Loading...
2006-04-25 CC Workshop Agenda PacketA1bcrtville .ft tyurs. ALBERTVILLE CITY COUNCIL AGENDA April 25, 2006 6:30 PM 1. CALL TO ORDER — ROLL CALL — ADOPT AGENDA 2. ALBERTVILLE PREMIUM OUTLET MALL ISSUES 3. ALBERTVILLE NORTHWEST QUADRANT STUDIES DISCUSSION A. Hotel Water Park Study B. Broader Transportation Studies 4. DOWNTOWN PARKING STUDY A. Review & Discussion regarding outcome of Public Meeting B. Railroad Right of Way Purchase • 5. COUNCIL PRIORITIES 6. ADJOURNMENT E BOl—TON&MBNK, Consulting Engineers & Surveyors 12224 Nicollet Avenue • Burnsville, MN 55337-1649 Phone (952) 890-0509 • FAX (952) 890-8065 April 19, 2006 Mr. Larry Kruse, City Administrator City of Albertville 5975 Main Avenue NE PO Box 9 Albertville, MN 55301 Re: Traffic Impact Study for Hotel/Waterpark City of Albertville BMI Project No. T42.21811 1 NC_ Honorable Mayor and City Council Members: Please find attached, the Traffic Impact Study for the proposed hotel/waterpark for your review. The study evaluates the traffic impacts of the proposed hotel/waterpark facility, as well as, possible impacts of development surrounding the Outlet Mall and proposed facility. Jon Huseby, Mark Kasma and myself will be at your April 25, 2006, Council Workshop to present and discuss our findings and recommendations and will be glad to address questions at any time. Sincerely, BOLTON & MENK, INC. ,144 4 Adam Nafstad, P.E. Albertville Assistant City Engineer Enclosure H:\ALBT\T4221811\Report\Report Cover Letter.doc MANKATO, MN • FAIRMONT, MN • SLEEPY EYE, MN • BURNSVILLE, MN • WILLMAR, MN • CHASKA, MN • AMES, IA www.bolton-menk.com An Equal Opportunity Employer • TRAFFIC IMPACT STUDY FOR HOTEL/WATERPARK CITY OF ALBERTVILLE, WRIGHT COUNTY, MN 0 Prepared by: February 2006 0 • • • Table of Contents I. Executive Summary.................................................................................................. I II. Background................................................................................................................ 2 III. Traffic Analysis.......................................................................................................... 3 IV. Conclusions................................................................................................................. 4 Appendix TrafficCounts.................................................................................................................. A TripGeneration................................................................................................................B SynchroAnalysis.............................................................................................................. C WarrantAnalysis............................................................................................................. D Hotel/Waterpark i Traffic Impact Study City of Albertville, Wright County, Minnesota February 2006 Prepared by: Bolton & Menk, Inc Hotel/Waterpark Traffic Study Albertville, Wright County • I. Executive Summary February 2006 The City of Albertville has received a proposal to develop a Hotel/Waterpark complex to be located north of I-94 and west of the Albertville Outlet Mall. The development would use 671h Street and CSAH 19 to access the regional roadway system. This study evaluates the impacts of this proposal and looks at the possible combined impacts of commercial/retail development in the properties surrounding the Outlet Mall and proposed Hotel/Waterpark. The results of the analysis indicate that the existing roadway system will accommodate the proposed Hotel/Waterpark. Due to roadway limitations, however, continued development of the surrounding land area will produce unacceptable traffic conditions on CSAH 19. The analysis indicates that approximately 25% of the developable land area could be supported if CSAH 19 is extended as a four -lane divided roadway to the north Albertville city limits and if the intersection with 67th Street is constructed with double left turn lanes for northbound left turns and traffic signals are installed. It could be reasonably expected that traffic signals will be warranted and needed in the first stages of continued development. If the area identified as `Northern Area' in this study builds out as . commercial/retail, it is expected that 3,100 vehicles per day would be multi -use trips that also will travel to the existing Outlet Mall. It would help overall traffic conditions if a direct connection could be planned from the existing Outlet Mall to the Northern Area. This connection would help alleviate the traffic conditions anticipated on CSAH 19. • It is recommended that the City of Albertville require detailed traffic studies for each proposal for development in this area. The traffic studies performed should include combined analysis of approved and pending development in order to determine roadway adequacy. It can be reasonably expected that at some point, development should be discouraged until the supporting roadway network is constructed. This network includes: • CSAH 19 divided roadway extension to north city limits; • CSAH 19 at 67th Street intersection with double left turns and traffic signals; • I-94 interchange southeast ramps at CSAH 19; • I-94 interchange construction at Kadler Avenue; • 70th Street construction. Detailed traffic studies will help identify the necessary road improvements and time -frame necessary to support the area as development occurs. H:\ALBT\T4221811 \Report\Report.doc Hotel/Waterpark Traffic Study February 2006 Albertville, Wright County . II. Background • A Hotel/Waterpark Development is being proposed for Albertville Business Park on the north side of I-94 west of the Albertville Outlet Mall (see Figure 1). The proposed development includes approximately 300 guest rooms with a 60,000 square foot Waterpark, an arcade/entertainment center, conference center, fitness center, Spa, and a restaurant/lounge. Access to the development would be provided on 671h Street and on Keystone Avenue. 67`' Street currently exists to the intersection with CSAH 19 (LaBeaux Avenue). Figure 1 Study Area and Northern Area Trip Distribution (Note: Hotel/Waterpark Assumed Trip Distribution not shown.) The Albertville Business Park and the surrounding properties between Kadler Avenue and CSAH 19 and between I-94 and 70`h Street are currently anticipated to develop as commercial/retail (see northern area in Figure 1). An overview of the potential traffic generated from the available land area was made considering existing wetland area and potential commercial developments. The land area available for development would support approximately 1.5 million square feet (floor space) of commercial/retail development. CSAH 19 is currently a four -lane divided roadway north of I-94 through the intersection at the Outlet Mall entrance. The roadway narrows to a two-lane roadway with turn lanes at the intersection with 67`' Street. It is anticipated that 2 H:\A LB T\T4221811 \ReporMeport.doc Hotel/Waterpark Traffic Study Albertville, Wright County February 2006 Sthe divided highway section will be extended northerly into Otsego in the near future (possibly in 2006). The road section anticipated would have turn lanes at the 67th Street intersection. The 67th Street intersection would provide the primary access to the proposed development. While 701h Street would also provide access to the development, the distribution of the new trips from the Hotel/Waterpark is anticipated to be southerly and easterly. The City of Albertville has planned street networks accessing CSAH 19 and 70th Street to serve the northern area. The street network is shown on Figure I with the proposed streets indicated as broken lines. It is noted that the intersection of CSAH 19 and planned 68th Street will allow right turns in and right turns out only. A median opening at this location does not meet Wright County guidelines and is not anticipated. III. Traffic Analysis The traffic volume anticipated for the Hotel/Waterpark is 3,000 vehicles per day. 125 vehicles will be entering the facility and 100 vehicles will be exiting the facility during the PM peak hour. This traffic will be primarily destined to the south and east. The Hotel/Waterpark traffic will use 67th Street to access CSAH 19 given the planned road network. It is not anticipated that measurable traffic would travel to 70th Street as this would be circuitous for the desired trips. Traffic analysis of the existing volume and traffic generated by the Hotel/Waterpark indicate that the existing and planned road network would function adequately. The surrounding developable land area (shown as Northern Area in Figure 1), however, would generate approximately 38,000 trips per day onto the surrounding road system if development is commercial/retail. Without completion of new interchanges at Kadler Avenue and Nabor Avenue and completion of 70th Street as a cross -county minor arterial, the existing road network would not be capable of distributing the traffic generated in the northern area. The Northeast Wright County Transportation Study indicated that CSAH 19 would be expected to have up to 30,000 ADT in 2040. This anticipated traffic considers regional growth and did not include the intense land development in the Northern Area. Traffic on CSAH 19 north of I-94 was measured at 15,000 in 2005. Normal regional growth would account for the expected 2040 traffic. The intense commercial/retail possibility (1.5 million square feet of developed floor space) will generate over 25,000 new trips onto CSAH 19 south of 67th Street. This traffic volume is unsupportable with the planned road network and for CSAH 19. The planned CSAH 19 (four -lane divided roadway) could support 15% of this commercial/retail activity (up to 225,000 square feet of floor space). 3 H:\ALBT\T4221811 \Report\Report. doc Hotel/Waterpark Traffic Study Albertville, Wright County February 2006 If double left turns for northbound CSAH 19 are planned for the 67th Street intersection, the roadway could support up to 25% of the land area (up to 375,000 square feet of floor space) as commercial/retail. Continued development in the North area should be discouraged without road network expansions. IV. Conclusions 1. The planned Hotel/Waterpark will generate approximately 3,000 trip ends per weekday. The peak hour traffic generated by the Hotel/Waterpark can be accommodated by the existing and planned road network. 2. The surrounding undeveloped properties south of 701h Street and west of CSAH 19/Labeaux Avenue have the potential to develop to intensities that cannot be supported by the planned road network. If fully developed as commercial/retail, the buildable land area indicates approximately 1.5 million square feet of floor space could be developed. This level of development would generate 38,000 trips per weekday. Considering the proximity of this property to the region indicates that a substantial portion of the trips would be destined southerly on CSAH 19 toward I-94. 3. Several intersections are planned with access onto 70th Street. The potential traffic demand, however, will remain on 67th Street as it provides the most direct connection for the desired trip. The planned intersection of CSAH 19 and 671h Street does not have the capacity to accommodate this concentration of commercial/retail traffic activity. 4. Installation of a traffic control signal at the intersection of CSAH 19 at 67th Street will be necessary to accommodate the expected traffic as the land area develops. A traffic signal is not required to accommodate the Hotel/Waterpark. If double left turn lanes are included in the planned intersection of CSAH 19 and 67th Street, the commercial/retail development west of CSAH 19 could be developed to approximately 25% of the developable land area. This would account for approximately 375,000 square feet of commercial/retail floor space. 6. Additional development beyond 25% of the North area shown in Figure 1 should be discouraged without additional access provisions that would accommodate the desired trips. For example, the land area north and west of the Hotel/Waterpark would need to be reanalyzed to orient primary access to the west. This may be difficult to accomplish considering the 4 H:\ALBT\T4221811 \Report\Report. doc • J Hotel/Waterpark Traffic Study Albertville, Wright County February 2006 issues surrounding the interchange configuration for I-94 at Kadler Avenue and the timing of each development. 