Loading...
2006-12-04 CC Agenda PacketA�Ibcrtvillc smas TOUM Lk*K,. ft .. ALBERTVILLE CITY COUNCIL AGENDA December 4, 2006 6:00 PM 1. Call Meeting to Order 2. Truth -in -Taxation 3. Adjournment ip Albertville Smcdl T No abu UN. ALBERTVILLE CITY COUNCIL AGENDA DECEMBER 4, 2006 7:00 PM 1. PLEDGE OF ALLEGIANCE 2. CALL TO ORDER — ROLL CALL — ADOPT AGENDA 3. MINUTES A. November 20, 2006 City Council minutes (pgs. 3-7) 4. CITIZEN FORUM — (10 Minute Limit) 5. CONSENT AGENDA A. Approve payment of claims check numbers 023609 to 023657 (pgs. 9-15) B. Approve Resolution No. 2006-58 entitled a Resolution for Re -Establishing Unchanged Precincts and Establishing New Voting Location from the St. Alberts Parish Center to the new City Offices (pg. 17) C. Approve Resolution No. 2006-59 a Resolution Setting Fees for Various Services within the City of Albertville (pgs. 19-26) D. Approve Resolution No. 2006-60 a Resolution Adopting the 2007 Final Budget (pgs. 27-29) E. Approve Resolution No. 2006-63 a Resolution Adopting the 2007 Final Levy (pg. 31) F. Approve Resolution No. 2006-64 a Resolution Setting a Public Hearing on Proposed Assessment for Lachman Avenue NE (set Monday, December 18) (pg. 33) G. Re -schedule Setting a Public Hearing for the Vacation of Utility Easement in the Towne Lakes 6th Addition (set Monday, December 18, 2006) H. Approve Bolton & Menk, Inc. Engineer's recommendation for Payment No. 2 for 52na Street NE Improvement to LaTour Construction, Inc. in the amount of $264,599.61 (pg. 35) 6. ACTION ON PULLED CONSENT ITEMS 7. PUBLIC HEARING A. Approve Resolution No. 2006-65 Order for Vacation of Mackenzie Avenue NE that lies North of 52nd Street NE and South of the Burlington Northern Railroad within the 0 City of Albertville (pg. 37) 8. DEPARTMENT BUSINESS is A. Finance Department 1). Accounts Receivable Update (pgs. 39-40) 2). Project Status Update (pg. 41) B. Planning and Zoning 1). Starbucks' Drive-thru Variance -Conditional Use Permit (pgs. 43-44) a. Approve Resolution No. 2006-61 entitled a Resolution Approving Starbucks Coffee Conditional Use Permit within the City of Albertville 2). Barthel's Industrial Park 2nd Addition (pgs. 45-46) a. Approve Resolution No. 2006-61 entitled a Resolution Approving Barthel's Industrial Park 2nd Addition Preliminary Plat and Final Plat within the City of Albertville 3). Towne Lakes 7th Addition (pgs. 47-56, plus insert) a. Approve Resolution No. 2006-66 entitled a Resolution Approving Towne Lakes 7th Addition Final Plat 4). Approve Ordinance No. 2006-13 entitled an Ordinance Amending Section 100.10 (Fees, Charges and Expenses) of Appendix A of the 2005 Albertville Municipal City Code to Establish Fees, Charges and Expenses by way of a Zoning Ordinance (pgs. 57-58) 0 C. Engineering 1). CSAH 19 Corridor Landscaping (discussion) D. Legal 1). Towne Lakes 7th Addition Developer's Agreement (pg. 59) E. Administration 1). Albert Villas Stormwater Ponding (pg. 61) 2). Written Report (pgs. 63-64) 3). Rental of City Office space (discussion) 9. ADJOURNMENT 0 2 A',1bcrtvi11C ALBERTVILLE CITY COUNCIL November 20, 2006 Albertville City Hall 7:00 PM PRESENT: Mayor Don Peterson, Council members John Vetsch, Ron Klecker, LeRoy Beming, and Tom Fay, City Planner Al Brixius, City Attorney Mike Couri, Assistant City Engineer Adam Nafstad, City Administrator Larry Kruse, and City Clerk Bridget Miller Mayor Peterson called the Albertville City Council meeting to order at 7:00 p.m. followed by the Pledge of Allegiance. ADOPT AGENDA MOTION BY Council member Klecker, seconded by Council member Berning to approve the agenda as amended by adding discussion regarding the pond and drainage issue in Albertville and on file in the office of the City Clerk. Motion carried unanimously. . MINUTES MOTION BY Council member Fay, seconded by Council member Klecker to approve the Monday, November 6, 2006 regular City Council minutes and the Thursday, November 9, 2006 Canvas Results minutes, which are on file in the office of the City Clerk. Motion carried unanimously. CITIZEN FORUM Mayor Peterson asked if there was anyone present that wanted to speak to the Council regarding an issue that was not on the agenda. There were no members of the audience that wished to speak to the Council regarding an issue that was not already on the agenda. No comments were received. CONSENT AGENDA MOTION BY Council member Klecker, seconded by Council member Vetsch to approve the consent agenda pulling item G. Motion carried unanimously. A. Approve payment of claims check numbers (distributed at the meeting) B. Approve Bonestroo Engineer's recommendation for Payment No. 9 for the new City Hall Project to Brietbach in the amount of $167,580 C. Approve issuing a $100 gift certificate -card to employees in 2006 D. Approve application for a One -Day 3.2 Malt Liquor License to Travelers Country Club for the Holiday Wine Tasting to be held by Villeroy & Boch at the Albertville Premium Outlets on December 8, 2006 from 10:00 a.m. to 9:00 p.m. 3 E. Approve Resolution No. 2006-xx entitled a Resolution Establishing the 2007 City Observed Holidays F. Request for Council Action to Authorize the Albertville Fire Department to Donate the Green Ford Fire Truck and Truck Specific Equipment to the Seaforth Fire Department G. 2007 LMC Liability Coverage and Waiver Form ACTION ON PULLED CONSENT ITEMS Item G. 2007 LMC Liability Coverage and Waiver Form City Administrator Kruse reported that he will contact Arlan Middleton to get additional information regarding Section No. 1 — Property — One-story non-combustible building located at 5975 Main Avenue NE, gazebos located within the city owned parks and how the insurance quote varies, Fire Hall Building, and the City Maintenance Facility. MOTION BY Council member Berning, seconded by Council member Fay to approve the 2007 LMC Liability Coverage and Waiver Form. Motion carried unanimously. OTHER BUSINESS APPROVE BONESTROO, ROSENE, ANDERLIK & ASSOCIATES ENGINEER'S CHANGE ORDER NO. 2 FOR CITY HALL Bonestroo, Rosene, Anderlik & Associates Engineer Mark Forbes reviewed Change Order No. 2 with the City Council explaining that the change order provides for cost changes related to the project. 0 Item 3 provides costs to install fire treated plywood per the kitchen consultant. Item 5 was costs to install FRP panel joint covers, which are required by the health department. Item 7 deals with the pocket door located near the Council console. The manufacturer stated the door pocket was not deep enough to handle the accordion door. Item 8 dealt with the hand -rails brought to ADA compliance. Item 9 was to switch the UPS panel to single phase. Item 11 was the cost to install a trench drain for water run-off from the building to provide a safe walkway when it rains or during the spring when there is a potential of water freezing. Item 16 provides the costs to insulate the waste drain line in the break room to meet ADA Code. Item 18 was a cost to install a VAC box in the Computer Room. It was constructed that the heat and air conditioning in the Computer Room would be regulated in conjunction with an adjoining room. LJ E • Item 19 dealt with the cost to install a knee wall under Stairway B to cover the ungrounded terrazzo. Bonestroo recommended installing the knee wall to protect against moisture during routine maintenance. MOTION BY Council member Berning, seconded by Council member Klecker to approve Bonestroo, Rosene, Anderlik & Associates Engineer's Change Order No. 2 for City Hall Construction minus item number 19 of the change order. Motion carried unanimously. DEPARTMENT BUSINESS PLANNING AND ZONING Consider Re -appointing Scott Dorenbush to the Albertville Planning and Zoning Commission City Planner Brixius informed the Council that Scott Dorenbush has submitted his written request to be re -appointed to the Albertville Planning and Zoning Commission. Mr. Dorenbush's term will expire at the end of 2006; therefore leaving a vacancy to be filled. The Planning and Zoning Commission recommends re -appointing Mr. Dorenbush. MOTION BY Council member Klecker, seconded by Council member Fay to approve re- appointing Scott Dorenbush to the Albertville Planning and Zoning Commission for a three-year term. Motion carried unanimously. ENGINEERING Approve Bolton & Menk, Inc. Engineer's recommendation to reduce the Letter of Credit for Shoppes at Towne Lakes Two from $419,000 to $135.000 Assistant City Engineer Nafstad explained to the Council that staff has met with the developer following the November 6, 2006 City Council meeting. The developer has removed the pile of dirt located within the Shoppes at Towne Lakes II Addition and the berm along 70th Street NE, which were a couple of the conditions required in order to reduce the letter of credit. MOTION BY Council member Fay, seconded by Mayor Peterson to approve the Bolton & Menk, Inc. Engineer's recommendation to reduce the Letter of Credit for Towne Lakes 6th Addition from $329,649 to $268,638. Motion carried unanimously. MOTION BY Council member Fay, seconded by Mayor Peterson to approve Bolton & Menk, Inc. Engineer's recommendation to reduce the Letter of Credit for Shoppes at Towne Lakes Two from $419,000 to $135,000. Motion carried unanimously. Albertville Premium Outlets Fence Mayor Peterson inquired about the Albertville Premium Outlets fence. Mayor Peterson stated that the Council approved an alteration to the current fence, but no Permit has been submitted for • the removal of the existing fence. Staff reported that they will contact the manager of the Albertville Premium Outlets regarding the fence concern and report back to Council. 