2006-10-16 CC Agenda PacketA.,lbertville
f
ALBERTVILLE CITY COUNCIL
AGENDA
OCTOBER 16, 2006
7:00 PM
1. PLEDGE OF ALLEGIANCE
2. CALL TO ORDER — ROLL CALL — ADOPT AGENDA
3. MINUTES
A. October 2, 2006 City Council minutes (pgs. 3-7)
4. CITIZEN FORUM — (10 Minute Limit)
5. CONSENT AGENDA
A. Approve payment of claims check numbers 23421 to 23470 (pgs. 9-14)
B. Approve the Albertville Lions Club's application for a 3.2 Malt Liquor License for the
Lioness' Comedy Nite to be held at the St. Albert Parish Center on Saturday,
October 28, 2006 from 4:00 p.m. to 11:00 p.m.
C. Approve Resolution No. 2006-48 entitled a Resolution Amending Resolution No.
2006-10 Regarding House Addresses on the Towne Lakes 51h Addition Plat (pg. 15)
D. Approve Bolton & Menk, Inc. Engineer's recommendation for Application for
Payment No. 1 (Final) for 2006 Seal Coat Improvements to Pearson Bros., Inc. in the
amount of $24,053.70 (pgs. 17-19)
E. Approve Bolton & Menk, Inc. Engineer's recommendation to reduce the Letter of
Credit for Towne Lakes 6th Addition from $329,649 to $268,638 (pg. 21)
F. Approve Bonestroo Engineer's recommendation for Application for Payment No. 8
for new City Hall construction to Brietbach Construction in the amount of $280,517.90
(pgs. 23-26)
G. Approve Bolton & Menk, Inc. Engineer's recommendation to reduce the Letter of
Credit for Shoppes at Towne Lakes Two from $419,000 to $135,000 (pg. 27)
H. Set Monday, November 20, 2006 from 4:00 p.m. to 6:30 p.m. as an Open House for the
new City Hall
6. ACTION ON PULLED CONSENT ITEMS
7. DEPARTMENT BUSINESS
• A. Building Department
1). Monthly Status Report (pgs. 29-30)
B. Planning and Zoning 0
C. Engineering
1). Project Status Update (pg. 31)
2). 57 h Street NE Sidewalk (discussion item)
3). Flood Mitigation Project
a. Engineer's Report (attachment)
b. Funding Flood Mitigation Project Discussion
D. Legal
E. Administration
1). Written Report (pgs. 33-34)
2). Accept Quote for Blinds for new City Hall (pg. 35)
8. ADJOURNMENT
•
E
2
Albertville
sfftca n Uwkw fttyUN.
ALBERTVILLE CITY COUNCIL
October 2, 2006
Albertville City Hall
7:00 PM
PRESENT: Acting Mayor LeRoy Berning, Council members John Vetsch, Ron Klecker, and
Tom Fay, City Planner Al Brixius, City Attorney Mike Couri, Assistant City Engineer Adam
Nafstad, City Administrator Larry Kruse, Finance Director Tina Lannes, and City Clerk Bridget
Miller
ABSENT: Mayor Don Peterson
Acting Mayor Berning called the Albertville City Council meeting to order at 7:00 p.m. followed
by the Pledge of Allegiance.
ADOPT AGENDA
MOTION BY Council member Klecker, seconded by Council member Fay to approve the
agenda as amended and on file in the office of the City Clerk. Motion carried unanimously.
Adding the following:
7.A.4. City Hall Wireless Bridge to PW Building and Fire Hall Building
7.C.1. Update on the Flood Study
7.D.3. Beatrice Roden Property and Albertville Plaza 2nd — Cost Estimate for Road
Construction
7.E.1. Press Release to Crow River News
7.E.2. City Hall Brochure Discussion
MTNITTER
MOTION BY Council member Vetsch, seconded by Council member Klecker to approve the
September 18, 2006 regular City Council minutes as presented and on file in the office of the
City Clerk. Motion carried unanimously.
3
CITIZEN FORUM
Acting Mayor Berning asked if there was anyone present that wanted to speak to the Council
regarding an issue that is not on the agenda.
There were no members of the audience that wished to speak to the Council regarding an issue
that was not already on the agenda.
CONSENT AGENDA
MOTION BY Council member Vetsch, seconded by Council member Fay to approve the
consent agenda pulling check number 23373. Motion carried unanimously.
e
A. Approve payment of claims check numbers 23370 to 23418
B. Approve Bolton & Menk, Inc. Engineer's recommendation for Application for
Payment No. 1 for 52"d Street Improvement to LaTour Construction in the amount of
$238,082.11
C. Approve Bolton & Menk, Inc. Engineer's recommendation to release the Grading
Escrow for Albertville Plaza 2"d Addition {RJ Marco} in the amount of $4,000
D. Approve Bolton & Menk, Inc. Engineer's recommendation to release the Letter of
Credit No. 1020014 for Space Aliens {Field Plaza) from $140,540 to $7,202
E. Approval the Memorandum of Understanding between Wright County and the City of
Albertville for the Purchase of Sand/Salt for the 2006-2007 Snow and Ice Removal •
Season
ACTION ON PULLED CONSENT ITEMS
Check Number 23373
MOTION BY Acting Mayor Berning, seconded by Council member Klecker to approve check
number 23373. Motion carried unanimously.
DEPARTMENT BUSINESS
FINANCE DEPARTMENT
Accounts Receivable Update
Finance Director Lannes reported that as of September 26 the total amount outstanding in
accounts receivable is $93,498.15. Any outstanding balances after November 15 will be certified
to the 2007 Property Taxes.
Project Status Update
Finance Director Lannes stated that you will notice on the report the Projects that are active
within Albertville. Previous Projects have been removed from the list as they are completed.
2
•Quarterly Budget Update
Finance Director Lannes informed the Council that this is an un-audited 3' Quarter Budget
Summary. The revenues and expenditures should be at approximately 75%. As of September 26
the annual budgeted revenue for the General Fund is at 55.1%, which is normal due to the fact
that the city does not receive the tax settlements until December 2006.
Wireless Bridge Connection to PW Building and Fire Hall
Finance Director Lannes explained that the city currently pays for internet connection to three
city building locations: City Hall, Fire Hall, and PW Facility. Staff was researching the
possibility of connecting the Fire Hall with a fiber optic line. After further consideration, staff is
recommending the option to purchase a wireless connection from City Hall to the Fire Hall and
the PW Facility. This connection would provide access to the internet, city server, e-mail, and
phone system.
Staff obtained a quote to connect the two buildings at a cost not to exceed $9,000. The savings
from internet connection, which we are currently paying for the Fire Hall and PW Facility,
would be approximately $145 per month. The cost savings over a five year time frame would
pay for itself.
Council took no action at this time, but would reconsider the wireless bridge connection at a
future date.
• Planningand Zoning
g
Darkenwald Real Estate, Albertville Business Park Second Addition - Approve Resolution No.
Road 19 within the City of Albertville
City Planner Brixius informed the Council that Darkenwald Real Estate has applied for a
Preliminary Plat for the Albertville Business Park 2nd Addition. The main purpose of the
preliminary plat is to plat an 80-foot right-of-way for Keystone Avenue NE to establish access to
70th Street NE. This would provide a second access to the commercial and industrial property
located in the northwest corner of Albertville.
Brixius stated that the Planning and Zoning Commission has reviewed the preliminary plat at the
September 13, 2006 meeting and heard public comments regarding the plat. The Commission is
making recommendation for approval with the conditions outlined in Resolution No. 2006-xx
entitled a Resolution Approving a Preliminary Plat for the Albertville Business Park 2nd
Addition, which is located south of 70d' Street NE, north of I-94, east of CSAH 19, and west of
Kadler Avenue NE within the Albertville City Limits.
John Darkenwald, with Darkenwald Real Estate, stated that he requires Council approval on the
Preliminary Plat to protect the access location off of 701h Street NE. Mr. Darkenwald went on to
explain that he would also need Council approval to extend the timeframe for filing the Final Plat
from six (6) months to 3-5 years.
MOTION BY Council member Vetsch, seconded by Council member Fay to approve •
Resolution No. 2006-xx entitled a Resolution Approving a Preliminary Plat for the Albertville
Business Park Second Addition, which is located south of 70th Street NE, north of I-94, east of
CSAH 19, and west of Kadler Avenue NE within the Albertville City Limits with a 3-5 year
extension on the recording of the Final Plat. Motion carried unanimously.
Engineering
Update on the Flood Study
Council inquired about the status of the Flood Study. Council has not heard anything on the
progress regarding how it is coming along.
Assistant City Engineer Nafstad informed the Council that staff is progressing with the study and
could potentially put together a cost estimate for the next Council meeting.
Sidewalk on 57th Street NE
Council asked where the city stands with the installation of the sidewalk along 571h Street NE.
Assistant City Engineer Nafstad reported that staff has heard for a majority of the homeowners
and there are a few residents that are opposed to the installation of a sidewalk on their property.
Staff stated that these residents would like to express their concerns at the October 16, 2006 City
Council meeting.
Legal
Beatrice Roden Property and Albertville Plaza 2nd — Cost Estimate for Road Construction
Council inquired about the cost estimate for the construction of the road and how it will affect
Beatrice Roden's property.
City Attorney Couri noted that when the Albertville Plaza Development was platted, it was noted
in the Developer's Agreement that at a point in time when the Roden's property was developed it
would require additional access. At that point the developer or whomever would potentially
absorb the cost for the construction of the road. It would also require working with the adjoining
development to have some type of agreement for a shared access or even cross -easement.
As of today, there has been no development plan presented for the Roden property; however,
staff could predict an estimated cost of the construction of the road.
Administration
Press Release to Crow River News
Council suggested sending a news release to the Crow River news on a weekly or bi-weekly
basis to give the readers an update on what's happening in Albertville. It would be nice if there
was a chart at city hall noting the progress of commercial construction. (ie. Preliminary plat,
final plat, ground -breaking, mid -completion, ribbon cutting, grand opening, etc.)
•
0
• City Hall Rental Brochure Discussion
City Administrator Kruse included in the Council's packet a draft of a brochure informing the
residents or others the prices for renting the new City Hall facilities various rooms.
Council noted that at the workshop there was discussion about having the facility be alcohol -
free. Since the workshop would like to re -consider the thought of an alcohol -free facility.
Council and staff will research what other communities are allowing within their facilities. At a
future Council meeting, the details on the procedure and policies will be discussed regarding the
renting of the new City Hall rooms.
ADJOURNMENT
MOTION BY Council member Klecker, seconded by Council member Vetsch to adjourn at
8:50 p.m. Motion carried unanimously.
•
0
•
•
•
A�Ibcrtvilleaf
City of Albertville
Check Detail Register
October 16, 2006
Check Amt Invoice Comment
10100 Premier Bank
Paid Chk# 023421 10/16/2006 ACTION FASTENING, INC
E 101-42000-404 Repair/Maint- $125.00 30609
Total ACTION FASTENING, INC $125.00
Paid Chk# 023422 10/16/2006 AFLAC
G 101-21710 Other Deducations $16.16 72950
Total AFLAC $16.16
Paid Chk# 023423 10/16/2006 ALBERTVILLE FIRE RELIEF ASSOC.