7. If possible, there would be some benefit to planning a future road connection directly between the Northern Area and the existing Outlet Mall. Upon build -out, if developed as commercial/retail, the Northern Area would develop a cross -traffic demand (referred to as `internal capture' in the traffic analysis) between compatible retail activity centers. The analysis indicates that this cross -activity would be 3100 vehicles per day. Without a direct connection, this cross -activity would use CSAH 19 and add to the traffic problems anticipated on CSAH 19. Detailed traffic studies for each new development is recommended prior to approval of continued development north of the Outlet Mall. The traffic studies need to take into account the accumulative impacts of the adjacent planned land uses to produce useful conclusions. The road network may need to be revisited based on the results of further analysis. H:\ALBT\T4221811 \Report\Report.doc NORTHWEST ASSOCIATED CONSULTANTS, INC. . 4800 Olson Memorial Highway, Suite 202, Golden Valley, MN 55422 Telephone: 7 3,231.2555 Facsimile: 763.231.2561 planners,@€;,nacplanning.com MEMORANDUM TO: Larry Kruse Mike Couri Jon Sutherland Adam Nafstad FROM: Alan Brixius DATE: April 7, 2006 RE: Albertville — Outlet Mall Outstanding Issues FILE NO: 163.06 — 06.09 BACKGROUND On April 25, 2006, the City Council and Chelsea Group are meeting to discuss the outstanding issues related to the Albertville Outlet Mall. At our April 4, 2006 City staff meeting, I was directed to provide a summary of issues for discussion. 1. Existing Dirt Pile An earthen berm exists on the western edge of the Outlet Mall property. This berm was not part of the approved site grading plan or wetland mitigation plan. The berm has raised concerns for the visibility of adjoining properties and with slope erosion into abutting wetlands. The City Council has required the removal of the dirt pile as a condition of lowering the fence along the Phase III parking lot. In past considerations, the City has discussed options for possibly reducing the berm height but not requiring its total removal. Another option is offered in the following language: The City and Chelsea agree that Chelsea shall have two years from the date of this agreement to remove the berm located west of Lot 1, Block 1, Outlets at Albertville, Wright County, Minnesota. If Chelsea fails to remove the berm within this two year period, the City may, but shall not be required to, remove the berm and dispose of the soil in any reasonable manner. In such event, Chelsea agrees to pay the City one-half of the cost of removing said berm. Said payment shall be made within 30 days of billing by the City. To date, no change has occurred with the dirt pile, although the Outlet Mall has offered the dirt as free fill. 2. Phase III Fence Height The Outlet Mall has requested approval to lower the height of the fence along the west edge. of the Phase III parking lot to provide better visibility of the available parking lot. The City is receptive to lowering the fence if all items related to the Outlet Mall can be addressed and the following fence conditions can be met: A. The lower fence height must block the headlights of a full size pickup. In response to this item, the Outlet Mall proposes to lower the fence 17 inches and re -stripe and sign the west edge of the parking lot for compact parking only. Both the height and additional striping should address the headlight issue. B. Jaywalkers crossing County Road 19 at locations different than the controlled intersection is a real concern. In lowering the fence, the City will require the following considerations: (1) The fence should be designed to prevent pedestrians from jumping the fence to gain access to County Road 19. (2) The fence must be extended south and east to prevent pedestrians from 0 walking around the fence to gain access to County Road 19. 3. Pedestrian Traffic Jaywalkers between Phase II and Phase III of the Outlet Malls is a serious issue. The City wants fences erected to discourage jaywalkers and direct pedestrians to the controlled intersection. Corrections should include: A. Fences at the east end of Phase II buildings and along the east edge of the parking lot. The Outlet Mall is interested in working with the County to place a fence in the right-of-way along the east side of the existing trail. B. A fence to the northwest edge of Phase III to discourage access into the Phase III at this location. 4. Pedestrian Access to Burger King The current pedestrian access to the Burger King site is unplanned and is occurring at an unsafe location due to the street curve, sight line, and traffic volumes. Burger King has extended a sidewalk to the street edge without City approval. The following items should be addressed: 2 A. A revised site plan should be submitted showing the pedestrian connection from 0 Burger King to the Outlet Mall buildings. B. Marked crosswalk location. C. Signage identifying crossing location. D. Sidewalk design showing width, disability accessibility. 5. Site Lighting The Outlet Mall lighting in Phases I and II has 45 degree directional lighting on very tall poles. This has created glare issues for residents living south of the freeway. Site examination reveals that the current lighting appears to be on an adjustable swivel that will accommodate some adjustments in the lighting angles. The City recommends an adjustment in site lighting to a 90 degree angle to down light the parking lot. 6. Trash Receptacles The Outlet Mall was approved with just trash compactors. When trash enclosures were recommended, the Outlet Mall indicated that the trash compactors would address the total need for Phase I and II and since they were self-contained, no additional screening was required. The PUD was approved with this premise. Since then, a number of trash dumpsters have been placed on Phase I and II sites in unplanned locations and unscreened. Past site inspections have revealed unsightly views of the dumpsters from County Road 19 and adjoining properties. After identifying this issue to the Outlet Mall, they proceeded to paint the dumpsters to match the building color to camouflage the units. However, at different times, inspections reveal that dumpsters are still a visual problem due to location, appearance, overflowing trash or outdoor storage of other materials (i.e., pallets). In Phase III, the dumpsters tend to wander from approved designated trash enclosures. This Phase III issue is a particular concern in that they abut hospitality businesses. We will be conducting a site inspection of the Outlet Mall to inventory existing conditions prior to the April 25th meeting. A plan to address the trash receptacles must be agreed upon. 7. Road Issues The City has expressed interest in extending a street between the Outlet Mall and Welcome Furniture to provide a second access and egress between the two commercial areas. Before this issue continues to be pursued, the City Engineer will further examine the practicality for this street from physical, financial and traffic perspectives. 3 Upon review of this summary, let's discuss any modifications necessary before forwarding a copy to Chelsea Group. • • NORTHWEST ASSOCIATED CONSULTANTS, INC. FW4800 Olson Memorial Highway, Suite 202, Golden Valley, MN 55422 Telephone: 783.231.2555 Facsimile: 763.231.2501 planners@nac;planning.com MEMORANDUM TO: Larry Kruse Albertville City Council FROM: Cassie Schumacher-Georgopoulos / Alan Brixius DATE: April 21, 2006 RE: Albertville — Downtown Parking Study NAC FILE: 163.13 The following are comments and concerns express at the Downtown Parking Study public open house on April 21, 2006: Overall Concerns — ■ Stormwater management in Downtown Area ■ Opportunities for private individuals to acquire railroad property ■ Increased traffic on already busy road ways Block One — ■ Vacate 60th Street NE right-of-way to allow parking north of Carbone's Block Two — ■ Reuse of historic industrial building in the B-4 District Block Three — ■ Stormwater ponding in residential yards Block Four — ■ Increased traffic to come with new development Block Five — ■ Parking proximity to residential property ■ Acquisition of railroad property to be used for parking lots ■ Maintaining green space around City Hall 0 Block Six ■ Blind intersection at 58th Street NE and Main Avenue NE and hidden drive on Main Avenue NE due to on -street parking ■ On -street parking striping should protect existing driveways ■ Congestion in front of Dance Studio ■ Residential lots on the west side of the block to be rezoned as commercial ■ Residents are in favor of the parking configuration and guiding of the new uses • 0 Albertville Downtown Parking Study 2006 Prepared by Northwest Associated Consultants With Estimates from Bolton & Menk DRAFT NORTHWEST ASSOCIATED CONSULTANTS, INC. 4800 Olson Memorial Highway, Suite 202, Golden Valley, MN 55422 Telephone: 763.231.2555 Facsimile: 763.231.2561 planners@nacplanning.com April 20, 2006 Mr. Larry Kruse City Administrator City of Albertville 5795 Main Avenue NE Albertville, MN 55301 Dear Mr. Kruse: Attached is the Albertville Downtown Parking Study for businesses in the Historic Central Business District along Main Avenue NE. Northwest Associated Consultants reviewed the land uses and existing businesses in the Downtown to comprehend the need for increased parking. A field study was conducted to analyze the amount and type of parking existing for each business. The amount of parking required for each business by the Albertville Zoning Ordinance was calculated to understand the lack of parking in the Downtown. GIS analysis was also conducted to recognize who owns property in the study area. The study proposes areas to increase parking by locating space for new parking lots, as well as illustrates potential locations for redevelopment. Also included within the report are estimated per stall construction costs for each block alternative. Detailed findings are found in the body of the report. We are available if you need additional information. Sincerely, NORTHWEST ASSOCIATED CONSULTANTS, INC wj-3)1� Alan R. Brixius, AICP Principal 0 Table Of Contents Page Introduction.............................................................................. 1 Block One — Existing Conditions ................................................... 5 Block One Alternative One — Redevelopment Options ...................... 8 Block One Alternative Two — Redevelopment Options ...................... 10 Block Two — Existing Conditions ................................................... 14 Block Two — Redevelopment Options ............................................ 16 Block Three — Existing Conditions ................................................ 21 Block Three Alternative One — Redevelopment Options .................... 23 Block Three Alternative Two — Redevelopment Options .................... 27 Block Four — Existing Conditions .................................................. 31 Block Four — Redevelopment Options ........................................... 32 Block Five — Existing Conditions ................................................... 35 Block Five Alternative One — Redevelopment Options ...................... 36 Block Five Alternatives Two and Three — Redevelopment Options ...... 38 Block Six — Existing Conditions..................................................... 42 Block Six — Redevelopment Options ............................................. 44 Conclusion / Recommendations.................................................... 48 List of Tables: Table 1 — Existing Conditions of Block One .................................... 6 Table 2 — Redevelopment Conditions of Block One Alternative One .... 8 Table 3 — Parking Lot Block One Alternative One ............................ 9 Table 4 — Redevelopment Conditions of Block One Alternative Two .... 11 Table 5 — Parking Lot Block One Alternative Two ............................. 12 Table 6 — Existing Conditions of Block Two .................................... 15 Table 7 — Redevelopment Conditions of Block Two .......................... 