0 Wright County's 2007 CSAH 19 south project review including layout, lighting and center median treatments Assistant City Engineer Nafstad updated the City Council that staff continues to review the CSAH 19 Project. Nafstad gave a brief overview of the progress being made and informed the Council of two potential styles of lighting that could be used for the CSAH 19 corridor. The two styles to select from are an acorn style or a tear drop style. Nafstad went on to discuss the potential of the landscape options to consider for the CSAH 19 corridor. City Administrator Kruse confirmed by stating that Wright County is ready to go out to bid on the CSAH 19 Project in February 2007 with construction to begin in Spring 2007. Mayor Peterson informed staff that he does not care to hear from SRF; however other Council members would like to hear from SRF to discover if there are other options for CSAH 19 Project to be completed in phases. LEGAL Set Monday, December 4.2006_for Vacation of Utilitv Easement in the Towne Lakes 6th Addition • City Attorney Couri stated that a Public Hearing needs to be set to vacate the utility easement in the Towne Lakes 6th Addition. MOTION BY Mayor Peterson, seconded by Council member Vetsch to approve setting Monday, December 4, 2006 for Vacation of Utility Easement in the Towne Lakes 61h Addition. Motion carried unanimously. ADMINISTRATION Otsego Border Road Agreement City Administrator Kruse informed the Council on the status of the Otsego Border Road Agreement. Kruse stated that City Attorney Couri has combined the CSAH 19 North Project, 70th Street NE Project, new MacIver Avenue NE Project, formerly known Maclver Avenue NE Project now known as 63`d Street NE, and CSAH 37 into one document. The draft of this agreement has been shared with the City of Otsego and Wright County. City Administrator Kruse stated that he would like to set up a meeting with the Albertville Council representatives, Otsego Council representatives, and Wright County to address concerns regarding the agreement. Kruse would like to accomplish this before the end of the year. Council member Berning reported that Council member Vetsch and himself met with St. Michael Mayor Zachman and Council member Hagerty discussing the Albert Villas storm water 0 ponding that Albertville is proposing to place on the new STMA School property. This storm iwater ponding will be located within the St. Michael city limits. Berning stated that as they discussed drainage, the subject of Main Street or Main Avenue connection came up in the conversation. The City Council looked to City Attorney Couri for advice inquiring what option the City Council could have should they decide to go forward, and only IF the Council would allow Main Street or Main Avenue to connect to St. Michael. Is there an option or options that could be put in a Comp Plan when and if the time arises to connect Main Street or Main Avenue, could the Council have the option to consider implementation or construction of the street? City Attorney Couri stated that it appears the safest approach would be to put a Comp Plan in place and basically leave it open as to whether the future Council has the option to proceed with the connection of Main Street or Main Avenue or not to proceed with the construction. Mayor Peterson informed the City Council members and staff that he was not in favor of the connection of Main Street or Main Avenue from Albertville to St. Michael. City Administrator Kruse reported that staff will discuss the option whether to proceed or not during the Tuesday, November 21 Consultant staff meeting. Staff will put together a proposal and present it to the Council at a future meeting. r ADJOURNMENT MOTION BY Council member Vetsch, seconded by Council member Klecker to adjourn at 9:07 p.m. Motion carried unanimously. Donald Peterson, Mayor Bridget Miller, City Clerk • 7 • Albcrtvillc Small Touin Wing. Big City Ufa. City of Albertville Check Detail Register December 4, 2006 Check Amt Invoice Comment 10100 Premier Bank Paid Chk# 023609 12/4/2006 ACTION RADIO & COMMUNICATIONS E 101-42000-404 Repair/Maint- $125.00 30763 Total ACTION RADIO & COMMUNICATIONS $125.00 Paid Chk# 023610 12/4/2006 AFLAC G 101-21710 Other Deducations Total AFLAC Paid Chk# 023611 12/4/2006 ALLINA HEALTH SYSTEM E 101-42000-108 Medical Training Total ALLINA HEALTH SYSTEM $16.16 408427 $16.16 Fire Dept Pager Repair AFLAC Insurance Prem $721.25 1110005429 Fire Dept Oct - Dec Medical Di $721.25 Paid Chk# 023612 12/4/2006 ARAMARK UNIFORM SERVICES E 101-43100-417 Uniform Rentals $15.00 629-6102361 Public Works - Uniform Sery E 601-49450-417 Uniform Rentals $10.00 629-6102361 Sewage Dept. - Uniform Sery E 101-45100-417 Uniform Rentals $15.00 629-6102361 Parks Dept - Uniform Sery E 602-49400-417 Uniform Rentals $10.00 629-6102361 Water Dept - Uniform Sery E 101-41940-404 Repair/Maint- $27.69 629-6102362 Mats E 602-49400-417 Uniform Rentals $19.08 629-6107227 Water Dept - Uniform Sery E 601-49450-417 Uniform Rentals $19.08 629-6107227 Sewage Dept. - Uniform Sery E 101-45100-417 Uniform Rentals $28.62 629-6107227 Parks Dept - Uniform Sery E 101-43100-417 Uniform Rentals $28.59 629-6107227 Public Works -Uniform Sery Total ARAMARK UNIFORM SERVICES $173.06 Paid Chk# 023613 12/4/2006 BRAUN INTERTEC CORP E 492-49000-300 Professional Srvs (GENERAL) $743.50 270822 52nd Street Total BRAUN INTERTEC CORP $743.50 Paid Chk# 023614 12/4/2006 CARQUEST E 101-45100-404 Repair/Maint - $39.68 1536-15797 Air Filter (2) E 101-45100-404 Repair/Maint - $8.48 1536-16020 O Ring, Air Tool Oil 32oz E 101-43100-404 Repair/Maint - $8.50 1536-16078 Quart BF (2) E 101-45100-404 Repair/Maint - $35.56 1536-16092 Clamp, HydFluid, N95 Particula E 101-43100-404 Repair/Maint - $37.03 1536-16301 Bucket Truck Mech Fuel pump E 101-45100-404 Repair/Maint - $2.53 1536-16340 Chain lube, brk clnr non- chlo E 101-43100-404 Repair/Maint - $70.76 1563-16305 Bucket Truck Remfg Starter E 101-42000-405 Repair/Maint - Buildings $25.14 C13403 Fire Dept Engine #6 Power Str Total CARQUEST $227.68 Paid Chk# 023615 12/4/2006 COBORN'S E 101-42000-352 General Notices and Pub Info $304.56 12-2006 Fire Dept Open House Total COBORN'S $304.56 • 0 Check Amt Invoice Comment Paid Chk# 023616 12/4/2006 COMMUNITY PARTNERS e E 101-41000-300 Professional Srvs (GENERAL) $657.60 11-06 TIF 12 Schultz & Schupp LLC, F Total COMMUNITY PARTNERS $657.60 Paid Chk# 023617 12/4/2006 CROW RIVER FARM EQUIPMENT E 101-45100-210 Operating Supplies $9.37 121457 HR rod Total CROW RIVER FARM EQUIPMENT $9.37 Paid Chk# 023618 12/4/2006 CROW RIVER NEWS NORTH E 101-41400-300 Professional Srvs (GENERAL) $19.80 10-2006 672816 Public Accuracy Test E 601-49450-300 Professional Srvs (GENERAL) $243.20 10-2006 663676 Utility Operator 2x5 E 602-49400-300 Professional Srvs (GENERAL) $243.20 10-2006 663676 Utility operator 2x5 E 101-41100-351 Legal Notices Publishing $39.36 681457 Mackenzie Ave NOPH Total CROW RIVER NEWS NORTH $545.56 Paid Chk# 023619 12/4/2006 D H B E 101-43100-405 Repair/Maint - Buildings $55.00 31358 Tim Cell Phone Wireless Shop C Total D H B $55.00 Paid Chk# 023620 12/4/2006 DENNIS FEHN GRAVEL & EXCAVATIN E 482-49300-300 Professional Srvs (GENERAL) $9,709.08 19620 Soil Corrections New City Hall E 482-49300-300 Professional Srvs (GENERAL) $894.12 20110 West Lot Repair New City hall E 101-45100-530 Improvements $470.06 20382 TN Granite 3/4" Class 2 Total DENNIS FEHN GRAVEL & EXCAVATIN $11,073.26 Paid Chk# 023621 12/4/2006 DXS TOTAL HOME CARE CENTER E 101-43100-215 Shop Supplies $7.38 finance chg E 101-45100-405 Repair/Maint - Buildings $10.94 16491 Adapter, hex bushing, couple E 101-42000-200 Office Supplies (GENERAL) $69.90 16523/1 Fire Dept Battry Alkln Dura C E 601-49450-210 Operating Supplies $9.04 16699 Rope Yllw Poly 1/4X100 E 602-49400-210 Operating Supplies $18.06 16707 Grease, oil mineral E 101-42000-200 Office Supplies (GENERAL) $6.48 16729/1 Fire Dept Cleaner, Walplat 1G E 601-49450-210 Operating Supplies $15.95 16785 Rule 48" Aluminum, great - mar E 101-42000-405 Repair/Maint - Buildings $8.94 16788 Fire dept furnace filter E 101-45100-210 Operating Supplies $15.47 16788 Nylon rope E 101-41940-404 Repair/Maint - $17.03 16807 fill valve anti siphon E 101-41940-404 Repair/Maint - ($17.03) 16851 Fill Valve Anti Siphon doesn't E 101-43100-215 Shop Supplies $4.30 16853 fasteners, bolts, glove - yllw E 101-43100-215 Shop Supplies $25.52 16872 tape duck pro E 101-45100-405 Repair/Maint - Buildings $31.36 16980 City Park Connect winggrd, sta E 101-45100-405 Repair/Maint Buildings $26.60 16995 8"long nose pliers E 101-43100-405 Repair/Maint - Buildings $2.59 17083 Fasteners bolt, elbow E 601-49450-210 Operating Supplies $32.87 17091 Screwdriver, strap tarp tiedow E 101-43100-215 Shop Supplies $6.17 17182 16" blksmith hammer handle E 101-42000-405 Repair/Maint - Buildings $102.93 17185 Fire Dept Bath Tissue, paper t E 101-45100-210 Operating Supplies $11.70 17185 caulk, joint paste teflon Total DJ'S TOTAL HOME CARE CENTER $406.20 • 10 Check Amt Invoice Comment Paid Chk# 023622 12/4/2006 EMBARQ - TX E 101-41940-321 Telephone $52.12 12-2006 763-497-2215-826 E 101-41940-321 Telephone $42.81 76349702618 763-497-3486 E 101-41940-321 Telephone $74.56 76349702618 Service Taxes & Surcharges E 101-42400-321 Telephone $42.81 76349702618 763-497-3704 E 101-42400-321 Telephone $42.81 76349702618 763-497-3695 E 101-41940-321 Telephone $214.81 76349702618 763-497-0261 E 101-43100-321 Telephone $47.46 76349748367 763-497-3145 E 101-42400-321 Telephone $162.82 76349748367 763-497-5007 E 101-41940-321 Telephone $128.79 76349748367 Partial Month Charges E 101-41940-321 Telephone $104.04 76349748367 Local Taxes and Surcharges E 101-41940-321 Telephone $100.22 76349748367 763-497-4182 E 101-42400-321 Telephone $79.72 76349748367 763-497-7485 E 101-42400-321 Telephone $79.72 76349748367 763-497-7416 E 101-42400-321 Telephone $38.55 76349748367 763-497-7474 E 601-49450-321 Telephone $36.69 76349748367 763-497-0269 E 101-43100-321 Telephone $47.46 76349748367 763-497-0179 E 101-41940-321 Telephone $43.01 76349748367 763-497-4214 E 101-42000-321 Telephone $179.31 76349748367 763-497-4836 E 101-43100-321 Telephone $37.51 76349748367 763-497-0774 E 101-41940-321 Telephone $54.63 76349748367 763-497-0452 Total EMBARQ - TX $1,609.85 Paid Chk# 023623 12/4/2006 EMBARQ-MO E 101-41940-321 Telephone $88.29 830383141 Acct 430815697 Total EMBARQ- MO $88.29 Paid Chk# 023624 12/4/2006 ENGINEERING AMERICA, INC E 601-49450-210 Operating Supplies $1,533.40 7212 302418 4 pk Lamps and Freight Total ENGINEERING AMERICA, INC $1,533.40 Paid Chk# 023625 12/4/2006 FRANKLIN OUTDOOR ADVERTISING E 482-49300-300 Professional Srvs (GENERAL) $1,560.71 4112 Moving Daktronics Antenna & El Total FRANKLIN OUTDOOR ADVERTISING $1,560.71 Paid Chk# 023626 12/4/2006 FRONTLINE PLUS FIRE & RESCUE E 101-42000-584 C/O - Turnout Gear $231.00 9937 Fire Dept Turnout Gear E 101-42000-587 C/O - Tools $4,142.47 9961 Fire Dept Fire Hose Total FRONTLINE PLUS FIRE & RESCUE $4,373.47 Paid Chk# 023627 12/4/2006 FTTH COMMUNICATIONS E 101-43100-321 Telephone $65.92 11-2006 Monthly Service PW Total FTTH COMMUNICATIONS $65.92 Paid Chk# 023628 12/4/2006 GIBSON, AMY E 101-42000-200 Office Supplies (GENERAL) $48.80 12-2006 Fire Dept - Wtor for Rescue Tr Total GIBSON, AMY $48.80 Paid Chk# 023629 12/4/2006 JASPER ENGINEERING & EQUIP CO E 601-49450-404 Repair/Maint - $209.20 134110 labor, travel time, mileage