E 101-42050-437 Misc. Donations $58.46
Total ALBERTVILLE FIRE RELIEF ASSOC. $58.46
Paid Chk# 023424 10/16/2006 ARAMARK UNIFORM SERVICES
E 101-45100-417
Uniform Rentals
E 601-49450-417
Uniform Rentals
E 101-43100-417
Uniform Rentals
E 602-49400-417
Uniform Rentals
E 602-49400-417
Uniform Rentals
E 101-45100-417
Uniform Rentals
E 601-49450-417
Uniform Rentals
E 101-43100-417
Uniform Rentals
E 101-41940-405
Repair/Maint - Buildings
E 601-49450-417
Uniform Rentals
E 101-43100-417
Uniform Rentals
E 602-49400-417
Uniform Rentals
E 101-45100-417
Uniform Rentals
E 602-49400-417
Uniform Rentals
E 101-43100-417
Uniform Rentals
E 101-45100-417
Uniform Rentals
E 601-49450-417
Uniform Rentals
E 101-41940-405
Repair/Maint - Buildings
Total
ARAMARK UNIFORM SERVICES
pager repair
AFLAC Insurance Prem
Parade candy - FD donations
$20.77 629-6057647 Parks Dept - Uniform Sery
$13.85 629-6057647 Sewage Dept. - Uniform Sery
$20.78 629-6057647 Public Works -Uniform Sery
$13.85 629-6057647 Water Dept - Uniform Sery
$10.02 629-606-3551 Water Dept - Uniform Sery
$15.03 629-606-3551 Parks Dept - Uniform Sery
$10.02 629-606-3551 Sewage Dept. - Uniform Sery
$15.01 629-606-3551 Public Works -Uniform Sery
$27.69 629-6063552 CH Mats
$10.00 629-6068471 Sewage Dept. - Uniform Sery
$15.00 629-6068471 Public Works - Uniform Sery
$10.00 629-6068471 Water Dept - Uniform Sery
$15.00 629-6068471 Parks Dept - Uniform Sery
$10.02 629-6073365 Water Dept - Uniform Sery
$15.03 629-6073365 Public Works - Uniform Sery
$15.01 629-6073365 Parks Dept - Uniform Sery
$10.02 629-6073365 Sewage Dept. - Uniform Sery
$27.69 629-6073366 CH Mats
$274.79
W
Check Amt Invoice Comment
Paid Chk# 023425 10/16/2006 BOLTON & MENK, INC
E 492-49000-303
Engineering
Fees
$10,631.00
97690
52nd Street Prelim Eng Rpt
E 101-41710-303
Engineering
Fees
$1,603.00
97691
LeBeaux Station
E 101-41710-303
Engineering
Fees
$1,253.00
97692
Hunters Pass
E 101-41710-303
Engineering
Fees
$931.00
97694
Towne Lakes 6th
E 101-42400-303
Engineering
Fees
$300.00
97695
Lot Surveys/As Built Reviews
E 101-41700-303
Engineering
Fees
$53.50
97721
CSAH 19 Speed study
E 101-41710-303
Engineering
Fees
($84.00)
97721
Geez
E 101-41710-303
Engineering
Fees
$336.00
97721
Shoppes at Towne Lakes 3
E 101-41710-303
Engineering
Fees
($84.00)
97721
Welcome Furniture
E 101-41700-303
Engineering
Fees
$588.00
97721
Staff Meeting
E 101-41710-303
Engineering
Fees
$42.00
97721
Site Review
E 101-41710-303
Engineering
Fees
$280.00
97721
Kollville 2nd
E 101-41710-303
Engineering
Fees
$252.00
97721
Fraser Steel
E 101-41710-303
Engineering
Fees
$168.00
97721
Perkins
E 101-41710-303
Engineering
Fees
$126.00
97721
Scrapbook Companions
E 101-41700-303
Engineering
Fees
$321.00
97721
School Speed zone
E 604-49660-300
Professional
Srvs (GENERAL)
$84.00
97721
Drainage review
E 101-41700-303
Engineering
Fees
$168.00
97721
Site reviews with staff
E 482-49300-303
Engineering
Fees
$588.00
97748
City Hall
E 101-41710-303
Engineering
Fees
$916.50
97749
Phil Morris
E 494-49000-303
Engineering
Fees
$462.00
97750
CSAH 19 & 50th St
E 473-49000-303
Engineering
Fees
$1,246.00
97751
Prairie Run
E 101-41710-303
Engineering
Fees
$2,464.00
97752
Shoppes of Towne Lakes II
E 101-41710-303
Engineering
Fees
$210.00
97753
State Bank Long Lake
E 604-49660-300
Professional
Srvs (GENERAL)
$1,144.50
97754
Wetland Mitigation (Barthel)
E 101-41710-303
Engineering
Fees
$588.00
97755
Albertville Clinic
E 101-43100-224
Street Overlayment
$4,826.00
97758
06 Overlay
E 101-43100-223
Seal Coating
$210.00
97759
06 Sealcoat
E 101-41710-303
Engineering
Fees
$519.00
97760
Outlet Mall Ped Cross
E 101-41710-303
Engineering
Fees
$790.50
97761
St. Michael-Albertv School Pla
E 604-49660-300
Professional
Srvs (GENERAL)
$1,069.50
97762
Flood Study Litigation
E 101-41710-303
Engineering
Fees
$42.00
97763
Intex Development
E 101-41710-303
Engineering
Fees
$606.00
97764
Eull Concrete Site
E 101-41710-303
Engineering
Fees
$513.00
97765
Plaza 2nd Add
E 101-41710-303
Engineering
Fees
$2,310.00
97766
Towne Lakes 5th
Total BOLTON & MENK, INC
$35,473.50
Paid Chk# 023426 10/16/2006 BRAUN INTERTEC CORP
E 482-49300-300 Professional Srvs (GENERAL) $223.40 267270 CH Soil Corrections testing
E 492-49000-300 Professional Srvs (GENERAL) $4,498.00 268298 52nd St Material Testing
E 101-43100-224 Street Overlayment $924.00 268303 06 Overlay testing
E 101-41000-300 Professional Srvs (GENERAL) $3,456.50 268494 Lachman Ave - Borings
Total BRAUN INTERTEC CORP $9,101.90
Paid Chk# 023427 10/16/2006 BREITBACH CONSTRUCTION CO
E 482-49300-300 Professional Srvs (GENERAL) $280,517.90 Pmt # 8 CH
Total BREITBACH CONSTRUCTION CO $280,517.90
Paid Chk# 023428 10/16/2006 BUFFALO BITUMINOUS INC.
E 101-43100-224 Street Overlayment $198,815.63 06 Overlay Pmt # 1
Total BUFFALO BITUMINOUS INC. $198,815.63
Paid Chk# 023429 10/16/2006 CANVAS PLUS, INC.
E 101-42000-310
Other Professional Services
Total CANVAS PLUS, INC.
Paid Chk# 023430 10/16/2006 CARQUEST
E 601-49450-210
Operating Supplies
E 101-43100-404
Repair/Maint-
E 601-49450-210
Operating Supplies
Total CARQUEST
Paid Chk# 023431 10/16/2006 CENTER POINT ENERGY
E 601-49450-383
Gas Utilities
E 101-43100-383
Gas Utilities
Total CENTER POINT ENERGY
$15.00 9544 CR Turnout gear repair
$15.00
$100.24 1536-14070 Voygr elec brk cntrl/tools
$4.55 D13402 refill for 40619
$141.65 D13812 Pintle hooks
$246.44
$75.23 5407574-290 6440 Maciver
$52.72 5421442-490 6461 Maciver
$127.95
•
•
•
10
.
Check Amt Invoice Comment
Paid Chk# 023432 10/16/2006
CHARTER COMMUNICATIONS
E 101-42000-321
Telephone
$80.05 10/06
FD internet
Total
CHARTER COMMUNICATIONS
$80.05
Paid Chk# 023433 10/16/2006
COURT & MACARTHUR
E 101-41600-304
Legal Fees
$2,437.50
staff, council mtgs, ordinance
E 101-41600-304
Legal Fees
$292.50
Industrial Park
E 101-41610-304
Legal Fees
$362.50
Eull Concrete
E 101-41600-304
Legal Fees
$390.00
Edina Development Default
E 101-41610-304
Legal Fees
$870.00
Phil Morris
E 101-41610-304
Legal Fees
$181.25
Darkenwald
E 101-41610-304
Legal Fees
$2,030.00
Albertville Plaza 2
E 482-49300-304
Legal Fees
$32.50
City Hall
E 604-49660-300
Professional Srvs (GENERAL)
$130.00
Albert Villas Drainage
E 101-41610-304
Legal Fees
$2,827.50
Shoppes at Towne Lakes 3
E 101-41610-304
Legal Fees
$3,806.25
Albertville Medical
E 101-41610-304
Legal Fees
$1,592.50
County hwy bldg
E 101-41610-304
Legal Fees
$145.00
Perkins
E 473-49000-304
Legal Fees
$650.00
Prairie Run Litigation
E 101-41610-304
Legal Fees
$92.00
Shoppes at Towne Lakes One
E 468-49000-304
Legal Fees
$65.00
1-94
E 101-41610-304
Legal Fees
$72.50
LaBeaux Station
E 492-49000-304
Legal Fees
$292.50
52nd St. Improvements
E 101-41610-304
Legal Fees
$72.50
Albert Villas 6
E 101-41600-304
Legal Fees
$65.00
RR Property Purchase
E 101-41610-304
Legal Fees
$36.25
Towne Lakes
Total COURI & MACARTHUR
$16,443.25
Paid Chk# 023434 10/16/2006
CROW RIVER SUSPENSION
& ALIGNM
E 101-45100-404
Repair/Maint -
$244.57 7756
alignment dually trucks
Total CROW
RIVER SUSPENSION & ALIGNM
$244.57
•
Paid Chk# 023435 10/16/2006
DASCOM
E 482-49300-300
Professional Srvs (GENERAL)
$5,838.00 0026319-IN
AV Equip CH pmt # 1
Total DASCOM
$5,838.00
Paid Chk# 023436 10/16/2006
ELERT & ASSOCIATES
E 482-49300-300
Professional Srvs (GENERAL)
$637.50 0154945
CH Phones
Total ELERT & ASSOCIATES
$637.50
Paid Chk# 023437 10/16/2006 EMBARQ - IL
E 101-41940-321
Telephone
$48.41 83038314190 Ldst
Total EMBARQ - IL
$48.41
Paid Chk# 023438 10/16/2006 EMBARQ - TX
E 101-41940-321
Telephone
$75.13
tax/surcharges
E 101-43100-321
Telephone
$35.95
497-0774
E 101-42000-321
Telephone
$36.95
497-7474
E 101-43100-321
Telephone
$45.57
497-3145
E 101-43100-321
Telephone
$50.54
497-0179
E 601-49450-321
Telephone
$35.16
497-0269
E 601-49450-321
Telephone
$27.80
497-1888
E 101-42000-321
Telephone
$47.13
497-4836
E 101-45100-321
Telephone
$1.63
497-2215
Total EMBARQ-TX
$355.86
Paid Chk# 023439 10/16/2006 EMERGENCY APPARATUS MNTC
E 101-42000-404
Repair/Maint -
$524.52 25793
ladder truck repair
Total EMERGENCY APPARATUS MNTC
$524.52
Paid Chk# 023440 10/16/2006 ESS BROTHERS & SONS, INC.