18 Table 8 — Parking Lot Block Two .................................................. 19 Table 9 — Existing Conditions of Block Three .................................. 22 Table 10 — Redevelopment Conditions of Block Three Alternative One 24 Table 11 — Parking Lot Block Three Alternative One ........................ 25 Table 12 — Redevelopment Conditions of Block Three Alternative Two 28 Albertville Downtown Parking Study Page Table 13 — Parking Lot Block Three Alternative Two ........................ 29 Table 14 — Existing Conditions of Block Four .................................. 31 Table 15 — Redevelopment Conditions of Block Four ........................ 32 Table 16 — Parking Lot Block Four ................................................ 33 Table 17 — Existing Conditions of Block Five ................................... 35 Table 18 — Redevelopment Conditions of Block Five Alternative One.. 36 Table 19 — Redevelopment Conditions of Block Five Alternative Two.. 38 Table 20 — Redevelopment Conditions of Block Five Alternative Three. 40 Table 21 — Existing Conditions of Block Six .................................... 43 Table 22 — Redevelopment Conditions of Block Six Alternative One .... 45 Table 23 — Parking Lot Block Six .................................................. 46 List of Figures: Figure 1 — Parking Study Map ...................................................... 4 Figure 2 — Block One, Alternative One ........................................... 7 Figure 3 — Block One, Alternative Two ........................................... 13 Figure4 — Block Two................................................................. 20 Figure 5 — Block Three, Alternative One ......................................... 26 Figure 6 — Block Three, Alternative Two ......................................... 30 Figure7 — Block Four................................................................. 34 Figure 8 — Block Five, Alternative One ........................................... 37 Figure 9 — Block Five, Alternative Two .............................................. 39 Figure 10 — Block Five, Alternative Three ....................................... 41 Figure 11 — Block Six................................................................. 47 • Albertville Downtown Parking Study INTRODUCTION The role and appearance of Albertville's Downtown District has changed from its historic origins. St. Albert's original church has transformed into a dance studio; the Post Office of 1910 has been converted into apartments. Many of the historic buildings are gone or are unrecognizable from their original architecture; nevertheless the service district is still intact. Albertville Body Shop, Main Avenue Hair Design, Highland Bank, and four restaurants reside in Downtown Albertville. Although the original historic church no longer serves the purpose of providing religion, faith is still grounded in the Downtown with the updated St. Albert's Church and Parish Center on the corner of Main Avenue and 57th Street NE. The Downtown businesses consist of small buildings on small lots relying on on -street parking to address their parking needs. As businesses have evolved from retail uses to service, entertainment and hospitality businesses, parking demand exceeded available on -street parking supply, resulting in overflow parking into residential areas, private parking lots, and unimproved parking areas. This current parking situation has raised concerns by adjoining neighborhoods. The City's Long Range Land Use Plan retains the Albertville Downtown as one of the commercial focal points of the community. Maintaining the Downtown area for commercial uses emphasizes the need to provide an adequate supply of convenient parking for both the existing businesses and future redevelopment efforts. The Albertville City Council has requested NAC to conduct a parking study for the Downtown area. This study identifies parking shortages and strategies for addressing parking to serve Downtown businesses and remedy parking conflicts in residential neighborhoods. Parking stalls per business were calculated using standards set by the Zoning Ordinance. Areas for redevelopment and new parking areas were also observed as part of the study. Study Area The Downtown Parking Study encompasses six blocks along Main Avenue NE between County Road 37 NE and 57 1h Street NE. There are ten businesses in the study area along with the new and existing Albertville City Hall sites and St. Albert's Parish Center. Inventory In the following pages, a detailed inventory of the parking situation has been conducted on a block -by -block basis. This inventory identified lots, parcel ownership, parcel size, current land use, building type, building size, existing on -site parking lots, and number Is Albertville Downtown Park Study Page 1 • of stalls. This information was necessary to calculate both parking demand and parking supply for the block. Within the entire Downtown Study Area, the current businesses and institutions provide area for approximately 255 off-street parking spaces and 82 on -street parking spaces in six paved lots and three gravel lots. The gravel parking lots do not always achieve the required parking due to unpaved and unmarked stalls. According to the parking standards of the Albertville Zoning Ordinance an approximate 427 parking spaces are required to serve the existing businesses and institutions in Downtown, leaving a shortage of roughly 90 parking spaces. Land is available in the downtown area to provide more parking in the downtown district, there is also land available for redevelopment. Redevelopment Options The parking study outlines a number of options for parking and redevelopment for the individual blocks. These options are for planning purposes only to illustrate how parking lots may be physically configured with the available land in each block. Where possible, sites for new buildings have been included as future redevelopment. The parking opportunity options also will provide the City Council with recommendations for a Downtown public parking location, if deemed appropriate by the City Council. The Downtown parking lot will attempt to provide parking to remedy the parking shortage and provide parking to accommodate business expansion or redevelopment. In developing the parking opportunity options, the following criteria were used: 1. Parking Proximity — Upgrading current parking locations and developing new parking areas near businesses. A walkable distance standard of 300 feet from each business was used to determine best used locations. 2. Street Front Building Placement and Visible Parking — with street forward buildings parking will have to occur to the rear of buildings. If the only parking area available for a business is behind the building the use of site lines and directional signage will be vital to having patrons utilize the parking space. 3. Parking Lot Design — All parking lots will be surfaces with asphalt and edged with concrete curb. Each parking lot will be stripped to have the maximum use of the site. Lighting will also be an essential part to each lot to ensure the safety of all patrons. Each lot layout takes into consideration the circulation needs of garbage and delivery traffic to access the buildings in such tight spaces. Albertville Downtown Parking Study Page 2 4. On -Street Parking — On -street parking is the most used parking in Downtown. While it is hard to create new on -street parking, the lost of existing on -street parking can be controlled by reducing the amount of new curb -cuts and allowing parking on side streets. 5. Current vs. Future Needs — Currently there is a need for increased parking and this demand can only grow as existing businesses expand and new businesses develop. A lack of parking is not alluring for new businesses desiring to develop in the downtown. Having future parking plans for developable areas can only make those sites more appealing for development. 6. Complimentary Businesses and Transfer of Uses — Having businesses which are complimentary to each other would allow patrons to walk from business to business and reduce the amount of vehicular traffic. Also having a mix of business operating during the day and during the evening would allow for parking exchange. 7. Property ownership patterns — Parcels of land in the downtown are typically very narrow and filled by the foot print of the building leaving no room for parking. Some properties will be more capable than others to establish the required amount of parking for their business. Ownership patterns determine who can provide adequate parking for their business and who cannot. Those businesses . that cannot provide parking on their site become a concern because it creates the need for resolutions between property owners to develop a parking agreement or the City may have to step in to help provide parking for businesses. • 8. Stormwater and Drainage Patterns — This report does not address the issue of stormwater and drainage, but we as well as the City Engineer are aware that increasing the number of parking stalls and development in the area will increase the amount of impervious surface and the amount of runoff. Albertville Downtown Parking Study Page 3 0 BLOCK ONE - EXISTING CONDITIONS • Block One of the Study Area is in the northeast corner of Downtown between County Road 37 and 60th Street NE along Main Avenue NE. Businesses on the block include Carbone's Pizzeria, carwash, Highland Bank, Albertville Lodge, Albertville Garage, and Albertville Post Office. Highland Bank owns the eastern half of the block, using two- thirds of its property for the bank, its drive -through, and 23 parking stalls. The remaining Highland property is vacant. Carbone's and the car wash are on the northwest corner of the block each property has a separate owner. The City of Albertville owns the lodge and garage properties in the center of the west half of Block One. The two lots of the post office site, including the building and the parking lot, are owned by a private trust. Circulation is open on all four sides of the block; however, 60th Street dead ends prior to Large Avenue to the east. Access to the center of the block is by means of an alley way. The block currently provides four paved parking lots for a total of 41 stalls. The parking lots are owned by Highland Bank, Carbone's, the carwash and the post office. Carbone's lot provides ten parking stalls but requires 13 stalls. Parking for the lodge and the garage is on the street and at the back of the building. The carwash and the post office are able to provide for their required parking. Highland Bank provides more parking than is required by the ordinance; however due to the location of the parking it is unable to serve other businesses on the block. Approximately ten on -street parking stalls are located on Main Avenue, four of these stalls are five minute parking in front of the post office. There are seven stalls along 59th Street and eight stalls along Large Avenue; however, these stalls are underutilized due to the pattern of development. All on -street parking is an estimate because no markings outline the stalls. Block One provides a total number of 66 on -street and off-street parking stalls which currently exceeds its need of 39 stalls by 27 stalls. Table of Existing Conditions are found on the following page. Albertville Downtown Parking Study Page 5 TABLE 1: EXISTING CONDITIONS OF BLOCK ONE Number 4F7 Of Required Parcel Parcel Current Building Size of Existing Parking Vacant Parking Lot # Number Ownershi Parcel Size Landuse Type Building Parking Lots Stalls Land Spaces Paul H. Carbone's 1 101500011212 Schutte 8,324 sqft Commercial Restaurant 832 sqft Paved 10 13 James R & Carleen C 2 101500011229 Hart 6,290 sqft Commercial Car Wash 2,400 sqft Paved 2 2 Commercial 101500011215 Parking 101500011230 Highland Area Drive Highland 3,4,5 101500011213 Bank 36,686 sqft Thru Bank 2,400 sqft Paved 23 11 Highland Vacant 6 101500011214 Bank 1 7,196 sqft(private) None 0 7,196 0 City of 7 101500011208 Albertville 7,196 sqft Institutional Lode 1 1,469 sqft None 0 7 City of 101500011209 Albertville 7,196 s ft Institutional Garage 4,000 s ft None 0 0 Eileen M Post Office L091 101500011211 Gottwalt and 101500011210 Rev Trst A 1 14,392 sqft I Institutional I