Loading...
2009-10-19 CC Agenda Joint WC CommissionersJOINT CITY OF ALBERTVILLE AND WRIGHT COUNTY COMMISSIONERS MEETING AGENDA 12:00 NOON, MONDAY, OCTOBER 19, 2009 ALBERTVILLE CITY HALL 12:00 Welcome by Mayor Ron Klecker Introductions Lunch City Council Member Tom Fay - Comments City Engineer Adam Nafstad Transportation Presentation (I-94, etc) Open forum for questions and comments 1:00 Adjournment COUNTY PRELIMINARY ROAD TOUR LIST October 19, 2009 8:45 a.m. Departure Time 1. CSAH 12 from TH 55 to CSAH 37 (future grading project?) 2. CSAH 12 at TH 55 intersection improvement (drive thru only) 3. CSAH 12 south of Buffalo (2010 construction) 4. CSAH 35 Bridge east of CSAH 3 5. CSAH 3 — South County Line to CSAH 31 (2012 construction) 6. CSAH 8 south of Waverly (2009 Overlay project providing a good ride!) Plus fly ash project north of CSAH 30 (then go south to CR 133) 7. CR 112 and CR 133 (overlay and turnback candidates) 8. CSAH 17 south of Delano (completed grading project) featuring a view of horse droppings on trail) 9. Delano — CSAH 30 and CR 139 (then Farmington Ave to CSAH 32/TH 55) 10. CSAH 32 at TH 55 — future Hwy 55 Coalition Project 11. CSAH 14 at TH 55 — lightweight fill project 12. CR 147 at TH 55 — future Hwy 55 Coalition project 13. CSAH 35 — changes to rumble stripes (new 6" stripe has been added) 14. CSAH 35 one-way pair in St. Michael 15. CSAH 19 — completed project in St. Michael 16. County -owned property: McNamara 17. County -owned property: Chouinard 18. CSAH 36 construction status 19. Safe Routes to School project in Otsego on CSAH 42 20. CSAH 37 east of I-94 (site of dynamic curve sign) 21. Noon: BBQ lunch in Albertville (put on by the City?) Plan on 45-60 min to eat and see their plans and model: I-94 improvements at CSAHs 19 and 37 22. CSAH 75 realignment (2011 construction) 23. Clearwater: CSAH 75 (old TH 152) R/W vacation 24. CSAH 40 Bridge (2011 construction) 25. CSAH 6 construction project 3:30 p.m. Return to Public Works Building