E 604-49660-406
RIM - Collection System
$83.07 JJ5782
R 4030 R Heavy Duty CB
E 601-49450-406
R/M - Collection System
$561.26 JJ5848
Sanitary MH, Frames, Ropes
Total
ESS BROTHERS & SONS, INC.
$644.33
11
Check Amt Invoice
Comment
•Paid
Chk# 023441 10/16/2006 FEDERATED CO-OPS, INC.
E 491-49000-300 Professional Srvs (GENERAL)
$156.77 F21960
Choice Mix
Total FEDERATED CO-OPS, INC.
$156.77
Paid Chk# 023442 10/16/2006 FUTRELL FIRE CONSULT & DESIGN
E 101-41000-300 Professional Srvs (GENERAL)
$143.75 19020
Perkins
Total FUTRELL FIRE CONSULT & DESIGN
$143.75
Paid Chk# 023443 10/16/2006 GREG KOOPMAN INVESTMENTS,
LLC
R 602-00000-99999 UNALLOCATED UTILITY
$58.51
Reimb overpmt UB
Total GREG KOOPMAN INVESTMENTS, LLC
$58.51
Paid Chk# 023444 10/16/2006 1-94 WEST CHAMBER OF COMMERCE
E 101-41100-433 Dues and Subscriptions
$260.00
Annual Dues 2006
Total 1-94 WEST CHAMBER OF COMMERCE
$260.00
Paid Chk# 023445 10/16/2006 JOINT POWERS BOARD
R 602-00000-37105 Water Sales - JPB
$63,533.75
JP Dist
R 602-00000-37105 Water Sales - JPB
$959.56
JP Dist Combo
R 602-00000-37130 Safe Water Test Fees
$900.35
Fed Wtr Test
R 602-00000-37105 Water Sales - JPB
$438.84
JP Dist Pen
R 602-00000-37166 Safe Water Penalty
$11.16
Fed Wtr Test Pen
R 602-00000-37105 Water Sales - JPB
$7.00
JP Access
R 206-00000-37171 WAC - JPB
$27,920.00
JP WAC
Total JOINT POWERS BOARD
$93,770.66
Paid Chk# 023446 10/16/2006 KENCO ENTERPRISES
G 101-22800 Landscaping Escrow
$2,750.00
Refund Escrow 10444 Karston Ci
Total KENCO ENTERPRISES
$2,750.00
Paid Chk# 023447 10/16/2006 LANO EQUIPMENT
E 101-43100-404 Repair/Maint-
$7.11 123335
rings, o-rings, etc
Total LANO EQUIPMENT
$7.11
Paid Chk# 023448 10/16/2006 METROPOLITAN UNDERGROUND SERV
•
E 101-43100-403 Repair/Maint - Catch Basins
$860.86 400-06
repair catch basin Kalland Dr
Total METROPOLITAN UNDERGROUND SERV
$860.86
Paid Chk# 023449 10/16/2006 MIDWEST LANDSCAPES
E 482-49300-300 Professional Srvs (GENERAL)
$4,649.00 E11719-001
Irrigation system CH
Total MIDWEST LANDSCAPES
$4,649.00
Paid Chk# 023450 10/16/2006 MILLS, TATE
E 101-42000-352
General Notices and Pub Info
$76.64
car seat clinic
Total MILLS, TATE
$76.64
Paid Chk# 023451 10/16/2006
MINNESOTA COPY SYSTEMS
E 101-41400-413
Office Equipment Rental
$22.63
Copier Maintenance Agreement
E 101-41400-413
Office Equipment Rental
$214.97
Copier Maintenance Agreement
Total
MINNESOTA COPY SYSTEMS
$237.60
Paid Chk# 023452 10/16/2006
N.A.C.
E 101-41910-306
Planning Fees
$625.00 15743
staff, planning comm, council
E 482-49300-306
Planning Fees
$29.55 15831
CH Plat
E 101-41910-306
Planning Fees
$450.87 15831
comp plan, plan comm agenda/pa
E 101-41915-306
Planning Fees
$1,213.75 15832
Darkenwald
E 101-41915-306
Planning Fees
$559.50 15832
Starbucks
E 101-41915-306
Planning Fees
$250.00 15832
Outlet mall trash enclsures
E 101-41915-306
Planning Fees
$198.10 15832
Albertville Plaza 2
E 101-41915-306
Planning Fees
$116.15 15832
Perkins
E 101-41915-306
Planning Fees
$102.55 15832
Clinic
E 101-41915-306
Planning Fees
$322.70 15832
Albertville Market Place
E 101-41915-306
Planning Fees
$52.25 15832
Space Aliens
E 101-41910-306
Planning Fees
$625.00 15833
staff, planning comm, council
Total N. A. C.
$5,197.75
Paid Chk# 023453 10/16/2006 PEARSON BROTHERS, INC.
E 101-43100-223
Seal Coating
$24,053.70
06 seal coat pmt # 1
Total PEARSON BROTHERS, INC.
$24,053.70
12
•
Check Amt Invoice Comment
Paid Chk# 023454 10/16l2006 PHILLIPS, DEXTER
G 101-22800 Landscaping Escrow
$3,000.00
reimb escrow 4883 Kassel
Total PHILLIPS, DEXTER
$3,000.00
Paid Chk# 023455 10/16/2006 PINNACLE PRINTING, INC.
E 601-49450-203 Printed Forms
$772.13 6063
UB bills
E 602-49400-203 Printed Forms
$772.12 6063
UB bills
Total PINNACLE PRINTING, INC.
$1,544.25
Paid Chk# 023456 10/16/2006 PIPELINE SUPPLY, INC.
E 604-49660-300 Professional Srvs (GENERAL)
$1,537.82 S2284982.00
quality culvert HDPE
E 604-49660-300 Professional Srvs (GENERAL)
$26.63 S2285725.00
split coupler
Total PIPELINE SUPPLY, INC.
$1,564.45
Paid Chk# 023457 10/16/2006 QUICK FUEL FLEET SERVICES
E 101-43100-212 Motor Fuels
$768.97 04084
Bio LS2
Total QUICK FUEL FLEET SERVICES
$768.97
Paid Chk# 023458 10/16/2006 R J MARCO
G 101-22850 Planning & Zoning Escrow
$4,000.00
refund grading escrow
Total R J MARCO
$4,000.00
Paid Chk# 023459 10/16/2006 RAPIT PRINTING
E 101-41100-300 Professional Srvs (GENERAL)
$464.38 261
Printing - Newsletter
Total RAPIT PRINTING
$464.38
Paid Chk# 023460 10/16/2006 SENTRY SYSTEMS, INC.
E 101-45100-405 Repair/Maint - Buildings
$30.96 508304
Lander Alarm
E 101-43100-405 Repair/Maint Buildings
$29.23 508304
PW Alarm
E 101-42000-405 Repair/Maint - Buildings
$4.21 508304
FD Alarm
E 101-42000-405 Repair/Maint - Buildings
$28.38 508304
FD Alarm
Total SENTRY SYSTEMS, INC.
$92.78
Paid Chk# 023461 10/16/2006 SHERWIN-WILLIAMS CO
E 101-45100-530 Improvements
$274.49 3484-6
hockey rink frame, pole, rolle
Total SHERWIN-WILLIAMS CO
$274.49
Paid Chk# 023462 10/16/2006 STAR NEWS
E 101-41100-433 Dues and Subscriptions
$40.00
annual subscription
Total STAR NEWS
$40.00
Paid Chk# 023463 10/16/2006 SUNSET PRINTING & ADV SPEC CO
E 101-42000-352 General Notices and Pub Info
$401.00 58799
handouts for FD open house
Total SUNSET PRINTING & ADV SPEC CO
$401.00
Paid Chk# 023464 10/16/2006 TINKLENBERG GROUP
E 468-49000-300 Professional Srvs (GENERAL)
$2,936.08 1300
1-94
Total TINKLENBERG GROUP
$2,936.08
Paid Chk# 023465 10/16/2006 VERIZON
E 101-42000-321 Telephone
$7.42 3697544017
Rescue truck cell phone
Total VERIZON
$7.42
Paid Chk# 023466 10/16/2006 WASTE MANAGEMENT
E 101-41940-384 Refuse/Garbage Disposal
$159.52 1437280-159
Refuse Waste Hauler
Total WASTE MANAGEMENT
$159.52
Paid Chk# 023467 10/16/2006 WRIGHT COUNTY IT
E 101-41400-335 Education
$125.00 06-090
Adobe class BM
Total WRIGHT COUNTY IT
$125.00
Paid Chk# 023468 10/16/2006 WRIGHT CTY SHERIFFS PATROL
E 101-42110-307 Police Contract Fees
$36,500.00 Patrol-06-110
service 10/06
Total WRIGHT CTY SHERIFFS PATROL
$36,500.00
Paid Chk# 023469 10/16/2006 XCEL ENERGY
E 101-43160-381 Electric Utilities
$35.89 51416598070
5700 Labeaux Signal
Total XCEL ENERGY
$35.89
13
Check Amt Invoice Comment
Paid Chk# 023470 10/16/2006 YOCUM OIL COMPANY, INC.
E 601-49450-404 Repair/Maint- $913.47 792736
E 601-49450-404 Repair/Maint- $795.53 L33192
Total YOCUM OIL COMPANY, INC. $1,709.00
10100 Premier Bank $735,434.80
Fund Summary
10100 Premier Bank
101 GENERAL FUND
$319,794.54
206 WAC FUND
$27,920.00
468 CSAH 19 RAMPS/I 94 Project
$3,001.08
473 PRAIRIE RUN
$1,896.00
482 CITY HALL 2004-5
$292,515.85
491 WWTF Phase 2
$156.77
492 52nd st Industrial Park
$15,421.50
494 CSAH 19 & 50th St. (South 19)
$462.00
601 SEWER FUND
$3,466.36
602 WATER FUND
$66,725.18
604 STORM WATER
$4,075.52
$735,434.80
diesel fuel
diesel fuel
•
•
14
CITY OF ALBERTVILLE
COUNTY OF WRIGHT
STATE OF MINNESOTA
RESOLUTION NO.2006-48
A RESOLUTION AMENDING RESOLUTION NO.2006-10 REGARDING
HOUSE ADDRESSES ON THE TOWNE LAKES 5" ADDITION PLAT
THE CITY COUNCIL OF THE CITY OF ALBERTVILLE, MINNESOTA ORDAINS:
WHEREAS, the City of Albertville has identified an error in the home addresses of three homes
in Towne Lakes 51h Addition plat; and
WHEREAS, the home address shall be corrected with the City and Wright County; and
WHEREAS, the home addresses of 10253, 10265, 10277, and 10319 Laurel Street shall be
changed to be addressed 11253, 11265, 11277, and 11319 68th Street NE.
NOW, THEREFORE, IT BE RESOLVED, the City of Albertville hereby re -addresses 10253,
10265, 10277, and 10319 Laurel Street (as shown on the Towne Lakes 5th Addition plat as Lot 7,
Lot 8, Lot 9, and Lot 10, Block 5 of Towne Lakes 5th Addition) as 11253, 11265, 11277, and
11319 681h Street NE.
This amendment shall be in full force and effective immediately following its recording at the
Wright County Government Center.
