Council meeting 23 6:00 p.m. Joint Powers Waterord meg 30 7:00 p.m. Cities of Albertville & S*-.".Miehael'And STMA Joint Workshop (tentative) ADJOURNMENT MOTION BY Council Monday, January 5, 201 unanimously. Board Wagner, seconded,'by Council rriember Sorensen to adjourn the pity Council meeting at 7:3fl p.m. Motion carried M:\Public Data\City Council\Council Minutes\2009 Minutes\Drafts\M 0I-05-09 B-drafts.doc Agenda Item NA.A. Meeting Date January 20, 2009 A TO: Mayor and City Council FROM: John Middendorf DATE: January 8, 2009 RE: Wastewater Treatment Plant and Water Department Update WATER • There was a water service line leak at 6787 LaSalle Circle NE. The leak was under the street. There was a bad flair on the corporation stop. • There was a water service line leak at 11711 54th Street NE. This one was in the driveway. The flair on the curb stop went bad. • We had a water main break on Main Avenue NE across from the 152 Club. Here the main cracked. WASTEWATER • The Utility Department has been busy with problems with the main lift station. On December 20th Pump No. 1 had a seal fail alarm. The pump was removed for repair. On December 27th Pump No. 2 burned out and was removed for repair. This left us with only Pump No. 3. Pump No. 1, which was a new pump replacing a problematic pump, was installed in January of 2008 and died on December 20, 2008. Pump No. 2 was rebuilt in May of 2008 and left for repairs on December 27, 2008. Both pumps were under warrantee. Pump No. 3 has more hours on it than any other pump, and has made it this long without needing a rebuild. • I would like to purchase an additional pump from a different company to help keep us out of this problem. I will bring quotes to the meeting. • The influent flow meter control unit is broken and out for repair. It should be back in service shortly. REED BED UPDATE • We have harvested the reeds in all 7 beds. That is, we cut them down and burned the reeds. This is a necessary step for the beds to do well next summer, and was recommended by Scott Davis of Reed Bed Systems, Inc. M:\Public Data\City Council\Council Packet information\2009\01-20-09 (Tue)\1 20 2009 8-C-1 Utilities Dept Report.doc Q Agenda Item No. t7. C. I . Meeting Date January 20, 2009 9 A,lb£r'tvi l le Mayor and Council Communication Sand Tour+ u b s. me 43W Ly— January 12, 2009 SUBJECT: BUILDING DEPARTMENT - 4TH QUARTER REPORT RECOMMENDATION: This space on the agenda is reserved for the City Council to consider the Building Official's Monthly Report and other building matters. BACKGROUND: Space is reserved on the Council agenda to accommodate the Mayor and Council to review and ask questions about the Monthly Reports. Building Official Jon Sutherland reported the following Activity: Construction Activity: We had 224 permits in September, 186 permits in October, 91 permits in November, and 41 permits in December. This resulted in a total of 1372 permits processed for the year 2008 and these permits had a total value of $21,388,817. The building Department Revenue for 2008 was $299,148. A large number of our permits were related to storm damage repair work. Some of the Highlights in our permit activity are as follows: A Commercial Tenant Finish for Design Enterprises at 5548 Barthel Industrial Drive, two Tenant Finishes at the Outlet Mall - Yankee Candle and Guess Outlet, a New Construction permit for Emma Krumbee's Restaurant, New Construction Permits for Albertville Townhomes 37 units and a Community Center, a new Billboard at I94 and CSAH 19 for the Knechtl property, a Tenant Finish Alteration for Impress Nails at 6597 Labeaux Ave, and a Commercial Accessory Building for Federated Coop located at 11229 60th Street • Revenue comparisons from the previous year have been included in the attachment to this report. • Storm Damage: We had a total of 339 storm damage repair permits for 4th quarter to bring the May 25th storm damage repair permits to a total of 1019. There are still homes that have not been repaired from the previous storms/damage that will require follow up and building code enforcement. Many of the City properties were damaged by the storm of May 25, 2008 and are now repaired. We are still working with the City insurance adjuster on getting bids to repair some of the remaining damaged City property. Planning and Zoning, Rental Housing, Miscellaneous Enforcement: Various enforcement activities for the quarter and the year include, but is not limited to, Vacant and Foreclosed properties located at 10460 62nd Street, 4973 Kama Lane, 10141 49th Street, 4916 Kama Lane, 4937 Kama Lane, 6191 Kahl Ave, 10408 62nd Street, 6182 Karmen Ave, 10568 62nd Street, 10831 Kantar Court and 10516 5 1 " Street. (A Notice to Secure Property was issued to the owner of this property). We have worked on answering various residential and commercial construction and development questions, dumpster violations, sign violations M:\Public Data\City Council\Council Packet information\2009\01-20-09 (Tue)\01 20 2009 8-Building 2008 4th quarter BO report.doc Agenda Item No. 8.D. I. Meeting Date January 20, 2009 11 Mayor and Council Communication — January 12, 2009 Building Official — Monthly Report Page 2 of 2 (and removal of lots of signs and storm chaser signs), rental licensing, along with revising and updating our various handouts. • Fire Code Inspections with the Fire Department: Follow up inspection work with the Full Moon Saloon Bar and 152 Club continues. KEY ISSUES: none POLICY CONSIDERATIONS: The Mayor and Council review monthly department reports. FINANCIAL CONSIDERATIONS: There are no financial considerations at this time. LEGAL CONSIDERATIONS: The Mayor and Council have the authority to review and direct staff to take action regarding all financial matters. Respectfully submitted, Larry R. Kruse City Administrator Department/Responsible Person: Building Department/Jon Sutherland, Building Official Attachments: Permit Activity Report M:\Public Data\City Council\Council Packet information\2009\01-20-09 (Tue)\01 20 2009 8-Building 2008 4th quarter BO report.doc Agenda Item No. 0.D. L Meeting Date January 20, 2009 December 2008 Building Department Permit Activity/Revenue Report Valuation Permit Fees Sub Total 2008 $ 520,362.00 $ 9,891.93 Less SAC, WA Storm Water, S & W & Meter $ - Less Signs $ 172.08 DEC 2008 TOTAL BUILDING DEPT REVENUE 2007 Valuation Permit Fees Sub Totals $1,251,286.00 $ 62,709.78 Less SAC, WAC Storm Water, S & W & Meter $ 41,700.00 Less Signs $ 3.150.00 DEC 2007 TOTAL BUILDING DEPT REVENUE INSPECTIONS November 262 Monthly Average 15 Year To Date 2930 $ 9,719.85 $ 17,859.78 13 A. 1b£r'tYlll£ Mayor and Council Communication January 13, 2009 SUBJECT: 0 FINANCE DEPARTMENT — PAYMENT OF BILLS RECOMMENDATION: It is respectfully requested that the Mayor and Council consider the following motion: Motion authorizing the Tuesday, January 20, 2009 payment of the claims that includes check numbers 026575 to 026627 as presented except the bills specifically pulled, which are passed by separate motion. BACKGROUND: The City process's claims on a semi-monthly basis. The bills are approved through their respective departments and administration and passed onto the City Council for approval. KEY ISSUES: Check No. 026578 Bob Heuring — Refund T-Square Escrow of $5,000. See attached Engineer's recommendations for release/payment Check No. 026585 City of Otsego — Payment # 3 for 70'l' Street. See attached Engineer's recommendations for payment. Check No. 026590 Dennis Fehn Gravel — Pulverized Black Dirt is $3,718.98 of this check for Central Park