Total JASPER ENGINEERING & EQUIP CO $209.20 • 11 Check Amt Invoice Comment Paid Chk# 023630 12/4/2006 JUST ADD WATER SPRINKLERS INC E 101-42000-405 Repair/Maint - Buildings $10.00 12-2006 Fire Hall Repair Wire Splice/D E 101-45100-405 Repair/Maint Buildings $260.00 12-2006 Ball Field 4 sprinkler heads E 101-45100-405 Repair/Maint - Buildings $175.00 12-2006 Ball Fields 2005 Winterization E 101-45100-405 Repair/Maint - Buildings $175.00 12-2006 Ball Fields Winterizations 20 E 101-45100-405 Repair/Maint - Buildings $150.00 12-2006 Ball Field 15 Stics PVC E 101-45100-405 Repair/Maint - Buildings $125.00 12-2006 Ball Field 1 1/2 trencher E 101-45100-405 Repair/Maint - Buildings $110.00 12-2006 Ball Field - 2 hours labor E 101-42000-405 Repair/Maint - Buildings $75.00 12-2006 Fire Hall Repair Service Call E 101-43100-405 Repair/Maint - Buildings $50.00 12-2006 City Garage Winterizations 200 E 101-43100-405 Repair/Maint - Buildings $50.00 12-2006 City Garage 2005 Winterization E 101-45100-405 Repair/Maint - Buildings $440.00 12-2006 Ball Field 8 hours labor E 101-45100-405 Repair/Maint - Buildings $15.00 12-2006 5 1/1/2 T's E 101-42000-405 Repair/Maint - Buildings $75.00 12-2006 Fire Hall 2005 Winterization E 101-45100-405 Repair/Maint - Buildings $6.00 12-2006 Ball Fields 3 Reducing Bushin E 101-45100-405 Repair/Maint - Buildings $5.00 12-2006 Ball Field -Wire splice/Dby's E 101-45100-405 Repair/Maint - Buildings $4.00 12-2006 Ball Field Primer/Glue E 101-45100-405 Repair/Maint - Buildings $4.00 12-2006 2 1 1/2" 90's E 101-45100-405 Repair/Maint - Buildings $4.00 12-2006 1 2"T E 101-45100-405 Repair/Maint - Buildings $3.00 12-2006 Ball Fields 3 1 1/2 Couplers E 101-45100-405 Repair/Maint - Buildings $2.00 12-2006 Ball Field teflon tape E 101-45100-405 Repair/Maint - Buildings $105.00 12-2006 Ball Field 3 Swing Joints E 101-42000-405 Repair/Maint - Buildings $75.00 12-2006 Fire Hall Winterizations 2006 E 101-45100-405 Repair/Maint - Buildings $25.00 12-2006 Ball Fields Wire Locate & Repa Total JUST ADD WATER SPRINKLERS INC $1,943.00 Paid Chk# 023631 12/4/2006 LATOUR CONSTRUCTION, INC. E 492-49000-300 Professional Srvs (GENERAL) $264,599.61 11-2006 Completed work to date 52nd St Total LATOUR CONSTRUCTION, INC. $264,599.61 Paid Chk# 023632 12/4/2006 LEAGUE OF MINNESOTA CITIES E 101-41100-433 Dues and Subscriptions $4,474.00 12-06 Annual dues E 101-41300-361 General Liability Ins $782.86 23645 1% Prop Liab Ins E 101-45100-361 General Liability Ins $782.86 23645 1% Prop Liab Ins E 101-41940-361 General Liability Ins $2,348.58 23645 3% Prop Liab Ins E 101-41100-361 General Liability Ins $4,697.16 23645 6% Prop Liab Ins E 101-42000-361 General Liability Ins $5,480.02 23645 7% Prop Liab Ins E 101-45100-361 General Liability Ins $5,480.02 23645 7% Prop Liab Ins E 602-49400-361 General Liability Ins $782.86 23645 1 % Prop Liab Ins E 101-41940-361 General Liability Ins $50,103.04 23645 64% Prop Liab Ins E 601-49450-361 General Liability Ins $1,565.72 23645 2% Prop Liab Ins E 101-41400-361 General Liability Ins $6,262.88 23645 8% Prop Liab Ins Total LEAGUE OF MINNESOTA CITIES $82,760.00 Paid Chk# 023633 12/4/2006 MAINSTREET DESIGNS, INC. E 101-45000-598 Pledges & Contributions $298.58 11754 Christmas Decorations C-7 Clea Total MAINSTREET DESIGNS, INC. $298.58 Paid Chk# 023634 12/4/2006 MARTENS ELECTRIC CO. E 601-49450-590 C/O - Alternative Electric Sou $16,775.00 2600 Relocation of Generator from e Total MARTENS ELECTRIC CO. $16,775.00 12 Check Amt Invoice Comment • Paid Chk# 023635 12/4/2006 MII LIFE E 101-43100-130 Employer Paid Ins $49.17 60902 Emp STDis E 602-49400-130 Employer Paid Ins $17.99 60902 Emp STDis E 602-49400-130 Employer Paid Ins $3.90 60902 Emp Life E 101-41500-131 Employer Paid Health $2.40 60902 Emp Life E 601-49450-130 Employer Paid Ins $26.05 60902 Emp STDis E 601-49450-130 Employer Paid Ins $5.40 60902 Emp Life E 101-41300-131 Employer Paid Health $54.29 60902 Emp STDis E 101-41500-131 Employer Paid Health $30.97 60902 Emp STDis E 101-41400-131 Employer Paid Health $21.10 60902 EMP STDis E 101-45100-130 Employer Paid Ins $19.55 60902 Emp STDis E 101-42400-130 Employer Paid Ins $18.90 60902 Emp Life E 101-41300-131 Employer Paid Health $14.10 60902 Emp Life E 101-43100-130 Employer Paid Ins $9.00 60902 Emp Life G 101-21710 Other Deducations $7.50 60902 Emp Life Ins Emp Port E 101-45100-130 Employer Paid Ins $5.40 60902 Emp Life E 101-41400-131 Employer Paid Health $4.80 60902 Emp Life E 101-42400-130 Employer Paid Ins $63.40 60902 Emp STDis Total MII LIFE $353.92 • Paid Chk# 023636 12/4/2006 MINNESOTA COPY SYSTEMS E 101-41400-413 Office Equipment Rental $113.63 152632 Total MINNESOTA COPY SYSTEMS $113.63 Paid Chk# 023637 12/4/2006 MONTICELLO ANIMAL CONTROL E 101-42700-309 Animal Control Contract $44.00 647 Total MONTICELLO ANIMAL CONTROL $44.00 Paid Chk# 023638 12/4/2006 MTR SERVICES INC E 101-41000-300 Professional Srvs (GENERAL) Total MTR SERVICES INC Paid Chk# 023639 12/4/2006 NEXTEL COMMUNICATIONS E 101-43100-323 Nextel Radio Units E 101-41300-321 Telephone E 601-49450-323 Nextel Radio Units E 101-45100-323 Nextel Radio Units E 101-42000-321 Telephone E 101-42400-323 Nextel Radio Units E 101-43100-323 Nextel Radio Units E 101-42400-323 Nextel Radio Units E 101-41400-323 Nextel Radio Units E 602-49400-323 Nextel Radio Units E 101-45100-323 Nextel Radio Units E 101-41400-323 Nextel Radio Units Total NEXTEL COMMUNICATIONS $325.00 4000 $325.00 Old Copier Final Meter Read animal pick ups Weeds 4935 kassel, 4937 Kama, $31.60 718183318-0 Nextel Phones $58.26 718183318-0 Nextel Phones $32.17 718183318-0 Nextel Phones $31.74 718183318-0 Nextel Phones $31.60 718183318-0 Nextel Phones $31.60 718183318-0 Nextel Phones $31.60 718183318-0 Nextel Phones $31.60 718183318-0 Nextel Phones $31.60 718183318-0 Nextel Phones $31.60 718183318-0 Nextel Phones $31.60 718183318-0 Nextel Phones $31.60 718183318-0 Nextel Phones $406.57 Paid Chk# 023640 12/4/2006 NFPA E 101-42000-433 Dues and Subscriptions $150.00 3662642X Fire Dept membership dues Total NFPA $150.00 Paid Chk# 023641 12/4/2006 NORTHERN TOOL & EQUIPMENT E 101-43100-404 Repair/Maint - $15.95 193187789 Purchase Rogers John Total NORTHERN TOOL & EQUIPMENT $15.95 13 Check Amt Invoice Comment Paid Chk# 023642 12/4/2006 OMANN BROTHERS E 482-49300-300 Professional Srvs (GENERAL) $86.27 9034 South Side New City Hall Parki Total OMANN BROTHERS $86.27 Paid Chk# 023643 12/4/2006 OXYGEN SERVICE COMPANY E 101-43100-215 Shop Supplies $30.85 7131474 Oxygen cylinder Total OXYGEN SERVICE COMPANY $30.85 Paid Chk# 023644 12/4/2006 PAT'S 66 E 101-42000-212 Motor Fuels $68.21 16164 Fire Dept Ladder #7 E 101-42000-212 Motor Fuels $39.00 16184 Fire Dept E 101-42000-212 Motor Fuels $39.22 16507 Fire Dept E 101-42000-212 Motor Fuels $4.01 2679 Fire Dept Total PAT'S 66 $150.44 Paid Chk# 023645 12/4/2006 RAPIT PRINTING E 101-41400-200 Office Supplies (GENERAL) $148.93 1831 Grand Opening Note Pads Total RAPIT PRINTING $148.93 Paid Chk# 023646 12/4/2006 RED'S PORTABLE TOILETS E 101-45100-415 Other Equipment Rentals $646.99 10646 Reg Unit Total RED'S PORTABLE TOILETS $646.99 Paid Chk# 023647 12/4/2006 REED BED SYSTEMS, INC E 491-49000-300 Professional Srvs (GENERAL) $2,560.00 616/06 WWTF Exp Albertville Reed Beds Total REED BED SYSTEMS, INC $2,560.00 Paid Chk# 023648 12/4/2006 SENTRY SYSTEMS, INC. E 101-45100-405 Repair/Maint - Buildings $30.96 514924 5801 Lander Avenue NE Monitori E 101-43100-405 Repair/Maint -Buildings $29.23 514924 6461 63rd Street Ne Monitoring E 101-42000-405 Repair/Maint -Buildings $32.59 514924 Fire Dept & test Total SENTRY SYSTEMS, INC. $92.78 Paid Chk# 023649 12/4/2006 SIMPLEXGRINNELL E 101-41940-405 Repair/Maint -Buildings $429.20 71227732 Fire Monitoring E 101-41940-405 Repair/Maint -Buildings $402.57 71227741 Security Monitoring Total SIMPLEXGRINNELL $831.77 Paid Chk# 023650 12/4/2006 SURPLUS SERVICES R 101-00000-34950 Other Revenues $10.00 6610 84 Misc - 100 3 each, 1 each R 101-00000-34950 Other Revenues $10.00 6615 84-Misc-100 4 each, 2 each Total SURPLUS SERVICES $20.00 Paid Chk# 023651 12/4/2006 TINKLENBERG GROUP E 468-49000-300 Professional Srvs (GENERAL) $4,500.00 1312 October 2006 2.5 TTG Consultin Total TINKLENBERG GROUP $4,500.00 11 14 Check Amt Invoice Comment • Paid Chk# 023652 12/4/2006 TRYCO LEASING INC E 101-41400-413 Office Equipment Rental $1,383.76 2943 Copier Leases 2 months Total TRYCO LEASING INC $1,383.76 Paid Chk# 023653 12/4/2006 VANCE BROS INC. E 101-43100-401 Repair/Maint - Unpaved $310.45 10314 UPM Patch Mix,broom poly 6" ha Total VANCE BROS INC. $310.45 Paid Chk# 023654 12/4/2006 VEOLIA ENVIRONMENTAL SERVICES E 482-49300-300 Professional Srvs (GENERAL) $4,286.09 11058 Soil Correction New City Hall Total VEOLIA ENVIRONMENTAL SERVICES $4,286.09 Paid Chk# 023655 12/4/2006 VERNON COMPANY E 101-41100-399 Miscellaneous $245.15 1396594 RI Mood Pencil Grand Opening E 101-41100-399 Miscellaneous $643.87 1400263 RI Grand Opening Lapel Pins 503, Total VERNON COMPANY $889.02 Paid Chk# 023656 12/4/2006 WRIGHT-HENNEPIN COOPERATIVE E 601-49450-381 Electric Utilities $45.78 35016871949 Electric lift stations E 101-45100-381 Electric Utilities $151.42 35016871949 Electric Parks E101-41940-381 Electric Utilities $271.80 35016871949 Electric streets Total WRIGHT-HENNEPIN COOPERATIVE $469.00 Paid Chk# 023657 12/4/2006 XCEL ENERGY E 601-49450-381 Electric Utilities $3,490.81 12-2006 6451 Maciver Avenue NE E 601-49450-381 Electric Utilities $220.93 12-2006 11200 60th Street NE E 601-49450-381 Electric Utilities $59.31 12-2006 11942 52nd Street NE E 601-49450-381 Electric Utilities $39.79 12-2006 5900 County Road 18 unit sewer E 601-49450-381 Electric Utilities $30.12 12-2006 4940 Kaiser Ave Unit Sewer E 101-45100-381 Electric Utilities $13.41 12-2006 5801 Main Avenue NE E 101-41940-381 Electric Utilities $244.13 12-2006 5975 Main Avenue NE E 101-43160-381 Electric Utilities $28.85 12-2006 11060 61 Street Unit Signal E 101-45100-381 Electric Utilities $42.60 12-2006 11401 58th Street NE E 101-41940-381 Electric Utilities $50.34 12-2006 6002 Main Avenue NE E 101-42400-381 Electric Utilities $63.89 12-2006 5964 Main Avenue NE E 101-41940-381 Electric Utilities $87.10 12-2006 Auto Protective Light, facili E 101-42000-381 Electric Utilities $417.84 12-2006 11350 57th Street NE E 101-43100-381 Electric Utilities $326.97 12-2006 6461 Maciver Avenue NE E 101-45100-381 Electric Utilities $7.86 12-2006 11474 58th Street NE Total XCEL ENERGY $5,123.95 10100 Premier Bank $413,863.40 Fund Summary 10100 Premier Bank 101 GENERAL FUND $99,396.82 468 CSAH 19 RAMPS/I 94 Project $4,500.00 482 CITY HALL 2004-5 $16,536.27 491 WWTF Phase 2 $2,560.00 492 52nd st Industrial Park $265,343.11 601 SEWER FUND $24,400.51 602 WATER FUND $1,126.69 $413,863.40 • 15 City of Albertville WRIGHT COUNTY RESOLUTION NO.2006-58 RESOLUTION FOR RE-ESTABLISHING UNCHANGED PRECINCTS AND ESTABLISHING NEW VOTING LOCATION Be it resolved, by the Albertville City Council, (1) WHEREAS, the boundaries of the Precinct 0005, which consists of the territory of the City of Albertville, remain unchanged following state legislative redistricting, the Albertville City Council hereby reestablishes this precinct with those boundaries as required by Minnesota Statutes 204B.14, subdivision3C. (2) WHEREAS, the polling place for Precinct 0005 changes to Albertville City Hall, 5959 Main Avenue NE, the Albertville City Council hereby establishes this location as the designated polling place for this precinct in accordance with Minnesota Statutes 204B.16. Approved by the City Council of the City Albertville this 4th day of December, 2006. Donald Peterson, Mayor Bridget Miller, City Clerk • 17 Is CITY OF ALBERTVILLE COUNTY OF WRIGHT STATE OF MINNESOTA RESOLUTION NO.2006-59 RESOLUTION SETTING FEES FOR VARIOUS SERVICES WITHIN THE CITY OF ALBERTVILLE WHEREAS, the Albertville City Council sets the following fees by resolution, effective upon the date of passage of this resolution: Exhibit A - attached — 2007 Fee Schedule Adopted by the City Council of the City of Albertville this 4th day of December 2006. Donald Peterson, Mayor Bridget Miller, City Clerk 19 Exhibit A — 2007 Fee Schedule Title Chapter Section Subject Proposed Fee 3 1 3.13.1. Dog License (altered) $10.00 per dog, per year, (pay up to 2-yrs.) plus sales tax 3 1 3.13.1. Dog License (un-altered) $15.00 per dog, per year, (pay up to 2-yrs.) plus sales tax 3 1 3.13.1. Dog License Replacement $5.00, plus sales tax 3 1 3.13.1. Dog Kennel Permit $50.00 per household, per year, plus sales tax 3 1 3.13.1. Garbage Hauler License $150.00 per year 4 2 3 Coin -Operated Amusement Device $15.00 annually (per State License (per location) Statute) 4 2 3 Coin -Operated Amusement Device $15.00 annually (per State License (per device) Statute) 4 3 1 Bingo License $25.00 annually 4 5 7 Massage Enterprise License & $300.00 Investigation 4 5 7 Message Therapist Individual $50.00 annually License 10 4 10 Rental Unit License and Inspection $150.00 per bldg. + $50.00 fee — Apartment complex per unit, annually 10 4 10 Rental Unit License and Inspection $100.00 annually fee — Single Family detached 10 4 10 Rental Unit License and Inspection $50.00 per bldg, plus fee — Single Family attached $50.00 per unit • • • 20 • Title Chapter Section Subject Proposed Fee $150.00, plus sales tax 3 1 3.13.1. Central Park Rental Shelter only Albertville Res. $200, plus sales tax Non - Res. $150.00, plus sales tax 3 1 3.B.1. Central Park Rental Shelter deposit Albertville Res. $200.00, plus sales tax Non -Res. 3 1 3.13.2. Central Park Rental scoreboard $7.00, plus sales tax per game 3 1 33.2. Central Park — Softball Leagues $75.00 per team, plus sales tax & proof of liability dis. $75.00 per field, per day, 3 1 3.13.2. Central Park — Tournaments plus sales tax & proof of liability dis. 3 1 3.13.2. Central Park Ballfield lights $15.00 per game, plus sales tax 3 1 3.13.2. Central Park Ballfield Rental $100.00 deposit 3 1 33.2. Central Park Ballfield Fine (if no Administrative Fine damage deposit) $200.00 3 1 3.13.2. Central Park Ballfield Lights left $100.00 per occurrence on fine 1 5 2.C. Special meeting fee $150.00 3 1 2 Returned check fee $20.00 plus bank fees 3 1 3.13.3. Special Assessment Deferment Federal Poverty Level Income level 3 1 3.13.3. Recycle bin $10.00, plus sales tax 3 1 33.3. Special Assessment Search $20.00 per property 3 1 3.13.3. PID and or Legal Description $10.00 per property t'-mali'%dt. Of L',lil, l iO3x4 t i :ifl. 21 Title Chapter Section Subject Proposed Fee 3 1 3.B.2. City Hall Rental — Council Chamber and Multi Purpose Room $ to be determined, plus sales tax 3 1 3.B.2. City Hall Rental — Council Chamber 1 $ to be determined, plus sales tax 3 1 3.B.2. City Hall Rental — Multi Purpose Room (Council Chamber 2) $ to be determined, plus sales tax 3 1 3.B.2. City Hall Rental — Multi Purpose Room plus kitchen facility $ to be determined, plus sales tax 3 1 3.B.2. City Hall Rental — Kitchen facility only $ to be determined, plus sales tax 3 1 3.B.2. City Hall Rental — East Conference Room $ to be determined, plus sales tax 3 1 3.B.2. City Hall Rental — West Conference Room $ to be determined, plus sales tax 3 1 3.B.2. City Hall Rental — Upper level $ to be determined, plus sales tax 3 1 3.13.3. Copies (8 t/2" x 11 ") $0.25, plus sales tax 3 1 3.B.3. Lot Survey Copy (I I" x 17") $1.00 per copy, plus sales tax 3 1 3.13.3. Color Copies $0.30 per copy, plus sales tax 3 1 3.13.3. Faxes $3.00 1st page, $0.25 ea. additional page 3 1 3.B.3. Comprehensive Plan $100.00, plus sales tax 3 1 3.13.3. Comprehensive Park Plan $75.00, plus sales tax 3 1 3.13.3. 2005 Albertville Municipal City Code Book $300.00, plus sales tax 3 1 3.B.3. Standard Detail Plates $25.00, plus sales tax 3 1 3.B.3. Maps — 2' x 3' wall, black & white $2.00, plus sales tax 3 1 3.B.3. Maps — 2' x 3' wall color $5.00, plus sales tax 3 1 3.13.3. Maps —11" x 17" street, blk & wht $2.00, plus sales tax 3 1 3.B.3. Maps — 11" x 17" street, color $5.00, plus sales tax • 22 • • Title Chapter Section Subject Proposed Fee 3 1 3.13.3. Maps — I I" x 17" zoning, color $5.00, plus sales tax 3 1 3.13.3. Maps — I I" x 17" sub -division $5.00, plus sales tax 3 1 3.13.3. Water Disconnect $35.00 3 1 3.13.3. Water Re -connect $35.00 3 1 3.13.3. Dog Impoundment & redemption fee (in addition, all impoundment, transport and boarding fees incurred by the City must be paid) 1 St Impoundment $50.00, plus Boarding fees 2nd impoundment $100.00, plus Boarding fees Subsequent impoundments $200.00, plus Boarding fees 3 5 1 & 2 False Alarms — 1 St and 2nd Free of charge 3 5 1 & 2 False Alarms — 3rd $300.00 3 5 1 & 2 False Alarms — 4th $400.00 3 5 1 & 2 False Alarms — 5th $500.00 3 5 1 & 2 False Alarms — 6th $600.00 3 5 1 & 2 False Alarms — 7th $700.00 3 5 1 & 2 False Alarms — 8th $800.00 3 5 1 & 2 False Alarms — 91h $900.00 3 5 1 & 2 False Alarms — IOth $1,000.00 etc. 3 1 3.13.3. Real Estate Annual Fee (include Parade of Homes) $50.00 per year i'emainder cif this page lift blank 23 Title Chapter Section Subject Proposed Fee 3 1 3.13.3. Vendor Transient Permit $10.00 per day, plus sales tax 3 1 3.B.3 Vendor Seasonal Permit $10.00 per day, plus sales tax 3 1 3.B.3. Peddler, Transient, Merchant $5000 per day, per indivi ndividual $100.00 minimum, 3 1 3.13.3. Weed Elimination equipment cost plus man hours $100.00 minimum, 3 1 3.13.3. Mowing equipment cost plus man hours $100.00 minimum, 3 1 3.13.3. Snow plowing equipment cost plus man hours 3 1 3.13.3. Zoning Request (lot size, permitted $25.00 per property use, etc.) 3 1 3.13.3. Temporary Outdoor Seasonal Sales $50.00, plus sales tax (90 days max) 4 6 9 Cable System Franchise $500.00, plus City expenses Application Fee Open Burning Nuisance Abatement $200.00 fee 9 2 5 Water meter test $50.00 plus sales tax, non- residential Sewer tap fee $250.00 9 4 6 Private Sewage Disposal System $100.00 Permit 9 4 g Private Sewage Disposal System $100.00 Inspection 3 1 3.13.3. Temporary Sign Permit $25.00 (under review) Business sign permit fee Per building permit fee schedule Advertising Device (Billboard) Per building permit fee permit fee schedule • • 24 • C Title Chapter Section Subject Proposed Fee 10 5 5.C.2.c. Advertising Device (billboard) $75.00 per billboard License - Renewal Water Rates (bi-monthly) 9 2 10 Joint Powers portion Safe Water Test fee $1.06 $6.50 Base Supply Fee $2.11 per 1,000 gal. 0-6,667 gallons $2.17 per 1,000 gal. over 6,667 6,668-13,335 gallons $2.24 per 1,000 gal. over 13,335 13,336-23,335 gallons $2.29 per 1,000 gal. over 23,335 23,336-33,335 gallons $234 per 1,000 gal over 33,335 Over 33,336 gallons 9 2 10 City of Albertville portion hold off on rate change until after study has been completed 0-6,667 gallons $4.43 minimum bill 6,668-13,335 gallons $0.69 per 1,000 gal. over 6,667 13,336-23,335 gallons $0.74 per 1,000 gal. over 13,335 Over 23,336 $0.79 per 1,000 gal. over 23,335 9 3.A. 8 Sewer Rates (bi-monthly) hold off on rate change until after study has been completed 0-10,000 gallons $30.62 minimum bill Over 10,000 gallons $3.44 per 1,000 gal. over 10,000 Storm water Rates (bi-monthly Consider plan for rate increase Storm Water 1 Residential $4.00 flat fee Storm Water 2 Residential $5.56 flat fee Storm Water 3 Residential $10.00 flat fee Non-residential impervious 0-5% $6.29 per acre Non-residential impervious 6-35% $11.85 per acre Non-residential impervious 36-65% $16.66 per acre Non-residential impervious 66-100% $29.98 per acre Building maintenance and $250.00 plus City expenses occupancy appeal fee Swimming pool permit fee Per building permit fee schedule Business lists (mailing list) DO NOT PROVIDE 25 Title Chapter Section Subject Proposed Fee Resident lists (mailing list) DO NOT PROVIDE Builders -Contractors lists DO NOT PROVIDE (mailing list) Minutes/Agendas Mailed $7.00 plus tax Electronic $5.00 plus tax Faxed $5.00 plus tax Picked up $3.00 plus tax Council/Planning Packets Mailed $25.00 plus tax Electronic $20.00 plus tax Picked up $20.00 plus tax Permit/Records — Duplicate $50.00 per hour Parking Fund $4,500.00 per stall Zoning Request (Lot size, permitted $25.00 per property use, etc) • IW CITY OF ALBERTVILLE COUNTY OF WRIGHT STATE OF MINNESOTA RESOLUTION NO.2006-60 A RESOLUTION ADOPTING THE 2007 FINAL BUDGET WHEREAS, the City Council of the City of Albertville has adopted a proposed budget; and WHEREAS, the Albertville City Council has adopted a final tax levy to be placed upon the taxable property in the City of Albertville; and WHEREAS, the Albertville City Council desires to reserve within the General Fund those monies designated as capital outlays within various budget classifications, such that those monies can be disbursed only for those capital outlays so specified within the budget. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ALBERTVILLE, MINNESOTA: 1. The attached budget is hereby adopted as the final budget for the City of Albertville for the period January 1, 2007, through December 31, 2007. 