Approved by the Albertville City Council the 16th day of October, 2006
•
15
MEMORANDUM
baw Stpu-m, be r 2 (4 2 806
To., Larry Kruse, Oly Administnatar
Cc: Tina Launts, Finavct Director
Frow Adam Natstad, F.E, Assistant City, Eagince"'40/
Subject; ray ystimate No. 1,& Fiaill
IftiSral Coat Improvewelto
City of Mlwrtville
RNH Project No. TI 5.21 PS
llcarskm Bros., lac-, has comp . the 1,006 Scal Coat tmprovenwats. Invoia No. 1443 fwin
their company is attwhed, 11w teal lumpsam awNuillbid key their firm wzw� S74,013,70 We
reconumnd mAing flml pmrtw,,nt to than in this, amount, Wc also recomme-ritl that tho, City
&-c4A 1,110 (Which b%,givis the an4 that the Cky tek-afe
tfiv. cbrxk uvwt� .1 c�Jnwn( of surav Anil licit received by 11w OW
Kease kt me kn,,lw if you have any questions.
AUachaw,or
0
17
qE I T A TTE.- —F
I hereby baA 1* that, la tf* beWl of m y kA mied" and W ief, all �Wres, Q0 SMA it , aftd Po COS 04
woo * " maWial why an ft Eetkvte ate can-odand Oat all work tias L*en pedomied ie,
s,alla = rl an More w 0 aw wo, An, % o I ft * �rlr a, I k i r I t w p r q r me Owmer
and ", unilorsign*0 Cmirlilor. and as aTonded by " authurimd "rws, md that if
$0regoing is * trm anol comct slaftment pf ft cw4w-1 amnLint k-N tie oame 0 , by this
qnvd red
CON, CT PrIA BROS., INC
By! SL,"E ATTACHED WVCHCE FROM PEARSON BROS, INC, (INV NG,
Nam Tific
mm
C-HECKED AND APPROVED AS'TOQUANTITIES AND AMM14T,
DOLTON &MIEW INC , 1515 FAST HOC�WNAY 13, S(JRNSVILLE. MN 174m fiT
We: 1 FIRQJECT MANAGER
DATE: '7-4;W-
PP ROVED FQAPAYMPNT'
PoWER" CITY OF AIJBIFRTIALLE
By
*aA I F-,
0
flK
0
0
0
PFARSON ROS-, INC.
11079 Ly"IONT AVE. NE
HANIOVER,MN $5,341-406:3
BILL TO
Won & Menk, Inc,
Atten: Mom Nafoad
121224 kroW Awevue
Burks wle, PAN .55337-164,9
19
BQ L_TON 8L M N K, I N C_
Consulting Engineers & Surveyors
NAU Building • 7333 Sunwood Drive • Ramsey, MN 55303
Phone (763) 433-2851 • FAX (763) 427-0833
October 9, 2006
Mr. Larry Kruse, City Administrator
City of Albertville
5975 Main Avenue NE, P. O. Box 9
Albertville, MN 55301
RE: Towne Lakes 6ch Addition
Letter of Credit Reduction (2" d Reduction)
BMI Project No. T15.21677
Dear Mr. Kruse:
Based on completed work, Contractor Property Developers Company has requested a reduction
to Letter of Credit No. 6512-117. To date, all of the public utility improvements have been
completed and the roadways have been constructed, with the exception of the placement of the
wear course. Restoration work, landscaping and construction of the private roadways will occur
next year. Upon review of the completed work and accounting for work outstanding, it is
recommended that the Letter of Credit be reduced from $329,649 to $268,638.
Please let me know if you have any questions or would like additional information.
Sincerely,
BOLTON & MENK, INC.
Adam Nafstad, P. E.
Albertville Assistant City Engineer
cc: Tina Lannes - Albertville Finance Director
David Hempel - CPDC
•
21
3IS %5t lar3h' y A& ` a Paul, N 5511
. PhoneOrfi,le: 65E-636-4600 1-ac 65g 3-1311
ti
Lwiy Kruse.
k :ity of Albcrtville
Albertville, MN 55301
tl tv i lle City Hall,
Pay, Re -quest
De at ir. "Ksusc,
Trap r'kitwd bc1'c ath am Fair ) epics c t for :Payment No, R, Wc b vc mvitw d the
request and bereby recommend appToval for p ynient in the amount o 2 0,$17, 0Plc;-
• execute the documents and distribute as follcros:
l copy City of Albertville
ertvill
2 copies rc t acb Construction, fi t; Mr, RyanHrcitlazh
l copy Borwstroo, Ro n , Ajiderfik & associate lnc. altn' Richard Bjelic
Also attacbmt are the Lien Waivers fixr Ray °R e u st. No.
Should you, have any questions regarding this project, plea �ci ffee to call me at 01 -(K
4914.
'`ours %, ry truly,
Richard Hj cllc
H,c '
Encloiwrc-
1�1
23
WN, 55301,00C C-sit, Octaber 5 200b
Fw, Period: 00 �Mkj to 9162(X6
C,t.m€ *r Rft0w--h f-%Gr,%1rv0xjm W Ist Ayr-rxja P 0 Box 78,, Elrnwm. MN, 66325
SUMIMRY
I CxjginM- Qor&wt Amcunt
2 Charge Order, AddiLman,
a Change Osier- D&Juclton
4 Revised r-*Mract Amowl
5 'Value OwTvAeted to Dade
6, Malerid on Hand
7 A.-rcunt Earr*d
Less 'Wainage 5%
10 Lars Atrw: Lmt Paifj'Frevjotj,
11 Uquitted damtr2ts,
12 AWJUNT WE TKS RIFQUEST FOR PAYN4ENT NO, 8
Zb�-'ormft*rvlad 1w Apprmag by�
DONESTROO, ROSEME, ANDERLIK & ASSOCIATES, INC,
Apprvved try O"wier
BMTMACK CONSTRUCTION
See altachedfor 'Q4VAmmah ,
Specirlwd con(r= Date..
No
s 3,09110mao
24
? Plei , t MM CRUTFICAT9 FOR, PiaPA=
page I
>. ----------------_--- ,----
-_----m ---- mm s.��..... a,x,x,a.�x�m,
-- -- a
a�lJIP1d6
TO
4,c a 'ii , L°Sri OF
MR K' a ',e',w1: nw—aAzm Ii - l m
iefir Paz 8
r�.YWKAIK xa z
m ;a
9 z D Fvxwa 44MYU 70,
M I.,V06
,FX44,. ECT: ALBWMILLS 1"Tt MLL
VIA 4, aITIT .xl , C+A6L�L:F�fi3':. Bt' .,3'.tC,; rli�: 5
ANCSMCT,4; rkwI s 0511A+.
% main Avolme
A� ��tar:
t, tcil� r
hLbo-'rLY1110 MN 51,162
Z115 w0y 16 West
_.
Ale. PW41 m mlxx o
a?FCTw7w
Appwzwrr 4 F ii
AppitrAticaa Lr m*O* for Pvywmt, as Sbawn belew, 1m mlotBT etlan
-111 ,,,a.1111-1,..1e-____-._.__---,__________________.___._ 101€hD CUMTrmM. tteie t",1srt- L ig 4=�Ui:ltvd_
10ram omm9R1" I
. - --- --11---_-__- _-__-_-___---_-1
=h"r. oriirrw *ter, In, I M*.Tlr:o%s
t: s Tait �� 1
---------- .. - ----_- ----1
«a ant a Orders 1
._. ... 1
ff—kw I ed 1 I 1
------------- _---------------1
w ,.R ....... .M,,_ ..--------------------------1
awermigred ContractDr certifien tsiat to the beat �e4 ti
C`nML.TaClWe'a 6,CMIn tw, ieii=mLi=ft gmd la k hex a« rR rrsvnq
by this Application for Paymm has t .n 04WVIaLed In ROO"A&Uem
Mitre thk CsMIACt BaduwasLm, > t aft ve 6wm paid by
the Con„rwmwr for Wrx tar vim pxevi,w Lertificatt.2 w .
St ae- W&Vti�.cx 3 de r w mra .. lrraz thf, .. r;, aC
t t curvent P u nt ehoAn herein is dine.
FOP AR9,17 ^tt rc..attlFTPt;+'Iy t Ifs
-------------------------------------------
ti 1T `t t iF TCh,,'m nP pAF tti
o ..-m-,1a„€t7,6 and 'Uir- datacc*Vriging 'tbt &bCek"e ApplLoatim,
arthi®ect'a a e, itformEi'uu and beliet Lh+e Mark has
Pr=4z�KAXOdas i s «gym th# qMULY Of rha ck I- i-
&r,vzr i with Me Co rtrt bcuss «ta; and the rrmt.metc
: 4 IUXKhL LONT"t s m.........................
k. r -aka ba c ut"re......................<, ,ds:
T=Al itetaITAite Zbla !iA -a f& Or �1s3 1s ... n 344,4S5.
,6. TCeAl fiAAW.D Lulr4 MMIMUN CL.za 4 m t5 ...... ,. ,. :.:>,744,6S7.,55
It. m a from prior, ----__---_d__
6. cmmrwr AJ jw,,Ta Pug mins 5 - `l.l . x , ... .x .... 250, S17. io
---- _ m ._
- __e- a.mm.ell
..w.._
8tat (
liiTLi:
AN
--------------------
,Amtach explarwim, It
cerritled a an.11 a2tion ammince i#itfarl
etmi:
My': DALm 9
'this C`*.rti,i.i .tt I mkt n*qotiable, The A04TINT C?��' IPI 5s
and aov,,eptwxv �f payment wre wV:rPDut preljLe ice u: rights
't�g tk ar Cr «r wx- wrur Fade C >T.r ct.
-------------------------------------------------------------
25
PROJECT PAYMENT 5TATUS
CyWNER Orf Oft ALBERTWLLE
#R.V,-Fg
SRA FILE NO, 001028,051 oo-o
CONTRACTOR BROT,$ACH CON$tRUCTION
4�HANGF- ORMRS
NoR Data pescq#lc
1 10 512006 1 Tl*s Chi_ Ordar provdes for aw cbanps
fim
MIT
0
PAYMENT $UMMARY
Klo
From
TG
Rat*
Cff
I Ul ir2ws
Ub'2airk
35'
2,[125.00
4050000
2
-3101=*
onl'ta
40,6,,2,70 00
406,27000
4167,100,00
I
'ADUNK6
X-JO"
6 1 5A TG,W
5510 w
1114MOM
4
05(Qlt2rPA'
O&QV06
460,2c,-,,- 00
79,440,30
1 j555,SM GO
5
OMI ?2006��%Jfv
�30,klfi
383,32600
99,615 00
1,99 ,3W-W
e
CqM142
07,11, lk)t-
3U.ml'oo
i 15 40 00
231-02MW
14ateria1 on Hand
mo
91m
I
0
26
•
•
•
BOL-TON 8L NA i== N K , I NC_
Consulting Engineers & Surveyors
NAU Building * 7333 Sunwood Drive • Ramsey, MN 55303
Phone (763) 433-2851 • FAX (763) 427-0833
October 9, 2006
Mr. Larry Kruse, City Administrator
City of Albertville
5975 Main Avenue NE, P. O. Box 9
Albertville, MN 55301
RE: Shoppes of Towne Lakes II
Letter of Credit Reduction
BMI Project No. T15.21660
Dear Mr. Kruse:
Based on completed work, GCI Builders, Inc. has requested a reduction to Letter of Credit No.