Improvements, $13,056.77 is payment # 3 (final) for Lachman Ave Improvements. Check No. 026605 Northdale Construction Co — Payment # 3 (Final) for the Phillip Morris Lift Station. See attached Engineer's recommendations for payment. Check No. 026606 Northland Trust Service Inc — Bond payments. $122,343.75 for Lease Revenue Bond Public Works Building, $81,668 for 2008 Sewer Revenue Bonds, $68,355.50 2008 Capital improvement Bonds Fire Hall, $33,022.50 CSAH 19, $11,002.50 Lachman, $20,680 Industrial Park and $16,017.50 Storm Water Pond Check No. 026612 Premier Electrical Corp. — Repair photocell for Christmas tree lights — Main Ave NE. Check No. 026617 Sterling Codifiers — Annual hosting fee M:\Public Data\Requests for Council Actions (RCA)\2009\01 20 2009 8 Finance Bills Report (RCA).doc Agenda Item No. 8. E . I . Meeting Date January 20, 2009 Mayor and Council Communication — January 14, 2009 Finance — Payment of Claims Page 2 of 2 PRACTICES/POLICY CONSIDERATIONS: It is the City's policy to review and approve payables on a semi-monthly basis. FINANCIAL CONSIDERATIONS: City staff has reviewed and recommends approval of payments presented. LEGAL CONSIDERATIONS: The Mayor and Council have the authority to approve all bills pursuant to Minnesota State Law, which requires all bills to be paid in a timely manner, generally within 30 days unless one party determines disputes the billing. Respectfully submitted, D-4Z Larry R. Krus City Administrator Department/Responsible Person: Finance/Tina Lannes, Finance Director Attachments: Check Register Detail, Engineer recommendations/reports M:\Public Data\Requests for Council Actions (RCA)\2009\01 20 2009 8 Finance Bills Report (RCA).doc Agenda Item No. 8. L'1. I . Meeting Date January 20, 2009 I A�Ibcrtvillc City We. Check Detail Register January 20, 2009 Check Amt Invoice Comment 10100 Premier Bank Paid Chk# 026575 1/20/2009 ALBERTVILLE PIT STOP E 101-42000-212 Motor Fuels $79.08 120208 Fuel E 101-43100-212 Motor Fuels $23.00 121508 Fuel E 101-42000-212 Motor Fuels $39.75 121808 Fuel E 101-43100-212 Motor Fuels $29.40 122208 Fuel E 101-43100-212 Motor Fuels $23.46 122908 Fuel E 101-45100-212 Motor Fuels $41.01 123008 Fuel E 101-42000-212 Motor Fuels $13.64 123008 Fuel E 101-42000-212 Motor Fuels $7.91 123108 Fuel Total ALBERTVILLE PIT STOP $257.25 Paid Chk# 026576 1/20/2009 BANYON DATA SYSTEMS E 101-41400-300 Professional Srvs (GENERAL) $390.01 143593 Program support E 601-49450-300 Professional Srvs (GENERAL) $390.01 143593 Program support E 101-41300-570 Office Equip and Furnishings $390.01 143593 Program support E 101-41500-570 Office Equip and Furnishings $390.01 143593 Program support E 602-49400-300 Professional Srvs (GENERAL) $39&01 143593 Program support E 604-49960-300 Professional Srvs (GENERAL) $389.98 143593 Program support Total BANYON DATA SYSTEMS $2,340.03 Paid Chk# 026577 1/20/2009 BEAUDRY OIL COMPANY E 101-43100-215 Shop Supplies $1,000.93 741542 DYED KODIAK PLUS Total BEAUDRY OIL COMPANY $1,000.93 Paid Chk# 026678 1/20/2009 BOB HEURING G 101-22828 Bob Heuring Escrow $5,000.00 T-Square Escrow Release Total BOB HEURING $5,000.00 Paid Chk# 026579 1/20/2009 BOLTON & MENK, INC E 101-41710-303 Engineering Fees $142.50 121590 Hunters Pass Plan & Plat E 101-41710-303 Engineering Fees $570.00 121591 TL 6th E 101-41710-303 Engineering Fees $380.00 121592 Phillip Morris E 494-49000-303 Engineering Fees $7,251.50 121593 CSAH 19 & 50th E 473-00000-303 Engineering Fees $190.00 121594 Prairie Run E 101-41710-303 Engineering Fees $190.00 121595 Parkside Comm E 101-41710-303 Engineering Fees $285.00 121596 Shoppes @ TL II E 497-00000-303 Engineering Fees $95.00 121597 70th Street Improv E 101-41710-303 Engineering Fees $1,285.00 121598 TL 5th E 101-41710-303 Engineering Fees $9,135.00 121626 Franklin Property E 101-41710-303 Engineering Fees $2,780.00 121627 Dominium TH E 503-00000-303 Engineering Fees $2,296.05 121628 CSAH 37 utility Extension E 604-49660-303 Engineering Fees $994.50 121630 Storm Water Mgmt Plan E 101-41710-303 Engineering Fees $190.00 121631 Niemeyer E 101-42400-313 Engineer Plan Check Fee $225.00 121633 Asbuilt surveys E 101-41700-303 Engineering Fees $1,254.00 121634 Landtrade Prelim & Final E 101-41700-303 Engineering Fees $73.00 121635 2008 Muni Aid E 101-41710-303 Engineering Fees $100.00 121678 Impress Nails Review E 101-41710-303 Engineering Fees $142.50 121678 Perkins E 101-41710-303 Engineering Fees $95.00 121678 Karston Cove 3 E 101-41700-303 Engineering Fees $95.00 121678 Proj Updates E 101-41700-303 Engineering Fees $237.50 121678 Staff meetings Total BOLTON & MENK, INC $28,096.55 Paid Chk# 026580 VOID VOID VOID VOID M:\Public Data\City Council\Council Packet information\2009\01-20-09 (Tue)\01 20 2009 8-E-1 Payment Posted Batch.doc Agenda Item No. 8.E.1. . Meeting Date January 20, 2009 17 Mayor and Council Communication - January 14, 2009 Finance - Payment of Claims Check Amt Invoice Comment 10100 Premier Bank Paid Chk# 026581 1/20/2009 BUFFALO COMPUTER COMPANY E 101-41500-207 Computer Supplies $725.00 900901 Total BUFFALO COMPUTER COMPANY $725.00 Paid Chk# 026582 1/20/2009 CARQUEST E 602-49400-210 Operating Supplies (GENERAL) E 101-43100-404 Repair/Maint - Machinery/Equip E 602-49400-210 Operating Supplies (GENERAL) E 101-43100-404 Repair/Maint - Machinery/Equip E 101-43100-404 Repair/Maint - Machinery/Equip Total CARQUEST Paid Chk# 026583 1/20/2009 CENTER POINT ENERGY E 101-43100-383 Gas Utilities E 601-49450-383 Gas Utilities E 101-41940-383 Gas Utilities E 101-42000-383 Gas Utilities E 101-41940-383 Gas Utilities E 101-45100-383 Gas Utilities Total CENTER POINT ENERGY Paid Chk# 026584 1/20/2009 CITY OF MONTICELLO E 101-42700-309 Animal Control Contract Total CITY OF MONTICELLO $51.39 69448 $9.93 69699 $17.01 69882 $5.33 69887 $8.50 69893 $92.16 Website Hosting Clamps - JM Mega Crimp Fitting Etching - JM Fuse Toggle switch $1,569.65 123008 11822 63rd Street $864.75 123008 11728 63rd Street $1,913.96 123008 City Hall 5959 Main $1,226.02 80000144255 Fire Dept $588.48 80000144255 Garage $190.88 80000144255 5801 Lander Ave $6,353.74 $268.38 11026 Nov animal control $268.38 Paid Chk# 026585 1/20/2009 CITY OF OTSEGO E 497-00000-300 Professional Srvs (GENERAL) $42,800.26 010709 70th Street Improv Total CITY OF OTSEGO $42,800.26 Paid Chk# 026586 1/20/2009 COBORN'S E 101-41400-200 Office Supplies (GENERAL) $248.00 101871604 supplies Total COBORN'S $248.00 Paid Chk# 026587 1/20/2009 COURT & MACARTHUR RUPPE, PLLP E 101-41610-304 Legal Fees $1,567.50 111408 Niemeyer E 101-41610-304 Legal Fees $41.25 111408 Shoppes @ TLII E 101-41610-304 Legal Fees $41.25 111408 Space Aliens II E 101-41610-304 Legal Fees $82.50 111408 Franklin Prop E 101-41610-304 Legal Fees $108.75 111408 Towne Lakes E 101-41610-304 Legal Fees $165.00 111408 Hunters Pass E 101-41610-304 Legal Fees $41.25 111408 AV 6th E 101-41600-304 Legal Fees $1,486.25 111408 RR land, agendas, fire code, e E 494-49000-304 Legal Fees $1,087.50 111408 CSAH 19 assess appeal E 503-00000-304 Legal Fees $36.25 111408 CSAh 37 utilities E 473-00000-304 Legal Fees $145.00 111408 Prairie Run Litigation E 604-49660-304 Legal Fees $1,798.44 111408 Albert Villas Drainage E 101-41610-304 Legal Fees $1,113.75 111408 Dominium Total COURI & MACARTHUR RUPPE, PLLP $7,714.69 Paid Chk# 026588 1/20/2009 CROW RIVER NEWS NORTH E 101-41100-351 Legal Notices Publishing $61.50 112008 Ph Application E 101-41100-351 Legal Notices Publishing $44.28 112408 Chap 1000 Gen Bldg E 101-41100-351 Legal Notices Publishing $46.74 112408 Chap 1007-G E 101-41100-351 Legal Notices Publishing $159.60 122008 BID CSAH 37 E 101-41.100-351 Legal Notices Publishing $684.00 122808 Truth in taxation Total CROW RIVER NEWS NORTH $996.12 Paid Chk# 026589 1/20/2009 D H B E 101-43100-323 Nextel Radio Units $63.89 32248 Ryan cell phone battery Total D H B $63.89 M:\Public Data\City Council\Council Packet inform ation\2009\0 1 -20-09 (Tue)\01 202009 8-E-1 Payment Posted Batch. doc Page 2 of 7 Agenda Item No. 8. E. I . Meeting Date January 20, 2009 Mayor and Council Communication - January 14, 2009 Finance - Payment of Claims Check Amt Invoice Comment 10100 Premier Bank Paid Chk# 026590 1/20/2009 DENNIS FEHN GRAVEL & EXCAVATIN E 499-49000-300 Professional Srvs (GENERAL) $13,056.77 010709 Pay Est No 3 - Lachman Improve E 102-49440-300 Professional Srvs (GENERAL) $3,718.98 22573 Central Park Project E 602-49400-407 R/M - Water Mains $195.26 22733 water main break Total DENNIS FEHN GRAVEL & EXCAVATIN $16,971.01 Paid Chk# 026591 1/20/2009 DEPT OF LABOR & INDUSTRY G 101-21705 Building. Permit Surcharge $4,266.89 5583171005 4th qrt surcharge Total DEPT OF LABOR & INDUSTRY $4,266.89 Paid Chk# 026592 1/20/2009 DJ'S TOTAL HOME CARE CENTER E 101-45100-210 Operating Supplies (GENERAL) $21.25 35645 PW tree wrap E 101-43100-405 Repair/Maint - Buildings $17.33 35685 PW paint E 101-45100-210 Operating Supplies (GENERAL) $5.84 35880 tape, coupling E 101-43100-405 Repair/Maint - Buildings $51.09 35966 PW E 602-49400-210 Operating Supplies (GENERAL) $19.66 36015 WWTP propane E 101-41940-405 Repair/Maint - Buildings $404.67 360211 key, rope, icemelt E 101-43100-405 Repair/Maint Buildings $287.55 36068 Ice melt City Hall E 101-45100-210 Operating Supplies (GENERAL) $11.69 36072 rollers PW E 101-45100-405 Repair/Maint - Buildings $6.36 36103 Key PW E 601-49450-210 Operating Supplies (GENERAL) $95.32 36187 PVC Pipe E 101-43100-405 Repair/Maint - Buildings $11.69 36229 connectors E 101-41940-405 Repair/Maint - Buildings $21.52 36237 salt CH E 602-49400-210 Operating Supplies (GENERAL) $25.51 36260 Duct tape Total DXS TOTAL HOME CARE CENTER $979.48 Paid Chk# 026593 1/20/2009 DJS TOTAL HOME CARE CNTR FIRE E 101-42000-200 Office Supplies (GENERAL) $11.56 357351 D-ring, wall anch, spring E 101-42000-200 Office Supplies (GENERAL) $17.52 35799 wall plates, mount E 101-42000-200 Office Supplies (GENERAL) $26.19 35802 cable, chain, bolts E 101-42000-200 Office Supplies (GENERAL) $5.99 36083 FD Supplies E 101-42000-200 Office Supplies (GENERAL) $4.19 56092 washers, nuts, bolts Total DJS TOTAL HOME CARE CNTR FIRE $65.45 Paid Chk# 026594 1/20/2009 DON'S AUTO & REPAIR E 101-43100-212 Motor Fuels $8.25 120208 Fuel E 101-42000-212 Motor Fuels $53.26 120308 Fuel E 101-43100-212 Motor Fuels $36.22 120508 Fuel E 101-43100-212 Motor Fuels $6.36 120908 Fuel E 101-42000-212 Motor Fuels $42.84 121108 Fuel E 101-43100-212 Motor Fuels $7.50 121708 Fuel E 101-42000-212 Motor Fuels $29.87 122208 Fuel E 101-43100-212 Motor Fuels $7.40 122308 Fuel Total DON'S AUTO & REPAIR $191.70 Paid Chk# 026595 1/20/2009 EGGEN'S DIRECT SERVICE, INC. E 101-42400-212 Motor Fuels $54.94 121808 Fuel E 101-43100-212 Motor Fuels $27.42 122708 Fuel E 101-43100-212 Motor Fuels $20.42 122908 Fuel E 101-43100-212 Motor Fuels $38.00 136774 Fuel E 601-49450-212 Motor Fuels $32.01 136792 Fuel E 101-43100-212 Motor Fuels $34.00 136793 Fuel E 101-43100-212 Motor Fuels $44.25 136815 Fuel E 601-49450-212 Motor Fuels $8.44 136817 Fuel E 602-49400-212 Motor Fuels $35.67 136837 Fuel E 101-43100-212 Motor Fuels $42.00 136846 Fuel E 601-49450-212 Motor Fuels $45.09 136848 Fuel E 602-49400-212 Motor Fuels $48.11 136856 Fuel E 101-43100-212 Motor Fuels $21.00 136873 Fuel E 602-49400-212 Motor Fuels $43.75 136886 Fuel MA\Public Data\City Council\Council Packet infonnation\2009\01-20-09 (Tue)\01 20 2009 8-E-1 Payment Posted Batch.doc Page 3 of 7 Agenda Item No. B.E. I.. Meeting Date January 20, 2009 19 Mayor and Council Communication - January 14, 2009 Finance - Payment of Claims Page 4 of 7 Check Amt Invoice Comment 10100 Premier Bank Paid Chk# 026595 1/20/2009 EGGEN'S DIRECT SERVICE, INC. (cont'd) E 101-45100-212 Motor Fuels $40.00 136907 Fuel E 101-45100-212 Motor Fuels $8.50 136927 Fuel E 602-49400-212 Motor Fuels $43.00 136944 Fuel E 101-43100-212 Motor Fuels $53.00 136952 Fuel E 602-49400-212 Motor Fuels $55.29 136962 Fuel E 101-43100-212 Motor Fuels $74.71 143993 Fuel E 602-49400-212 Motor Fuels $39.75 143995 Fuel Total EGGEN'S DIRECT SERVICE, INC. $809.35 Paid Chk# 026596 1/20/2009 EMERGENCY MEDICAL PRODUCTS E 101-42000-230 Medical Supplies $224.87 1125940 Medical Supplies, gauze, blank Total EMERGENCY MEDICAL PRODUCTS $224.87 Paid Chk# 026597 1/20/2009 FIRE ENGINEERING E 101-42000-433 Dues and Subscriptions $21.00 330769B Subscription Total FIRE ENGINEERING $21.00 Paid Chk# 026598 1/20/2009 H & L MESABI PRODUCTS E 101-43100-404 Repair/Maint - Machinery/Equip $952.20 76401 Carbon plow blades Total H & L MESABI PRODUCTS $952.20 Paid Chk# 026599 1/20/2009 MINNESOTA GFOA E 101-41500-433 Dues and Subscriptions $60.00 Dues Total MINNESOTA GFOA $60.00 Paid Chk#, 026600 1/20/2009 MINNESOTA MUNICIPAL UTILITIES E 601-49450-433 Dues and Subscriptions $366.00 32625 2009 Dues E 60'1-49450-433 Dues and Subscriptions $174.00 32827 2009 Drug & Alcohol dues Total MINNESOTA MUNICIPAL UTILITIES $540.00 Paid Chk# 026601 1/20/2009 MONTICELLO ANIMAL CONTROL E 101-42700-309 Animal Control Contract $75.00 301b Dec pick ups Total MONTICELLO ANIMAL CONTROL $75.00 Paid Chk# 026602 1/20/2009 MSFDA E 101-42000-433 Dues and Subscriptions $216.00 FD Dues Total MSFDA $216.00 Paid Chk# 026603 1/20/2009 N. A. C. E 101-41910-306 Planning Fees $500.00 123108 PZ meeting/Staff/CC meetings E 101-41910-306 Planning Fees $446.75 18234 2009 Zoning Fees E 101-41910-306 Planning Fees $168.80 18234 Plan Sub Requirements E 101-41910-306 Planning Fees $362.85 18234 ordinances, agendas,etc E 101-41910-306 Planning Fees $497.90 18234 Nuisance Ord. E 101-41910-306 Planning Fees $843.80 18234 Accessory Bldg Review E 101-41910-306 Planning Fees $240.50 18234 Landscape Ord E 101-41915-306 Planning Fees $13.50 18235 Perkins E 101-41915-306 Planning Fees $205.00 18235 Pr lanscape compliance E 101-41915-306 Planning Fees $13.50 18235 Follow up to staff meeting E 101-41915-306 Planning Fees $564.30 18235 Albertville TH sign variance Total N. A. C. $3,856.90 Paid Chk# 026604 1/20/2009 NAGELL APPRAISAL & CONSULTING E 494-49000-300 Professional Srvs (GENERAL) $4,750.00 15278 Labeaux Street Improv E 494-49000-300 Professional Srvs (GENERAL) $175.00 15280 CSAH 19 Appraisal reports Total NAGELL APPRAISAL & CONSULTING $4,925.00 Paid Chk# 026605 1/20/2009 NORTHDALE CONSTRUCTION CO E 501-49000-300 Professional Srvs (GENERAL) $33,371.13 010709 Pay Est 3 Phillip Morris Lift Total NORTHDALE CONSTRUCTION CO $33,371.13 M:\Public Data\City Council\Council Packet inform ation\2009\0 1 -20-09 (Tue)\01 20 2009 8-E-1 Payment Posted Batch.doc Agenda Item No. 8. E. J . Meeting Date January 20, 2009 20 Mayor and Council Communication — January 14, 2009 Finance — Payment of Claims Check Amt Invoice Comment 10100 Premier Bank Paid Chk# 026606 1/20/2009 NORTHLAND TRUST SERVICE INC E 354-47000-620 Fiscal Agent's Fees $403.00 Gen Cap Improv E 362-47000-611 Bond Interest $20,680.00 Gen Improv Bonds E 361-47000-611 Bond Interest $11,002.50 Gen Improv Bonds E 360-47000-611 Bond Interest $33,022.50 Gen Improv Bonds E 358-47000-601 Debt Sry Bond Principal $80,000.00 Project Lease Rev E 358-47000-611 Bond Interest $42,343.75 Project Lease Rev E 354-47000-611 Bond Interest $7,952.50 Gen Cap Improv E 354-47000-601 Debt Sry Bond