2. All monies designated within the budget, as capital outlays shall be reserved within the Capital Reserves Fund, such that those monies can be disbursed only for those capital outlays so specified within the budget. 3. The Albertville City Council has hereby complied with Minnesota Statutes. 4. The Finance Director is hereby authorized to transmit certification of compliance with Minnesota Statutes to the Commissioner of Revenue as required. Adopted by the Albertville City Council this 4th day of December, 2006. Don Peterson, Mayor Bridget Miller, City Clerk • 27 Genera 31010 32100 32110 32120 32150 32210 32240 33405 33406 33422 33620 34101 34001 34050 34103 34105 34106 34107 34302 34780 34950 35000 36210 A,lbertville Small Town Living. Big City Ufa. 2007 BUDGET SUMMARY COMPARISON (preliminary) GENERALFUND 2007 Proposed % I Fund Revenue: 2006 Budget Budget Difference Inc/Dec Current Ad Valorem Taxes 1,735,899 2,009,558 $273,659 15.8% Business Licenses & Permits 27,000 28,000 $1,000 3.7% Liquor Licenses 20,000 22,000 $2,000 10.0% 3.2 Liquor Licenses 440 200 -$240 -54.5% Sign Permits 4,000 3,094 -$906 -22.7% Building Permits 500,000 420,000 -$80,000 -16.0% Animal Licenses 500 700 $200 40.0% Police Aid 14,000 17,000 $3,000 21.4% Fire Aid 50,000 55,000 $5,000 10.0% Other State Aid Grants 150 500 $350 County Grants & Aids 10,000 10,000 $0 0.0% Charges for Services 8,000 8,000 $0 0.0% Lease Payments - City Property 5,000 27,700 $22,700 454.0% Administration fees 245,428 276,351 $30,923 12.6% Developer Fees 3% 150,000 125,000 -$25,000 -16.7% Zoning & Subdivision Fees 15,000 15,000 $0 Plan Check Fee 74,000 $100,000 100.0% Sale of Maps 300 300 $0 PID/Le al Description Requests 1,500 1,500 $0 0.0% Title Searches 1,500 1,500 $0 0.0% Fire Protection Contract Charges 60,500 84,944 $24,444 40.4% Park Rental Fees 2,000 2,000 $0 0.0% Other Revenues 10,000 10,000 $0 Fines & Forfeits 100 200 $100 100.0% Interest Earnings 75,000 75,000 $0 0.0% Reserves 21,545 25,000 $3,455 Total Revenues 2,957,862 3,292,547 360,685 11.3% • • 28 P-j is 2007 BUDGET SUMMARY COMPARISON (preliminary) GENERALFUND General Fund Department 2007 Proposed % Expenditures 2006 Budget Budget Difference Inc/Dec 41100 Council 38,625 39,494 $869 2.3% 41300 Administrator 119,176 124,327 $5,151 4.3% 41400 City Clerk 128,327 137,177 $8,851 6.9% 41440 Elections 5,000 6,000 $1,000 20.0% 41500 Finance 90,250 92,542 $2,293 2.5% 41550 City Assessor 35,000 35,000 $0 0.0% 41600 City Attorney 31,500 32,760 $1,260 4.0% 41700 City Engineer 41,200 42,500 $1,300 3.2% 41800 Economic Development 10,500 9,700 -$800 -7.6% 41910 Planning & Zoning 34,084 34,084 $0 0.0% 41940 City Hall 198,304 259,591 $61,287 30.9% 42000 Fire Department 348,127 404,192 $56,065 16.1% 42110 Police 440,000 453,200 $13,200 3.0% 42400 Building Inspection 444,940 485,390 $40,450 9.1% 42700 Animal Control 3,500 3,500 $0 0.0% 43100 Public Works - Streets 395,271 464,101 $68,830 17.4% 43160 Street Lighting 48,000 55,000 $7,000 14.6% 43200 Recycling 40,000 45,000 $5,000 12.5% 45000 Culture & Recreation 24,250 35,250 $11,000 45.4% 45100 Parks & Recreation 181,809 196,239 $14,431 7.9% 1-94 100,000 100,000 $0 0.0% 49300 Capital Reserves 200,000 237,500 $37,500 18.8% Total Expenditures 2,957,862 3,292,547 334,686 11.3% Levy 2006 2007 General Fund & EDA 1,735,899 2,009,558 Total Tax Levy 1,735,899 2,009,558 273,659 Bonds 96 11,200 11,200 Bonds 99 42,170 41,003 Bonds 03 PF Lease Rev 59,501 64,181 GO Improvement Bond 03 81,497 79,262 City Hall 05 PW Facility 04 165,313 165,313 Total Debt Service Levy 359,681 360,959 $1,278.50 Total Levy 2,095,580 2,370,517 $274,937.51 29 CITY OF ALBERTVILLE COUNTY OF WRIGHT STATE OF MINNESOTA RESOLUTION NO.2006-63 A RESOLUTION ADOPTING THE FINAL 2006 TAX LEVY COLLECTIBLE IN 2007 WHEREAS, the City Council of the City of Albertville has adopted a proposed budget; and WHEREAS, the Albertville City Council has determined that a tax levy upon the taxable property in the City of Albertville is necessary to provide sufficient funds for the operation of the City from January 1, 2007, through December 31, 2007; and NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ALBERTVILLE, MINNESOTA, that 5. The following sums of money be levied for the current year, collectible in 2006, upon the taxable property in the City of Albertville, for the following purposes: GENERAL FUND $2,009,558 DEBT SERVICE FUND $360,959 6. The Finance Director is hereby instructed to transmit a certified copy of such levy to the County Auditor of Wright County, Minnesota, to be placed upon the tax rolls the property within the City of Albertville. Adopted by the Albertville City Council this 4th day of December 2006. Don Peterson, Mayor Bridget Miller City Clerk 31 CITY OF ALBERTVILLE COUNTY OF WRIGHT STATE OF MINNESOTA RESOLUTION NO.2006-64 A RESOLUTION SETTING PUBLIC HEARING ON PROPOSED ASSESSMENT WHEREAS, by a resolution passed by the Albertville City Council on December 4, 2006, the City Clerk was directed to prepare a proposed assessment of the cost of improving Street NE between line of Street NE and the line of Street NE by AND WHEREAS, the City Clerk has notified the City Council that such proposed assessment has been completed and filed in the office of the City Clerk for public inspection, NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ALBERTVILLE, MINNESOTA: A hearing shall be held on the 18t' day of December, 2006, in the Albertville City Hall, located at 5959 Main Avenue NE at 7:00 p.m. or soon there after to pass upon such proposed assessment and at such time and place all persons owning property affected by such improvement will be given an opportunity to be heard with reference to such assessment. M2. The City Clerk is hereby directed to cause a notice of the hearing on the proposed assessment to be published once in the official newspaper at least two weeks prior to the hearing, and she shall state in the notice the total cost of the improvement. She shall also cause mailed notice to be given to the owner of each parcel described in the assessment roll not less than two weeks prior to the hearing. The owner of any property so assessed may, at any time prior to certification of the assessment to the county auditor pay the whole of the assessment on such property, with interest accrued to the date of payment, to the City Clerk except that no interests shall be charged if the entire assessment is paid within 30 days from the adoption of the assessment. He may at any time thereafter, pay the Town Treasurer the entire amount of the assessment remaining unpaid, with interest accrued to December 31 of the year in which such payment is made. Such payment must be made before November 15 (except in the year of the assessment) or interest will be charged through December 31 of the succeeding year. Adopted by the Albertville City Council this 4t' day of December, 2006. • 33 • 35 CITY OF ALBERTVILLE WRIGHT COUNTY RESOLUTION NO.2006-65 ORDER FOR VACATION OF MACKENZIE AVENUE NE THAT LIES NORTH OF 52ND STREET NE AND SOUTH OF THE BURLINGTON NORTHERN RAILROAD WITHIN THE CITY OF ALBERTVILLE WHEREAS, the City Council, pursuant to its own motion and it's authority under Minnesota Statute §412.851 did hold a public hearing on December 4, 2006 at 7:00 p.m. at the Albertville City Hall. At said time and place the City Council heard all interested parties on whether to vacate that portion of Mackenzie Avenue NE which lies North of 52" d Street and South of the Burlington Northern Railroad within the City of Albertville. WHEREAS, all notice requirements of Minnesota Statute §412.851 have been satisfied; and WHEREAS, the City Council finds and determines that it is in the public interest to vacate the roadway as legally described above as such roadway is no longer required by the City. NOW THEREFORE BE IT RESOLVED that the City Council of City of Albertville, Wright County, Minnesota does hereby order as follows: 1. That portion of Mackenzie Avenue NE which lies North of 52" d Street and South of the Burlington Northern Railroad within the City of Albertville is hereby vacated. 2. The City Council has determined that the following property owners have not been negatively affected by the road vacation: a. Albertville Investments, LLC c/o Scherer Brothers Lumber Company 9401 73rd Avenue N., Suite 400 Brooklyn Park, MN 55428 b. Dale Rossing 544 Marlow Avenue NE Albertville, MN 55301 4. The City Clerk is directed to file a certified copy of this Order in the records of the City and along with a "Notice of Completion of Proceeding" with the Office of the Wright County Auditor and Recorder. Passed by the Albertville City Council on the 4 h day of December 2006. 37 Albertville Small Town Living. Blg City life. TO: City Council FROM: Tina L. Lannes DATE: December 1, 2006 RE: Accounts Receivable Update Total accounts receivable outstanding through November 29, 2006 is $73,611.53 The percentage of the total due based on the aging report is as follows: 0-30 days outstanding 30-60 days outstanding 60-90 days outstanding Over 90 days outstanding $14,325.41 19.46% $7,159.40 9.73% $9,487.17 12.89% $42,639.55 57.93% The majority of the over 90 days outstanding is due to Gold Key Development, Terra Development and Towne Lakes. With the reduction of letter of credit for Towne Lakes they are working on a draw to pay their outstanding bills and the City of Albertville will continue to work with them to make sure payment is made. 39 Vendor Amount Due 0-30 Days 30-60 days 60-90 days 90 days & Over ALBERTVILLE DENTAL $168.00 $168.00 ALBERTVILLE HOLDINGS $2,095.07 $2,095.07 ALBERTVILLE MEDICAL CLINIC $618.50 $618.50 ALBERTVILLE PLAZA $1,234.25 $1,234.25 BORDER FOODS $72.00 $72.00 BURGER KING $1,443.37 $1,443.37 CEDAR CREEK TOWNHOMES $108.75 $108.75 CPG PARTNERS $283.60 $283.60 EDINA DEVELOPMENT $2,542.10 $725.00 $0.60 $1,816.50 FRANCIS PROPERTIES $110.00 $110.00 GOLD KEY DEVELOPMENT $5,766.06 $5,766.06 LEURER-MUNSTERTEIGER $294.00 $294.00 McBRIDE, KYLE $100.00 $100.00 MINNESOTA DEVELOPMENT AGENCY $2,353.63 $1,008.00 $1,345.63 NEARY, BRIAN $100.00 $100.00 NEXTEX PROPERTIES $594.15 $594.15 NORTHWOODS CUSTOM HOMES $247.50 $247.50 PERKINS $3,420.43 $264.80 $259.90 $2,895.73 PHIL MORRIS $2,730.15 $2,730.15 PREMIER DEVELOPMENT GROUP $48.14 $48.14 ROSETTI'S PIZZA $256.26 $256.26 SCHULTZ & SCHUPP $1,632.78 $1,632.78 SHOPPES AT PRAIRIE RUN - FINKE $611.72 $611.72 SHOPPES AT TOWNE LAKES 2 $2,206.00 $2,206.00 ST. MICHAEL -ALBERTVILLE DIST $5,475.00 $5,475.00 STARBUCKS $1,454.87 $674.09 $599.50 $181.28 STATE BANK OF LONG LAKE $455.00 $455.00 T-SQUARE PROPERTIES $831.38 $142.38 $689.00 TERRA DEVELOPMENT $8,148.06 $364.00 $1,616.97 $6,167.09 TOWNE LAKES $28,306.26 $2,276.40 $3,304.58 $22,725.28 WOODSIDE COMMUNITIES $72.50 $72.50 Total $739611.53 $14,325.41 $79159.40 $9,487.17 $42,639.55 Current 0-30 days $14,325.41 19.46% 30-60 days $7,159.40 9.73% 60-90 days $9,487.17 12.89% over 90 day $42,639.55 57.93% 40 ■ 0 J^so�^-�- Albertville Small Town living. Big City We. TO: City Council FROM: Tina L. Lannes DATE: November 24, 2006 RE: Project Update Council requested an update on outstanding project status. Below are the contracted projects with amounts paid to date as of November 24, 2006: Project Total Contract Paid to Date Difference 2004 School Pedestrian Trail (Bituminous) $353,876.90 $305,703.71 $48,173.19 2004 Prairie Run $1,595,233.53 $1,567,701.19 $27,532.34 2003 CSAH 19 Upgrade $1,446,496.70 $1,340,629.92 $105,866.78 Frontage Avenue Improvements $313,719.00 $281,636.12 $32,082.88 Water Main Change Order $32,394.00 $30,288.00 $2,106.00 CSAH 37 / 60th Street Storm Sewer $49,983.00 $47,941.00 $2,042.00 City Hall $3,113,287.00 $2,912,231.65 $201,055.35 37 Trail $241,522.75 $226,608.96 $14,913.79 Total $7,146,512.88 $6,712,740.55 $433,772.33 I-94 Project a $350,659.94 93.93 % Construction R = Retainage C&R C&R C&R C&R R R W CITY OF ALBERTVILLE WRIGHT COUNTY STATE OF MINNESOTA RESOLUTION NO.2006-61 RESOLUTION APPROVING STARBUCKS COFFEE CONDITIONAL USE PERMIT WITHIN THE CITY OF ALBERTVILLE WHEREAS, Starbucks Coffee has submitted an application for a Conditional Use Permit for a drive -though for City approval; and WHEREAS, the City Council considered the Conditional Use Permit for a drive -though and they agree with the recommendation of the Planning Commission and City staff, and WHEREAS, the Albertville Planning Commission has held a public hearing, reviewed the development application, and recommended approval of the conditional use permit for a drive - though plans, with conditions outlined in the November 8, 2006 NAC planning report and Engineer's memorandum, as amended NOW, THEREFORE BE IT RESOLVED, that the City Council of Albertville, Minnesota hereby approves the Starbucks Coffee Conditional Use Permit for the drive -through subject to the attached Findings of Facts and Decisions. Findings of Fact: Based on review of the application and evidence received, the City Council now makes the following finding of fact and decision: A. The site is legally described as Lot 1 Block 1 Albertville Crossing, Wright County, Minnesota. B. The planning report dated November 8, 2006 from Northwest Associated Consultants and City Engineer's comments from September 1, 2006 are incorporated herein. C. The proposed CUP can be accommodated with existing public services and will not overburden the City's service capacity. D. Traffic generated by the proposed CUP is within capabilities of streets serving the property as proposed. E. The requirements of the Albertville Zoning Ordinance have been reviewed in relation to the proposed CUP. 43 F. The proposed actions have been considered in relation to the specific policies and provisions of and have been found to be consistent with the Comprehensive Plan. G. The proposed CUP will be compatible with present and future land uses of the area. H. The proposed use conforms to applicable Zoning Ordinance performance standards and approved planned unit development standards. I. The proposed CUP will not tend to or actually depreciate the area in which it is proposed. Decision: Based on the foregoing information and applicable ordinances, the City Council APPROVES the Conditional Use Permit for the drive -through based on the most current plans received October 31, 2006 and information received to date subject to the following conditions: 1. Applicant shall provide traffic signs to signify a one-way traffic circulation pattern on the north side of the building. 2. The drive through land and the by-pass lane shall be properly striped and signed to illustrate the separation and show one-way circulation. 3. The landscape screen along 571" Street NE shall be planted with five Austrian Pines, no less than five feet in height and shall be guaranteed for two years. is 4. If lighting is to be added to the drive through area, a new lighting plan shall be submitted for City review. 5. The parking at the north east corner of the site, east of the building, shall be angled parking to create a one-way circulation pattern parallel to the drive through stacking. 6. A sidewalk connection shall be added to the north side of the building to allow for pedestrians to enter along 57th Street NE and cross the drive through lane at the west entrance. Location of the sidewalk to be approved by the City Engineer. Adopted by the Albertville City Council this 4th day of December 2006. CITY OF ALBERTVILLE WRIGHT COUNTY STATE OF MINNESOTA RESOLUTION NO.2006-62 A RESOLUTION APPROVING BARTHEL'S INDUSTRIAL PARK 2ND ADDITION PRELIMINARY PLAT AND FINAL PLAT WITHIN THE CITY OF ALBERTVILLE WHEREAS, The City of Albertville has submitted an application for Preliminary Plat and Final Plat for the Barthel's Industrial Park 2nd Addition for City approval; and WHEREAS, the City Council considered the Preliminary Plat and Final Plat and they agree with the recommendation of the Planning Commission and City staff, and WHEREAS, the Albertville Planning Commission has held a public hearing, reviewed the development application, and recommended approval of the preliminary plat and final plat, with conditions outlined in the November 8, 2006 NAC planning report, as amended NOW, THEREFORE BE IT RESOLVED, that the City Council of Albertville, Minnesota hereby approves the Preliminary Plat and Final Plat dated September 28, 2006 for Barthel's Industrial Park 2nd Addition subject to the attached Findings of Facts and Decisions. Findings of Fact: Based on review of the application and evidence received, the City Council now makes the following finding of fact and decision: A. The site is legally described as found on Exhibit A. B. The planning report dated November 8, 2006 from Northwest Associated Consultants is incorporated herein. C. The proposed plat can be accommodated with existing public services and will not overburden the City's service capacity. D. Traffic generated by the proposed plat is within capabilities of streets serving the property as proposed. E. The requirements of the Albertville Zoning Ordinance have been reviewed in relation to the proposed plat. F. The proposed actions have been considered in relation to the specific policies and provisions of and have been found to be consistent with the Comprehensive Plan. 45 G. The proposed plat will be compatible with present and future land uses of the area. 0 H. The proposed use conforms to applicable Zoning Ordinance performance standards and approved planned unit development standards. I. The proposed plat will not tend to or actually depreciate the area in which it is proposed. Decision: Based on the foregoing information and applicable ordinances, the City Council APPROVES the Preliminary Plat and Final Plat for Barthel's Industrial Park 2nd Addition based on the most current plans dated October 18, 2006 and information received to date subject to the following conditions: 1. Frasier Steel shall enter into a purchase agreement for the expansion of Lot 1, Block 1 prior to the plat being finalized. 2. A signature line shall be added to the final plat for Frasier Steel. 3. The approval of the plat is dependant on the vacation approval of Mackenzie Avenue NE by the City Council at the December 14, 2006 meeting. 4. Site and building plan reviews will be required for all new developments in the Barthel's Industrial Park 2" Addition. 0 Adopted by the Albertville City Council this 4th day of December 2006. 46 ft it Olson T - • - 202, Golden Telephone: 763.231.2555 Facsimile: 763.231.2561 plan ners@nacpla PLANNING REPORT TO: Larry Kruse FROM: Carie Fuhrman/Alan Brixius DATE: November 20, 2006 RE: Albertville — Towne Lakes 7th Addition — Final Plat NAC FILE: 163-06 — 06.34 BACKGROUND Contractor Property Developers Company (CPDC) is requesting final plat approval for Towne Lakes 7th Addition. The subject area is legally described as Lot 1, Block 4, Towne Lakes 3rd Addition; outlot B, Towne Lakes 6th Addition; and outlots D and E, Hunters Pass Estates. The total site area encompasses 25.8 acres. The proposed final plat includes 61 residential lots, which are part of the overall Towne Lakes Planned Unit Development. The following is a review of the proposed final plat based on plans do submitted October 25, 2006. Attached for reference: Exhibit A: Final Plat Exhibit B: Sanitary Sewer, Water Main, Storm Sewer, & Street Design Exhibit C: Final Landscaping & Lighting Plan Exhibit D: Grading, Drainage, & Erosion Control Plan Exhibit E: Storm Water Pollution Prevention Plan ISSUES ANALYSIS Zoning. The subject area is zoned appropriately for the proposed development. It was rezoned from R-1A to PUD in March of 2003, which has allowed flexibility in the development regulations, specifically as they relate to lot size, lot width, lot depth, building height, and street design. Comprehensive Plan. The preliminary plat was approved based on the fact that the design was consistent with the guided residential density defined in the Comprehensive Plan. Performance Standards. The lot, block, and street design illustrated on the proposed final plat are generally consistent with the PUD preliminary plat approved in March of 2003 and the amendment approved in December of 2004. 