166. To date, the majority of the public utility improvements have been completed and the
private roadway has been constructed. The placement of the wear course and construction of the
West Lake Towne Drive turn lane will be completed next year. Upon review of the completed
work and accounting for work outstanding, it is recommended that the Letter of Credit be
reduced from $419,000 to $135,000. The reduced balance ($135,000) will adequately ensure the
completion of the remaining work.
Please let me know if you have any questions or would like additional information.
Sincerely,
BOLTON & MENK, INC.
Adam Nafstad, P. E.
Albertville Assistant City Engineer
cc: Tina Lannes - Albertville Finance Director
Al Keller — GCI Builders, Inc.
27
Nblertvillc
Small Town living. Big Cky Ufa.
MEMORANDUM
Building Department
5975 Main Avenue NE • P.O. Box 9 • Albertville, MN 55301
Phone: 763-497-5106 9 Fax: 763-497-3210
TO: Honorable Mayor, City Council, and City Staff
FROM: Jon Sutherland, Building Official
DATE: October 11, 2006
RE: SEPTEMBER 2006 PERMIT ACTIVITY
Residential Construction Activity: 4 Single Family Dwelling permits were issued this month
for a total of 72 dwellings for year to date (YTD). This is slower than last year when we had 105
Single Family Dwellings to date. We also had two (2) addition permits and eight (8) deck
permits. Additional storm damage from high winds occurred this month causing various damage
including Signs, Siding, and Roofing on the north half of the city. This storm also blew out a
garage overhead door and a garage wall in the Towne Lakes development. The City of Rogers
sustained much worse damage when a Tornado from the same system touched down and
destroyed numerous homes.
Commercial Construction Activity: Nike completed a tenant alteration at the Outlet Mall.
Various other permits include; footing and foundation permit for the Goodyear Tire and Retail
Center at 11019 61 sc Street NE, a footing and foundation permit for the Albertville Medical
Clinic at 11091 Jason Avenue NE, a tenant finish for Scrapbook Companions and BB Wireless at
5262 Kyler Avenue NE. Other miscellaneous permits processed for the month were for fire
sprinkler, alarm, mechanical, and plumbing.
Miscellaneous: Miscellaneous permits issued including Storm Damage, Signs, Plumbing,
Mechanical, and Fences, totaled 52 for the month.
Total permits: We have a total of 1,169 for the year to date (YTD) with a Construction value
YTD of $28,412,629.
Inspection Activity: This and existing work in progress generated approximately 250 related
Inspections including Rental Licensing, Complaints and Zoning Enforcement.
Attachment: Permit Activity Report
0 JS
29
o lb : ille
A�lbcrtvilli:Small if
Permit Activity Report
September YEAR: 2006
•
RESIDENTIAL
NEW CONSTRUCTION
NO.
PERMITS
NO.
UNITS
VALUATION
NO.
UNITS
VALUATION
SINGLE FAMILY DETACHED
4
0
808,877
50
11,799,788
SINGLE FAMILY ATTACHED
0
0
0
22
2,455,152
TWO FAMILY / DUPLEX
0
0
0
0
0
MULTIPLE FAMILY 3 OR MORE UNITS
0
0
0
0
0
TRANSIENT HSG. HOTELS / MOTELS
0
0
0
0
0
SUB -TOTAL
4
0
808,877
72
14,254,940
NON-RESIDENTIAL
NEW CONSTRUCTION
NO.
PERMITS
NO.
UNITS
VALUATION
NO.
UNITS
VALUATION
COMMERCIAL RETAIL / RESTAURANT
1
0
800,000
1
800,000
OFFICE / PROFESSIONAL
1
0
426,000
4
2,270,512
INDUSTRIAL
0
0
0
0
0
PUBLIC / SCHOOLS
0
0
0
1
3,000,000
SUB -TOTAL
2
0
1,226,000
6
6,070,512
RESIDENTIAL
ADDITIONS / ALTERATIONS
NO.
PERMITS
NO.
UNITS
VALUATION
NO.
UNITS
VALUATION
ADDITIONS TO PRINCIPAL BUILDINGS
2
0
14,500
10
170,684
DETACHED ACCESSORY BUILDINGS
0
0
0
2
6,800
DECKS
8
0
27,416
65
227,091
SWIMMING POOLS
2
0
0
9
47,099
REMODEL - MISC. RESIDENTIAL
34
0
208,186
671
4,323,501
REMODEL - MULTIPLE DWELLINGS
1
0
94,000
28
1,070,194
SUB -TOTAL
45
0
344,102
785
5,845,369
NON-RESIDENTIAL
ADDITIONS / ALTERATIONS
NO.
PERMITS
NO.
UNITS
VALUATION
NO.
UNITS
VALUATION
COMMERCIAL RETAIL / RESTAURANT
3
0
41,000
32
1,854,389
OFFICE / PROFESSIONAL
0
0
0
3
93,000
INDUSTRIAL
0
0
0
3
30,000
PUBLIC / SCHOOLS
0
0
0
0
20,000
DETACHED ACCESSORY BUILDINGS
0
0
0
2
43,500
SIGNAGE
1
0
0
23
156,486
SUB -TOTAL
4
0
41,000
63
2,197,375
DEMOLITIONS / MOVE BUILDINGS
NO.
PERMITS
NO.
UNITS
VALUATION
NO.
UNITS
VALUATION
RESIDENTIAL DWELLINGS
0
0
0
0
0
NON-RESIDENTIAL DWELLINGS
1
0
9,933
3
36,933
MOVE BUILDING - RESIDENTIAL
1
0
7,500
1
7,500
SUB -TOTAL
2
0
17,433
4
44,433
TOTAL
57
0
2,438,812
930 7
28,412,629
PERMIT COUNT
THIS
MONTH
Y-T-D
VALUATION
I
BUILDING
57
930
2,438,812
FENCES & RETAINING WALLS
5
29
25,000
PLUMBING
5
97
20,000
MECHANICAL / FIREPLACE
7
107
21,450
GRADING
0
2
0
S & W, STREET EXCAV., FIRE, ETC.
1
4
1,200
TOTAL
75
1,169
7 2,506,462
0
30
• BO I_TON ao. NA r-== N K
Consulting Engineers & Surveyors
NAU Building • 7333 Sunwood Drive • Ramsey, MN 55303
Phone (763) 433-2851 • FAX (763) 427-0833
MEMORANDUM
Date: October 12, 2006
To: Honorable Mayor and City Council
Larry Kruse, Albertville City Administrator
From: Adam Nafstad, P.E., Assistant City Engineer
Subject: Project Status Update
The following is a brief project status update:
1. 52" d Street Improvements
To date, all utility installation has been completed, ponds have been excavated and the
majority of the site grading has been completed. The construction of the roadway is
. underway and curb is scheduled for the last week of October.
2. Hunter's Pass Estates
All improvements, with the exception of fencing and minor punch list items, have been
completed.
Towne Lakes 6th Addition
The utility installation has been completed and the public roadways have been constructed.
Construction of the private streets, landscaping and restoration work will resume next year.
4. Shoppes of Towne Lakes II
Currently, the majority of the utility installation has been completed, as well as, the
construction of the private roadways. The turn lane on West Lake Towne Drive and the
concrete entrance to the site off of West Lake Towne Drive will be completed next year.
5. Flood Mitigation Feasibility
The study has been completed and will be presented to Council at the October 16th meeting.
The study identifies a potential phase 1 improvement, with an estimated cost of
approximately $1,100,000, which can be incorporated into the design of the high school
site. The School District is planning on bidding the high school project in January of 2007.
Funding options for flood mitigation improvement will also be discussed at the Council
meeting.
6. 2006 Overlay Project & 2006 Seal Coat Project
With the exception of minor outstanding punch list items, both the overlay and seal coat
projects have been completed.
31
7. Long Lake State Bank
The utilities, roadway and parking lot have all been constructed and soon restoration of the
property will begin. The sidewalk in front of the bank on the north side of 57th has been •
aligned to accommodate an additional westbound lane in the future. Additional pedestrian
provisions will need to be installed prior to connecting the sidewalk to the CSAH 19 and
57th intersection.
Albertville Plaza 2nd (Goodyear)
The majority of the utility installation has been completed and construction of the roadways
and parking lot is underway.
9. Medical Clinic
Mass grading of the site has begun and utility work is expected to begin within the next
week.
10. School Zone Speed Study
The requested speed study has been completed and distributed to staff for review. The
study will be presented at the November 6th Council meeting.
I will be at your October 16th City Council meeting to answer any questions concerning these
and/or other projects taking place in town.
•
•
32
•vo
AIbertville
Sang TwiAn Whig. 09 City tit..
MEMORANDUM
Date: October 13, 2006
To: City Council
From: Larry R. Kruse, City Administrator
Re: General Update
CITY HALL CONSTRUCTION:
The parking lot has the final wear coarse installed and is now striped. It appears there is one
small water puddle which is going to be repaired. Sodding has been completed. Where there is
no irrigation, dormant sod will be installed later this fall. Most of the interior doors have been
hung and are looking pretty good. The plan is to install all the doors and view the stain
• color/finish later in November. If any doors need to be replaced, it may take up to eight weeks
for delivery. In the interim, we will use the existing doors. The terrazzo floor in the hallway is
now being installed. The furniture, phone system and audio visual systems will be installed in
the next few weeks. Enclosed in your pack is a recommendation for window blinds for the south
office windows. We also priced out blinds for the second story, but have not included them in
our recommendation. In general, things are progressing as planned.
I-94 PROJECT IMPLEMENTATION TASK FORCE MEETING:
The workgroup will meet again this Tuesday, October 24 to review a Memorandum of
Understanding between Albertville, Otsego, St. Michael and Wright County. The group will
focus on completion of the issues worksheet for each interchange. Representatives of MNROAD
have been invited to discuss their future plans and comment on a Kadler interchange with those
comments being included in the issues worksheet.
The full I-94 Implementation Task Force is tentatively scheduled to meet on Wednesday,
November 15, 2006 to recommend adoption of the Memorandum of Understanding which is
attached at the end of this report.
City Attorney Couri and I continue to work with Mr. Knechtl on acquisition of right-of-way for
the CSAH 19 interchange. I anticipate closing by November 30.
52nd STREET NE INDUSTRIAL PROJECT:
The Industrial Park expansion is going very well. Utilities have been installed and the remaining
street work will be completed yet this fall.
33
•
OTSEGO BOARDER ROAD AGREEMENTS:
City Administrator Mike Robertson and I met with County Engineer Wayne Fingalson on
Tuesday, September 19 about getting CSAH 19 North on the County's five year plan. We
reviewed the proposal that both cities would initially fund the County's share of the
improvement cost and get reimbursed at a later time. Fingalson said he understood the project
and invited Otsego and Albertville to make a presentation to the County Transportation
Committee later this fall.
City Attorney Couri is packaging the five Albertville/Otsego Boarder Road Agreements to be
presented to both City Councils for adoption prior to year end.
PUBLIC WORKS FULL TIME UTILITY EMPLOYEE:
We received 18 applications for the Public Works employee. Staff is in the process of ranking
candidates and arranging interviews. Interviews will likely be held the week of October 16 or 23.
PERSONNEL POLICY UPDATES:
For the past year, we have been working on updating the Personnel Policy. There is a number of
State and Federal language updates throughout the document that need addressing. Further, the
City employees have expressed interest in a few changes. The Personnel Committee will be
reviewing these changes and coming back to the Council with a recommendation in the near
future. 0
WINKELMAN PROJECT:
Mr. Schupp has stated they would like to remove the old Eull Concrete building yet this year.