Principal $60,000.00 Gen Cap Improv E 604-49660-611 Bond Interest $16,017.50 Gen Improv Bonds E 601-49450-611 Bond Interest $11,265.00 Gen Sewer Rev Bonds E 601-49450-601 Debt Sry Bond Principal $70,000.00 Gen Sewer Rev Bonds E 601-49450-620 Fiscal Agent's Fees $403.00 Gen Sewer Rev Bonds Total NORTHLAND TRUST SERVICE INC $353,089.75 Paid Chk# 026607 1/20/2009 NOW CARE MEDICAL CENTERS E 101-42000-305 Medical -Physicals $86.00 121208 Josh Eull Total NOW CARE MEDICAL CENTERS $86.00 Paid Chk# 026608 1/20/2009 ONVOY, INC. E 101-41940-321 Telephone $710.90 90102009622 Network Charges E 602-49400-321 Telephone $35.54 90102009622 Network Charges E 601-49450-321 Telephone $35.54 90102009622 Network Charges E 101-42000-321 Telephone $82.94 90102009622 Network Charges E 101-43100-321 Telephone $82.94 90102009622 Network Charges E 101-42400-321 Telephone $236.97 90102009622 Network Charges Total ONVOY, INC. $1,184.83 Paid Chk# 026609 1/20/2009 OXYGEN SERVICE COMPANY E 101-43100-215 Shop Supplies $60.55 7317326 ARGON/CARBON DIOXIDE Total OXYGEN SERVICE COMPANY $60.55 Paid Chk# 026610 1/20/2009 PATTI WIRTZ G 101-22900 Rental Deposit Escrow $100.00 123008 City Hall Deposit refund Total PATTI WIRTZ $100.00 Paid Chk# 026611 1/20/2009 POSTMASTER E 101-41400-413 Office Equipment Rental $98.00 121608 Po Box 9 Total POSTMASTER $98.00 Paid Chk# 026612 1/20/2009 PREMIER ELECTRICAL CORP E 101-41940-399 Miscellaneous $270.00 46940 xmas lights main ave Total PREMIER ELECTRICAL CORP $270.00 Paid Chk# 026613 1/20/2009 RC GRADING & EXCAVATING INC E 602-49400-407 R/M - Water Mains $945.00 113008 57th & Lander Total RC GRADING & EXCAVATING INC $945.00 Paid Chk# 026614 1/20/2009 REED BUSINESS INFORMATION E 503-00000-300 Professional Srvs (GENERAL) $222.30 4092125 Legal Ads Total REED BUSINESS INFORMATION $222.30 Paid Chk# 026615 1/20/2009 S & T OFFICE PRODUCTS E 101-41400-200 Office Supplies (GENERAL) $77.10 12304 supplies E 101-41400-200 Office Supplies (GENERAL) $118.31 144135 office supplies Total S & T OFFICE PRODUCTS $195.41 Paid Chk# 026616 1/20/2009 SCHARBER & SONS E 101-45100-404 Repair/Maint - Machinery/Equip $35.36 1020929 ball bearings Total SCHARBER & SONS $35.36 M:\Public Data\City Council\Council Packet inform ation\2009\0 1 -20-09 (Tue)\01 20 2009 8-E-1 Payment Posted Batch.doc Page 5 of 7 Agenda Item No. 8.E. I.. Meeting Date January 20, 2009 21 Mayor and Council Communication - January 14, 2009 Finance - Payment of Claims Check Amt Invoice Comment 10100 Premier Bank Paid Chk# 026617 1/20/2009 STERLING CODIFIERS, INC. E 101-41400-300 Professional Srvs (GENERAL) $500.00 8458 2009 Annual Fee Total STERLING CODIFIERS, INC. $500.00 Paid Chk# 026618 1/20/2009 TIM DALY E 101-42000-404 Repair/Maint - Machinery/Equip $15.95 277901 Pressure Washer Parts - FD Total TIM DALY $15.95 Paid Chk# 026619 1/20/2009 TYTHER CONTRACTING R 101-00000-32210 Building Permits $268.80 281335 Refund of Permit B28-1335 Total TYTHER CONTRACTING $268.80 Paid Chk# 026620 1/20/2009 USABLE LIFE E 101-41300-131 Employer Paid Health $14.10 Emp Life Ins E 101-41500-131 Employer Paid Health $35.53 Emp STDis Ins E 101-41500-131 Employer Paid Health $4.95 Emp Life Ins E 101-45100-130 Employer Paid Ins (GENERAL) $5.40 Emp Life Ins E 101-41400-131 Employer Paid Health $6.60 Emp Life Ins G 101-21710 Other Deducations $7.50 Emp Life Ins E 101-43100-130 Employer Paid Ins (GENERAL) $9.00 Emp Life Ins E 101-42400-130 Employer Paid Ins (GENERAL) $67.96 Emp STDis Ins E 101-42400-130 Employer Paid Ins (GENERAL) $20.55 Emp Life Ins E 101-41400-131 Employer Paid Health $22.81 Emp STDis Ins E 601-49450-130 Employer Paid Ins (GENERAL) $9.00 Emp Life Ins E 101-43100-130 Employer Paid Ins (GENERAL) $49.19 Emp STDis Ins E 101-41300-131 Employer Paid Health $54.29 Emp STDis Ins E 602-49400-130 Employer Paid Ins (GENERAL) $33.80 Emp STDis Ins E 60� 49400-130 Employer Paid Ins (GENERAL) $9.00 Emp Life Ins E 601-49450-130 Employer Paid Ins (GENERAL) $33.82 Emp STDis Ins E 101-45100-130 Employer Paid Ins (GENERAL) $19.55 Emp STDis Ins Total USABLE LIFE $403.05 Paid Chk# 026621 1/20/2009 WASTE MANAGEMENT E 601-49450-384 Refuse/Garbage Disposal $55.82 481370915938 City Pk/PW/WWTP E 101-45100-384 Refuse/Garbage Disposal $68.69 481370915938 City Pk/PW/WWTP E 101-43100-384 Refuse/Garbage Disposal $48.75 481370915938 City Pk/PW/WWTP E 101-41940-384 Refuse/Garbage Disposal $20.04 481371015936 96 gal garbage PU Total WASTE MANAGEMENT $193.30 Paid Chk# 026622 1/20/2009 WEIDNERS PLUMBING & HEATING CO E 101-41940-405 Repair/Maint -Buildings $1,361.00 226095 City Hall Contract E 101-41940-405 Repair/Maint -Buildings $446.00 226110 Boiler Repair Work Total WEIDNERS PLUMBING & HEATING CO $1,807.00 Paid Chk# 026623 1/20/2009 WRIGHT COUNTY RECORDER E 101-41000-300 Professional Srvs (GENERAL) $746.00 200800000129 Recording Documents downtown p Total WRIGHT COUNTY RECORDER $746.00 Paid Chk# 026624 1/20/2009 WRIGHT CTY AUDITOR/TREASURER E 101-41400-300 Professional Srvs (GENERAL) $100.00 Tori Leonhardt Notary Recordin Total WRIGHT CTY AUDITOR/TREASURER $100.00 Paid Chk# 026625 1/20/2009 WRIGHT CTY SHERIFFS PATROL E 101-42110-307 Police Contract Fees $40,880.00 0901 Jan 09 Patrol Total WRIGHT CTY SHERIFFS PATROL $40,880.00 Paid Chk# 026626 1/20/2009 WRIGHT RECYCLING E 101-43200-308 Recycling Contract Fee $4,500.00 120408 Dec recycling Total WRIGHT RECYCLING $4,500.00 M:\Public Data\City Counci]\Council Packet information\2009\01-20-09 (Tue)\01 20 2009 8-E-1 Payment Posted Batcb.doc Page 6 of 7 Agenda Item No. 8. E. I.. Meeting Date January 20, 2009 W Mayor and Council Communication — January 14, 2009 Finance — Payment of Claims Page 7 of 7 Check Amt Invoice Comment 10100 Premier Bank Paid Chk# 026627 1/20/2009 XCEL ENERGY E 601-49450-381 Electric Utilities $50.12 1808371.11 E 101-43160-381 Electric Utilities $34.43 253894360 E 101-43160-381 Electric Utilities $5,035.78 254213487 E 101-41940-381 Electric Utilities $4.04 254213689 Total XCEL ENERGY $5,124.37 10100 Premier Bank $575,418.34 Fund Summary 10100 Premier Bank 101 GENERAL FUND $104,692.57 102 CAPITAL OUTLAY RESERVE $3,718.98 354 1999 LEASE/REVENUE $68,355.50 358 Lease Revenue Bond 2004 $122,343.75 360 CSAH 19, 2007A $33,022.50 361 Latchman, 2007A $11,002.50 362 Industrial Park, 2007A $20,680.00 473 PRAIRIE RUN $335.00 482 CITY HALL 2004-5 $1,109.69 494 CSAH 19 & 50th St. (South 19) $13,264.00 497 70th Street $42,895.26 499 Lachman Ave $13,056.77 501 Phil Morris Lift Station $33,371.13 503 CSAH 37 Utilities $2,554.60 601 SEWER FUND $83,827.92 602 WATER FUND $1,987.75 604 STORM WATER $19,200.42 $575,418.34 5900 Cty Rd 18 Unit Sewer 5700 Labeaux unit signal Street Lighting - 58-59-60 St. 10820 Kantar Court Fire Siren M:\Public Data\City Council\Council Packet information\2009\01-20-09 (Tue)\01 20 2009 8-E-1 Payment Posted Batch.doc Agenda Item No. 8.E. I.. Meeting Date January 20, 2009 23 • B® L.8L M F:== N K • Consulting Engineers & Surveyors " 7533 Sunwood Drive NW • Ramsey, MN 55303 Phone (763) 433-2851 • Fax (763) 427-0833 www.bolton-menk.com January 7, 2009 Mr. Larry Kruse, City Administrator City of Albertville 5959 Main Avenue NE, P.O. Box 9 Albertville, MN 55301-0009 Re: Pay Estimate No. 3 & Final Lachman Avenue Improvements - 2007 City of Albertville, Minnesota BMI Project No.: T15.21652 Dear Mr. Kruse: Rk�h'R Enclosed please find three (3) copies of Pay Estimate No. 3 and Final for the above referenced project. Payment No. 3 includes all project related work and complete release of all retainage. We have reviewed Pay Estimate No. 3 & Final and recommend payment in the amount of $13,056.77 