47 Lots and Blocks. The proposed final plat consists of 61 single family lots. The lot and block design is generally consistent with what was proposed during the preliminary plat review. The most significant changes are as follows: the addition of three lots in Blocks 4 through 6; the addition of Large Avenue, which were both approved in the PUD and preliminary plat amendment in 2004; and six lots were moved into the Sixth Addition portion of Towne Lakes. The amendment was initiated to facilitate a needed street improvement, which was the creation of the Large Avenue intersection at 70th Street. At the time of the amendment, the applicant requested some lot size flexibility to transition their larger lots to the smaller lots in the adjoining plat, Hunter's Pass Estates. Lot areas in the updated plat range from 11,070 square feet (Lot 4, Block 5) to 37,054 square feet (Lot 7, Block 4). The following table illustrates where the lot changes were made (Blocks 4 - 6), comparing what was approved in the original preliminary plat before the amendment, and what is being proposed in the final plat: Preliminary Plat Final Plat (Blocks 4-5) (Blocks 4-6) Total Lot Area 374,968 374,968 (square feet) Number of Lots 22 25 Average Lot Area 17,044 14,999 (square feet) Streets and Access. The plans include the extension of Lancaster Way to Lakewood Drive; the extension of Linden Street to Lakewood Drive; the extension of Lakewood Drive to Large Circle N.E.; and the construction of Lakewood Court from Lakewood Drive to Large Circle N.E. Landscaping. A final landscape plan for the 7th Addition has been submitted. The landscape plan includes a visual of where plantings will occur as well as a planting schedule, notes, and a detailed description of the trees. The plan indicates landscaped boulevards that are spaced approximately 50 feet apart with Maple varieties, American Linden, Oak varieties, Ash varieties, and Honeylocust. The trees are proposed along both sides of the roads and extend the entirety of the roadways within the 7th Addition. The types of trees and shrubs are consistent with those approved in previous Additions, and the variety will add a differing landscape throughout the 7th Addition. The number of plants and plant sizes meet the requirements of Section 1000.7 of the Zoning Ordinance. The landscape plan is general, well laid out, and consistent with the previous landscape plans approved for the surrounding Towne Lakes Additions. The landscape plan illustrates buffer yard plantings between the residential lots and 70th Street. The quantity, location, plant types, and sizes appear to be appropriate for buffering the lots and are consistent with the previous landscape plans approved. is 0 Park and Trails. The park land dedication was satisfied with the 5th and 6th Additions. Signage. A signage plan has been submitted, indicating the locations of stop signs, no parking signs, street signs, and crosswalks. Shoreland. Lots 7 through 11 of Block 4 and Outlot B are located within the Shoreland Overlay District of Mud Lake, which is identified as a natural environment lake. PUD approval and variance approvals were received in March of 2003 allowing for the impervious surface in the Shoreland Area to exceed 30% and a variance from the 50% open space requirement within Tier 1. Grading, Drainage, and Utilities. The final grading and drainage plans are subject to the review of the City Engineer. Easements. The final plat has dedicated the required easement areas, including drainage and utility easements near Mud lake, the exterior of the individual lots, and the outlots. The City Engineer should verify that the location and size of the easements are adequate. Development Agreement. As part of the final plat approval, the applicant will be required to enter into a development agreement with the City. to RECOMMENDATION The proposed design and layout is generally consistent with the intent of the Phase II PUD and preliminary plat approval for the Towne Lakes development. As such, our office recommends approval of the Towne Lakes 7th Addition final plat based on the findings made in this report and subject to the following conditions: 1) The developer must enter into a development contract with the City. 2) All homes shall comply with the approved Preliminary Plat and PUD standards. 3) Demarcation posts should be placed at the edge of all wetland areas. 4) The City Engineer should verify that the locations and sizes of the easements are adequate. 5) Additional comments from City Staff, Planning Commission, and City Council. Pc. Mike Couri Adam Nafstad Bridget Miller • 49 CITY OF ALBERTVILLE WRIGHT COUNTY STATE OF MINNESOTA RESOLUTION NO.2006-66 A RESOLUTION APPROVING TOWNE LAKES 7TH ADDITION FINAL PLAT WHEREAS, Contractors Property Developers Company has requested final plat approval for Towne Lakes 7th Addition; and WHEREAS, the site is legally described as Lot 1, Block 4, Towne Lakes 3rd Addition; outlot B, Towne Lakes 6th Addition; and outlots D and E, Hunters Pass Estates; and WHEREAS, the planning report, dated November 20, 2006 from Northwest Associated Consultants is incorporated herein; and WHEREAS, the proposed use can be accommodated with existing public services and will not overburden the City's service capacity; and WHEREAS, traffic generated by the proposed use is within capabilities of streets serving the property as proposed; and WHEREAS, the requirements of the Albertville Zoning Ordinance have been reviewed in relation to proposed plans; and WHEREAS, the proposed actions have been considered in relation to the specific policies and provisions of and have been found to be consistent with the Comprehensive Plan; and WHEREAS, the proposed development will be compatible with present and future land uses of the area; and WHEREAS, the proposed use conforms to all applicable Zoning Ordinance performance standards and the approved preliminary plat and amendment; and WHEREAS, the proposed use will not tend to or actually depreciate the area in which it is proposed; THEREFORE BE IT RESOLVED, the City of Albertville hereby approves the Towne Lakes 7th Addition Final Plat; and BE IT FURTHER RESOLVED, the developer must enter into a development contract with the City; and 51 BE IT FURTHER RESOLVED, all homes shall comply with the approved Preliminary Plat and PUD standards; and BE IT FURTHER RESOLVED, demarcation posts should be placed at the edge of all wetland areas; and BE IT FURTHER RESOLVED, the City Engineer should verify that the locations and sizes of the easements are adequate; and BE IT FINALLY RESOLVED, additional comments from City Staff, the Planning and Zoning Commission, and City Council shall be taken into consideration. Adopted by the Albertville City Council this 4th day of December 2006. • 52 BU I_TON 8- M r-= N K , I NC_ Consulting Engineers & Surveyors NAU Building • 7333 Sunwood Drive • Ramsey, MN 55303 Phone (763) 433-2851 • FAX (763) _427-0833 MEMORANDUM Date: November 20, 2006 To: Al Brixius, City Planner Cc: Larry Kruse, City Administrator David Hempel, CPDC John Becker, P.E., Westwood Professional Services, Inc. From: Adam Nafstad, P.E., Albertville Assistant City Engineer Subject: Towne Lakes 7th Addition Site & Utility Plan Review — Final Plat City of Albertville, Minnesota BMI Project No. T15.21942 We have reviewed, the civil plan sets titled "Construction Plans" and "Grading, Drainage & Erosion Control Plan" and "SWPPP", all dated 7/12/06, as well as, the "Final Landscape and Lighting Plan, dated 8/l/06, and the Final Plat for the Towne Lakes 7th Addition, prepared by Westwood Professional Services, Inc. Based upon of review of the submitted plans and plat we offer the following comments: GENERAL: 1. The Developer will be responsible for all construction permits required for the improvements (sanitary, water, storm water, etc.). 2. No construction activity shall take place on adjacent properties without permission and/or easement from the respective property owner. Add note to plan stating, "All construction shall comply with City of Albertville engineering standards, the 2000 edition of the MnDOT standard construction specifications (including supplements), and all MPCA and MN Department of Health guidelines". GRADING, DRAINAGE & EROSION CONTROL PLAN.• 4. Show the HWL for Pond 6P (Offsite Pond) as 951.4, per the stormwater calculations. 5. The lowest floor elevation of structures adjacent to a wetland is 3-feet above the HWL. Adjust the following lots accordingly: - Lots 1 & 2, Block 3 - Lot 3, Block 4 0 - Raise the low floor of Lot 3, Block 4 to a minimum elevation of 950.8. 53 6. Lots abutting a pond shall have the lowest opening no less than 2-feet above the emergency overflow elevation. Adjust Lot 11, Block 2 accordingly. 7. Move the 950 contour line to the north on Lots 8-11, Block 4 to prevent grading from occurring in the wetland. 8. Move the silt fence so that it is outside (north) of the wetland boundary line on Lots 8-11, Block 4 to prevent sediment from entering the wetland during grading operations. 9. Show a buffer strip around the wetland (Mud Lake) 30-feet in width. Wetland buffer signs are required at each lot line where it crosses a wetland buffer with a maximum spacing of 200-feet between signs. Signs shall be mounted 4-feet above grade and set at least 42-inches into the ground. The signs shall be mounted on a treated 4"x4" post. Restore buffer strip with MnDOT seed mixture 5B or a comparable mix. See Chapter 5000 zoning ordinance, on the City's website, for additional details. 10. Center the drainage swale between Lot 9 & 10, Block 2 on the common lot line, or adjust the easement. 11. Include delineated wetland boundary line type in legend. CONSTRUCTIONPLANS: 12. SHEET 3 of 14: Provide an outside drop at Manhole 704. 13. SHEET 3 of 14: Show SDR 26 sanitary sewer pipe for depths over 16-feet for the full pipe length between manholes. 14. SHEETS 3 & 5 of 14: Show insulation above the watermain where it is being lowered for a storm sewer crossing. 15. SHEETS 7, 8 & 11 of 14: Show on the plans with hatching or line work the existing storm sewer pipe that is to be removed with this phase of the project. 16.SHEETS 5& 6of14: Show the existing watermain in Hunters Pass Estates that is being connected into or note on plans that connection locations shall be verified in the field. 17. SHEET 10 of 14: Show the width of the street bubble on Lakewood Court. 18. SHEET 13 of 14: Provide a detail of the proposed Pedestrian Curb Ramp (Handicap Ramp Detail), which must be in compliance with current MNDOT/ADA Standards (Truncated Domes). 19. SHEET 13 of 14: Show sanitary sewer and watermain details for pipe installation, service connections, manholes, drop connections, tracer wire details and other construction related details. i 54 20. SHEET 13 of 14: Add a note saying that all details shall comply with the City of Albertville's standards. 21. SHEET 14 of 14: Street light locations are not shown. Revise title of sheet or add street lighting. 22. SHEET 14 of 14: Signing and striping of the streets shall be in accordance with the latest edition of the MMUTCD (note on plans). 23. STORM SEWER SHEETS. Show an 18" culvert under Lakewood Drive (station—18+70), on the west side of the existing 27" culvert, with an invert elevation on the south side of 948.50. This is to serve as an emergency overflow pipe in case the 27" culvert would get plugged. 24. STORM SEWER SHEETS: Label the typical length of street edge drain tile, 100-ft minimum (to be added to all street low points). 