Prior to doing that, we will be bringing forward a TIF Development Agreement for your
approval.
CSAH 19 SOUTH PROJECT:
Wright County is currently doing soil borings and completing final design to bid the CSAH 19
project this winter for spring 2007 construction.
PARK AND RECREATION BUDGET:
Finance Director Lannes reported that the Culture and Recreation is over budget because we did
not budget for the newly created Senior Center Program in 2006. One-fourth of the payments
are still due on the Senior Center and Library for 2006. The Senior Program is budgeted in 2007.
•
34
•
.A\1bcrtvi11c
Small down Uving. Big City Ufa.
•
TO: City Council
FROM: Tina Lannes/Larry Kruse
DATE: October 13, 2006
RE: City Hall Window Coverings
REQUEST FOR COUNCIL ACTION
Staff received quotes for window coverings for the offices and the break room for the new City
Hall. The quotes for the vertical blinds were from Budget Blinds in the amount of $3,775.42 and
Peek -A -Boo Blinds in the amount of $4,862.80. Staff is recommending awarding the quote to
Budget Blinds.
RECOMMENDATION:
Move to accept the vertical blinds quote from Budget Blinds for the new City Hall in the amount
of $3,775.42.
35
PRELIMINARY ENGINEERING REPORT
2006
FLOOD
STORAGE
MITIGATION
J000*%%%00100%%%%
lbi:rtvillc
■
Small Tawn Living. 13iE) City Life.
City Of
Albertville
BMI PROJECT NO. T15.21926
OCTOBER 2006
2006 Flood Mitigation Improvements, City of Albertville
BMI Project No. T15.21926
J
October 11, 2006
'
Mr. Larry Kruse, City Administrator
City of Albertville
5975 Main Avenue NE
Albertville, MN 55301
Re: 2006 Flood Mitigation Project
BMI Project No. T 15.21926
Honorable Mayor and City Council Members:
In accordance with your request, the following Preliminary Engineering Report has been prepared for
flood mitigation improvements as recommended in the 2006 County Ditch No. 9 Flood Study.
The existing flood study model was modified to simulate what effect the proposed improvement
would have on flooding elevations for a 100-year, 24-hour storm. The model shows that the regional
pond will have a significant impact on lowering high water levels for a 100-year storm event. The
results are discussed in more detail in the enclosed report. The total estimated project cost is
$1,088,100.
I will attend the October 16, 2006 Council meeting for the purpose of presenting this report and
responding to any questions or concerns that you may have.
Respectfully submitted:
BOLTON ,AWN/D MENK, INC.
Adam Nafs ad, P.E.
Albertville Assistant City Engineer
AN/11
Enclosure
2006 Flood Mitigation Improvements, City of Albertville
' BMI Project No. T15.21926
CERTIFICATION SHEET
I hereby certify that this plan, specification or report was prepared by me or under my direct
supervision, and that I am a duly Licensed Professional Engineer under the laws of the State of
Minnesota.
Lanol L. Leic
Date: W /%2&o
2006 Flood Mitigation Improvements, City of Albertville
BMI Project No. T15.21926
Lic. No. 20846
TABLE OF CONTENTS
PAGE
TITLE SHEET
CERTIFICATION SHEET
TABLE OF CONTENTS
1.
INTRODUCTION............................................................................................................
5
2.
BACKGROUND.............................................................................................................
5
3.
EXISTING CONDITIONS..............................................................................................
6
4.
PROPOSED IMPROVEMENTS.....................................................................................7
5.
IMPROVEMENT RESULTS.......................................................................................... 8
6.
ESTIMATED COSTS ............... .............................................................. .'........................ 9
7.
UTILITIES/EASEMENTS/PERMITS............................................................................ 9
8.
FEASIBILITY AND RECOMMENDATION...............................................................10
9.
RECOMMENDATIONS FOR FUTURE IMPROVEMENTS
.....................................10
APPENDIX A - FIGURES
APPENDIX B - OPTION AND UTILITY SERVICES AGREEMENT
I
' PRELIMINARY ENGINEERING REPORT
2006 FLOOD STORAGE MITIGATION
CITY OF ALBERTVILLE, MINNESOTA
7
7
7
7
H
1. INTRODUCTION
This report examines the feasibility of mitigating flooding conditions associated with areas in the region
of the Albert Villas subdivision. This project would help reduce damages to residences and
infrastructure from overland flooding during large storm events. The need for this project is to minimize
the economic loss and hardship to the community from repeated damages caused by flooding. An
analysis of the existing conditions is discussed along with recommendations for detention ponding. The
report concludes with estimates of costs for the proposed project and recommendations for future
improvements.
2. BACKGROUND
In the past several years there has been flooding in the Albert Villas development area. In June of 2003
there was an 8.5" rainfall event that caused flooding in this area of Albertville. In the fall of 2005 there
were several smaller rainfall events that caused localized street flooding and several sediment ponds to
encroach onto private property, which resulted in City 'Staff pumping the ponds down to prevent
potential damage to residential property.
On April 17, 2006, Bolton & Menk, Inc. presented a report to the City of Albertville entitled, "2006
County Ditch No. 9 Flood Study". The study was undertaken to look at possible flood mitigation
solutions associated with County Ditch No. 9. That study found that residential homes within the Albert
Villas development would not be protected from flooding caused by a 100-year, 24-hour storm event.
The study recommendation was to provide additional ponding and storage upstream, west of Albert
Villas in St. Michael.
The purpose of this report is to examine the feasibility of constructing detention storage in order to add
additional storage volume upstream of Albert Villas to mitigate flooding from a 100-year, 24-hour storm
event. To be deemed feasible, the project should be: 1) constructible, 2) maintainable, 3) economically
justifiable, and 4) acceptable to the Albertville City Council. This preliminary engineering report
attempts to ensure project success by investigating all avenues that could potentially cause project failure
and satisfy any concerns raised. City staff recommended that a Phase 1 project, in the amount of
approximately $1,000,000.00, be initiated in conjunction with development of the proposed St. Michael -
Albertville School.
2006 Flood Mitigation Improvement, City of Albertville
BMI Project No. T15.21763 Page 5
U
1�
3. EXISTING CONDITIONS
In the 2006 County Ditch No. 9 Flood Study the existing County Ditch No. 9 watershed was modeled to
simulate existing conditions. The stormwater model showed that a 100-year, 24-hour storm event would
cause flooding of homes in the Albert Villas development area. Recommendations were developed to
address the flooding issues, one of which was providing upstream detention flood storage west of Albert
Villas in St. Michael.
In 2003 there were numerous homes that experienced flooding to some degree from an 8.5" storm event.
The majority of these homes are located within the Albert Villas subdivisions.
There is currently no emergency overflow route to protect the residential properties on the west side of
Kahl Avenue from high stormwater flows coming from upstream of the watershed. The existing ditch,
which leads to the 36" culvert beneath Kahl Avenue, overflows into the detention pond in the back of
these lots. The pond then overflows into the rear yards of those homes where water enters into the low
openings of several homes before it overflows onto the street in an eastward direction.
The Flood Study shows that during a 100-year, 24-hour storm event that six (6) homes within the Albert
Villas development would be subject to flooding; i.e., water would enter into the low opening of the
home. Also, ten (10) homes would have a freeboard elevation of less than one foot between the low
' opening and the high water elevation. Freeboard is a term used to describe a factor of safety in feet
above a design flood elevation for flood protection.
The elevation information used in determining the low openings for the affected lots in Albert Villas was
collected from data available at City Hall and field information such as lot certificates, field surveys, as -
built lot surveys and development plans. Actual low opening elevations maybe different from what was
' shown on this information. The most accurate way of determining the actual elevation would be to field
survey each home low opening.
H
0
The Cities of St. Michael and Albertville are currently in the process of building a new elementary
school on land immediately to the west, or upstream, of Albert Villas. In the Spring of 2006, the St.
Michael/Albertville (STMA) School District and the City of Albertville reached an agreement, as part of
the planning process for the school, that a portion of the land where the elementary school is to be
located would be retained for future expansion of a regional detention pond. This land provides an
opportune area for flood volume storage upstream of Albertville, which would help to mitigate flooding
concerns during large storm events.
2006 Flood Mitigation Improvement, City of Albertville
BMI Project No. T15.21763 Page 6
E
4. PROPOSED IMPROVEMENTS
' Each option evaluated in the 2006 County Ditch No. 9 Flood Study dealt with providing upstream flood
storage. There are many variations as to the location and configuration of where the storage could be
1 located, but the most adventitious site to locate storage is in St. Michael, west of the Albert Villas
development. To minimize earthwork volumes and costs, the lower the existing terrain where the
ponding is located, the smaller the amount of material would need to be excavated. The topography in
' this area is ideal for locating ponding to help in the flood mitigation.
With the timing and construction of the STMA Elementary School the prospective exists for a portion of
' this upstream land to be excavated for storage to assist in improving the flooding conditions for
downstream properties.
' The proposed improvements would enlarge the proposed southwest school pond and take advantage of
potential storage in an upstream wetland (see Figure 1). Each aspect of the proposed improvements are
discussed below:
' 1 The school is proposing to construct a detention and south of the proposed school building to
p p P
meet water quantity and quality runoff standards. This pond would be expanded to the east, where
' it would abut a new north/south road extending from the school property to the south. A culvert
would be installed beneath this new road, which would outlet into the existing ditch. This ditch
' leads to an existing 36" reinforced concrete culvert, which flows beneath Kahl Avenue, into the
large wetland in Albert Villas.
' The east roadway on the school property, when extended to the southern property line, would act as
a dike to allow water to rise in the detention pond to an elevation that would otherwise impact
homes along the west side of Kahl Avenue. A berm, extending east to west, would be built along
the southern school property line to prevent water from overflowing out of the pond onto the
farmland abutting the property to the south during a 100-year, 24-hour storm event. This ponding
configuration on the school property will allow for a maximum amount of water to be stored
I
within the basin upstream of Albertville.
2) There is a 10-acre wetland located on a 40-acre parcel to the west of the proposed elementary
' school. A berm and outlet structure are proposed to be constructed in the southeast corner of the
parcel where the wetland outlets into a ditch. The ditch flows to the east along the southern
property line of the elementary school toward Albert Villas. This wetland, which is dominated by
reed canary grass, would be bounced the maximum amount allowed.
Approximately 173,000 cubic yards of material would be excavated for the proposed pond. Surface
twater that flows into the ditch along the southern edge of the property would be directed into the
expanded school pond. The pond would serve as a detention basin to reduce peak flows from the
upstream watershed during large storm events. An outlet structure on the east side of the pond would
tcontrol the rate of discharge that leads to the 36" culvert beneath Kahl Avenue.
' 2006 Flood Mitigation Improvement, City of Albertville
BMI Project No. T15.21763 Page 7
P
5. IMPROVEMENT RESULTS
The improvements, which include the school ponding improvements, were modeled with a 100-year, 24-
hour storm to see the resulting flood elevation reductions. The results indicate that the high water
elevations, when compared with the results from the 2006 County Ditch No. 9 Flood Study, would be
reduced approximately 0.7-ft to 2.4-ft in critical areas of the watershed where homes experienced water
problems in the past. These areas include the pond on the west side of Albert Villas, the large wetland in
Albert Villas and elevations of County Ditch No. 9 both upstream and downstream of County Road 18.