to Dennis Fehn Gravel and Excavating, Inc. For`your information the final contract amount, including all additional work items, is $261,135.40. Please verify that the total amount of previous payments plus the final payment does not exceed the final contract amount. If everything meets your approval, please sign all three (3) copies, retain one (1) copy, return one (1) copy to our office, and submit one (1) copy along with payment to: Dennis Fehn Gravel and Excavating, Inc. PO Box 256 5050 Barthel Industrial Drive Albertville, MN 55301 We have requested that the Contractor submit all lien waivers, IC- 134 forms and consent of surety. Please do not release payment until receipt of these items has been verified. Please contact me if you have any questions regarding this final payment. Sincerely, BOLTON & MENK, INC. Adam Nafstad, P.E. Project Manager Enclosures Cc: Tina Lannes, Finance Director DESIGNING FOR A BETTER TOMORROW Bolton & Menk is an equal opportunity employer 24 - Eac> L _T"CJN a. M r-== N K , i Nam@ • Consulting Engineers & Surveyors it 7533 Sunwood Drive NW • Ramsey, MN 55303 Phone (763) 433-2851 • Fax (763) 427-0833 www.bolton-menk.com January 7, 2009 Mr. Larry Kruse, City Administrator City of Albertville 5959 Main Avenue NE, P.O. Box 9 Albertville, MN 55301-0009 Re: Partial Pay Estimate No. 3 & Final Phillip Morris Lift Station City of Albertville, Minnesota BMI Project No.: RI3.39382 Dear Mr. Kruse: Enclosed please find three (3) copies of Pay Estimate No. 3 and Final for the above referenced project. Please note Payment No. 3 includes all project related work, with the exception of the construction of the driveway. Due to project delays, primarily caused by the Albertville Marketplace development, the Contractor has requested that they be relieved of the driveway component of the project and have agreed to a $3,500 deduction. The deduction is based on a quote received from Oman Brothers Paving, who has agreed to assume the original contract's construction and warranty responsibilities for the driveway. We have reviewed Pay Estimate No. 3 & Final and recommend payment in the amount of $33,371.13 to Northdale Construction Company, Inc. It is further recommended that the Contractor be relieved of the driveway construction requirements of the contract to avoid potential costs related to the delays. For your information the final contract amount, including driveway deduction, is $137,523.25. Please verify that the total amount of previous payments plus the final payment does not exceed the final contract amount. If everything meets your approval, please sign all three (3) copies, retain one (1) copy, return one (1) copy to our office, and submit one (1) copy along with payment to: Northdale Construction Company, Inc. 9625 71 st Street NE Albertville, MN 55301 DESIGNING FOR A BETTER TOMORROW Bolton & Menk is an equal opportunity employer 25 \ Lift Station Final •��1 1/07/09 Page 2 of 2 We have requested that the Contractor submit all lien waivers, IC- 134 forms and consent of surety. Please do not release payment until receipt of these items has been verified. Please contact me if you have any questions regarding this final payment. Sincerely, BOLTON & MENK, INC. Adam Nafstad, P.E. Project Manager Enclosures Cc: Tina Lannes, Finance Director 26 • s BQ L -rc:>N 8 MP= rl--.I K, • Consulting Engineers & Surveyors t` 1 7533 Sunwood Drive NW • Ramsey, MN 55303 Phone (763) 433-2851 • Fax (763) 427-0833 www.bolton-menk.com January 7, 2009 Mr. Larry Kruse, City Administrator City of Albertville 5959 Main Avenue NE, P.O. Box 9 Albertville, MN 55301-0009 RE: 701h Street Improvements - 2007 Partial Pay Estimate No. 3 City of Albertville, MN BMI Project No.: T15.21660 Dear Mr. Kruse: I have reviewed the enclosed December 4, 2008 invoice from the City of Otsego for the above referenced project. The invoice includes Partial Pay Estimate No. 3 and associated professional service fees for the period of 5/1/08 to 10/31/08. The total invoice amount is $42,800.26. This amount represents 50% of the partial payment and professional fees and is consistent with the 701h Street agreement. It is therefore recommended that payment be made to the City of Otsego in the amount of $42,800.26. For your information, Albertville has been previously invoiced and paid $126,492.57. To date, Albertville's total project responsibility (including the December invoice) is $169,292.83. Please ensure the total amount previously paid to Otsego plus payment #3 does not exceed this amount. Please let me if you have any questions regarding this partial payment. Sincerely, BOLTON & MENK, INC. Adam Nafstad, P.E. Assistant City Engineer Enclosures Cc: Tina Lannes — Finance Director DESIGNING FOR A BETTER TOMORROW Bolton & Menk is an equal opportunity employer 27 Nbertville s� xaun u.Yq. ero a¢u Ur.. Mayor and Council Communication January 7, 2009 SUBJECT: 0 FINANCE - T-SQUARE BUSINESS PARK — ROBERT HEURING ESCROW RELEASE RECOMMENDATION: It is respectfully requested that the Mayor and Council consider approving the following motion: Motion approve releasing, in full, the $5,000 Escrow posted by Mr. Robert Heuring as surety for the T-Square Business Park plat. BACKGROUND: Mr. Robert Heuring, Co -Developer of the T-Square Business Park plat has requested a complete release of the escrow held by the City as surety for the T-Square plat, currently in the amount of $5,000. This escrow served as security to ensure the obligations of the development contract were fulfilled. To date, we are unaware of any outstanding contract obligations or defaults on the terms of the agreement by Mr. Heuring. Assuming Mr. Heuring is current with all fees owed to the City and to be consistent with the development agreement, it is recommended that the escrow be released in full. For your information, the platting of the T-Square subdivision required two (2) development contracts, one with Mr. Heuring and one with T-Square Properties, LLC. The letter of credit posted by T-Square Properties, LLC was released in August of 2008. POLICY CONSIDERATIONS: This release is consistent with the agreement between the City and Developer. With or without a letter of credit in place, the Developer is required to comply with the conditions of the Development Agreement. FINANCIAL CONSIDERATIONS: There are no financial implications for this request. LEGAL CONSIDERATIONS: The City has the legal authority under the Development Agreement to release the letter of credit upon completion of required improvements. The City also has legal authority under the Development Agreement to deny requests for release or reduction if required improvements are found unacceptable. Respectfully submitted, Larry R. se City Administrator Department/Responsible Person: Engineering/Assistant City Engineer Adam Nafstad; Finance Department/Finance Director Tina Lannes Attachments: Bolton & Menk, Inc.'s Recommendation M:\Public Data\Requests for Council Actions (RCA)\2009\0 120 2009 8 Finance RCA (LOC Release - Heuring).doc Agenda Item No. 8._E. .a. Meeting Date January 20, 2009 • Consulting Engineers & Surveyors 7533 Sunwood Drive NW • Ramsey, MN 55303 Phone (763) 433-2851 • Fax (763) 427-0833 www.bolton-menk.com January 7, 2009 Mr. Larry Kruse, City Administrator City of Albertville 5959 Main Avenue NE, P. O. Box 9 Albertville, MN 55301 RE: Escrow Release T-Square Business Park Albertville, Minnesota Honorable Mayor and City Council: Mr. Robert Heuring, Co -Developer of the T-Square Business Park plat has requested a complete release of the escrow held by the City