Parking 1,301 sqft Paved 6 1 6 Total Off -Street 41 39 Total On -Street 25 Total Provided 66 Missing +27 • 0 Albertville Downtown Parking Study Page 6 • BLOCK ONE: ALTERNATIVE ONE - REDEVELOPMENT OPTIONS The first redevelopment option for Block One maintains existing businesses and focusing redevelopment only to the under-utilized sites. The first site for redevelopment would be the Albertville Lodge and the Albertville Garage parcels. Both sites are currently owned by the City of Albertville. The site layout (page 9) for these lots would keep the existing curb cut to allow for access from Main Avenue into the alley and a14 stall parking area. The building for the lodge and garage site could be up to 3,575 square feet and require 15 parking stalls. The second site is the vacant land owned by Highland Bank which could support 4,750 a square foot building, and 18 off-street parking stalls of the required 22 stalls. The alley in the center of the block would widen to 24 feet to provide public access for customers, as well as service vehicles, to the rear of buildings for access to the parking lots and trash enclosures. Block One currently has a large amount of parking created by on -street parking which makes up for the deficit of five stalls from the new buildings. The cost per stall for these new driveways and parking areas would $4,386.64 (Table 3). The cost is markedly high due to a low number of created stalls. Block One would not be a high development priority for the City. Any changes within Block One would be spurred by redevelopment interests. TABLE 2: REDEVELOPMENT CONDITIONS OF BLOCK ONE ALTERNATIVE ONE Size of Required Parcel Parcel Current Building Current Buildable Building Parking Lot # Number Ownership Parcel Size Landuse Type Building Space Size Spaces Paul H. Carbone's 1 101500011212 Schulte 8,324 sqft Commercial Restaurant 832 scift Remain 13 James R & Carleen C 2 101500011229 Hart 6,290 sqft Commercial Car Wash 2,400 sqft Remain 2 Commercial 101500011215 Parking 101500011230 Highland Area Drive Highland 3,4,5 101500011213 Bank 36,686 sqft Thru Bank 2,400 sqft Remain 11 Highland Vacant New Building 6 101500011214 Bank 7,196 sqft (private) / Parking 4,750 sqft 22 City of New Building 7 101500011208 Albertville 7,196 sqft Institutional Lodge 1,469 sqft / Parking 3,575 sqft 15 City of New Building Combined 8 101500011209 Albertville 7,196 sqft Institutional Garage 4,000 sqft / Parking Eileen M Post Office 101500011211 Gottwalt and 9,10 101500011210 Rev Trst A 14,392 sgft Institutional Parking 1,301 sqft Remain 6 Total Needed 69 Off-street Supplied 65 On -street Supplied 20 Total Supplied 85 Albertville Downtown Parking Study Page 8 . TABLE 3: PARKING LOT BLOCK ONE - ALTERNATIVE ONE PRELIMINARY CONSTRUCTION COST ESTIMATE CITY OF ALBERTVILLE BMI PROJECT NO. T1521660 ITEM ITEM APPROXIMATE NO. QUANTITY UNIT DATE: UNIT PRICE 12/13/2005 AMOUNT STREETS & PARKING LOTS IMPROVEMENTS 1 MOBILIZATION 1 LS $5,000.00 $5,000.00 2 TRAFFIC CONTROL 1 LS $500.00 $500.00 3 CLEAR & GRUB 1 LS $1,000.00 $1,000.00 4 COMMON EXCAVATION 3,100 CY $6.00 $18,600.00 5 GRANULAR SUBGRADE MATERIAL 2,425 TON $6.00 $14,550.00 6 AGGREGATE BASE CL 5 (CV) 1,065 TON $12.50 $13,312.50 7 REMOVE CONCRETE WALK 300 SF $2.00 $600.00 8 REMOVE CONCRETE PAVEMENT 25 SF $4.00 $100.00 9 REMOVE BITUMINOUS PAVEMENT 1,055 SY $3.00 $3,165.00 10 REMOVE CURB & GUTTER 100 LF $3.00 $300.00 11 2" TYPE MV NONW EAR COURSE MIXTURE 370 TON $45.00 $16,650.00 12 1.5" TYPE MV WEAR COURSE MIXTURE 280 TON $48.00 $13,440.00 13 BITUMINOUS TACK COAT 150 GA $2.50 $375.00 14 GOETEXTILE FABRIC 3,100 SY $1.50 $4,650.00 15 CONCRETE CURB & GUTTER, B618 1,500 LF $12.50 $18,750.00 16 4" CONCRETE SIDEWALK (INCLUDES AGGREGATE) 200 SF $5.00 $1,000.00 17 SOD WITH TOPSOIL 650 SY $4.50 $2,925.00 18 TREES/BUSHES (LANDSCAPING) 1 LS $3,000.00 $3,000.00 19 6" CONCRETE DRIVEWAY (INCLUDES AGGREGATE) 85 SY $40.00 $3,400.00 20 SIGNAGE 1 LS $500.00 $500.00 21 PAVEMENT MARKINGS 38 STALL $50.00 $1,900.00 22 LIGHTING 6 EA $3,500.00 $21,000.00 SUBTOTAL: $144,717.50 STORM SEWER IMPROVEMENTS 23 12" RCP STORM SEWER PIPE 3006G, CL 5 300 LF $33.00 $9,900.00 24 15" RCP STORM SEWER PIPE 3006G, CL 5 55 LF $35.00 $1,925.00 25 CONST DRAINAGE STRUCTURE DES. SD-1 3 EA $900.00 $2,700.00 26 CONST DRAINAGE STRUCTURE DES. 4022-48" 1 EA $1,200.00 $1,200.00 27 CONST DRAINAGE STRUCTURE DES. 4020-60" 1 EA $1,500.00 $1,500.00 28 CASTING ASSEMBLY, STORM 5 EA $300.00 $1,500.00 SUBTOTAL: $18,725.00 EROSION PROTECTION 29 INLET PROTECTION 5 EA $165.00 $825.00 30 SILT FENCE 250 LF $2.50 $625.00 31 CONSTRUCTION ENTRANCE 2 EA $900.00 $1,800.00 SUBTOTAL: $3,250.00 BUILDING DEMO/LAND COST 32 BUILDING DEMO 1 LS $0.00 $0.00 33 LAND COST 1 LS $0.00 $0.00 34 UITLITY RELOCATION 1 LS $0.00 $0.00 SUBTOTAL: $0.00 ESTIMATED CONSTRUCTION COST $166,692.50 CONTINGENCY (15%) $25,003.88 ENGINEERING (20%) $33,338.50 ADMIN., LEGAL, MISC. (10%) $16,669.25 TOTAL ESTIMATED PROJECT COST: $241,704.13 PROPOSED NUMBER OF STALLS 38 COST PER PARKING STALL PARKING LOT ONLY $4,386.64 Albertville Downtown Parking Study Page 9 • BLOCK ONE: ALTERNATIVE TWO - REDEVELOPMENT OPTIONS • Alternative Two for Block One is similar to Alternative One; however, Alternative Two is a more aggressive approach which includes the two lots of post office in the redevelopment. The site design (page 13) also includes the redevelopment of the Albertville Lodge and Garage and the vacant parcel owned by Highland Bank. The lodge and garage lots and the post office lots could support two buildings and a 33 stall parking lot would be shared through a cross easement. The lodge and garage site owned by the City could support a 3,575 square foot building requiring 15 parking stalls and the post office lots could support a 4,750 square foot building requiring 22 stalls. The off-street parking lot is short four stalls, but the front and the side streets allow for twelve on -street parking stalls making up for the deficit. This alternative is not meant to move the post office out of the downtown but rather update the property and building while include more space for commercial or service uses. The vacant land owned by the Highland Bank could support a 4,750 square foot building, requiring 22 parking stalls by having an 18 stall parking lot in the rear of the building and by utilizing on -street parking to make up the difference. The redevelopment of Block One will rely heavily on the use of the alley to access the rear of each building. The alley would serve as the main entrance into the off-street parking lots for all three new buildings. The alley would also provide access to the rear of the buildings for all delivery trucks and service vehicles. The cost per stall for Alternative Two would be $3,203.77 (Table 5); this cost is lower than Alternative One due to the increased number of stalls. The total for each alternative is almost the same. Block One is not a high priority for the City to invest in because redevelopment of this block will happen on its own. Albertville Downtown Parking Study Page 10 • • TABLE 4: REDEVELOPMENT CONDITIONS OF BLOCK ONE ALTERNATIVE TWO Size of Required Lot # Parcel Number Parcel Ownership Parcel Size Current Landuse Building Type Current Building Buildable Space Building Size Parking Spaces Paul H. Carbone's 1 101500011212 Schulte 8,324 sqft Commercial Restaurant 832 sqft Remain 13 James R & Carleen C 2 101500011229 Hart 6,290 sqft Commercial Car Wash 2,400 sqft Remain 2 Commercial 101500011215 Parking 101500011230 Highland Area Drive Highland 3,4,5 101500011213 Bank 36,686 sqft Thru Bank 2,400 sqft Remain 11 New Highland Vacant Building / 6 101500011214 Bank 7,196 sqft(private) Parking 4,750 sqft 22 New City of Building / 7 101500011208 Albertville 7,196 sqft Institutional Lodge 1 1,469 sqft Parking 3,575 sqft 15 New Combined City of Building / 8 101500011209 Albertville 7,196 sqft Institutional Garage 4,000 sqft I Parkin Eileen M Post Office New 101500011211 Gottwalt and Building / 9,10 101500011210 Rev Trst A 14,392 sqft Institutional Parking 1,301 sqft Parking 4,750 sqft 22 Total Needed 85 Off-street supplied 84 On -street Supplied 20 Total Supplied 104 Albertville Downtown Parking Study Page 11 TABLE 5: PARKING LOT BLOCK ONE - ALTERNATIVE TWO PRELIMINARY CONSTRUCTION COST ESTIMATE ,CITY OF ALBERTVILLE BMI PROJECT NO. T1521660 / DATE, 1213/20051 _ ITEM APPROXIMATE. tin ITEM UNIT UNIT PRICE AMOUNT STREETS & PARKING LOTS IMPROVEMENTS 1 MOBILIZATION 1 LS $5,000.00 $5,000.00I 2 TRAFFIC CONTROL 1 LS $500.00; $500.00; 3 CLEAR & GRUB 1 LS $1,000.00; $1,000.00 4 COMMON EXCAVATION 2,600 CY $6.00: $15,600.00 5 GRANULAR SUBGRADE MATERIAL 2,550 TON $6.W $15,300.00''. 6 AGGREGATE BASE CL 5 (CV) 1,185 TON $12.% $14,812.501 7 REMOVE CONCRETE WALK 3001 SF $2.00; $600.00' 8 REMOVE CONCRETE PAVEMENT 251 SF $4.00 $100.00' 9 REMOVE BITUMINOUS PAVEMENT 1,055'; SY $3.00 $3,165.00': 10 REMOVE CURB & GUTTER 100, LF $3.00, $300.00: 11 2" TYPE MV NONWEAR COURSE MIXTURE _ 375' TON $45.00 $16,875.00 12 1.5" TYPE MV WEAR COURSE_ MIXTURE 285'._ TON $48.00 $13,680.00 13 BITUMINOUS TACK COAT 160I GA $2.50: $400.00i 14 GOETEXTILE FABRIC 3,130 _ _ SY $1.50 _- $4,695.00i 15 CONCRETE CURB & GUTTER, B618 1,2101 LF $12.50 $15,125.00i 16 4" CONCRETE SIDEWALK (INCLUDES_ AGGREGATE) 200', SF $5.00 $1,000.00':. 17 !SOD WITH TOPSOIL 1,300' SY $4.50 $5,850.00 18 TREES/BUSHES (LANDSCAPING) 1 LS $3,000.00 $3,000.00, 19 6" CONCRETE DRIVEWAY (INCLUDES AGGREGATE) 85 SY $40.00 $3,400.00 20 SIGNAGE 1 LS $500.00 $500.00' 21 PAVEMENT MARKINGS 51 STALL $50.00! $2,550.00, 22 LIGHTING 5 EA _ _$3,500.00' _, $17,500.00 SUBTOTAL: $140,952.50: STORM SEWER IMPROVEMENTS 23 12" RCP STORM SEWER PIPE 3006G, CL 5 300 LF $33.00 $9,900.00: 24 15" RCP STORM SEWER PIPE 3006G, CL 5 55,LF $35.00 $1,925.00' 25 ;CONST DRAINAGE STRUCTURE DES. SD-1 4 �_ $900.00, _ . $3,_ _600.00.; 26 CONST DRAINAGE STRUCTURE DES. 4022 48" 1' EA $1,200.00' $1,200.00 27 CONST DRAINAGE STRUCTURE DES_, 4020-60" 1' EA $1,500.00 $1,500.00 28 CASTING ASSEMBLY, STORM 6' EA mom. $1,800.00'. SUBTOTAL: $19,925.001 EROSION PROTECTION 29 INLET PROTECTION 6 EA $165.00; $990.00I 30 SILT FENCE 250. LF $2.50 $625.00 31 CONSTRUCTION ENTRANCE 1, EA $900.00 900.00'; SUBTOTAL, $2,515.00' BUILDING DEMO/LAND COST 32 'BUILDING DEMO _ 1,, LS _ 0.00 0.00'; 33 ; LAND COST 1' LS 0.00, 0.00', 34 UITLITY RELOCATION 1I LS 0.00' 0.00 SUBTOTAL:: $0.00' ESTIMATED CONSTRUCTION COST' $163,392.50, CONTINGENCY (15%)$24,508.88; _ ENGINEERING (20%),,. $32,678.50 _ ADMIN., LEGAL, MISC. (10%)'' $16,339.25' TOTAL ESTIMATED PROJECT COST: $236,919.13 PROPOSED NUMBER OF STALLS. 51 COST PER PARKING STALL PARKING LOT ONL $3 203.77 Albertville Downtown Parking Study Page 12 W Z Q� Q� L S ..