The goal of the proposed improvement was to provide a minimum 1-foot freeboard between the
calculated 100-year, 24-hour storm event and the existing low openings of adjacent structures. This has
been achieved with the exception of one home located along County Ditch 9, south of CSAH 18. This
home has only 0.8-feet of freeboard between the low opening and the calculated high water level. See
Table 1 for a comparison of home low opening elevations versus modeled high water level elevations.
Figures 3, 4 and 5 in Appendix A show the following:
Figure 3 shows the number of homes with less than 1-foot of freeboard and the number of low openings
below the modeled High Water Level (HWL). As -built and lot survey information was used to
determine the low opening elevations.
' Figure 4 shows the number of homes with less than 1-foot of freeboard and the number of low openings
below the modeled High Water Level (HWL). Original development plan information was used to
determine the low opening elevations.
' Figure 5 shows the number of homes with less than 1-foot of freeboard and the number of low openings
below the modeled High Water Level (HWL) with the proposed regional pond. As -built and lot survey
' information was used to determine the low opening elevations.
r
Table 1 — Low Oveninz ComiDarisons to Modeled Hi h Water Levels HWL
# of Homes with less than
Figure*
# of Homes below HWL
1' of Freeboard
Figure 3
As-built/Proposed Low Opening
6
10
versus calculated HWL'
Figure
Development Plan Low Opening
5
34
versus calculated HWLZ
Figure 5
As-built/Proposed Low Opening
0
1
versus HWL with Regional Pond in lace3
*See Figures in Appendix A
2006 Flood Mitigation Improvement, City of Albertville
BMI Project No. T15.21763 Page 8
L
1
I
F
H
I
I
6. ESTIMATED COSTS
Estimated construction costs presented in the following table include a 10 percent contingency factor.
Overhead costs, estimated at 20 percent, include legal, engineering, administrative and financial costs.
The cost estimates are based upon public construction cost information. Since the consultant has no
control over the costs of labor, materials, competitive bidding process, weather conditions, and other
factors affecting the cost of construction, all cost estimates are opinions for general information of the
client and no warranty or guarantee as to the accuracy of construction cost estimates is made. It is
recommended that costs for project financing should be based upon actual, competitive bid prices with
reasonable contingencies. Final costs will be determined by using actual construction costs of the
proposed work.
ESTIMATED PROJECT COSTS
ITEM
QUANTITY
UNIT
UNIT COST
TOTAL
Clearing & Grubbing
1
Lump Sum
2,000
$2,000
Common Excavation
173,000
C.Y.
$4.50
$778,500
Outlet Structures & Miscellaneous
Storm Sewer
1
Lump Sum
$40,000
$40,000
Turf Establishment
4
Acres
$1,000
$4,000
Wetland Mitigation
0.5
Acres
$25,000
$12,500
Subtotal Project Costs
$837,000
Contingencies (10%)
$83,700
Engineering & Administration (20%)
$167,400
Total Project Costs*
$1,088,100
*Total project costs do not include costs for land purchase.
7. UTILITIES/EASEMENTS/PERMITS
No future utilities would be impacted by the proposed detention storage. Construction of a berm around
the downstream portion of the wetland is proposed as part of the improvements. This berm may be
constructed over an existing 8-inch petroleum pipeline. Further coordination with the utility company
would be needed to ensure there would be no conflicts with the pipeline.
2006 Flood Mitigation Improvement, City of Albertville
BMI Project No. T15.21763 Page 9
L
H
fl
I
The proposed improvements for expansion of the school pond would occur on property owned by the
STMA School District within the City of St. Michael. The City of Albertville has an option over the
proposed ponding area. A temporary construction easement from the property owner south of the school
may be needed to divert the east/west ditch into the expanded school pond. Final design plans will help
in determining the extent of any easements that may be required.
A permit would be required from the Minnesota Pollution Control Agency for the pond grading
(National Pollutant Discharge Elimination System permit).
Access to the site for construction purposes would most likely occur from the proposed southerly road
extension that is located on the east side of the school property.
8. FEASIBILITY AND RECOMMENDATION
From an engineering standpoint, improvements to the existing flooding condition in the Albert Villas
area and the County Ditch No. 9 watershed are necessary, and the improvement option described in this
report is feasible. The location of the proposed ponding area would utilize available land that could be
used for detention storage that is currently in an undeveloped condition.
The recommendation is cost-effective in that the value of protected property is similar or greater than the
estimated costs of the improvements. It is recommended that the work be done under one contract with
the proposed high school improvement in order to complete the work in an orderly and efficient manner.
The City and its financial consultant will have to determine the economic feasibility of the proposed
improvements.
9. RECOMMENDATIONS FOR FUTURE IMPROVEMENTS
In order to protect properties from future storm events in excess of the 100-year, 24-hour storm an
' emergency overflow ditch should be constructed that would allow excess flow from the western
watershed to be bypassed around Albert Villas.
It is recommended that the City of Albertville continue to work towards obtaining this emergency
overflow to bypass extreme flows from storms in excess of a 100-year, 24-hour event. Ideally, the
overflow would be constructed such that extreme flows would be diverted around the west side of the
Albert Villas development into County Ditch No. 9. A diversion route through the backyard ponds west
of Kahl Avenue or along the western City limits would be the most cost effective method of providing an
emergency overflow. Figure 2 shows a future diversion route direction.
2006 Flood Mitigation Improvement, City of Albertville
BMI Project No. T15.21763 Page 10
r
i
u
APPENDIX A
FIGURES
C
i
D
O
r
m{
O
0
3
..
N
N)
N
(D
a
f
�
S
�
(D
�,
N (n O
•
a
£
o n
o D
•
o
c0
m
D
=
®
1
01
�
NO
Lo
O
rt N
0)
(J)
W
� O
W
A
N
(D
3
<
m
a
m'I
m
m
O
�
D
O
Z
m�
0r
z
ul '
< K
3
N
r z
r
rt
m
�
O
� D
�
Z �7
m
n O
3
D Z
�
K:
N
z m
J
m
S
�m
c
-<
z
z
03
-S
D �_
K r
m r
D
D�
Z
K
Z
0
O
O
CD
O
O
L
E
N
LIJ Cb
W
LL O
� O
>
i
Q) O
Nry
m m m m m = m = = m m m m
N No
c N
0 >
o ;
o
>
N
c
lily
o�'
c3
d
0;v'u
0 0 2
d
..
Eo
o u
Eua
..+Oy
V �
xn
x�wo
7
LA
Q ,
N
6'7
VON37VN
o�
o
2��2
P�
)Pyo
14N-111,
I0
G
J J
m U
a0
Li ~
0 cn
Z Z
OZ
w d D
00
0
0U-1 m
Z.g
3�
Y
'31
4,
T z
z"
W
wa4
cN
�ty�,
v c ugh
c
ytij
% W Z
KALENDA AVE
F c
JSo
0m
s h
�
2
h
10 837HVN
3AV NVDVN
3 V
7HVN
3AV 7HVN /
ALL
3AV 83S/VN
YS
O n
yYd
m
Ci
� 8
2�
m�
dVd N37H"
oo
L
a
t�
O
o
N �8
KAGAN AVE
Y8
�
a
��
y
C
O
V
N
>
o
0
0
O
N
ID
°°3
o
O L
two
N
E o E
E
EO d
x°a
O
O O
N
>
�
U
U
r—
1J N37HVN
3AV 7HVY
00
0 V)
Z Z
O Z
_ W
w d
a0 o
00 w
UJ
I�I
3AV d35/VN
"s�
o
� n
2�
ms
AVG 837NVN
o
Y
,
E
KAGAN AVE
�€
y
c�
�m
w�
}
�°
D
U
- »
I
#
00
0-
i} -
}
}\\}
0}
00-
cl
Ek
/_!
^fix
�
K
�
§
— 7HVX
e&
§
)
§
�
!§
/
_ _n
=
§
_
§!
•#
/
(
7
7
APPENDIX B
I
OPTION AND UTILITY SERVICES AGREEMENT
l
7
7
1]
DRAFT DATE April 10, 2006
r
C
OPTION AND UTILITY SERVICES
' AGREEMENT BETWEEN CITY OF ALBERTVILLE
AND INDEPENDENT SCHOOL DISTRICT 885
THIS AGREEMENT, entered into this day of , 2006 by
and between the City of Albertville, County of Wright, State of Minnesota referred
' to herein as "Albertville" and Independent School District 885, hereinafter referred
to as "ISD 885";
' WITNESSETH:
WHEREAS, Albertville owns an option to purchase certain real property
' within the City of St. Michael, said option is attached as Exhibit A ("Land Option").
This real property which is subject to the option is proposed to be used to alleviate a
drainage control problem in Albertville, and is described on the attached Exhibit B
' ("Land Option Property");
WHEREAS, ISD 885 provides public education services for students
residing in Albertville and St. Michael;
' WHEREAS, ISD 885 is planning to construct two new educational facilities
(one high school and one elementary school) on real property located within the
boundaries of St. Michael, as described on the attached Exhibit C, hereinafter
' referred to as the "Subject Property";
' WHEREAS, in order for ISD 885 to construct the educational facilities in
accordance with its plans ISD 885 will need to utilize the real property described on
Exhibit B.
NOW, THEREFORE, IT IS HEREBY AND HEREIN MUTUALLY
1 AGREED, in consideration of each parry's promises and considerations herein set
forth, as follows:
' 1. Option Agreement: Albertville hereby assigns its Land Option to ISD 885 for
consideration of $5,000 and the other terms and conditions as set out in this
Agreement. ISD 885 shall exercise the option prior to its expiration and use ISD
' 885 funds to purchase the property described in Exhibit B. In addition, the
parties agree to the following terms:
A. ISD 885 shall grant Albertville a five-year option to obtain a drainage and
utility easement over land within the area described in Exhibit D for the
'
purpose of constructing storm water ponds ("Easement Option'). The
approximate size, location, dimensions, and area of such easement is
shown on Exhibit D, which is attached hereto and incorporated herein by
reference. If Albertville exercises the Easement Option, Albertville will
be solely responsible for maintaining such ponds as are needed by
'
Albertville and are contained within the drainage and utility easement
area. Said maintenance by Albertville shall include all landscaping,
mowing and other similar maintenance of the ground cover of the land
'
around the ponds in the Easement Option acquired by Albertville.
Albertville shall not be responsible for the maintenance or construction of
ponds which retain storm water originating only from the educational
'
facilities under the control of ISD 885.
'
B. ISD 885 shall have the Land Option Property delineated for the presence
of wetlands in accordance with the Wetland Conservation Act and shall
determine the total acreage of such property which is not determined to be
'
wetlands. In the event Albertville exercises the Easement Option,
Albertville shall be entitled to purchase all or part of the easement area
shown on Exhibit D at a per acre price consisting of the purchase price
paid by ISD for the Land Option Property divided by the total amount of
non -wetland acreage existing on such property at the time of purchase by
ISD. Such per acre price shall not apply to wetland acreage which may
be contained within the easement areas purchased by Albertville. Such
easement purchase amounts due from Albertville may be offset against
'
any trunk line fees due to Albertville from ISD 885. In the event the
trunk line fees then due are less than the easement purchase price,
Albertville shall pay the difference between the two to ISD 885. In the
event the trunk line fees then due are greater than the easement purchase
price, ISD 885 shall pay Albertville the difference between the two.