as surety for the T-Square plat, currently in the amount of $5,000. This escrow served as security to ensure the obligations of the development contract were fulfilled. To date, we are unaware of any outstanding contract obligations or defaults on the terms of the agreement by Mr. Heuring. Assuming Mr. Heuring is current with all fees owed to the City and to be consistent with the development agreement, it is recommended that the escrow be released in full. For your information, the platting of the T-Square subdivision required two (2) development contracts, one with Mr. Heuring and one with T-Square Properties, LLC. The letter of credit posted by T-Square Properties, LLC was released in August of 2008. Please let me know if you have any questions or would like additional information. Sincerely, BOLTON & MENK, INC. Adam Nafstad, P. E. Albertville Engineer cc: Mr. Robert Heuring Tina Lannes DESIGNING FOR A BETTER TOMORROW Bolton & Menk is an equal opportunity employer 30 S '_ b£r'tV1ki£ s.,ron tom, . ft n� �.. Mayor and Council Communication January 8, 2009 SUBJECT: ENGINEERING - AMENDMENT TO TOWNE LAKES 6M ADDITION PLANNED UNIT DEVELOPMENT AGREEMENT RECOMMENDATION: It is respectfully requested that the Mayor and Council consider approval the following motion: Motion directing Staff to amend to the Plan Unit Development Agreement for Towne Lakes 6th Addition to extend the completion of the municipal and on- and off -site improvements until October 31, 2010, with the exception of the trunk water extension, which shall be completed by October 31 st, 2009, and conditioned upon the Developer signing the amendment. BACKGROUND: This past year ownership of the Towne Lakes 61h Addition was turned over to M&I Bank. Since acquiring the property, M&I and its representatives have diligently worked with Staff to achieve compliance with the terms of the development contracts. To date, the Bank has renewed the required Letter of Credit and has appointed management groups to maintain and market the properties. Currently the Bank is seeking an extension to the completion dates as specified in the Addition's Planned Unit Development Agreement. This agreement requires all municipal and on -and off - site improvements be complete by October 31", 2006, unless otherwise approved by the City. Although a large portion of the required improvements are in place, numerous required improvements have yet to be completed. In general, outstanding improvements include: placement of the wear course on the public streets, construction of the private drives, landscaping and lighting, utility adjustments, and completion of the trunk municipal utility systems through Outlot B. Of the outstanding improvements, the placement of the wear course on Linwood Avenue NE and 69th Street NE and the construction of the trunk watermain raise the most concern. The first lift of pavement was placed on both Linwood Avenue and 69th Street in 2006 and is currently sufficient for the roads low traffic volume. However, as the area continues to develop, specifically the Shoppes of Towne Lakes additions, the second and final lifts will be necessary to prevent premature failure of the roadway's section. Also, from a maintenance perspective, the final lift of pavement provides for a more manageable road surface. Another requirement of the 61h Addition is the extension of trunk water to the easterly plat boundary. This extension is necessary to loop the Hunter's Pass Additions into the municipal water system and provide an alternate feed to assure continuous flows. Hunter's Pass is currently connected to the municipal water system by a main that crosses Hunter's Lake and is connected to the watermain in the Towne Lakes 2nd Addition. Although water supply to Hunter's Pass is sufficient, without being looped into the municipal system, the Addition is very susceptible to water outages and/or reduced flows should a watermain break occur. If a break M:\Public Data\Requests for Council Actions (RCA)\2009\01 20 2009 Engineering (TL6 - DA Amendment) RCA.doc Agenda Item No. 8.1... ( . Meeting Date January 20, 2009 Mayor and Council Communication — January 8, 2009 Engineering — Towne Lakes 6th Addition Page 2 of 2 were to occur in the portion of main that lies beneath the lake, residents could be without water for a significant period of time. Through discussions with M&I representatives, it is my understanding that the Bank is aware of the outstanding construction items and, obviously, would prefer to prolong the completion of the items, as they are not contractors or developers. However, acknowledging their contract obligations as the property owner, the Bank has respectfully asked that the completion dates of the contract be extended as long as permissible and ideally to such time that the property is sold or development resumes. Given the state of the area economy and how it has adversely impacted the residential housing market, it is unknown when development of the 6th Addition will resume. Upon discussing the outstanding requirements with City Staff and in effort to meet the goals of all parties, it is recommended that the Towne Lakes 61h PUD Agreement be amended to extend the completion of the municipal and on -and off -site improvements until October 31 st, 2010, with the exception of the trunk watermain extension, which shall be completed by October 31 st, 2009. As a condition of this recommendation, the Owner will be required to sign an amendment to the PUD Agreement. Should development of the property not resume in the near term, it is believed that the aforementioned amendment will provide the Bank and the City sufficient time to coordinate efforts and complete the obligations of the PUD Agreement. KEY ISSUES: • Amend development contract such that completion dates are extended. • Letters of Credit to remain intact until all requirements are fulfilled. POLICY CONSIDERATIONS: It is City policy to have all amendments to agreements approved by the City Council FINANCIAL CONSIDERATIONS: There are no financial implications for this request LEGAL CONSIDERATIONS: The Mayor and Council posses the authority to approve or deny amendments to agreements. Respectfully submitted, WZLarry R. City Administrator Department/Responsible Person: Engineering/Assistant City Engineer Adam Nafstad Attachments: Bolton & Menk, Inc. Engineer's Recommendation Letter M:\Public Data\Requests for Council Actions (RCA)\2009\01 20 2009 Engineering (TL6 - DA Amendment) RCA.doc Agenda Item No. 8.1.. Meeting Date January 20, 2009 • = BO L_TO�N 8� rs- i E= N P< , • Consulting Engineers & Surveyors " 7533 Sunwood Drive NW • Ramsey, MN 55303 Phone (763) 433-2851 • Fax (763) 427-0833 www.bolton-menk.com January 7, 2008 Mr. Larry Kruse, City Administrator City of Albertville 5959 Main Avenue NE, P. O. Box 9 Albertville, MN 55301 RE: Towne Lakes 6th Addition Development Agreement Amendment — Extended Completion Dates Honorable Mayor and City Council: t r_11J+::^e As you aware, this past year ownership of the Towne Lakes 6th Addition was turned over to M&I Bank. Since acquiring the property, M&I and its representatives have diligently worked with Staff to achieve compliance with the terms of the development contracts. To date, the Bank has renewed the required Letter of Credit and has appointed management groups to maintain and market the properties. Currently the Bank is seeking an extension to the completion dates as specified in the Addition's Planned Unit Development Agreement. This agreement requires all municipal and on -and off -site improvements be complete