}-11 0 0 � o 3:Z J D �- Z � o U) o j Z � 0 V Q w z 0 z p m op w � Q s1lin's }8"4.s-uo g 3N anuaAV a6J'O-1 3N anuaAV UIDW sttn3.s I aaj3.s-uo g spots }aSJ4.s_uo L O n M 0 0 BLOCK TWO - EXISTING CONDITIONS • Block Two is in the center east side of the Study Area north of the railroad tracks and south of 59th Street NE along Main Avenue. Businesses on the block include Old Castle Glass, Tela-Ad Company, Albertville Body Shop, and Main Avenue Hair Design. The majority of the study area of Block Two extends along Barthel Industrial Boulevard to the east. Much of the land along Barthel is vacant land with vacant buildings. The large parcel of land along Barthel is owned by different parties. The two smaller parcels adjacent'to 59th Street NE have separate ownership, as well as the commercial Tela-Ad building on the corner of 59th Street NE and Main Avenue NE. The Albertville Body Shop and Main Avenue Hair Design are under the same owners and they own a small parcel across the street which serves as their parking lot. Circulation through the site is by an alleyway which enters the block in the middle of 59th Street NE and exits onto Main Avenue NE, between the railroad and Main Avenue Hair Design. Circulation around the block is by Main Avenue NE to the west and 59th Street NE and Barthel Industrial Boulevard to the north. Parking for Block Two is minimal and is provided separately by each business. Tela-Ad Company has two stalls on their lot, but those stalls also serve as parking for a single family home behind the commercial building. Old Castle Glass provides two stalls on their lot, as well as area for truck circulation. Parking for the Albertville Body Shop is located on a gravel lot across the street and provides the required amount of stalls for the business. Businesses where parking is deficient are the Tela-Ad Company and Main Avenue Hair Design. These commercial uses have little or no space on their lot to provide enough parking to meet the requirement of the Zoning Ordinance. On -street space is provided for nine on -street parking stalls along Main Avenue NE and 59th Street NE. However, Block Two still has a deficiency of 15 parking stalls due to the lack of space provided by the smaller lots. Table of Existing Conditions is found on the following page. Albertville Downtown Parking Study Page 14 0 TABLE 6: EXISTING CONDITIONS OF BLOCK TWO Number of Required Parcel Parcel Current Building Size of Existing Parking Vacant Parking Lot # Number Ownership Parcel Size Landuse Type Building Parking Lots Stalls Land Spaces Vaughn E Tela-Ad 11 101500011217 Fesenmaier 7,196 sqft Commercial Co 3,000 sqft 2 14 Jamie L & Albertville Krista E Body 12 101500011216 Stevens 7,196 sqft Commercial Shop 6,000 sqft Off Site Gravel 14 14 Main Jamie L & Street Krista E Hair 13 101500011203 Stevens 4,792 sqft Commercial Salon 1,512 sqft 0 7 David M & Old Jeanne M Castle 14 101500011222 Vetsch 7,196 s ft Commercial Glass 4,136 sqft Paved 2 7 Loren F Vacant Vacant 15 1 101500011218 Becker 7,196 sqft (private) Building 7,196 Gary Vacant 16 101500011201 Anderson 7,105 sqft (private) 7,105 Gary Vacant 17 101500011205 Anderson 25,565 sqft (private) 25,565 Vil Norsk Vacant Vacant 18 101500011202 LLC 65,466 s ft (private) Building 65,466 Vil Norsk Vacant 19 101500011226 LLC 29,316 sqft (private) 29,316 Total Off -Street 18 42 Total On -Street 9 I Total 27 Missing -15 6 Albertville Downtown Parking Study Page 15 9 BLOCK TWO - REDEVELOPMENT OPTIONS Block Two is in the east central part of the study area. The Study Area of Block Two (page 19) includes large parcels of land which are currently vacant. Ownership is a major factor in determining where new buildings would be place to insure each owner would have the opportunity to develop a building on their land. The vacant Eull Concrete site is a key are for redevelopment due two the size of the property. The City is currently working with the owner of the property to establish a TIF District for the development of a commercial building. Two large lots, under the same owner, would be combined to support an 18,200 square foot building and 132 parking stalls. The property adjacent to the Eull Concrete site to the west is another area for redevelopment. This property could support a 6,000 square foot building and up to a 43 stall parking lot. The building would only require 27 stalls so the remained of the parking could be shared by a cross easement with Main Avenue Salon and the Albertville Body Shop; both businesses currently have no parking within the block. Parking for the body shop and salon within the block could also be acquired by exchanging their property across the street for property within Block Two. The Old Castle Glass building is also an area for redevelopment. This lot can also support a 6,000 square foot building with a 29 stall parking lot to the south. This lot would also act as a second access to the alley for service and delivery traffic. The Tela-Ad building and single family house, on the corner of 59th Street NE and Main Avenue, would be isanother area for redevelopment on Block Two. The lot is also large enough to support a 6,000 square foot building but the lot is not large enough to include the parking. Parking for this site would have to be provided through cross easements from the proposed lots to the east and on -street parking. • Block Two is located in the east central part of the study area. The redevelopment option for Block Two would involve land assembly to create lots large enough to accommodate contemporary commercial buildings and a shared field of on -site parking to accommodate both the existing and new business. Block Two redevelopment options include the following components: 1. Combining Parcels 11 with Parcels 12 and 13 to create another commercial building or accommodate the expansion of Albertville Auto Body. 2. Assembling Parcels 14, 15, 16, and 17 into a single site which could accommodate either two 6,000 square foot buildings or a single larger building. The parking lot is oversized to accommodate the parking needs of the new buildings as well as the existing businesses along Main Street. 3. Redevelopment of Parcels 18 and 19 from industrial to downtown commercial. This option shows an 18,000 square foot multi -tenant building with parking. Albertville Downtown Parking Study Page 16 • Access to the proposed buildings should not be a problem for delivery and service vehicles through cross easements. Turning radii have been taken into account for all drives and parking lots. The gravel drive adjacent to Main Avenue Salon would be removed to limit the number of drives onto Main Avenue. Cost for the construction of all new lots and drives are $1,533.37 per stall (Table 8). This estimate is noticeably less expensive than Block One due to the large number of stalls created. New building construction and existing businesses would require a total of 183 stalls; the redevelopment of Block Two would provide 202 off-street stalls and 16 on -street stalls. Redevelopment of Block Two will occur on its own, and should not be considered an investment priority of the City. Albertville Downtown Parking Study Page 17 • • I ABLE / : KEDEVELOPMENT CONDITIONS OF BLOCK TWO Lot # Parcel Number Parcel Ownership Parcel Size Current Landuse Building Type Size of Current Building Buildable Space Building Size Required Parking Spaces New 11 101500011217 Vaughn E Fesenmaier 7,196 sqft Commercial Tela-Ad Co 3,000 sqft Building / Parking 6,000 sqft 27 Jamie L & Albertville Krista E Body 6,000 12 101500011216 Stevens 7,196 scift Commercial Shop sqft Remain 0 14 Main Jamie L & Street Krista E Hair 1,200 13 101500011203 Stevens 4,791 sqft Commercial Salon sqft Remain 0 6 David M & Old New 14 101500011222 Jeanne M Vetsch 7,196 scift Industrial Castle Glass 4,136 sqft Building / Parking 6,000 scift 27 New 15 101500011218 Loren F Becker 7,196 sqft Vacant (private) Building / Parking New 16 1 101500011201 Loren F Becker 7,104 sqft Vacant (private) Building / Parking New 17 101500011205 Gary Anderson 25,565 sqft(private) Vacant Building / I Parking 6,000 scift 27 New 18 101500011202 Vil Norsk LLC 65,466 sqft Vacant (private) Building / Parking 18,200 sqft 82 New Combined 19 101500011226 Vil Norsk LLC 29,315 sqft(private) Vacant Building / Parking Total Needed 183 Off-street Supplied 202 n-street Su lied 16 F otal Supplied 218 Albertville Downtown Parking Study Page 18 TABLE 8: PARKING LOT BLOCK TWO PRELIMINARY CONSTRUCTION COST ESTIMATE CITY OF ALBERTVILLE BMI PROJECT NO. T1521660 DATE: 12/13/2005 ITEM ITEM APPROXIMATE UNIT UNIT PRICE AMOUNT NO. QUANTITY STREETS & PARKING LOTS IMPROVEMENTS 1 MOBILIZATION 1 LS $7,500.00 $7,500.00 2 TRAFFIC CONTROL 1 LS $500.00 $500.00 3 COMMON EXCAVATION 5,300 CY $6.00 $31,800.00 4 GRANULAR SUBGRADE MATERIAL 3,940 TON $6.00 $23,640.00 5 AGGREGATE BASE CL 5 (CV) 1,740 TON $12.50 $21,750.00 6 REMOVE CONCRETE WALK 300 SF $2.00 $600.00 7 REMOVE CONCRETE PAVEMENT 100 SF $4.00 $400.00 8 REMOVE BITUMINOUS PAVEMENT 75 SY $3.00 $225.00 9 REMOVE CURB & GUTTER 100 LF $3.00 $300.00 10 2" TYPE MV NONWEAR COURSE MIXTURE 635 TON $45.00 $28,575.00 11 1.5" TYPE MV WEAR COURSE MIXTURE 485 TON $48.00 $23,280.00 12 BITUMINOUS TACK COAT 265 GA $2.50 $662.50 13 GOETEXTILE FABRIC 5,300 SY $1.50 $7,950.00 14 CONCRETE CURB & GUTTER, B618 3,350 LF $12.50 $41,875.00 15 4" CONCRETE SIDEWALK (INCLUDES AGGREGATE) 200 SF $5.00 $1,000.00 16 SOD WITH TOPSOIL 3,700 SY $4.50 $16,650.00 17 TREES/BUSHES (LANDSCAPING) 1 LS $4,500.00 $4,500.00 18 6" CONCRETE DRIVEWAY (INCLUDES AGGREGATE) 85 SY $40.00 $3,400.00 19 SIGNAGE 1 LS $1,500.00 $1,500.00 20 PAVEMENT MARKINGS 204 STALL $35.00 $7,140.00 21 LIGHTING 12 EA $3,500.00 $42,000.00 SUBTOTAL: $265,247.60 STORM SEWER IMPROVEMENTS 22 12" RCP STORM SEWER PIPE 3006G, CL 5 500 LF $33.00 $16,500.00 23 15" RCP STORM SEWER PIPE 3006G, CL 5 150 LF $35.00 $5,250.00 24 CONST DRAINAGE STRUCTURE DES. SD-1 10 EA $900.00 $9,000.00 25 CONST DRAINAGE STRUCTURE DES. 4022-48" 3 EA $1,200.00 $3,600.00 26 CONST DRAINAGE STRUCTURE DES. 4020-60" 1 EA $1,500.00 $1,500.00 27 CASTING ASSEMBLY, STORM 14 EA $300.00 $4,200,00 28 WATER QUALITY POND 1 LS $7,500.00 $7,500.00 SUBTOTAL: $40,050.00 EROSION PROTECTION 29 INLET PROTECTION 14 EA $165.00 $2,310.00 30 SILT FENCE 1,000 LF $2.50 $2,500.00 31 CONSTRUCTION ENTRANCE 3 EA $900.00 $2,700.00 SUBTOTAL: $7,510.00 BUILDING DEMO/LAND COST 32 BUILDING DEMO 1 LS $0.00 $0.00 33 LAND COST 1 LS $0.00 $0.00 34 UITLITY RELOCATION 1 LS $0.00 $0.00 SUBTOTAL: $0.00 ESTIMATED CONSTRUCTION COST $312,807.50 CONTINGENCY (15%) $46,921.13 ENGINEERING (20%) $62,561.50 ADMIN., LEGAL, MISC. (10%) $31,280.75 TOTAL ESTIMATED PROJECT COST: $453,570.88 • PROPOSED NUMBER OF STALLS 204 COST PER PARKING STALL PARKING LOT ONLY $1,533.37 Albertville Downtown Parking Study Page 19 9 BLOCK THREE - EXISTING CONDITIONS Block Three of the Study Area is in the southeast corner of Downtown between the railroad to the north and 57th Street NE to the south. Block Three sees a large amount of evening activity due to the three bar and grills, including 152 Club, Geez, and Smack Down's. Other buildings within the study area of Block Three include the historic Albertville Roller Mill, the 1910 Post Office now converted into apartments, and single family homes along 57th Street NE to the east. Each lot has separate ownership and all except one lot is small in nature. The owners of the 152 Club have the largest lot on the block. Block Three has a lot of evening activity and this has resulted in incompatibility issues with the adjacent residential lots. Several complaints have been received from the residents to deal with the noise generated within this block. Circulation and access of the block is by Main Avenue NE and 57th Street NE. There are no interior alleyways; there is only access from the Main Avenue into parking lots. Because of all the activity, Block Three has the greatest deficit of parking. The three bar and grills together require an estimated total of 147 parking stalls but only provides approximately 39 stalls. There are no paved parking lots within the block, which causes the amount of parking can vary depending on how each patron parks. The Albertville Mill and Geez are unable to provide any parking due to their lot size. The apartments provide enough space for each resident. On -street parking is important to this block due to the lack of parking. Along Main Avenue and 57th Street a total of 20 stalls could be provided; however, there is no stripping to illustrate where each stall should be located. In total the entire block is lacking approximately 100 stalls. Table of Existing Conditions is on the following page. • Albertville Downtown Parking Study Page 21 • I AISLE if: CXISTING UONDITIONS OF BLOCK I HREE Number of Required Lot # Parcel Number Parcel Ownership Parcel Size Current Landuse Building Type Size of Building Existing Parking Lots Parking Stalls Parking Spaces Michael R 101500011231 & Deborah 152 Club 20,21 101500011206 L Holm 30,658 sqft Commercial Bar & Grill 2,520 sgft Gravel 22 30 Erwin Greeninger Albertville 22 101500011207 Rev Liv Tr 8,512 sqft Vacant Mill 4,000 sqft 0 10 Curt L Geez 23 101013001010 Gentile 3,402 sqft Commercial Bar & Grill 2,008 sqft 0 38 Stuart M 24 101013001020 Ran 3,528 scift Residential Apartments 2,008 sqft Gravel 4 1 4 Smack Lyle J Down Bar 25 101013001041 Talbot 14,523 sqft Commercial & Grill 4,200 sgft Gravel 17 79 Total Off -Street— 43 163 20 Total On -Street 63 Total Missing -100 Albertville Downtown Parking Study Page 22 0 BLOCK THREE: ALTERNATIVE ONE - REDEVELOPMENT OPTIONS The main focus of Block Three redevelopment options is the creation of new parking areas. As Option One on page 25 shows, the majority of the lots already have buildings and businesses; however, many of these businesses do not have enough lot area to provide the required parking. The property of the 152 Club is the only lot within the block able to create a new paved parking lot. Currently the area is gravel and serves as the location for the volleyball courts of the 152 Club. Redevelopment Option One includes the following components: 1. City acquisition of excess railroad right-of-way to expand the land area for redevelopment, parking and buffering. The current parcels lack sufficient size to resolve the existing land use issues. 