25. STORM SEWER SHEETS Hydrant locations shall be reviewed and approved by the fire chief. STORM WATER POLL UTION PREVENTION PLAN. 26. SWPPP — SHEET 2 of 7.- Change the contact information for the City of Albertville to: Adam Nafstad @ 612-328- 0878. 27. SWPPP — SHEET 2 of 7.- Change the note under 4 STORM WATER POLLUTION PREVENTION BEFORE AND DURING CONSTRUCTION, the sixth line, to read: "Place wood fiber blanket on all slopes 4:1 or greater". 28. SWPPP — SHEET 2 of 7. Add a section that addresses final stabilization, dewatering and basin draining. 29. SWPPP — SHEETS S & 6 of 7: Show inlet protection, drop inlet style, around the backyard catch basins. 30. SWPPP —Sheet 7 of 7. Provide a detail of a concrete washout area, with an indication sign. Indicate the location of the concrete washout area on the plans. 31. SWPPP — Sheet 7 of 7. Provide an inlet protection detail (drop inlet style) for catch basins located within the roadway. 55 LANDSCAPE PLAN: 32. On corner lots, no plantings are allowed within a triangular area as follows: Thirty feet (30') from the intersection of the projected property lines of two (2) intersecting streets. Relocate and or remove any plantings that are located within this site triangle area. 33. The number of streetlights appears to be inadequate. Plans shall be revised to match the streetlight spacing and typical locations used in the previous additions. Final Plat: 34. All wetland buffers shall be 30' in width and shall be located within a drainage and utility easement. Revise plat to include a minimum of a 30' drainage and utility easement adjacent to all wetland boundaries. Please let me know if you have any questions. • • of IE • 011 The orientation of this beanhg system is based an the north line of 0utlot B, 70KNE LfKM 5TH ADD1770N, Well Is assumed to boor N 89059'10' W Drainage and UtUlty Easements are shown thus: II II —I 5 F�- 5 II o I I o -----�--- L----1----- 1 (Not 7o scale) f Behg 5 feet in width, unless otherwise hdlcated, and adjoining lot lines. and 10 feet In width, unless otherwise 1"d/cated and odlall bg street right—of-way Ares and rear lot Unes as shown on the plot i i i � N O fd Lkwes-� Na 7139 � dr4b32 02" \ --- --L-4 .73 133• E Ilaos , r & i. r Hof of utYONNE IAKES 6tli i tORMW i LAKE 9f7.3e (1929 NOVA) i 3 (Per D.AM) -east the of o0of A rOMNE LAKES VIN AMnON WESTWOOD ProAmalonal Serrica; Inc Is CITY OF ALBERTVILLE WRIGHT COUNTY, MINNESOTA ORDINANCE NO.2006-13 AN ORDINANCE AMENDING SECTION 100.10 (FEES, CHARGES, AND EXPENSES) OF APPENDIX A OF THE 2005 ALBERTVILLE MUNICIPAL CITY CODE TO ESTABLISH FEES, CHARGES AND EXPENSES BY WAY OF A ZONING ORDINANCE THE CITY COUNCIL OF THE CITY OF ALBERTVILLE, MINNESOTA ORDAINS: SECTION 1. Section 100.10 of the Albertville Zoning Ordinance is hereby amended to read as follows: 100.10 Fees, Charges and Expenses. (a). Fees and charges, as well as expenses incurred by the City for engineering, planning, attorney and other services related to the processing of applications shall be established by this Zoning Ordinance and collected by the Zoning Administrator for deposit in the City's accounts. Fees shall be established as follows. The Council may establish charges for public hearings, special meetings, or other such Council or Planning Commission actions as are necessary to process applications. ZONING ORDINANCE Section Subject Proposed Fee / Escrow 300.1 Rezoning $300 / $1,000 400.2.H Conditional Use Permit $300 / $1,000 500.2.A.3.a Minor Variance $100 / $100 500.2.B.2.a Major Variance / Appeals $300 / $500 700.2 Certificate of Occupancy $50 1000.53 Swimming Pool Permit Building Code Schedule 1000.23.A Temporary Outdoor Seasonal Sales $50 1500.5.B.1 Site and Building Plan Review $300 / $1,000 1600.3.A Home Occupation $30 1600.3.B Special Home Occupation Permit $300 / $1,000 57 1800.2.A Land Filling Permit Residential Single Lot $25 Commercial/Industrial/Institutional Single Lot $200 / $1000 per acre 1900.3.B Land Excavation, Grading Permit Residential Single Lot $25 Commercial/Industrial/Institutional Single Lot $200 / $1000 per acre 2100.3 Essential Service Permit $300 / $1,000 + $50 per lot 2700.4.C.2.b PUD Concept Plan $300 / $1,000 + $50 per lot 2700A.A.1 PUD Rezoning or Conditional Use Permit $300 + $50 per lot / $5,000 SECTION 2. Enactment. This ordinance shall be in full force and effect upon its passage and publication. Adopted this 41h day of December 2006 by the City Council of Albertville 58 0 MEMORANDUM TO: City Council FROM: Mike Couri DATE: November 27, 2006 RE: Towne Lakes 71h Addition CITY ATTORNEY' S SUMMARY OF TOWNE LAKES 7Tx ADDITION DEVELOPER'S AGREEMENT Listed below are the highlights of the proposed developer's agreement with Contractor Property Developers Company for Towne Lakes 7 h Addition. The developer's agreement is the City's standard agreement, with only a few specific items which are unique to this development. The significant items and the items which vary from our standard developer's agreement are as follows: • Paragraph 1. This is the final phase of a Master Planned Unit Development. This Developer's Agreement is to be read together with the terms and conditions set out in the Master Developer's Agreement for the Towne Lakes 3rd Addition. • Paragraph 5. There are 61 single family lots in this development. • Paragraph 6A. The developer must supply a letter of credit in the amount of $1,446,141.00. • Paragraph 17. Park dedication has been satisfied by dedication of park land and installation of improvements in prior plats. • Paragraph 18. The developer must pay an administrative fee in the amount of $47,000.00. The full developer's agreement is available for review at the City. I will be at Monday's meeting to answer any questions regarding the developer's agreement which may arise. Wei AIbertville Date: November 30, 2006 To: Albertville City Council From: Council members LeRoy Berning and John Vetsch Re: Stormwater Ponding and Extension of Main/Edgewood On Wednesday, November 22, a meeting was held with St. Michael Mayor Jerry Zachman, Council member Joe Hagerty and Albertville Council members LeRoy Berning and John Vetsch to discuss the Albert Villas stormwater issue and Main Avenue/Edgewood Street interconnect between our two cities. St. Michael acknowledges the need for and their willingness to cooperate on Albertville's stormwater ponding in St. Michael if Albertville acknowledges that when the Zachman' property develops south of 57t' Street, the City of Albertville will preserve the right of way for a future street to connect the two communities. To memorialize this understanding, both cities would enter into a Memorandum of Understand to agree that the proposed street would not be constructed prior to CSAH 37 and Main Avenue intersection traffic issues being resolved or the year 2015. Albertville would agree to identify a southerly street corridor in its Comprehensive Plan to document the future connection. Other issues as to the streets constructability through the wetland and funding would be evaluated and decided when development occurs along the proposed corridor and plans are formally being considered by the City of Albertville. Note: Council member Vetsch requested the Council discuss requiring a Naber Interchange be installed as an additional condition. • 61 A�Ibcrtvillc Uvbtg. Big Cky mL MEMORANDUM Date: November 30, 2006 To: City Council From: Larry R. Kruse, City Administrator Re: General Update CITY HALL CONSTRUCTION: Most of the punch list items have been completed. Dascom has some additional work to complete the low voltage systems in the Council Chamber. Kitchen equipment has been ordered; however, I think it will not be installed until later in January. Staff continues to work on learning how to manage all the new systems and creating operational manuals for future reference. CITY HALL RENTAL: Through the month of December, I would suggest that we begin by allowing the non-profit groups to start using the facility. I will be presenting a 2007 fee proposal at the second meeting in December. Rogers allows residential non-profit groups to use the facility once a month for free and then charges a discounted rate for additional use. Perhaps following that logic, we could do something similar. Allowing non-profit groups to start using the building in December will help us work through some of the key cards, security system, along with the set-up and or teardown issues. Then in January, we can formally start renting space. In Rogers, Kathy works about 15 hours a week managing the scheduling, invoicing and rental of their community room. Further, Rogers employs someone to set-up and take down tables and chairs. In December, we will be pursuing proposals for building cleaning and maintenance. I-94 AND I-94 PROJECT IMPLEMENTATION TASK FORCE: Task force staff will be meeting on Tuesday, December 12 to continue working on I-94 issues. On other I-94 related issues, Federal Highway and MnDOT have approved the Findings of No Significant Impacts (FONSI) thus completing the environmental process. I have yet to receive this confirmation in writing. This event is a significant accomplishment, and now the City will need to begin working on an acceptable layout leading to a design. City Attorney Couri and I will continue to negotiate the purchase of the Knechtl property pursuant to Federal Guidelines to use a portion of the $800,000, which Congress approved for this project. 63 52°d STREET NE INDUSTRIAL PROJECT: The bituminous base course has been installed on the project and is buttoned up for the winter. ARENA LAND AND EXTENSION OF LACHMAN: Assistant City Engineer Nafstad and I met with the Barthel family about the extension of Lachman Avenue NE and how we can proceed with the land acquisition. After much discussion, we agreed to proceed in smaller incremental steps as follows: • Develop a preliminary plat of the right-of-way needed for the street and the lot abutting the arena, with the balance of the land probably being an outlot • Call for a public hearing on Monday, December 4 to be held Monday, January 15 • Seek an appraisal of the platted lot with street and utilities • Process the final plat • Try to negotiate the purchase of the lot I believe we have made some progress towards extending the street, which will lead us to an opportunity to negotiate purchasing the lot. Whether we can agree on an acceptable price will not be known until we work through some of these issues. It's a good thing that we can move the discussion forward. • 0 MOA