by October 315t, 2006, unless otherwise approved by the City. Although a large portion of the required improvements are in place, numerous required improvements have yet to be completed. In general, outstanding improvements include: placement of the wear course on the public streets, construction of the private drives, landscaping and lighting, utility adjustments, and completion of the trunk municipal utility systems through Outlot B. Of the outstanding improvements, the placement of the wear course on Linwood Avenue NE and 69th Street NE and the construction of the trunk watermain raise the most concern. The first lift of pavement was placed on both Linwood Avenue and 69th Street in 2006 and is currently sufficient for the roads low traffic volume. However, as the area continues to develop, specifically the Shoppes of Towne Lakes additions, the second and final lifts will be necessary to prevent premature failure of the roadway's section. Also, from a maintenance perspective, the final lift of pavement provides for a more manageable road surface. Another requirement of the 6th Addition is the extension of trunk water to the easterly plat boundary. This extension is necessary to loop the Hunter's Pass Additions into the municipal water system and provide an alternate feed to assure continuous flows. Hunter's Pass is currently connected to the municipal water system by a main that crosses Hunter's Lake and is connected to the watermain in the Towne Lakes 2nd Addition. Although water supply to Hunter's Pass is sufficient, without being looped into the municipal system, the Addition is very susceptible to water outages and/or reduced flows should a watermain break occur. If a break were to occur in the portion of main that lies beneath the lake, residents could be without water for a significant period of time. DESIGNING FOR A BETTER TOMORROW Bolton & Menk is an equal opportunity employer 33 Towne Lakes 6th 4•� 1/7/2008 \ Page 2 of 2 Through discussions with M&I representatives, it is my understanding that the Bank is aware of the outstanding construction items and, obviously, would prefer to prolong the completion of the items, as they are not contractors or developers. However, acknowledging their contract obligations as the property owner, the Bank has respectfully asked that the completion dates of the contract be extended as long as permissible and ideally to such time that the property is sold or development resumes. Given the state of the area economy and how it has adversely impacted the residential housing market, it is unknown when development of the 6th Addition will resume. Upon discussing the outstanding requirements with City Staff and in effort to meet the goals of all parties, it is recommended that the Towne Lakes 6th PUD Agreement be amended to extend the completion of the municipal and on -and off - site improvements until October 31st, 2010, with the exception of the trunk watermain extension, which shall be completed by October 3 I't, 2009. As a condition of this recommendation, the Owner will be required to sign an amendment to the PUD Agreement. Should development of the property not resume in the near term, it is believed that the aforementioned amendment will provide the Bank and the City sufficient time to coordinate efforts and complete the obligations of the PUD Agreement. Please let me know if you have any questions or would like additional information regarding this matter. I will be at your January 20th City Council meeting to address any questions you may have regarding this issue. Sincerely, BOLTON & MENK, INC. Adam Nafstad, P. E. Albertville Engineer Cc: Larry Kruse — City Administrator Bridget Miller - City Clerk Mike Couri — City Attorney Megan King — Jones Lang LaSalle 34 • = EaG L <w. M r-=- N P<,- Consulting Engineers & Surveyors 7533 Sunwood Drive NW • Ramsey, MN 55303 Phone (763) 433-2851 • Fax (763) 427-0833 www.bolton-menk.com MEMORANDUM Date: January 7, 2009 To: The Honorable Mayor and City Council Cc: Larry Kruse, Albertville City Administrator From: Adam Nafstad, P.E., Albertville Engineer Subject: Project Status Update The following is a brief project status update as of January 7, 2009: 1. Albertville Townhomes (Dominium Development) With the exception of the final lift of pavement, the new roadways and utilities are substantially complete. The main entrance that serves the town homes and apartments will be resurfaced next year. 2. Albertville Markedlace Other than minor items related to the restaurant site, work is not anticipated to resume until spring or the development of the one the remaining lots. It is believed that the restaurant will open in March. 3. Niemeyer Trailer Sales Staff is working with the Developer to finalize the terms of the development agreement. 4. CSAH 19 Project 57th Street to Albertville Southerly Limits) Staff is assisting the City Attorney as required with the current assessment appeal trails. Also, it is expected that the County will process the final pay estimate and closeout the project yet this winter. 5. Storm Water Management Plan Staff has finalized the modeling component of the study and is working to identify existing and potential flood susceptible areas, and is the process of reviewing stormwater management codes and ordinances. 6. CSAH 37 (West) Utility Extension —Niemeyer Development Bids will be received and opened on January 14th and presented to Council at the first meeting in February. M:\Public Data\City Council\Council Packet information\2009\01-20-09 (Tue)\8-Engineering Project Status Update January 7, 2009.doc Agenda Item No. 8.1.a.• Meeting Date January 20, 2009 35 Albertville Project Status Update 1/7/09 Page 2 of 3 7. Hunters Pass Staff will be coordinating the completion of all outstanding requirements with the Developer. The LOC has been drawn in full and payment has been made to the Prime Contractor and the city will be using necessary funds from the LOC to complete the outstanding requirements. 8. Albertville Railroad Exchange Plat The plat has been approved and recorded. In the spring, staff will further investigate the abandoned storm sewer along the southerly boundary of the plat. 9. Phil Morris Lift Station The transformer dedicated to the lift station is defective and not working. Xcel has ordered a replacement transformer and believes to have installed by the end of February. If the restaurant requires sanitary sewer service before this date, Xcel has agreed to install a temporary transformer. Start-up of the lift station took place in late December with the use of the City's generator. To date, with the exception of the driveway, the Contractor has completed all construction requirements of the contract. To do delays due to the Marketplace development, Staff has recommended that the Contractor be relieved of the driveway components of the contract and the project be closed -out. Oman Brothers have agreed to assume the driveway responsibilities and complete the driveway in the spring for the amount deducted from the original contract. 10. Winter park Improvements Overall the project is complete; however, Staff is working with the Contractor to resolve a few drainage issues with the trail and parking lot. These issues will be completed in the spring. 11. Towne Lakes 51h Addition Several outstanding punchlist and warranty items have been completed. The primary items that remain are related to trail defects and the completion of stub streets. Staff is working with Contractor and Mr. Hemple, who represents Peter Scherer, to complete the punchlist items. 