2. Alternative One illustrates extensive fence and landscape buffers between the commercial parking lot and outdoor activities, and single family homes along 57tn Street. 3. Alternative One retains the volleyball courts at their current location on the railroad right-of-way. i4. The parking lot contains 108 parking stalls over property controlled by the 152 Club and the railroad. A second 16 stall lot may also be possible. The parking lot developed would have to be financially equitable among all the benefited businesses that would share the available parking. • 5. Access to parking must be preserved for each of the Block Three commercial uses through cross easements, leases or public ownership of the parking lot. 6. Alternative One would be accommodated with the expansion of the 152 Club or a new commercial building (2,150 square feet). 7. Stormwater ponding must be incorporated into the site planning to accommodate the expanded hard surface. Redevelopment within Block Three would provide 140 off-street stalls plus 18 on -street stalls, for a total of 158 stalls. However, the businesses of Block Three require 181 parking stalls, leaving a deficit of 23 stalls. The 140 stalls would cost $1,891.41 per stall (Table 11). Albertville Downtown Parking Study Page 23 is • TABLE 10: REDEVELOPMENT CONDITIONS OF BLOCK THREE ALTERNATIVE ONE Size of Required Lot # Parcel Number Parcel Ownership Parcel Size Current Landuse Building Type Current Building Buildable Space Building Size Parking Spaces Michael R 101500011231 & Deborah 152 Club Bar 2,150 20,21 101500011206 L Holm 30,657 sqft Commercial & Grill 2,520 sqft Addition sqft 39 Erwin New Greeninger Building / 4,000 22 101500011207 Rev Liv Tr 8,511sqft Albertville Mill 4,000 s ft Parking scift 21 Curt L Geez 23 1 101013001010 Gentile 3,402sgft Commercial Bar & Grill 2,008 sgft Remain 38 Stuart M 24 101013001020 Ran 3,528 scift Residential Apartments 2,008 sqft Remain 1 1 4 Lyle J Smack Down 25 101013001041 Talbot 14,522 sqft Commercial I Bar & Grill 1 4,200 sqft Remain 79 Total Needed 181 Off-street Supplied 140 On -street Supplied 18 Total Supplied 158 Albertville Downtown Parking Study Page 24 TABLE 11: PARKING LOT BLOCK THREE- ALTERNATIVE ONE PRELIMINARY CONSTRUCTION COST ESTIMATE CITY OF ALBERTVILLE BMI PROJECT NO. T1521660 DATE: 12/13/2005' ITEM ITEM APPROXIMATE UNIT UNIT PRICE AMOUNT NO. QUANTITY STREETS & PARKING LOTS IMPROVEMENTS 1 MOBILIZATION 1 LS $5,000.00 $5,000.00 2 TRAFFIC CONTROL 1 LS $500.00 $500.00. 3 CLEAR & GRUB 4 COMMON EXCAVATION 5 GRANULAR SUBGRADE MATERIAL 6 AGGREGATE BASE CL 5 (CV) 7 REMOVE CONCRETE WALK 8 REMOVE CONCRETE PAVEMENT 9 REMOVE BITUMINOUS PAVEMENT 10 REMOVE CURB & GUTTER 11 2" TYPE MV NONWEAR COURSE MIXTURE 12 1.5" TYPE MV WEAR COURSE MIXTURE 13 BITUMINOUS TACK COAT 14 GOETEXTILE FABRIC 15 CONCRETE CURB & GUTTER, B618 16 4" CONCRETE SIDEWALK (INCLUDES AGGREGATE) 17 SOD WITH TOPSOIL 18 TREES/BUSHES (LANDSCAPING) 19 6" CONCRETE DRIVEWAY (INCLUDES AGGREGATE) 20 SIGNAGE 21 PAVEMENT MARKINGS 22 LIGHTING STORM SEWER IMPROVEMENTS 23 12" RCP STORM SEWER PIPE 3006G, CL 5 24 15" RCP STORM SEWER PIPE 3006G, CL 5 25 CONST DRAINAGE STRUCTURE DES. SD-1 26 CONST DRAINAGE STRUCTURE DES. 4022-48" 27 CONST DRAINAGE STRUCTURE DES. 4020-60" 28 CASTING ASSEMBLY, STORM 29 WATER QUALITY POND EROSION PROTECTION 30 INLET PROTECTION 31 SILT FENCE 32 CONSTRUCTION ENTRANCE BUILDING DEMO/LAND COST 33 BUILDING DEMO 34 LAND COST 35 UITLITY RELOCATION • 1! LS $4,000.00 $4,000.00I 5,750: CY $6.00 $34,500.00' 4,000 TON $6.00 $24,000.00, 1,900 TON $112.50 $23,750.00' 300 SF $2.00 $600.00' 150 SF $4.00' $600.00 50, SY $3.00, $160.00 100 LF $3.00 $300.00'. 688', TON $45.001 $30,960.00 526', TON $48.00 $25,248.00 290' GA $2.50' $725.00 6,400' SY $1.50 $9,600.00 1,800! LF $12.50 $22,500.00 300' SF $5.00 $1,500.00 2,000' SY $4.50 $9,000.00' 1 LS $6,000.00 $6,000.00 160' SY $40.00 $6,400.00' 1 LS $1,500.00 $1,500.00 140 STALL $50.00 $7,000.00' 8! EA $3,500.00 $28,000.00 SUBTOTAL: $241,833.00 250I LF $33.00 $8,250.00 55i LF $35.00 $1,925.00 3' EA $960.00I $2,700.00 1 EA $1,200.00 $1,200.00' 1 EA $1,500.00 $1,500.00 4 EA $300.00' $1,200.00! 1' LS 7500.00 $7,500.00' SUBTOTAL: $16,775.00' 6 EA $165.00 $990.00, 1,000' LF $2.50. $2,560.00 3 EA wo.00 $2,700.00; SUBTOTAL:; $6,190.00' 1' LS $0.00' $0.00 1 LS $0.00 $0.00 1 LS $0.00 $0.00 SUBTOTAL:' $0.00 ESTIMATED CONSTRUCTION COST $264,798.00 CONTINGENCY (15%0), $39,719.70' ENGINEERING (20%), $52,959.60' ADMIN., LEGAL, MISC. (10%)i $26,479.801 TOTAL ESTIMATED PROJECT COST:' $383,957.10 PROPOSED NUMBER OF STALLS' 140 COST PER PARKING STALL PARKING LOT ONL $1891.41 Albertville Downtown Parking Study Page 25 4 0Lj W Z Or 0) i 4' H S LO N 0 BLOCK THREE: ALTERNATIVE TWO - REDEVELOPMENT OPTIONS The site plan for Alternative Two (page 29) is similar to Alternative One except for Alternative Two takes a more aggressive redevelopment approach. Alternative Two duplicates Alternative One with the following additions: Acquisition of the home at 11548 57t" Avenue. This would provide greater physical separation between the commercial businesses and nearest single family home to the east. This property acquisition and household relocation would dramatically add to the redevelopment expenses of this block. 2. Alternative Two provides an extensive landscape fence screen along both the north and west edges of the remaining single family homes along 57th Street. 3. Alternative Two would allow for the expansion of the Smack Down building or a new commercial building (3,000 square feet) at the corner of 57th Street and Main Avenue. 4. The Albertville Mill and other business within Block Three would have to share parking with the 152 Club by a cross easement or lease arrangement in order to provide enough parking for their patrons. Cost per stall for the parking lots of Alternative Two would be $1,907.07 (Table 13). The price does not include the acquisition of the single family home or the railroad property. Alternative Two provides a total of 179 on- and off-street parking stalls, but the existing and proposed buildings require 195 stalls total. Albertville Downtown Parking Study Page 27 • • TABLE 12: REDEVELOPMENT CONDITIONS OF BLOCK THREE ALTERNATIVE Two Size of Required Lot # Parcel Number Parcel Ownership Parcel Size Current Landuse Building Type Current Building Buildable Space Building Size Parking Spaces Michael R 101500011231 & Deborah 152 Club 2,150 20,21 101500011206 L Holm 30,657 sqft Commercial Bar & Grill 2,520 sqft Addition sqft 39 Erwin New 22 101500011207 Greeninger Rev Liv Tr 8,511sgft Albertville Mill 4,000 sqft Building / Parking 4,000 sqft 21 Curt L Geez 23 101013001010 Gentile 3,402s ft Commercial Bar & Grill 2,008 scift Remain 38 Stuart M 24 101013001020 Ran 3,528 scift Residential Apartments 2,008 sqft Remain 4 Smack Lyle J Down Bar 3,000 25 101013001041 Talbot 14,522 sqft Commercial & Grill 4,200 sqft Addition sqft 93 Total Needed 195 Off-street Supplied 158 On -street Supplied 21 Total Supplied 179 Albertville Downtown Parking Study Page 28 TABLE 13: PARKING LOT BLOCK THREE - ALTERNATIVE TWO PRELIMINARY CONSTRUCTION COST ESTIMATE CITY OF ALBERTVILLE BMI PROJECT NO. T1521660 DATE: 12/13/2005 ITEM ITEM NO. APPROXIMATE UNIT UNIT PRICE AMOUNT QUANTITY STREETS & PARKING LOTS IMPROVEMENTS 1 MOBILIZATION 1 LS $5,000.00 $5,000.00 2 TRAFFIC CONTROL 1 LS $500.00 $500.00 3 CLEAR & GRUB 1 LS $4,000.00 $4,000.00 4 COMMON EXCAVATION 6,700 CY $6.00 $40,200.00 5 GRANULAR SUBGRADE MATERIAL 4,500 TON $6.00 $27,000.00 6 AGGREGATE BASE CL 5 (CV) 2,200 TON $12.50 $27,500.00 7 REMOVE CONCRETE WALK 300 SF $2.00 $600.00 8 REMOVE CONCRETE PAVEMENT 25 SF $4.00 $100.00 9 REMOVE BITUMINOUS PAVEMENT 1,055 SY $3.00 $3,165.00 10 REMOVE CURB & GUTTER 100 LF $3.00 $300.00 11 2" TYPE MV NONWEAR COURSE MIXTURE 800 TON $45.00 $36,000.00 12 1.5" TYPE MV WEAR COURSE MIXTURE 610 TON $48.00 $29,280.00 13 BITUMINOUS TACK COAT 333 GA $2.50 $832.50 14 GOETEXTILE FABRIC 6,500 SY $1.50 $9,750.00 15 CONCRETE CURB & GUTTER, 6618 2,070 LF $12.50 $25,875.00 16 4" CONCRETE SIDEWALK (INCLUDES AGGREGATE) 200 SF $5.00 $1,000.00 17 SOD WITH TOPSOIL 2,300 SY $4.50 $10,350.00 18 TREES/BUSHES (LANDSCAPING) 1 LS $4,500.00 $4,500.00 19 6" CONCRETE DRIVEWAY (INCLUDES AGGREGATE) 85 SY $40.00 $3,400.00 20 SIGNAGE 1 LS $750.00 $750.00 21 PAVEMENT MARKINGS 158 STALL $50.00 $7,900.00 22 LIGHTING 8 EA $3,500.00 $28,000.00 SUBTOTAL: $266,002.50 STORM SEWER IMPROVEMENTS 23 12" RCP STORM SEWER PIPE 3006G, CL 5 300 LF $33.00 $9,900.00 24 15" RCP STORM SEWER PIPE 3006G, CL 5 100 LF $35.00 $3,500.00 25 CONST DRAINAGE STRUCTURE DES. SD-1 8 EA $900.00 $7,200.00 26 CONST DRAINAGE STRUCTURE DES. 402248" 2 EA $1,200.00 $2,400.00 27 CONST DRAINAGE STRUCTURE DES. 4020-60" 1 EA $1,500.00 $1,500.00 28 CASTING ASSEMBLY, STORM 11 EA $300.00 $3,300.00 29 WATER QUALITY POND 1 LS 7500.00 $7,500.00 SUBTOTAL: $27,800.00 EROSION PROTECTION 30 INLET PROTECTION 11 EA $165.00 $1,815.00 31 SILT FENCE 1,200 LF $2.50 $3,000.00 32 CONSTRUCTION ENTRANCE 3 EA $900.00 $2,700.00 SUBTOTAL: $7,515.00 BUILDING DEMO/LAND COST 33 BUILDING DEMO 1 LS $0.00 $0.00 34 LAND COST 1 LS $0.00 $0.00 35 UITLITY RELOCATION 1 LS $0.00 0.00 SUBTOTAL: $0.00 ESTIMATED CONSTRUCTION COST $301,317.50 CONTINGENCY (15%) $45,197.63 ENGINEERING (20%) $60,263.50 ADMIN., LEGAL, MISC. (10%) $30,131.75 TOTAL ESTIMATED PROJECT COST: $436,910.38 PROPOSED NUMBER OF STALLS 158 0 COST PER PARKING STALL PARKING LOT ONLY $1,907.07 Albertville Downtown Parking Study Page 29 0 Li 0 0 0 C7 • BLOCK FOUR - EXISTING CONDITIONS Block Four of the Study Area is in the northwest corner of Downtown between County Road 37 and 60th Street NE. Although this block is zoned B-3 Highway Commercial and B-4 General Business, the use is residential. The L-shaped lot, zoned B-3 currently, houses a shed while the second lot contains a single family home. Each lot has separate ownership. Circulation around the site is provided by Main Avenue to the east and 60th Street NE to the south. Access to the north and west is provided by gravel drives. Because there are only single family uses occurring within the block, there is no lack of parking. On - street parking is not calculated in the total amount of parking for the block due to residents' concerns about increasing traffic along 60th Street. TABLE 14: EXISTING CONDITIONS OF BLOCK FOUR Number of Required Parcel Parcel Current Building Size of Existing Parking Parking Lot # Number Ownership Parcel Size Landuse Type Building Parking Lots Stalls Spaces Harry G & Storage 26 101500363402 Edna L Weber 31,598 s ft Residential Shed Donald J & P Single 27 1 101500363401 1 Vorderbruggen 1 16,871 sgft I Residential I Family 2 2 Total Off -Street 2 Missing do Albertville Downtown Parking Study Page 31 • BLOCK FOUR - REDEVELOPMENT OPTIONS Block Four would include the redevelopment of both lots into a single lot with a L- shaped 10,500 square foot building (page 33). The block is large enough to provide the required 48 stalls of the building plus ten more, for a total 58 off-street parking stalls. The building would need to be street forward with parking in the rear. Access into the lot would be from 60th Street and Lander Avenue NE for patrons as well as service and delivery trucks. The redevelopment of Block four would not include any on -street parking due to concerns expressed by owners of neighboring single family homes. Cost per stall is estimated to be $2,305.94 (Table 16). Redevelopment of Block Four can happen without involvement from the City due to the block's size and location; therefore, it is not an investment priority of the City. TABLE 15: REDEVELOPMENT CONDITIONS OF BLOCK FOUR Size of Required Parcel Parcel Current Building Current Buildable Building Parking Lot # Number Ownership Parcel Size Landuse Type Building Space Size Spaces New Harry G & Storage Building / 10,500 26 101500363402 Edna L Weber 31,598 s ft Residential Shed N/A Parking sqft 48 New Combined Donald J & P Single Building / 27 1 101500363401 1 Vorderbruggen 1 16,870 sgft I Residential I Family N/A Parking I Total Needed 48 Off-street Supplied 58 Total Supplied 58 Albertville Downtown Parking Study Page 32 i TABLE 16: PARKING LOT BLOCK FOUR PRELIMINARY CONSTRUCTION COST ESTIMATE CITY OF ALBERTVILLE BMI PROJECT NO. T1521660 DATE: 12/13/2005 ITEM ITEM APPROXIMATE UNIT UNIT PRICE AMOUNT NO. QUANTITY STREETS & PARKING LOTS IMPROVEMENTS 1 MOBILIZATION 1 LS $3,000.00 $3,000.00 2 TRAFFIC CONTROL 1 LS $500.00 $500.00 3 COMMON EXCAVATION 2,555 CY $6.00 $15,330.00 4 GRANULAR SUBGRADE MATERIAL 1,725 TON $6.00 $10,350.00 5 AGGREGATE BASE CL 5 (CV) 837 TON $12.50 $10,462.50 6 REMOVE CONCRETE PAVEMENT 25 SF $4.00 $100.00 7 REMOVE BITUMINOUS PAVEMENT 100 SY $3.00 $300.00 8 REMOVE CURB & GUTTER 10 LF $3.00 $30.00 9 2" TYPE MV NONWEAR COURSE MIXTURE 306 TON $45.00 $13,770.00 10 1.5" TYPE MV WEAR COURSE MIXTURE 234 TON $48.00 $11,232.00 11 BITUMINOUS TACK COAT 128 GA $2.50 $320.00 12 GOETEXTILE FABRIC 2,600 SY $1.50 $3,900.00 13 CONCRETE CURB & GUTTER, B618 1,110 LF $12.50 $13,875.00 14 4" CONCRETE SIDEWALK (INCLUDES AGGREGATE) 200 SF $5.00 $1,000.00 15 SOD WITH TOPSOIL 1,250 SY $4.50 $5,625.00 16 TREES/BUSHES (LANDSCAPING) 1 LS $3,000.00 $3,000.00 17 6" CONCRETE DRIVEWAY (INCLUDES AGGREGATE) 85 SY $40.00 $3,400.00 18 SIGNAGE 1 LS $500.00 $500,00 19 PAVEMENT MARKINGS 58 STALL $50.00 $2,900.00 20 LIGHTING 4 EA $3,500.00 $14,000.00 SUBTOTAL: $113,594.50 STORM SEWER IMPROVEMENTS 21 12" RCP STORM SEWER PIPE 3006G, CL 5 250 LF $33.00 $8,250.00 22 15" RCP STORM SEWER PIPE 3006G, CL 5 . 