7
H
0
2. Sanitary Sewer and Municipal Water Services: Albertville shall provide
municipal water and sanitary sewer services to the Subject Property in sufficient
amounts as to provide for a maximum capacity of 2,750 students. ISD 885 shall
construct, at ISD 885's sole expense, all utility lines and any lift stations which
may be necessary to serve the Subject Property. In addition, the parties agree to
the following terms:
A. Development of the Subject Property shall be subject to Albertville's
Sanitary Sewer Trunk Line Fees and Municipal Water Trunk Line Fees.
Payment of such fees may be deferred by Albertville until such time as
Albertville decides whether it will exercise the Easement Option, at
which time such Trunk Line Fees will be offset against the purchase
price of the easement as set out in paragraph 1.13. above. The combined
Sanitary Sewer Trunk Line Fee and Municipal Water Trunk Line Fee
applicable to the Subject Property shall be $3,000 per acre. Such fee
shall apply to no more than 115 acres of the Subject Property.
B. Development of the Subject Property shall be subject to Albertville's
Sewer Access Charge ("SAC") and Water Access Charge ("WAC") in
effect at the time of development, except that Albertville shall charge
only one-half of the WAC fee applicable to the construction of the high
school building. Albertville and ISD 885 expect that the City of St.
Michael will collect the other half of the WAC fee (at St. Michael's
WAC rate) related to the high school construction.
3. Ponding/Wetlands: Albertville and ISD 885 agree that if feasible, ponding shall
occur on the Land Option Property in coordination with the construction of the
schools. In addition, the parties agree to the following terms:
A. Albertville may construct a dike to increase the ponding capacity of any
wetlands contained within the Subject Property, provided such action is
permitted under the Wetlands Conservation Act and approved by the City
of St. Michael. In the event that Albertville's actions in modifying the
existing wetlands for ponding purposes or in creating new ponding
increases the amount of wetlands on the Subject Property, Albertville shall
purchase additional easement for said expanded wetlands from ISD 885 at
the per acre purchase price for ponding easement as determined under
paragraph I.B. above.
B. ISD 885 and Albertville agree that engineers hired by both parties in
connection with the terms of this Agreement shall work in a cooperative
manner and shall share all topographic, soil boring and other relevant data
in order to place ponds in the most beneficial location for both parties.
H
Albertville shall reimburse ISD 885 for the cost of any soil borings which
are requested by Albertville and are not needed for ISD 885 purposes.
C. In the event that ISD 885 requires borrow in order to develop the Subject
Property, ISD 885 agrees to utilize borrow material from the pond
easement area described in Exhibit D before using borrow from any other
location, provided the borrow is of an acceptable quality. Albertville
agrees to reimburse ISD 885 for the amount, if any, in excess of what it
otherwise would have cost ISD 885 to move such borrow if it were taken
from another location on the Subject Property.
D. In the event that Albertville approves the storm water ponding project and
there is construction of storm water ponds, ISD 885 and Albertville agree
to work cooperatively and attempt to coordinate the pond construction
with the construction of the high school. The purpose of coordinating said
projects will be to enable Albertville and ISD 885 to bid the excavation
work for both projects in one bid, with Albertville paying the portion of
the bid to cover additional costs associated with the storm water pond.
E. If Albertville constructs the storm water ponds on a timetable which does
not coincide with construction of the high school, ISD 885 agrees to allow
Albertville to spread soil excavated from the storm water ponds over the
Subject Property, provided the spreading of soil is performed pursuant to a
grading plan which has been approved by ISD 885.
F. In the event that Albertville is required to mitigate any wetlands on the
Subject Property for purposes associated with constructing storm water
ponds, ISD 885 agrees to allow Albertville to mitigate such wetland area
within the Subject Property in a location acceptable to ISD 885 and the
local wetland authorities. Albertville further agrees to compensate ISD
885 at the per acre purchase price for ponding easement as determined
under paragraph LB. above for any non -wetland areas on the Subject
Property that are converted to wetland for mitigation purposes described
in this paragraph.
4. Road Construction.
A. ISD 885 agrees to coordinate with the Albertville City Engineer regarding
road construction on the Subject Property and connection with the
Albertville street system.
B. Albertville and ISD 885 anticipate that the City of St. Michael will require
a road extension and water line extension from the eastern -most north-
M
south road planned by ISD 885 on the Land Option Property as shown on
Exhibit D to the south border of the Land Option Property. In the event
St. Michael requires such a road extension and water line extension,
Albertville shall pay for the construction of such road from the south
'
border of the Land Option Property north to the westerly extension of 52nd
Street as extended from Albertville. ISD 885 shall provide the right of
'
way for such road extension and water line extension. ISD 885 and
Albertville shall coordinate the location of such road extension and water
line extension with each other and the City of St. Michael.
' 5. Future Road Reconstruction Assessments. In the event Albertville exercises
the Easement Option, Albertville shall reimburse ISD 885 for all assessments and
' charges imposed by the City of St. Michael for future reconstruction of the Road
Extension, based on the amount of lineal feet of the land used for the Easement
Option abutting the Road Extension.
' 6. Severabili . If an portion, section subsection sentence clauseparagraph or
tY Y P �
phrase of this Contract is for any reason held invalid by a Court of competent
jurisdiction, such decision shall not affect the validity of the remaining portion of
this Contract
7. Title. This Contract shall run with the land and shall be recorded against the title
to the property.
' 8. Integration Clause, Modification by Written Agreement Only. This
Agreement represents the full and complete understanding of the parties and none
' of the parties is relying on any prior agreement or statement(s), whether oral or
written. Modification of this Agreement may occur only if in writing and signed
by a duly authorized agent of all parties.
9. Notification Information. Any notices to the parties herein shall be in writing,
' delivered by hand (to the City Clerk for Albertville) or registered mail addressed
as follows to the following parties:
' City of Albertville
c/o City Clerk
' P.O. Box 9
Albertville, MN 55301
Telephone: (763) 497-3384
Independent School District 885
c/o Superintendent
1
1
1
1
St. Michael -Albertville Senior High School
11343 50th St. NE
Albertville, MN 55301
Telephone: (763) 497-2192
9. Agreement Effect. This Agreement shall be binding upon and extend to the
representatives, heirs, successors and assigns of the parties hereto.
10. Jointly Drafted Agreement. For purposes of interpreting this Agreement, both
parties shall be deemed to have jointly drafted this Agreement.
CITY OF ALBERTVILLE,
By
Don Peterson, Its Mayor
By
Bridget Miller, Its Clerk
INDEPENDENT SCHOOL DISTRICT 885
By
Its: Superintendent
By_
Its:
STATE OF MINNESOTA )
) ss.
COUNTY OF WRIGHT )
2
The foregoing instrument was acknowledged before me this
day of , 2006, by Don Peterson as Mayor of the City of
Albertville, a Minnesota municipal corporation, on behalf of the city and pursuant to
the authority of the City Council.
Notary Public
STATE OF MINNESOTA )
) ss.
COUNTY OF WRIGHT )
The foregoing instrument was acknowledged before me this
day of , 2006, by Bridget Miller, as Clerk of the City of
Albertville, a Minnesota municipal corporation, on behalf of the city and pursuant to
the authority of the City Council.
Notary Public
STATE OF MINNESOTA )
) ss.
COUNTY OF WRIGHT )
The foregoing instrument was acknowledged before me this
day of , 2006, by _ , as_
of Independent School District 885.
STATE OF MINNESOTA )
) ss.
COUNTY OF WRIGHT )
Notary Public
7
0
u
11
The foregoing instrument was acknowledged before me this
day of , 2006, by , as_
of Independent School District 885.
DRAFTED BY:
Couri, MacArthur & Ruppe PLLP
P.O. Box 369
705 Central Avenue East
St. Michael, MN 55376
(763) 497-1930
Notary Public
EXHIBIT A
Option Agreement
EXHIBIT B
Land Subject to Option Agreement
EXHIBIT C
Subject Property
EXHIBIT D
Land within Albertville Easement for Storm Water Ponds
W
CITY OF ,.
FLOODVILLE
STORAGE MITIGATION
FUNDING OPTIONS
This information is intended for use by the City of Albertville to help make decisions
regarding how to fund the Flood Storage Mitigation Project. While there are many
financing scenarios for funding the project, three options are shown below. Each option
assumes that $260,000.00 will be taken from the Storm Water Fund to reduce the overall
project costs.
Project Cost = $1,088,100.00
8 Acres of Land n, $40,000/Ac = $ 320,000.00
Total Cost = o $1,408,100.00
Option #1— Storm Water Fund and City Wide Storm Water Utility Fee Increase
This option raises the existing storm water utility fee, which is charged to residents and
businesses on a semi-monthly basis, to finance the balance of the project. The
commercial accounts have been changed to equivalent number of residential units for
calculation purposes. The actual number of equivalent residential may vary slightly in
the final tabulation.
Construction Costs =
8 Ac Land @ $40,000/Ac =
Total =
Less Storm Sewer Fund
Balance =
$1,088,100.00
$320,000.00
$1,408,100.00
$1,148,100.00
Equivalent # of Single Family Units (SFU) = 2692
20 Year
15 Year
Annual Payment =
$100,096.59
$118,211.55
Annual Cost/SFU =
$37.18
$43.91
Equivalent SFU
Semi Month Billing Fee =
$6.20
$7.32
10 Year
$155,990.00
$57.95
$9.66
Option 42 — Storm Water Fund and Special Assessment to Albert Villas
This option places a special assessment on the residents of Albert Villas to finance the
balance of the project. The total number of existing lots in Albert Villas is 346.
Construction Costs =
8 Ac Land @ $40,000/Ac =
Total =
Less Storm Sewer Fund
Balance =
$1,088,100.00
$320,000.00
$1,408,100.00
($260,000j
$1,148,100.00
Single Family Lots in Albert''illas = 346
20 Year
Annual Payment = $100,096.59
15 Year
$118,211.55
10 Year
$155,990.00
Annual Assessment/Lot = $289.30 $341.65 $450.84
Option #3 — Storm Water Fund General Fund Storm Water Utility Fee Increase and
Special Assessment to Albert Villas
This option uses four funding sources to raise revenue to finance the project. An
amount of $240,000 was taken from the general fund. The total number of existing lots
in Albert Villas is 346, of which a special assessment of $400,000 was applied. The
remainder, $508,100, was applied to the storm water utility fee on a citywide basis. The
storm water utility is considered to have an equivalent of 2,692 Single Family Units
(SFU). It should be noted that variations to this option are numerous.
Construction Costs = $1,088,100.00
8 Ac Land @ $40,000/Ac = $320,000.00
Total — $1,408,100.00
Less Storm Sewer Fund = ($260,000)
Less General Fund = ($2. 0,000)
Balance = $908,100.00
Assessment to Albert Villas = $400,000
Raise Storm Water Utility Fee = $508,100
Single Family Lots in Albert Villas = 346
Albert Villas Assessment of $400,000
20 Year 15 Year 10 Year
Annual Payment = $34,873.82 $41,185.11 $54,347.18
Annual Cost/Lot — $100.79 $119.03 $157.07
Storm Water Utility Fee Increase of $508,100
20 Year 15 Year 10 Year
Annual Payment — $44,298.47 $52,315.38 $69,034.51
Annual Cost/SFU = $16.46 $19.43 $25.64
Semi -Monthly Billing Fee = $2.74 $3.24 $4.27