12. Towne Lakes 61h Addition Staff is working with the owner and its representatives to amend the development contracts and possibly extend the contract completion dates. This item will be discussed at the January 20t" meeting. 13. 70th Street (CSAH 19 to MacIver) Otsego is currently working with the Contractor to complete the final payment application. Once completed by Otsego and the Contractor, Staff will present a payment recommendation to Council. M:\Public Data\City Council\Council Packet information\2009\01-20-09 (Tue)\8-Engineering Project Status Update January 7, 2009.dooc Agenda Item No. O.I.. Meeting Date January 20, 2009 36 Albertville Project Status Update ., 1/7/09 a = Page 3 of 3 14. Karston Cove 3rd Addition Staff is working with the Developer to renew the letter of credit and to amend the PUD Agreement to allow for extended contract completion dates. 15. Mapping Staff will be meeting to compile all map revisions and updates and to add Utility As- Builts to the City Online Mapping System. 16. Intersection Crash History Staff has received crash histories for the CSAH 19 intersections at 57th Street and CSAH 37. Staff is working to schedule a meeting with the County to discuss the crash rates and potential corrected measures. 17. 2009 Municipal State Aid System Staff is working to complete the required 2008 Mileage Certification. It is this certification that is the basis for the City's MSAS allotment. 18. Naber Avenue EA/EAW — St. Michael (Layout Attached) The City has received and reviewed an Environmental Assessment/Environmental Assessment Worksheet prepared for the City of St. Michael's Naber Avenue Extension and Interchange. The EA/EAW has been prepared as part of St. Michael's Interstate Access Request and is necessary for St. Michael to preserve the necessary right-of-way for the project. The proposed project includes the extension of Naber Avenue from 50th Street north to CSAH 37 as a four -lane roadway, with an interchange to provide full access between I-94 and Naber Avenue. The extension is approximately a mile in length, includes bicycle and pedestrian facilities, as well as, a standard diamond interchange to overpass and provide access to I-94. To accommodate the overpass and south interstate ramps, approximately 1.3 miles of the BNSF railroad track will have to be realigned. Staff has found the environmental document to be consistent with the I-94 Freeway Study Report, Northeast Wright County Sub -Area Transportation Study, and the I-94 Interstate Access Request, all joint efforts of both Albertville and St. Michael. Attached for you use, please find a copy of the proposed St. Michael project. 19. Projects to resume in the Spring Include: • Franklin Property Sewer Extension — Punchlist Items. • Winter Park Improvements — Punchlist Items • Niemeyer Trailer Sales — Grading • Albertville Townhomes — Site Improvements I will be at your January 20th City Council meeting to discuss any questions concerning these and/or other projects taking place in town. M:\Public Data\City Council\Council Packet information\2009\01-20-09 (Tue)\8-Engineering Project Status Update January 7, 2009.doc Agenda Item No. O. 1.). Meeting Date January 20, 2009 37 A,lbertville SwA Tnum tMng. Ng Oty Ufa. MEMORANDUM Date: January 15, 2009 To: City Council From: Larry R. Kruse, City Administrator Re: General Update CSAH 37 WEST UTILITY PROJECT On January 14, 2009 staff opened bids for the CSAH 37 West Project and had 16 companies bid the project. The apparent low bidder was Nodland Construction, Inc. at $339,699.55. This amount is substantially under the engineers $400,000 plus estimate. Staff continues to work with Mr. Niemeyer to finalize the terms of the Development Agreement to bring back to Council to award the contract. Early spring construction is likely. SNOW REMOVAL City crews continue to do an excellent job keeping up with the many snowfalls. The Sheriff's department has also done a good job of tagging cars parked in the streets. Public Works Supervisor Guimont reported the plow broke on the 1998 one ton plow truck and then the transmission went out on the backup which is the 1989 plow. Guimont emphasized the importance of having good equipment. ANNUAL AUDIT Staff has been working hard on closing out 2008 financials. W-2's have been mailed to employees, Council and Commissions. We plan on presenting the 2008 audit in late April or early May. I-94 CHAMBER "STATE OF THE CITIES MEETING" The State of Cities Annual meeting was held at the Albertville City Hall on Tuesday, January 13, 2009. All the Cities seemed to present the same message that everyone is dealing with the economic downturn, state aid cutbacks and housing foreclosures. All cities reported they are financially sound, and working hard to minimize expenses, but the work of law enforcement, fire protection, snow removal and other services goes on. The City received many compliments about the great facility we have. I-94 Six Lane Project There is some discussion of the some Chamber representatives and City officials going to Washington to lobby for widening I-94 in March. This would involve all the members' cities in the I-94 Coalition. M:\Public Data\City Administrator\2009\01-21-2009 City Admin Report. doc Agenda Item No. 8.K.1. Meeting Date January 20, 2009 39 Mayor and Council Communication - January 15, 2009 Administrator — Written Report 2 of 2 SENIOR HOUSING TAX INCREMENT FINANCING (TIF) PROPOSAL Northland Securities has been authorized to proceed with the Senior Housing TIF Financial Study. I understand Guardian Angels are making some adjustments to the project, and they will provide key information for the report in mid to late January. STATE AID LOSS The State of Minnesota has notified us that they will not be making the second half of the Market Value Credit payable to us in December 2008 in the amount of $48,436. We will have to work on this to minimize the impact on our reserves. DOWNTOWN LAND TRADE Completed! WATERMAIN BREAK AND LIFT STATION PROBLEMS Over the weekend of January I O`h, the Utilities Dept. experienced another watermain break by the BP Station. I have to compliment Supervisor Middendorf and his crew on an excellent job responding to and evaluating the situation. The actual waterline break is under CSAH 37 and the crew installed another valve outside the Highway thus isolating the problem until next summer or perhaps we can avoid digging up the County Road altogether. A little out of the box thinking helped us avoid digging up the County Road! I-94 INTERCHANGE APPROVAL Official approval of the approved I-94 Interchange Layout should be here by the end of January. STMA ARENA I am assisting STMA Arena Manager Grant Fitch on improving Board packets and communication with and to the STMA Arena Board. Further, we are trying to improve the financial report to the Board making sure it has up to -date information on the operation. 5975 Main Avenue (Old City Hall) Infit Fitness is considering a larger location. We are coming up on the 90 day notice to renew their lease. They asked about being able to go month to month until they find a location. I requested they send a letter and we would evaluate it. I believe it would be in both of our interest to keep them there as long as possible. I would suggest a 60 day notice at a minimum to vacate the lease. I believe it is both our goal to incubate new business and maximize the rent from that facility. M:\Public Data\City Administrator\2009\0 1 -21-2009 City Admin Report.doc ��Il Agenda Item No. 8.K. l.. Meeting Date January 20, 2009 40