50 LF $35.00 $1,760.00 23 CONST DRAINAGE STRUCTURE DES. SD-1 3 EA $900.00 $2,700.00 24 CONST DRAINAGE STRUCTURE DES. 4022-48" 1 EA $1,200.00 $1,200.00 25 CONST DRAINAGE STRUCTURE DES. 4020-60" 1 EA $1,500.00 $1,500.00 26 CASTING ASSEMBLY, STORM 5 EA $300.00 $1,500.00 SUBTOTAL: $16,900.00 EROSION PROTECTION 27 INLET PROTECTION 5 EA $165.00 $825.00 28 SILT FENCE 250 LF $2.50 $625.00 29 CONSTRUCTION ENTRANCE 2 EA $900.00 $1,800.00 SUBTOTAL: $3,250.00 BUILDING DEMO/LAND COST 30 BUILDING DEMO 1 LS $0.00 $0.00 31 LAND COST 1 LS $0.00 $0.00 32 UITLITY RELOCATION 1 LS $0.00 0.00 SUBTOTAL: $0.00 • ESTIMATED CONSTRUCTION COST $133,744.50 CONTINGENCY (15%) $20,061.68 ENGINEERING (20%) $26,748.90 ADMIN., LEGAL, MISC. (10%) $13,374.45 TOTAL ESTIMATED PROJECT COST: $193,929.53 PROPOSED NUMBER OF STALLS 58 COST PER PARKING STALL PARKING LOT ONLYr $2,305.94 Albertville Downtown Parking Study Page 33 3N anua� N . • �J • BLOCK FIVE — EXISTING CONDITIONS Block Five of the Study Area is in the center of the western blocks between 60th Street NE and the railroad along Main Avenue NE. The majority of Block Five contains the existing and new City Halls which are owned by the City of Albertville. A small piece of property south of the City Hall sites serves as the parking lot for Albertville Body Shop and is under the same ownership. Two residential properties west of the City Hall are included in the study area and each are under separate ownership. Circulation around the site is via 60th Street NE to the north and Main Avenue to the east. Access to the interior of block is by drives along 60th Street NE and along Main Avenue into the City Hall parking lot. The new City Hall development provides enough parking for the two buildings. Both single family homes provide their own parking. On - street parking along Main Avenue provides twelve parking spaces. At the request of neighboring residents no parking will occur along 60th Street north of the existing City Hall. Block Five, according to the total number of 100 on- and off-street parking are provided, which currently exceeds its need of 88 stalls by 12 stalls. TABLE 17: EXISTING CONDITIONS OF BLOCK FIVE Number Lot # Parcel Number Parcel Ownership Parcel Size Current Landuse Building Type Size of Building Existing Parking Lots of Parking Stalls Vacant Land Required Parking Spaces Gregory A & Tina M Single 28 101500012118 Weitzel 13,247 sqft Residential Family 2 2 Leroy R & Marlene Single 29 101500012122 Kasper 15,189 sqft Residential Family 2 2 30, 101500012109 31, 101500012110 32, 101500012111 33, 101500012112 34, 101500012113 35, 101500012114 36, 101500012116 37, 101500012117 City of City Hall 17,130 38 101500012126 Albertville 1 69,176 sqft I Institutional Parking sqft Paved 84 84 Jamie L & Parking Krista E Vacant for body 40 101500012125 Stevens 4,177 sqft (private shop Gravel Total Off -Street 88 88 Total On -Street 12 Total 100 Missing +12 Albertville Downtown Parking Study Page 35 • • BLOCK FIVE - ALTERNATIVE ONE REDEVELOPMENT OPTIONS Redevelopment of Block Five has already been put into action with the construction of the new City Hall. The new construction also includes a new parking lot with 84 stalls. The existing City Hall will remain as is. The nine lots between the two city halls have been converted into two lots and a cross easement will allow each building to share parking. No cost estimates were conducted for Block Five because the development of the new City Hall is already a priority of the City. ABLE 1?5: KEDEVELOPMENT UONDITIONS OF BLOCK MVE ALTERNATIVE UNE Size of Required Parcel Parcel Current Building Current Buildable Building Parking Lot # Number Ownership Parcel Size Landuse Type Building Space Size Spaces Gregory A & Tina M Single 28 101500012118 Weitzel 13,247 sqft Residential Family N/A Remain 2 Leroy R & Marlene Single 29 101500012122 Kasper 15,189 sqft Residential Family N/A Remain 2 101500012109 101500012113 30, 32, 101500012114 City of City Hall 33, 34 101500012116 Albertville 44,318 sqft Institutional Parking 2,700 sqft Remain 16 101500012110 101500012111 31,35, 101500012112 36, 37, 101500012117 City of City Hall 38 101500012126 Albertville 1 24,878 sqft Institutional Parking 14,430 sqft Remain 68 Jamie L & Parking Krista E Vacant for body 40 101500012125 Stevens 4,177 sqft(private) shop Remain 0 Total Needed 88 Off-street Supplied 88 On -street Supplied 14 Total Supplied 102 Albertville Downtown Parking Study Page 36 m SIPP o IF b m i iJ 0 S i' 0 %D w N anuanb ujnW 0 %D CD 4) L6 M 3 0 0 BLOCK 5 - ALTERNATIVES TWO AND THREE REDEVELOPMENT OPTIONS • • The 4,000 square foot parcel located immediately south of the new City Hall site will be difficult to redevelop due to its size and triangular configuration. Independent of other parcels, it is estimated that the site could accommodate 14 parking stalls in compliance with City zoning standards. Alternative Two proposes the following components: 1. Acquisition of excess railroad right-of-way and assembled with the adjoining 4,000 square foot parcel to the north to create a redevelopment parcel for a 4,600 square foot office building and a 12 stall parking lot. 2. Stormwater consideration must be given to the future site design to accommodate the increase in pervious surface. TABLE 'Ito: REDEVELOPMENT CONDITIONS OF BLOCK FIVE ALTERNATIVE 1 WO Size of Required Lot # Parcel Number Parcel Ownership Parcel Size Current Landuse Building Type Current Building Buildable Space Building Size Parking Spaces 28 1015000121 Gregory A & 13,247 sqft Residents Single N/A Remain 2 18 Tina M al Family Weitzel 29 1015000121 Leroy R & 15,189 sqft Residenti Single N/A Remain 2 22 Marlene al Family Kasper 30, 32, 1015000121 City of 44,318 sqft Institution City Hall 2,700 sqft Remain 16 33,34 09 Albertville al Parking 1015000121 13 1015000121 14 1015000121 16 31, 35, 1015000121 City of 24,878 sqft Institution City Hall 14,430 Remain 68 36, 37, 38 10 Albertville al Parking sqft 1015000121 11 1015000121 12 1015000121 17 1015000121 26 40 1015000121 Jamie L & 4,177 sqft Vacant Parking for body shop New 4,600 sqft 21 25 Krista E (private) Building #1 Stevens Total Needed 109 Off-street Supplied 109 On -street Supplied 14 Total Supplied 123 Albertville Downtown Parking Study Page 38 `w LL z 4.11 CD O 3: w Q z w J Q 3N anuany uJnW 0 M � 0 • • Alternative Three proposes the following components: 1. Acquisition of excess railroad right-of-wayand assembly with the adjoining 4,000 Y J g square foot parcel to the north. 2. Provide a 40 foot green yard along the south side of the new City Hall. 3. Provide a new parking lot of 15 stalls along the railroad. 4. Stormwater considerations must be given to future site design to accommodate the expanded impervious surface. I MILE LU: KEDEVELOPMENT UONDITIONS OF BLOCK I-IVE ALTERNATIVE I HREE Size of Required Parcel Parcel Parcel Current Building Current Buildable Building Parking Lot # Number Ownership Size Landuse Type Building Space Size Spaces Gregory A & Tina M 13,247 Single 28 101500012118 Weitzel sqft Residential Family N/A Remain 2 Leroy R & Marlene 15,189 Single 29 101500012122 Kasper sqft Residential Family N/A Remain 2 101500012109 101500012113 30, 32, 101500012114 City of 44,318 City Hall 2,700 33,34 101500012116 Albertville sqft Institutional Parking sqft Remain 16 101500012110 101500012111 31,35, 101500012112 36, 37, 101500012117 City of 24,878 City Hall 14,430 38 101500012126 Albertville sqft Institutional Parkin sqft Remain 68 Jamie L & Parking Krista E 4,177 Vacant for body Paved 40 101500012125 Stevens sqft rivate shop Parking 15 Total Needed 103 Off-street Supplied 103 On -street Supplied 14 Total Supplied 117 Albertville Downtown Parking Study Page 40 iBLOCK SIX - EXISTING CONDITIONS a Block Six of the Study Area is in the southwest corner of Downtown between the railroad and 57th Street NE along Main Avenue NE. Block Six is mostly residential except for the Historic St. Albert's Church now a dance studio, and St. Albert's Parish Center. Block Six includes a piece of the park which is currently home to the Lion's picnic shelter and owned by the City. Two lots on the corner of Main Avenue and 58t" Street NE are under the same ownership. One of these lots contains a single family home and the other lot directly on the corner is vacant. St. Albert's Parish Center resides on the south end and spans the width of the block. Three single family homes and the dance school are all under private ownership. Circulation is open around the block. 58th Street NE is a narrower side street but allows direct access from the downtown to the park. An alleyway provides access to the center of the block, but is a dead end to the south. Block Six contains the 52 stall parking lot of St. Albert's Parish Center which provides parking not only for the Center but also for many businesses Downtown. The dance studio provides three parking spaces in front of the building, but several patrons park along the side of 58th Street NE. The single family homes provide parking for themselves. Additional parking for business can be found along Main Avenue NE, which has room for 16 stalls. Block Six, according to the total number of on- and off-street parking provides 79 total parking stalls which currently meets all of the needs of block. Table of Existing Conditions d ons are found on the following page. Albertville Downtown Parking Study Page 42 • • • I AISLE L"I : CXISTING UONDITIONS OF BLOCK SIX Number Parcel Parcel Current Building Size of Existing of Parking Vacant Required Parking Lot # Number Ownership Parcel Size Landuse Type Building Parking Lots Stalls Land Spaces Barthel, Mark A & Single 39 101500012103 Dianne M 16,309 sqft Residential Family 2 2 City of Picnic 41 101500012132 Albertville 60,784 sqft Park Shelter Gravel 0 0 Gordon & Theresa Single 42 101500012102 Berning 13,904 sqft Residential Family 2 2 Kay Marie & Kay Marie Carol's & Carol's Dance 43 101500012124 Invest Co 8,760 s ft Commercial School 3,690 sqft Paved 3 19 St. Church of Albert 44 101500012123 St. Albert 51,697 sgft Institutional Parish 6,113 sqft Paved 52 52 Terrence A & Lynda J Single 45 101500012101 Hughes 9,727 sqft Residential Family 2 2 Terrence A 46 101500012107 & Lynda J Hughes 21,941sqft(private) Vacant 0 21,941 scift 0 47 1 101500012108 Mikan 1 Raymond 7,571 sqft Residential Single Family 2 2 Total Off -Street 63 79 Total On -Street 16 Total 79 Missing 0 Albertville Downtown Parking Study Page 43 BLOCK SIX - REDEVELOPMENT OPTIONS 0 • The Block Six redevelopment option is aggressive and consists of the following components: 1. Assembly and redevelopment of the residential parcels along Main Street (Parcels 45, 46, and 47) for commercial land uses. This concept plan pushes the building towards Main Avenue to replicate the Downtown building location. 2. Preserve the alley to provide common access to the commercial properties for parking and service vehicles. 3. Screen remaining residential properties through site design, fencing and landscaping. 4. Provide parking at the rear of the lots to complement on -street parking. 5. Taking advantage of the limited use of 58t" Street, the concept plan provides angled parking. This is intended to maximize the number of stalls in close proximity to Main Avenue to benefit both Block Six and Block Three businesses. 6. The concept plan proposes to relocate the Lion's picnic shelter to Central Park to provide a new building site and parking. 7. Taking advantage of the City -owned property, the redevelopment concept proposes an expanded City -owned lot that would be improved (paved, striped, landscaped, and lighted) to benefit Central Park, community events, and address Downtown business park shortages. 8. Any parking lot improvements should incorporate an attractive streetscape theme that will complement existing businesses and encourage redevelopment. The cost per stall for the redevelopment of Block Six is estimated to be $2,110.84 (Table 21). This estimated does not include the purchase of the three privately owned residential lots. Block Six requires 175 off-street parking stalls, but the total supply for on -street and off-street stalls is 246 which would provide parking for other blocks in the downtown. Albertville Downtown Parking Study Page 44 • • 1 ABLE LL: KEDEVELOPMENT UONDITIONS OF 13LOCK bIX ALTERNATIVE ONE Size of Required Parcel Parcel Current Building Current Buildable Building Parking Lot # Number Ownership Parcel Size Landuse Type Building Space Size Spaces New City of Picnic Building / 41 101500012132 Albertville 60,784 sgft Park Shelter Parking 9,900 s ft 48 Barthel,Mark A & Dianne Single 39 101500012103 M 16,309 scift Residential Family N/A Remain 2 Gordon & Theresa Single 42 101500012102 Berning 13,904 s ft Residential Family N/A Remain 2 Kay Marie & Kay Marie & Carol's Carol's Dance 43 101500012124 Invest Co 8,759 s ft Commercial School 3690 Remain 19 St. Church of Albert 44 101500012123 St. Albert 51,697 s ft Institutional Parish 6113 Remain 52 Terrence A New & Lynda J Single Building / 45 101500012101 Hughes 9,726 s ft Residential Family N/A Parking Terrence A New 11 sqft gft 52 & Lynda J Vacant Building / Combined 46 101500012107 Hughes 21,941 s ft (private) Parkin New Mikan Single Building / 47 101500012108 Raymond 7,570 s ft Residential 1 Family N/A Parkin Total Needed 175 Off-street Supplied 221 On -street Supplied 25 Total Supplied 246 Albertville Downtown Parking Study Page 45 TABLE 23: PARKING LOT BLOCK SIX PRELIMINARY CONSTRUCTION COST ESTIMATE CITY OF ALBERTVILLE BMI PROJECT NO. T1521660 DATE: 12/13/2005 ITEM NO. ITEM APPROXIMATE QUANTITY UNIT UNIT PRICE AMOUNT STREETS & PARKING LOTS IMPROVEMENTS 1 MOBILIZATION 1 LS $7,500.00 $7,500.00 2 TRAFFIC CONTROL 1 LS $500.00 $500.00 3 COMMON EXCAVATION 10,150 CY $6.00 $60,900.00 4 GRANULAR SUBGRADE MATERIAL 6,850 TON $6.00 $41,100.00 5 AGGREGATE BASE CL 5 (CV) 3,340 TON $12.50 $41,750.00 6 REMOVE CONCRETE WALK 150 SF $2.00 $300.00 7 REMOVE CONCRETE PAVEMENT 100 SF $4.00 $400.00 8 REMOVE BITUMINOUS PAVEMENT 55 SY $3.00 $165.00 9 REMOVE CURB & GUTTER 100 LF $3.00 $300.00 10 2" TYPE MV NONWEAR COURSE MIXTURE 1200 TON $45.00 $54,000.00 11 1.5" TYPE MV WEAR COURSE MIXTURE 930 TON $48.00 $44,640.00 12 BITUMINOUS TACK COAT 508 GA $2.50 $1,270.00 13 GOETEXTILE FABRIC 10,000 SY $1.50 $15,000.00 14 CONCRETE CURB & GUTTER, B618 3,400 LF $12.50 $42,500.00 15 4" CONCRETE SIDEWALK (INCLUDES AGGREGATE) 200 SF $5.00 $1,000.00 16 SOD WITH TOPSOIL 3,770 SY $4.50 $16,965.00 17 TREES/BUSHES (LANDSCAPING) 1 LS $5,500.00 $5,500.00 18 6" CONCRETE DRIVEWAY (INCLUDES AGGREGATE) 165 SY $40.00 $6,600.00 19 SIGNAGE 1 LS $3,000.00 $3,000.00 20 PAVEMENT MARKINGS 219 STALL $35.00 $7,665.00 21 LIGHTING 12 EA $3,500.00 $42,000.00 SUBTOTAL: $393,055.00 STORM SEWER IMPROVEMENTS 22 12" RCP STORM SEWER PIPE 3006G, CL 5 900 LF $33,00 $29,700.00 23 15" RCP STORM SEWER PIPE 3006G, CL 5 150 LF $35.00 $5,250.00 24 CONST DRAINAGE STRUCTURE DES. SD-1 12 EA $900.00 $10,800.00 25 CONST DRAINAGE STRUCTURE DES. 4022-48" 4 EA $1,200.00 $4,800.00 26 CONST DRAINAGE STRUCTURE DES. 4020-60" 2 EA $1,500.00 $3,000.00 27 CASTING ASSEMBLY, STORM 18 EA $300.00 $5,400.00 28 WATER QUALITY POND 1 LS 9000.00 $9,000.00 SUBTOTAL: $58,950.00 EROSION PROTECTION 29 INLET PROTECTION 18 EA $165.00 $2,970.00 30 SILT FENCE 2,200 LF $2.50 $5,500.00 31 CONSTRUCTION ENTRANCE 2 EA $900.00 1 0 SUBTOTAL: $10,270.00 BUILDING DEMO/LAND COST 32 BUILDING DEMO 1 LS $0.00 $0.00 33 LAND COST 1 LS $0.00 $0.00 34 UITLITY RELOCATION 1 LS $0.00 $0.00 SUBTOTAL: $0.00 ESTIMATED CONSTRUCTION COST $462,275.00 CONTINGENCY (15%) $69,341.25 ENGINEERING (20%) $92,455.00 ADMIN., LEGAL, MISC. (10%) $46,227.50 TOTAL ESTIMATED PROJECT COST: $670,298.75 PROPOSED NUMBER OF STALLS 219 COST PER PARKING STALL PARKING LOT ONLY $2,110.84 Albertville Downtown Parking Study Page 46 x L6 C� 4 J 91I8W L 3N &%"AV UM R 31 EMI 480u" IT • • L • CONCLUSION The goal of the Downtown Parking Study is to find areas where parking is deficient and establish areas within the Downtown where new development and parking could occur. For the Downtown to remain a commercial focal point of the City, the provision of adequate convenient parking and the promotion of commercial growth within the Downtown area will be essential to its future success. The Downtown Parking Study identifies conceptual parking layouts and potential new building sites within the Downtown area. Based on our analysis of Downtown parking, we offer the following recommendations: Zoning The following language in the Albertville Zoning Ordinance addresses the parking standards in the B-4 Zoning District: 1200.9.C. B-4 Parking Requirements: Within the B-4 Zoning District, the City may approve development and uses which do not comply with the required number of parking spaces as a conditional use permit; provided that: 1. A development agreement running with the land is completed in Swhich it is agreed that the property in question is financially responsible for its proportionate share of the city -sponsored and provided parking space construction, maintenance, and parking site acquisition for on -street, lot and/or ramp parking. Said responsibility shall be determined on the basis of the property's parking space shortage based upon ordinance requirements, in relationship to the total parking space shortage, as defined by this chapter for a defined service and benefit area. The "service and benefit area" shall include all properties which benefit from the available public parking serving a particular retail and commercial neighborhood or district. • 2. The amount of parking provided on the property in question is the maximum amount possible, taking into account the use and design objectives of the B-4 District, as outlined by this Ordinance and the Comprehensive Plan. 3. The parking shortages created by the development are not premature or in excess of the supply which can be provided by the City through a public parking system on a long term basis. Albertville Downtown Parking Study Page 48 4. The requirements of a conditional use permit are considered and satisfactorily met. To make this ordinance effective, the City must: 1. Identify a location for a municipal public parking lot. 2. Prepare a design plan for a municipal public parking lot. 3. Identify a per stall charge for businesses that have a parking shortage and pay for the available public parking. Based on this parking analysis, the average cost of parking stalls would be approximately $2,500.00 absent land acquisition or stormwater improvement. This cost per stall will increase if land acquisition and stormwater improvements are necessary. Railroad Right -of -Way The current Downtown parcels are limited in size, creating issues for redevelopment or parking. The City is working with the railroad to acquire the excess right-of-way. The purchase of this right-of-way would provide space to correct existing issues and provide sites for future redevelopment. 0 On -Street Parking LJ The on -street parking stalls should be striped to identify parking locations and to economize on the available spaces. Off -Street Parking 1. Off-street parking should be paved and striped to maximize use of available space. 2. Parking lots must be screened from residential neighborhoods. 3. Wherever possible, shared parking between businesses should be promoted through cross easements or leases. Shared parking will reduce parking demand, economize on available space, and promote business interchange between businesses. Albertville Downtown Parking Study Page 49 Block Recommendations 0 Block One 1. Currently, Block One has sufficient parking to address the demands of the existing businesses. 2. Land area exists to accommodate future redevelopment. Redevelopment will be driven by private development interests. City involvement will be determined based on the merit of individual projects. Block One is not an immediate redevelopment priority. Block Two 1. The City is currently investigating a redevelopment of the Eull Concrete site. This project must provide on -site parking to meet City ordinances. 2. The City will encourage and support assembly of the remaining smaller parcels to provide future redevelopment and parking for future uses. 3. Actual redevelopment will be driven by private development interests. City participation will be considered by project. 4. The land area within the block is sufficient to address the parking demand of the 0 existing businesses. Block Three 1. Block Three has the largest parking deficit. 2. The City should acquire railroad right-of-way to expand the supply of useable land within the block to address redevelopment and parking needs. 3. Due to property ownership patterns, expanded parking supply will require the cooperation of all benefited businesses. City involvement may be offered if the businesses present a unified plan that offers a practical solution to the parking issues. 4. Initially, if a parking solution is pursued, Alternative One is suggested to reduce project costs associated with purchase of the single family home at 11548 57tn Street and relocation of the household. 5. The railroad right-of-way land may be utilized to provide a shared parking lot. 6. Any redevelopment of Block Four will require stormwater management improvements. Albertville Downtown Parking Study Page 50 0 Block Four 1. Block Four has adequate parking to meet its current needs. 2. Future redevelopment of this site will be driven by private development interests. Block Five 1. The City Hall site has adequate parking. 2. Explore land assembly of the parcel to the south of the new City Hall with railroad right-of-way acquisition to create a redevelopment site, or provide green space for the new City Hall and parking for Albertville Auto Body. Block Six 1. Block Six currently has sufficient parking to address existing uses. 2. In evaluating all of the Downtown Study Area, we would recommend this block for public municipal parking lot for the following reasons: a. The City currently controls most of the land, eliminating land acquisition 10 costs. • b. The site is central to the Downtown Study Area and provide close proximity to Block Three which has the greatest parking deficit. C. The parking lot could be the impetus for future redevelopment in the balance of the Block Six commercial zoned properties. d. The municipal parking lot would serve multiple parking needs, Downtown businesses, Central Park events, and special civic events. 3. If the City Council determines that a municipal lot is appropriate, the following steps must be taken: a. Detailed parking lot design. This must include attractive streetscape details and stormwater management improvements. b. Define cost per stall to charge to businesses that have a parking deficiency. Albertville Downtown Parking Study Page 51 3N anuaAV aBJVI SIPPz SIPPiz 3N anuaAV UIVW C) 00 � o LA- 0 m 0 0 LSJ z .> cu OJ L 0 s 0 Z W z J � Z O O � to O > z C) w z p z J � 0 0 m Q slymp ;seal s-uo g T--- V--- 4 3N anuaAV aOJ'O-1 3N anuaAV UIDW 511015 saaJiS—uO 9 spn�s IaaJ4.3-uo L T .F+d AA L� �F+ N 1 C O L ti .7 0 • W U. al"s 4064E-40 y LU W F- W i a z w J Q 3N anuany uJnW r d' 0